<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
    <channel>
        <title><![CDATA[Latest Real Estate News]]></title>
        <link><![CDATA[https://www.adamscameron.com/real-estate-info]]></link>
        <description><![CDATA[Latest Real Estate News]]></description>
        <language><![CDATA[en-us]]></language>
        <ttl><![CDATA[60]]></ttl>
                <item>
        <title>
            <![CDATA[Ormond Beach New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/ormond-beach-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>The City of Ormond Beach lists four impact fees for a new single-family home on its schedule of connection, impact and mobility fees. Parks and recreation is two thousand five hundred dollars. Local roads is eight hundred sixty-four dollars and fifty-nine cents. Police is two hundred forty dollars and fire is two hundred ninety-two dollars. Those four lines add up to three thousand eight hundred ninety-six dollars and fifty-nine cents, a total computed for this guide that the schedule does not print. Volusia County has its own impact fees, the city has connection fees and permit fees, and the certificate of occupancy has a list of items. All of it concerns new construction in <a href="http://www.adamscameron.com/ormond-beach-florida-real-estate-and-homes.html">Ormond Beach</a>.</p>

<p>Every figure below comes from the city's Building Division pages, the city's PDFs, the Volusia County impact fee pages or the Florida Statutes, as read on November 17, 2026.</p>

<h2>What the City of Ormond Beach Asks For Before a New Home Permit</h2>

<p>The Building Division is at 22 South Beach Street, Room 104, in Ormond Beach. The phone number is 386-610-0540 and the email is bponline@ormondbeach.org. Hours are Monday through Friday, 8:00 a.m. to 5:00 p.m. The division accepts building applications, reviews plans, issues permits, performs building inspections and processes Business Tax Receipts.</p>

<p>Applications go in on the city's Civic Access portal, and the application must include all contractors with license numbers. A completed, signed and notarized Permit Application Affidavit must be uploaded on all permits. Applicants can view the status of a project and the reviewers' comments in Tyler EnerGov Civic Access. Anyone can look up permit information there by parcel number, address or permit number.</p>

<p>The city's page says a building permit is required for all projects to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure. It also lists an owner builder exemption. To qualify, the property must be titled in the property owner's name and not a corporation or trust. The building or residence must be for the use of the property owner and not for rent, lease or sale within 1 year of completing the construction. Owners must appear in person at Room 104 to sign an Owner-Builder affidavit under Florida Statute 489.103, and a city staff representative notarizes the signature.</p>

<p>The city's Permit Forms page has a category for single-family residential, manufactured homes and townhomes, new construction. It lists the Building Permit Application, which is the Permit Application Affidavit, and the Required Submittal Documents. It also lists a Surface Water Management Plan form for residential projects, a Roll Off Form, a Tree Removal Application, a Non Tree Removal Form, an Engineering Permit and a site plan review checklist.</p>

<p>The checklist titled New Single-Family Residence is headed "As of August 05, 2026." Its first section covers forms, signed and notarized where required. They are the Permit Application Affidavit with subcontractors listed, the Owners Disclosure Statement if the applicant is the owner and builder, the Notice of Commencement if applicable, the Roll-Off Form, the tree removal application or a Statement of Non-Tree Removal, and the Volusia County impact fee application filled out.</p>

<p>The second section is energy calculations, with the Energy Performance Level card signed by the licensed building contractor. The third section is the building drawings. The checklist asks for architectural and engineering drawings as one PDF and says "do not upload individual sheets." The drawings must be of sufficient clarity to describe the work and confirm code compliance under Florida Building Code section 107.2.1, including the criteria and documents listed in section 107.3.5. The checklist adds that additional documents and information will be requested if required.</p>

<p>The fourth section is the site drawings. A boundary survey shows the proposed site plan with existing and proposed structures, exterior dimensions, setbacks from property lines and other structures, easements if any, and septic tank and drainfield locations if any. A topographical survey and drainage plan shows a current topographical survey of the existing site with all existing structures, on-site elevations and off-site elevations at least 10 feet beyond the property line. It shows stormwater management, except in subdivisions with an approved stormwater plan. It also shows finished floor elevations and flood zone information.</p>

<p>Two tree documents complete that section. A tree survey is preferred on a separate sheet. A tree protection and removal plan shows all proposed improvements, including stormwater and swale areas. On that plan, trees or palms to be removed carry an "x" mark. Trees or palms to be saved are shown with a tree protection barricade at the drip line. The city tree protection barricade detail LS-4 and the existing tree legend appear on the plan.</p>

<p>The last two sections are the truss package, with engineering and layout, and the Florida product approvals. The product approvals are the installation instructions for exterior doors, windows, soffit, siding and roofing materials, and each item is uploaded as its own PDF.</p>

<p>The checklist closes with additional guidelines. A separate demolition permit is required for demolition of existing buildings. Documents must bear a third-party verifiable digital seal when required, and digital seals must be registered with the City of Ormond Beach in advance. Fences, pools and other accessory structures are permitted separately. A Revision or Modification form is only required for design changes that are not due to city-required corrections.</p>

<p>The residential surface water management plan form comes from the Public Works Engineering Division, phone (386) 610-0550. It asks for the total proposed impervious area in square feet. It offers four choices. One is a waiver for projects proposing net impervious area of less than 1,000 square feet. Another is an exemption for projects in an existing subdivision with an approved plan that comply with the approved grading plan. The third is an exemption for projects not in a subdivision with an approved plan. The fourth is a plan submittal. A note on the form says approval of an exemption or waiver does not relieve the applicant of obtaining a building permit and an engineering permit when required.</p>

<p>For trees, the city's Neighborhood Improvement Division issues tree removal permits for residential properties and can be reached at (386) 229-7250. The city also has an early review process. Its checklist is dated February 2026 and calls for an Early Review Form and plans for each discipline with a third-party verified digital seal. In the city's building fee ordinance, early review is listed at four hundred dollars in total, made up of fifty dollars administrative and three hundred fifty dollars plan review. The ordinance says early review fees are in addition to the fees required at full application submittal.</p>

<p>A separate checklist covers the Utility Connection Permit, dated February 2026. It lists a utility verification application to receive an estimate of fees, and a plumbing permit application, which is required in the city's building permit jurisdiction. It also lists an Equivalent Living Unit form, a site permit and an annexation agreement, with notes that those items may apply to commercial projects or to projects outside city jurisdiction.</p>

<p>The city's flood page says FEMA is updating flood risk data in Volusia County through its Risk MAP program, and that no changes are proposed within the limits of the City of Ormond Beach. It says to contact the city Planning Department or use the Forerunner site to find a property's flood zone. It also says most flood policies have a 30-day waiting period before they become effective. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/ormond-beach-flood-zones-and-insurance-guide">Ormond Beach Flood Zones and Insurance Guide</a>.</p>

<h2>Impact Fees, Connection Fees and Permit Fees</h2>

<p>The city's Schedule of Connection, Impact and Mobility Fees carries the effective date September 4, 2023. Its connection fees for a single-family home are two thousand three hundred thirty-three dollars for water, three thousand five hundred seventy-seven dollars for wastewater and two thousand three hundred thirty-three dollars for irrigation. Adding the water and wastewater lines gives five thousand nine hundred ten dollars, which is a computed figure and not a printed one. The schedule notes that irrigation connection fees include a separate tap or a "T" off an existing meter, and that irrigation meters are not allowed in the Hunter's Ridge-Flagler County DRI Service Area.</p>

<p>The impact fees on that schedule are charged per dwelling unit. For a single-family home they are the four lines named at the top of this guide. For multi-family the schedule lists parks and recreation at two thousand twenty-one dollars, local roads at five hundred forty-eight dollars and thirty-two cents, police at one hundred ninety-eight dollars and fire at two hundred sixty-two dollars. For a manufactured or mobile home it lists one thousand six hundred fifty-eight dollars for parks, seven hundred forty dollars and thirty-three cents for roads, one hundred sixty-six dollars for police and two hundred forty dollars for fire.</p>

<p>A footnote on the local roads table says development within Transportation Concurrency Exception Areas is subject to a mobility fee based on the number of project trips. The footnote names South Atlantic Avenue, U.S. Highway 1 south of Granada Boulevard, and the stretch of Granada Boulevard from SR A1A to Williamson Boulevard. It gives comdev@ormondbeach.org and (386) 676-3341 for more information.</p>

<p>Ordinance 2023-30 amends the city's Land Development Code sections on connection fees, mobility fees and impact fees. The ordinance title says it creates the water and wastewater connection fee section, amends the mobility fee, deletes stormwater impact fees, amends local road impact fees and creates police and fire impact fees. Section 1-27 as amended lists the impact fees imposed as parks and recreation, local road, police and fire.</p>

<p>The ordinance also sets timing. Section 1-27 says "Impact fees shall be paid at the time a building permit is issued." If the city identifies an impact-generating development whose fees were not paid when due, the city notifies the owner, and the owner pays within 30 days of the notice. Section 1-25 says water and wastewater connection fees "shall be paid at the time of development permitting," and it names building, utility connection, irrigation meter installation and site engineering permits. The obligation to pay both kinds of fees runs with the land.</p>

<p>The ordinance has exemptions and credits. Reconstruction, expansion or replacement of an existing residential structure is exempt when it does not change the use from residential to commercial and does not increase the number of dwelling units. An accessory dwelling unit is considered part of the single-family residential dwelling unit and is exempt from payment of the impact fees and the connection fees. Land with building improvements, past or present, has impact fee credits that do not expire over time. The ordinance makes it the property owner's responsibility to provide documents demonstrating previous buildings. Residential credits are based on the dwelling units on the property, and the owner gives the Chief Building Official the number of units, the type of use and the building square footage. Connection fee credits run with the land and are not transferable to other off-site property.</p>

<p>Florida's Impact Fee Act, section 163.31801, sets a rule for impact fees adopted or increased after July 1, 2026. It says collection of the impact fee may not be required to occur earlier than the date of issuance of the building permit for the property subject to the fee. The statute also requires notice at least 90 days before the effective date of an ordinance imposing a new or increased impact fee.</p>

<p>Volusia County has five growth-related impact fees. They are Transportation (roads), Education (schools), Parks and Recreation, Emergency Medical Services and Fire Rescue. The county says impact fees pay for the cost of new or expanded county roads and facilities needed to serve new residential and non-residential development. The impact fee office is at 123 W. Indiana Ave., Room 200, in DeLand. The phone number is (386) 736-5924 and the email is impactfees@volusia.gov.</p>

<p>The county's residential schedule shows fees effective June 3, 2026. For parcels in any city, four of its lines apply: thoroughfare road, schools, emergency medical services and the district and coastal park fee. The Fire line and the local park line show a dash in the city column. For a single-family detached home, the city-column total depends on size. It is twelve thousand four hundred seventy-one dollars and eleven cents for 1,200 square feet or less. For 1,201 to 1,700 square feet it is twelve thousand seven hundred ninety-one dollars and sixty-three cents. For 1,701 to 2,200 square feet it is thirteen thousand two hundred dollars and sixty-seven cents. For 2,201 to 3,000 square feet it is thirteen thousand six hundred six dollars and twenty-five cents. Above 3,000 square feet it is fourteen thousand sixty dollars and forty-three cents.</p>

<p>The road line changes with each size band, and it reads four thousand eight hundred sixty-four dollars, five thousand ninety-seven dollars, five thousand four hundred sixty-four dollars, five thousand eight hundred thirty-five dollars and six thousand two hundred fifteen dollars in that order. The schools line is seven thousand twenty-two dollars and seventy cents in every band. The county's fee schedule page says fee schedules are based on the application date of the building permit.</p>

<p>According to the county FAQ, a project inside city limits applies through the county's Connect Live portal, by email or in person. The bottom of the application must be signed by city staff before it is uploaded. The county FAQ says an impact fee is assessed and due from anyone who builds a new residence or commercial building or changes the use of an existing building. The county FAQ says impact fee payments are due before the issuance of a certificate of occupancy. The county's forms page says an impact fee review may take three to five business days and that payment may be deferred until prior to the issuance of a certificate of occupancy. The county's fee schedule page says it does not accept prepayment of impact fees.</p>

<p>Payment can be made by cash, check or credit card, and applicable fees may apply. Online payment through Connect Live requires a registered user who is listed as the applicant on the permit. Payments can also be made at the Volusia County Treasury and Billing office, in the Historic Courthouse at 125 W. New York Ave., Room 120, in DeLand. The county says partial payments are not accepted, but a payment can be made for each use separately in its entirety. Its example is paying the road impact fees now and the school impact fees later.</p>

<p>The notes on the city's fee schedule say Volusia County impact fees are due prior to a certificate of occupancy or completion. They say the permit holder must provide a Volusia County impact fee payment receipt or a statement of no impact fees as part of the permit close-out.</p>

<p>The city's building permit fees sit in Ordinance 2026-16, which the city's Schedule of Fees page links as Building Fees. Its whereas clauses cite section 553.80 of the Florida Statutes and the change made by House Bill 803, which prohibits inspection fees based on project valuation and limits inspection fees to actual costs. The ordinance's new New Construction table lists residential single-family at four hundred eighty dollars administrative, five hundred ten dollars plan review and one thousand seven hundred sixty dollars inspections, for a total of two thousand seven hundred fifty dollars. The townhome row shows the same four figures. Note 1 says these permits include all fees for electrical, gas, plumbing and mechanical. Note 3 says single-family homes over 2,000 square feet are assessed at a fee of twenty-five cents per square foot.</p>

<p>The same ordinance lists several other lines. The Plan Resubmittal line lists sixty dollars for a third submittal and any after it. A plan revision costs forty dollars for a minor one of 0 to 30 minutes, sixty dollars for an intermediate one of 31 to 60 minutes, and sixty dollars per hour of review for a major one over 60 minutes. Reinspection is fifty-five dollars for the first, one hundred dollars for a second or more on the same item and two hundred dollars for a third or more on the same item. An inspection after hours, on a weekend or on a holiday is two hundred dollars. Fire and life safety plan review is five cents per square foot under roof.</p>

<p>For a single-family home or an addition, the ordinance reduces plan review by 80 percent when a private provider performs the plan review, and it reduces inspections by 80 percent when a private provider performs the inspections. Work started without a permit carries a penalty of two hundred dollars or 100 percent of the usual permit fee, whichever is higher, in addition to the required permit fees. The ordinance lists the state surcharges as well. The Florida Building Code surcharge is 1 percent of the building permit fee or two dollars, whichever is greater. The inspector education surcharge is 1.5 percent of the building permit fee or two dollars, whichever is greater.</p>

<p>Refunds have conditions. The chief building official authorizes a refund of permit fees on written request when the permit has not expired, no work has commenced, and the total permit fees exceed one hundred dollars, or when fees were erroneously paid or collected. Building plan review fees, fire and life safety plan review fees, administrative fees, state fees, plan resubmittal fees and plan revision fees are non-refundable.</p>

<p>The Building Division's page carries a notice about fraudulent emails seeking payment for permits and site plan reviews. The city says all permit and development-related invoices are issued exclusively through the Tyler permitting system and that city staff will never request payment via wire transfer. It gives (386) 610-0540 for questions before making any payment.</p>

<h2>Inspections, the Certificate of Occupancy and the Clocks That Run Through the Build</h2>

<p>Required inspections are listed on every issued permit placard. An inspection can be scheduled online with the permit number, which is on the front of the permit. Inspections scheduled before 4:00 PM are done the following business day. Inspectors may arrive as early as 7:00 AM, and the city says time requests are not guaranteed. The office conducts building, fire and engineering inspections. Indoor inspections of occupied homes are prioritized. The page also says all outstanding inspection fees are required to be paid before receiving the final building inspection.</p>

<p>The inspections page quotes the Florida Building Code on covered work. Construction or work for which a permit is required is subject to inspection by the City Building Official and "shall remain exposed and provided with access for inspection purposes until approved." Neither the building official nor the jurisdiction is liable for the expense of removing or replacing material needed to allow inspection.</p>

<p>The city's Missed Inspection Policy is dated March 5, 2007 and marked revised June 11, 2020. It describes a path when a component requiring inspection has been covered. A Florida licensed testing agency, architect or engineer may verify code compliance when all of the policy's conditions are met. The inspector of record and the chief building inspector determine that the work cannot be inspected as a regular required inspection. The chief building inspector authorizes the contractor to use the testing agency or design professional. The chief building inspector may witness the third-party inspection, and the contractor must give at least 48 hours advance notice. The agency or professional submits a signed and sealed letter that lists the permit number, the address, the date of inspection, the items inspected and the methodology. The letter also carries a statement and site-specific photographs, and the name and license number of the person signing. The policy adds that the inspection verification may require removal of coverings and invasive inspections.</p>

<p>The city has a Private Provider Registration form. The city requires registration for all private providers before they begin work. The checklist calls for a state license issued by the Department of Business and Professional Regulation as a professional engineer under chapter 471, an architect under chapter 481 or a standard building code administrator under chapter 468. It also calls for general liability insurance showing the City of Ormond Beach as certificate holder, workers' compensation coverage, resumes, a notarized employment affidavit for authorized representatives and driver's licenses. The form cites section 553.791(17) of the Florida Statutes for minimum professional liability coverage.</p>

<p>Section 553.79 of the Florida Statutes says a building permit for a single-family dwelling expires 1 year after issuance or on the effective date of the next edition of the Florida Building Code, whichever is later. It says the paragraph does not prevent a local government from extending a permit beyond the expiration date, and that a local government may send written notice of expiration no less than 30 days before the permit is set to expire. The city's Request To Extend an Active Permit form, revised October 21, 2025, cites Florida Building Code section 105.4. It says permits expire if work has not commenced 180 days after issuance or if work has been suspended or abandoned for more than 180 days. It says the Building Official may grant a 90 day extension before the permit has expired, and that the request must show justifiable cause.</p>

<p>The ordinance fee tables also list renewals. A permit that expired less than 180 days ago renews for fifty dollars. A permit that expired more than 180 days ago, or following a code change, must be replaced with a new application and is subject to all current codes and fees, with no credit given for permit fees paid previously. A permit extension is listed at forty dollars.</p>

<p>Florida law also sets review clocks. Under section 553.792, a local government must approve, approve with conditions or deny a completed and sufficient application within 30 business days for residential units under 7,500 square feet, and 60 business days for 7,500 square feet or more, for an applicant using a local government plans reviewer. The timeframes apply unless the applicant waives them in writing, and the local government may not require the waiver as a condition of reviewing the application. The local government must give written notice within 5 business days saying what information is needed. If it does not, the application is deemed properly completed and accepted.</p>

<p>The statute sets a fee reduction for a missed deadline. The building permit fee is reduced by 10 percent for each business day, unless the parties agree in writing to an extension, the delay is caused by the applicant, or the delay is attributable to force majeure or other extraordinary circumstances. There is no reduction if the agency gives written notice within the timeframes that states the specific reasons the application fails the code. That notice must also say the applicant has 10 business days to submit revisions, and that failing to correct the application in that time results in denial. If revisions arrive in time, the agency has 10 business days to approve or deny, and the fee is reduced 20 percent per business day for missing that deadline unless the applicant agrees to a longer period in writing.</p>

<p>The city's Waiver of Timelines and Number of Submissions form cites section 553.792 and Florida Building Code section 105.3.1.3.4. The form says the Code limits local government reviews to three before final action unless the applicant requests a waiver. It says the resubmittal time under the statute is 10 business days after written notice, and that failure to respond leads to denial of the permit application and payment of review fees. It says projects may submit a waiver at any time. The applicant signs the form before a notary.</p>

<p>Under section 713.135, the authority that issues a building permit must require the applicant to file a copy of the notice of commencement before the first inspection if the direct contract is greater than five thousand dollars. Without the copy, the issuing authority or a private provider may not perform or approve subsequent inspections until it is filed. The statute also requires the permit card to carry a printed warning. The warning says failure to record a notice of commencement may result in the owner paying twice for improvements, and that the notice must be recorded and posted on the site before the first inspection.</p>

<p>The Residential Certificate of Occupancy Checklist has a header that reads "Please fill out the form and include the required documentation after ALL FINAL inspections have been approved." The header says to email the form to bponline@ormondbeach.org to be reviewed for completeness. The form is footed 04/2026. It lists nine items.</p>

<p>Item one is a copy of the recorded Notice of Commencement. Item two is a final survey indicating the finished floor elevation and the crown of road elevation. Item three is a Volusia County impact fee payment receipt or proof of a zero balance due. Item four is a copy of the final termite treatment certificate. Item five is that all final inspections be completed and approved on all the permits linked to the address. Item six is that, if the contractor used a private provider, all the inspection reports go to the city office for verification. Item seven is that digitally signed elevation certificates apply to special floodplain areas only, if applicable. Item eight is that all permit fees be paid. Item nine is the Energy Performance Level Display Card, completed and signed by the builder.</p>

<p>The same form has a separate commercial certificate of occupancy list. It says a building shell must have a Certificate of Completion issued before the build-out receives a certificate of occupancy. It also lists a Business Tax Receipt application for commercial businesses.</p>

<p>The statute has its own clock for the certificate. Section 553.791(16), which is in the private provider section, says no more than 10 business days, or no more than 2 business days when the permit relates to single-family or two-family dwellings, after receipt of a request for a certificate of occupancy and the applicant's presentation of a certificate of compliance and approval of all other government approvals required by law, including payment of all outstanding fees, the local building official shall issue the certificate or give notice of incomplete forms or documents. If no notice comes within the period, the request is automatically granted and deemed issued as of the next business day. The official must provide the written certificate within 10 days after it is automatically granted.</p>

<p>The city's utility rules also mention the certificate. Section 3-57(5), as printed in Ordinance 2023-30, says the owner of a lot with a building occupied or proposed for occupancy shall connect to the public water distribution system at the time a certificate of occupancy is issued, or sooner with prior approval by the city. It says the owner is liable for all impact, connection and meter installation fees and customer deposits. It says every connection to the potable water system, except fire hydrants and fire protection systems, is metered, with meter installation by city forces.</p>

<p>Three more statutes mention the certificate or substantial completion. Section 95.11(3)(b) says an action founded on the design, planning or construction of an improvement to real property runs from the date the authority issues a temporary certificate of occupancy, a certificate of occupancy or a certificate of completion, or the date of abandonment of construction, whichever is earliest. For a latent defect the time runs from discovery, but in any event the action must be commenced within 7 years after that date. The statute says correction or repair of completed work, whether performed under warranty or otherwise, does not extend the period. A model home runs from the first recorded deed. When there are multiple buildings, each is its own improvement.</p>

<p>Section 192.042 says real property is assessed on January 1 of each year, and that improvements or portions not substantially completed on January 1 have no value placed on them. The statute defines substantially completed to mean the improvement, or some self-sufficient unit within it, can be used for the purpose for which it was constructed. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/ormond-beach-property-tax-bill-line-by-line">Ormond Beach Property Tax Bill, Line by Line</a>.</p>

<p>Section 501.1375 covers the buyer's deposit in a new-home contract. In offers and contracts between a building contractor or developer and a buyer of a one-family or two-family residential dwelling unit, the buyer is notified that any deposit, up to 10 percent of the purchase price, shall be placed in escrow unless the buyer waives that in writing. The escrow holder can be a savings and loan association, bank or trust company, a member of The Florida Bar, a licensed Florida real estate broker or a title insurance company. The contract carries a conspicuous legend. The statute defines a building contractor to exclude a person who sells or constructs fewer than 10 units per year statewide. It defines default as the buyer's failure to close after issuance of the certificate of occupancy, or failure to comply with other obligations in the contract. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a>.</p>

<p>See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/buying-a-lot-in-ormond-beach-what-it-takes-to-build">Buying a Lot in Ormond Beach: What It Takes to Build</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/living-in-ormond-beach-neighborhoods-costs-and-what-to-know">Living in Ormond Beach: Neighborhoods, Costs and What to Know</a>.</p>

<h2>The Bottom Line</h2>

<p>A new single-family home in Ormond Beach has four city impact fees that total three thousand eight hundred ninety-six dollars and fifty-nine cents on the city's schedule effective September 4, 2023, plus city connection fees and the county's fees. The county's schedule effective June 3, 2026 lists city-column totals from twelve thousand four hundred seventy-one dollars and eleven cents to fourteen thousand sixty dollars and forty-three cents, depending on size. The notes on the city's fee schedule and the county both say the county fees are due before the certificate of occupancy, and the city's residential certificate checklist has nine items and is submitted after all final inspections are approved. For the city itself, see <a href="http://www.adamscameron.com/ormond-beach-florida-real-estate-and-homes.html">Ormond Beach</a>.</p>

<p>Short answers drawn from the documents above.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Where does a new home permit application go in Ormond Beach?</strong></summary>
<p>The City of Ormond Beach Building Division is at 22 South Beach Street, Room 104, phone 386-610-0540, email bponline@ormondbeach.org, open Monday through Friday, 8:00 a.m. to 5:00 p.m. Applications are completed on the city's Civic Access portal and must include all contractors with license numbers. A completed, signed and notarized Permit Application Affidavit must be uploaded on all permits. The city's New Single-Family Residence checklist is headed "As of August 05, 2026."</p>
</details>
<details>
<summary><strong>What does the city's new single-family checklist ask for?</strong></summary>
<p>The checklist lists signed and notarized forms, energy calculations with the Energy Performance Level card, architectural and engineering drawings as one PDF, a boundary survey, a topographical survey and drainage plan, a tree survey, a tree protection and removal plan, a truss package and Florida product approvals. The forms include the Permit Application Affidavit, the Roll-Off Form, a tree removal application or non-tree-removal statement, and the Volusia County impact fee application filled out.</p>
</details>
<details>
<summary><strong>How much are the city's impact fees for a new single-family home in Ormond Beach?</strong></summary>
<p>The city's schedule, effective September 4, 2023, lists parks and recreation at two thousand five hundred dollars, local roads at eight hundred sixty-four dollars and fifty-nine cents, police at two hundred forty dollars and fire at two hundred ninety-two dollars per dwelling unit. Those four lines add up to three thousand eight hundred ninety-six dollars and fifty-nine cents, which is a computed total and not printed on the schedule. Ordinance 2023-30 says impact fees are paid at the time a building permit is issued.</p>
</details>
<details>
<summary><strong>When are Volusia County impact fees due on a new home inside Ormond Beach?</strong></summary>
<p>The county says impact fee payments are due before the issuance of a certificate of occupancy, and its forms page says payment may be deferred until prior to the issuance of a certificate of occupancy. The city's fee schedule says the same and adds that the permit holder must provide a Volusia County impact fee payment receipt or a statement of no impact fees as part of the permit close-out. The county's fee schedule page says it does not accept prepayment of impact fees, and its FAQ says partial payments are not accepted.</p>
</details>
<details>
<summary><strong>What is on the city's residential certificate of occupancy checklist?</strong></summary>
<p>The form lists nine items: a recorded Notice of Commencement, a final survey with the finished floor elevation and crown of road elevation, a Volusia County impact fee payment receipt or proof of zero balance due, the final termite treatment certificate, approval of all final inspections on all permits linked to the address, private provider inspection reports if a private provider was used, digitally signed elevation certificates where applicable, payment of all permit fees and the Energy Performance Level Display Card signed by the builder.</p>
</details>
<details>
<summary><strong>How long does a building official have to issue a certificate of occupancy?</strong></summary>
<p>Section 553.791(16), which is in the private provider section, says the local building official has no more than 10 business days, or no more than 2 business days when the permit relates to single-family or two-family dwellings, after receipt of the request and the applicant's presentation of a certificate of compliance and approval of all other government approvals, including payment of all outstanding fees. If no notice of incomplete forms is given in that period, the request is automatically granted and deemed issued as of the next business day.</p>
</details>
<details>
<summary><strong>How long is a single-family building permit good for?</strong></summary>
<p>Section 553.79 says a single-family building permit expires 1 year after issuance or on the effective date of the next edition of the Florida Building Code, whichever is later, and a local government may extend it. The city's extension form cites Florida Building Code section 105.4, which says permits expire if work has not commenced 180 days after issuance or if work is suspended or abandoned for more than 180 days. The Building Official may grant a 90 day extension before expiration.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:25:18 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/ormond-beach-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Bunnell Short-Term Rental Rules for Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/bunnell-short-term-rental-rules-for-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Searches of the City of Bunnell's Municode library on November 17, 2026 for "short-term rental," "short term rental" and "vacation rental" each returned zero results. Flagler County's Tourist Development Tax is 5% on rentals of six months or less. See <a href="http://www.adamscameron.com/bunnell-florida-real-estate-and-homes.html">Bunnell homes for sale</a>.</p>

<h2>What the Bunnell code says and what it defines</h2>

<p>The Municode library for Bunnell lists two publications. The Code of Ordinances shows online content updated on March 18, 2026. The Land Development Code shows online content updated on April 21, 2025 and states that it is codified through Ordinance No. 2024-19, enacted October 28, 2024, as Supplement No. 18.</p>

<p>The Municode site searches returned zero results for six terms: "short-term rental," "short term rental," "vacation rental," "airbnb," "transient occupancy" and "tourist development." The search for the single word "transient" returned four results, three in the Code of Ordinances and one in the Land Development Code. One of those is Section 25-2, a definitions section in the Water Conservation Ordinance for Landscape Irrigation, which refers to "commercial or transient housing units, hotel and motel units, and public medians and rights-of-way." The search for "tourist" returned two results, both in the Land Development Code. They are Section 1-2, the definitions section, and Section 34-201, an off-street parking section with a line for "Motels and tourist courts."</p>

<p>Section 1-2 of the Land Development Code defines "Hotel, motel, motor lodge or tourist court" as a building licensed by the state department of business and professional regulation containing individual guest rooms for which daily or weekly lodging is provided as the transient residence, even for extended periods, of individuals.</p>

<p>The same section defines "Dwelling" as any building or portion thereof, including modular factory-built homes, which is designated for or used for residential purposes. The definition does not include a trailer coach or converted trailer, hotel, motel, lodginghouse or boardinghouse.</p>

<p>The section also defines "Boardinghouse, roominghouse, lodginghouse or dormitory." It means any building or part thereof, other than a hotel, motel or restaurant, where meals or lodging are provided for a fee for three or more unrelated persons where no cooking or dining facilities are provided individual rooms.</p>

<h2>Which Bunnell zoning districts list lodging uses</h2>

<p>Sections 34-111, 34-112, 34-114, 34-115 and 34-116 of Chapter 34 of the Land Development Code list the uses for the R-1, R-2, R-3A, R-3B and RMU districts.</p>

<p>Section 34-111 covers the R-1 Single-family residential district. Its permitted principal and accessory uses are single-family dwellings, including modular homes, and customary single-family accessory buildings. The list also names public and institutional uses, parks, swimming pools, playgrounds and conservation areas, home daycare facilities, and special care housing with a maximum of six residents. The special exceptions listed for R-1 are churches, golf courses and related club house facilities, daycare centers, and other uses not listed that may be compatible.</p>

<p>Section 34-112 covers the R-2 Multiple-family residential district. Its stated purpose is to provide for medium population density. Its permitted uses are any use permitted in R-1, multiple-family dwelling structures, mobile home parks as regulated in article VI, and daycare centers.</p>

<p>The R-2 section lists five permitted special exceptions. The first is churches and related activities. The second is boarding houses, rooming houses, lodging houses or dormitories, with four conditions attached. Rentals are made on a monthly, semi-annual or annual basis, and the text says no hourly, daily or weekly rentals are permitted. All rooms must be accessible from a single building entrance. All shared facilities, meaning bathrooms, laundry room and kitchen, must be internally accessible from all rooms. There must be no less than one bathroom containing a toilet, sink and shower or tub per every four rooms. The third special exception is bed and breakfast inns. The fourth is convenience stores without gas pumps. The fifth is other uses not listed that may be compatible with and complement the permitted uses as approved by the planning, zoning and appeals board.</p>

<p>Section 34-114 covers the R-3A Multiple-family residential district. Its permitted uses include multiple-family dwelling structures and mobile home parks. Its permitted special exceptions include rooming and boarding houses as per R-2, housing for the elderly, hotels and motels with a 30 unit maximum, and professional and business offices.</p>

<p>Section 34-115 covers the R-3B Multiple-family residential district. Its permitted uses include multiple-family dwelling structures and mobile home parks. Its permitted special exceptions include housing for the elderly and hotels and motels with a 50 unit maximum.</p>

<p>Section 34-116 covers the RMU Residential mixed use district. Its permitted principal and accessory uses include multiple-family dwellings, business, professional and medical offices, general service and retail establishments, and restaurants and other eating establishments. The list also includes hotels, motels, bed and breakfasts, and rooming houses per subsection 34-112(c)(2). That subsection is the R-2 rooming house condition set out above.</p>

<p>A search for the phrase "bed and breakfast" returned three Land Development Code results. They are Section 34-112 for the R-2 district, Section 34-117 for the B-1 Business district and Section 34-202 on off-street parking lot layout, construction and maintenance. Section 34-202 includes the line "Historic preservation mixed-use or bed and breakfast inn. A minimum of two parking spaces shall have a paved surface."</p>

<h2>How a special exception or a zoning question moves through the city</h2>

<p>The City of Bunnell's Planning and Zoning Division page says the division manages the city's land use planning, zoning regulations and development review. Its listed services include variances and special exceptions, zoning interpretation and zoning verification requests. The page also lists land use questions, described as "what can I do on my property?", along with nonconforming uses and zoning verification.</p>

<p>The page says land use and development applications are reviewed through public meetings of the Planning, Zoning, and Appeals Board, called the PZA. When required, the City Commission is the final decision-making authority for certain applications.</p>

<p>The city's Community Development Special Exception Application form carries a revision date of October 2020. The applicant describes the exact reason for the request and the physical nature of the premises. The attachments listed are a non-refundable filing fee, a survey, plot plan or sketches, and written permission from the property owner if the applicant is not the owner, or a copy of a contract for sale that grants permission. The form states that all costs of advertising, meaning newspaper advertising and required adjacent property letters, are billed to the applicant. A note on the form lists the special exception fee as two hundred dollars under Resolution 2020-30.</p>

<h2>The city's local business tax receipt</h2>

<p>The city's Local Business Tax Receipts page states that anyone who engages in any type of business within the city limits is required to have a City of Bunnell Local Business Tax Receipt, called an LBTR. The receipt is valid from October 1 through September 30 and must be renewed annually. The City Commissioners fix the fees, and each fee is attached to a classification that describes the business. The fee for a new receipt issued from April 1 through September 30 is one-half the regular annual license tax. Community Development, at 386-437-7516, takes questions and the completed application.</p>

<p>Section 58-39 sets the calendar. Receipts are sold beginning August 1 of each year, are due on or before September 30 and expire on September 30 of the following year. Half-year rates apply between April 1 and September 30. A receipt that is not renewed when due is delinquent. The penalty is ten percent for the month of October plus an additional five percent for each later month, and the total penalty may not exceed 25 percent of the business tax. The city's page repeats the same penalty terms.</p>

<p>The city's page says the city partners with the Flagler County Tax Collector's Office for all receipt renewals under an Interlocal Agreement. Renewal notices come by email or postcard from the Tax Collector's office starting in July. The page also says a ten percent fee applies to changes in business name, location or owner.</p>

<p>Section 58-47 says it is unlawful for any person to engage in any trade, business, profession or occupation within the city without first obtaining a local business tax receipt. It also says it is unlawful to do so under a receipt issued upon false information. Section 58-46 addresses receipts obtained on false statements, and Section 58-48 addresses suspension and revocation of a receipt.</p>

<p>Section 58-45 says no business tax receipt shall be issued for any business until the location has been approved by the city and a certificate of occupancy for any new structures issued by the building official.</p>

<p>Section 58-49 lists the rates for each class of receipt. Class Q covers hotels and motels in six size tiers by number of rooms. The tiers are 1 to 9 rooms, 10 to 19, 20 to 39, 40 to 69, 70 to 99, and 100 and up. Each tier carries a different base rate.</p>

<p>The city's instruction sheet for businesses within the city limits lists what an applicant needs. The application must be filled out completely, and the sheet states that incomplete applications will be denied. The sheet states that the location must be approved by the zoning official for the type of business being applied for and that some businesses may require approval of the PZA Board. It lists a copy of a recorded warranty deed, a lease or a letter of permission to use the location. It lists a fictitious name registration where one applies and state licenses where required. It states that a fire inspection will be conducted for the location and that any corrections noted must be corrected prior to receiving a receipt and opening to the public.</p>

<p>A separate box on the sheet is headed Hotel, Motels and Restaurant. It says to contact the Division of Hotels and Restaurants at 850-487-1395 prior to obtaining the business tax receipt. The city's receipts page lists the same division and number among its useful numbers.</p>

<h2>State law on vacation rentals</h2>

<p>Section 509.032(7)(a) of the Florida Statutes says the regulation of public lodging establishments, including sanitation standards and inspections, is preempted to the state. The paragraph does not preempt a local government's authority to conduct inspections of public lodging establishments for compliance with the Florida Building Code and the Florida Fire Prevention Code.</p>

<p>Section 509.032(7)(b) says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. The paragraph then says it does not apply to any local law, ordinance or regulation adopted on or before June 1, 2011. Paragraph (c) says paragraph (b) does not apply to a local law exclusively relating to property valuation as a criterion for vacation rental if the law must be approved by the state land planning agency under an area of critical state concern designation.</p>

<p>Section 509.242(1)(c) defines a vacation rental as any unit or group of units in a condominium or cooperative, or any individually or collectively owned single-family, two-family, three-family or four-family house or dwelling unit, that is also a transient public lodging establishment but is not a timeshare project. Section 509.242(1)(f) defines a bed and breakfast inn as a family home structure with no more than 15 sleeping rooms that has been modified to serve as a transient public lodging establishment. It provides the accommodation and meal services generally offered by a bed and breakfast inn and is recognized as one in the community or by the hospitality industry.</p>

<p>Section 509.013(12) defines transient occupancy as occupancy that is temporary. It includes occupancy of a dwelling unit at a hotel, motel, vacation rental, bed and breakfast inn or timeshare project, unless a written rental or lease agreement expressly states that the dwelling unit is the sole residence of the guest. A transient is a guest in transient occupancy.</p>

<p>Section 509.241(1) says each public lodging establishment shall obtain a license from the division. The license may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree. The subsection also says local law enforcement shall provide immediate assistance in pursuing an illegally operating establishment. Licenses are renewed annually.</p>

<p>The Division of Hotels and Restaurants at the Department of Business and Professional Regulation lists two vacation rental license types on its page. The condo type is for a single unit or group of units in a condominium or cooperative rented transiently. The dwelling type is for single-family homes, townhouses, duplexes, triplexes or quadruplexes rented transiently. The division keeps a searchable online database of licensed vacation rentals. The page says the database gives the location address of every vacation rental condo or dwelling currently licensed by the division and refreshes daily. Address changes made online are reflected in the public database within 24 hours.</p>

<h2>The Flagler County Tourist Development Tax and sales tax</h2>

<p>The Flagler County Tax Collector's page says the county began collecting the Tourist Development Tax, also known as the bed tax, effective August 1, 2018, under Flagler County Ordinance 2018-10. The tax applies to any living quarters or accommodations, including hotels, motels, apartment buildings, single or multifamily dwellings, mobile home parks, recreational vehicle parks, condominiums, cottages and boats permanently affixed to a dock. Any person who rents or leases transient accommodations for a period of six months or less is responsible for collecting and remitting the tax.</p>

<p>The tax is 5% of the gross monthly revenue. The page says it is in addition to the 7% State of Florida Sales and Use Tax remitted to the Florida Department of Revenue. The Tax Collector's office collects the local tax. Taxable charges listed on the page are the room rate, cleaning fees, pet fees and traveler service fees. Non-taxable charges are damage deposits and optional travel insurance.</p>

<p>The page states, in capital letters, that the Tax Collector does not have an agreement or contract with online platforms such as Airbnb and VRBO. It says those platforms do not remit the 5% tax to the Tax Collector's office and that it is the homeowner's responsibility to ensure the tax is remitted. It adds that all rental properties also require a local business tax, regardless of how long the property is being rented.</p>

<p>The tax is due to the Tax Collector monthly. It is due on the first day of the month following the reporting period and becomes delinquent if not paid or postmarked by the 20th day of that month. The page says all owners and operators must submit a return even if no taxes were collected for the month. The penalty is 10% of the tax due for each month or fraction of a month that the return is delinquent. The penalty has a minimum of fifty dollars and a maximum of 50% of the tax due. The interest rate is variable, and the page gives 386-313-4160 as the number to call about it.</p>

<p>Section 212.03(1)(c) of the Florida Statutes addresses the state sales tax on rentals. It exempts the rental of facilities intended primarily for rental as a principal or permanent place of residence. It says the rental of such facilities that primarily serve transient guests is not exempt by that subsection. The department considers a facility as primarily serving transient guests unless the owner makes a verified declaration, on a form prescribed by the department, that more than half of the total rental units available are occupied by tenants who have a continuous residence in excess of three months. The owner must redetermine the facility's taxable status at the end of the owner's accounting year, using a consecutive three-month period.</p>

<h2>Association and condominium rental rules</h2>

<p>Florida Statutes address rental amendments for homeowners' associations and condominiums. Section 720.306(1)(h) covers homeowners' associations. Subparagraph 1 says a governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title to the parcel after the effective date of the document or amendment, or to a parcel owner who consents.</p>

<p>Subparagraph 2 says an association may amend its governing documents to prohibit or regulate rental agreements for a term of less than six months. It may also prohibit the rental of a parcel for more than three times in a calendar year. Those amendments apply to all parcel owners. Subparagraph 3 says the paragraph does not affect the amendment restrictions for associations of 15 or fewer parcel owners under section 720.303(1).</p>

<p>For a condominium, section 718.110(13) says an amendment prohibiting unit owners from renting their units, altering the duration of the rental term, or specifying or limiting the number of times unit owners are entitled to rent their units during a specified period applies only to unit owners who consent to the amendment and unit owners who acquire title to their units after the effective date of that amendment.</p>

<p>Section 720.401(1)(a) says a prospective parcel owner in a community must be presented a disclosure summary before executing the contract for sale. Item 2 of the summary form reads that there have been or will be recorded restrictive covenants governing the use and occupancy of properties in the community. Under subsection (1)(c), if the summary was not provided before the contract, the purchaser may void the contract by written notice within three days after receipt of the summary or prior to closing, whichever occurs first. The right may not be waived and terminates at closing. Subsection (2) says the section does not apply to an association regulated under chapter 718, 719, 721 or 723.</p>

<p>Section 720.30851 covers estoppel certificates. Within 10 business days after receiving a written or electronic request from a parcel owner or the parcel owner's designee, or from a parcel mortgagee or the parcel mortgagee's designee, the association shall issue the estoppel certificate. Each association shall designate on its website a person or entity with a street or e-mail address for receipt of requests.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-bunnell-fl-neighborhoods-costs-and-what-to-know">Living in Bunnell, FL: Neighborhoods, Costs and What to Know</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/11/17/bunnell-property-tax-bill-line-by-line">Your Bunnell Property Tax Bill, Line by Line</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/bunnell-flood-zones-and-flood-insurance-guide">Bunnell Flood Zones and Flood Insurance Guide</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/bunnell-fl-acreage-zoning-wells-and-septic-for-buyers">Bunnell FL Acreage: Zoning, Wells and Septic for Buyers</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-a-condo-in-florida-under-the-new-condo-laws-a-volusia-county-guide">Buying a Condo in Florida Under the New Condo Laws: A Volusia County Guide</a>.</p>

<h2>Bottom line</h2>

<p>Searches of Bunnell's Municode library for short-term rental, short term rental and vacation rental returned zero results on November 17, 2026. The Land Development Code lists lodging uses by district, with hotels and motels as special exceptions in R-3A and R-3B, bed and breakfast inns as a special exception in R-2, and hotels, motels and bed and breakfasts as permitted uses in RMU. The city requires a local business tax receipt for any business within its limits. The Flagler County Tourist Development Tax is 5% on rentals of six months or less, and the state public lodging license may not be transferred from one place or individual to another. Section 509.032(7)(b) says a local rule may not regulate the duration or frequency of vacation rentals, and that this paragraph does not apply to local laws adopted on or before June 1, 2011.</p>

<p>More on <a href="http://www.adamscameron.com/bunnell-florida-real-estate-and-homes.html">Bunnell</a>.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Does Bunnell have a short-term rental ordinance?</strong></summary>
<p>Searches of the City of Bunnell's Municode library on November 17, 2026 for "short-term rental," "short term rental," "vacation rental," "airbnb," "transient occupancy" and "tourist development" each returned zero results. The Land Development Code defines hotel, motel, motor lodge or tourist court and lists hotels and motels, bed and breakfast inns and rooming houses in the R-2, R-3A, R-3B and RMU districts. The city's Planning and Zoning Division page lists zoning verification requests and land use questions among its services.</p>
</details>

<details>
<summary><strong>Does a rental in Bunnell need a local business tax receipt?</strong></summary>
<p>The city's Local Business Tax Receipts page says anyone who engages in any type of business within the city limits is required to have a City of Bunnell Local Business Tax Receipt. Section 58-47 of the Code of Ordinances makes it unlawful to engage in any business within the city without first obtaining one. The Flagler County Tax Collector's page says all rental properties also require a local business tax, regardless of how long the property is being rented. Receipts run from October 1 through September 30.</p>
</details>

<details>
<summary><strong>What is the Flagler County Tourist Development Tax rate?</strong></summary>
<p>The Flagler County Tax Collector's page states the tax is 5% of the gross monthly revenue from rentals of six months or less. It is in addition to the 7% State of Florida Sales and Use Tax. Taxable charges listed are the room rate, cleaning fees, pet fees and traveler service fees. Damage deposits and optional travel insurance are listed as non-taxable. The tax is due on the first day of the month after the reporting period and becomes delinquent if not paid or postmarked by the 20th.</p>
</details>

<details>
<summary><strong>Do Airbnb and VRBO collect the Flagler County tourist tax?</strong></summary>
<p>The Flagler County Tax Collector's page states that the office does not have an agreement or contract with online platforms such as Airbnb and VRBO. It says those platforms do not remit the 5% Tourist Development Tax to the office and that it is the homeowner's responsibility to ensure the tax is remitted to the Tax Collector. The page also says all owners and operators must submit a return even if no taxes were collected for the month.</p>
</details>

<details>
<summary><strong>Can a state public lodging license be transferred from one place or individual to another?</strong></summary>
<p>Section 509.241(1) of the Florida Statutes says each public lodging establishment shall obtain a license from the division and that the license may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree. The Division of Hotels and Restaurants keeps a searchable online database of licensed vacation rentals that gives the address of every currently licensed vacation rental condo or dwelling and refreshes daily.</p>
</details>

<details>
<summary><strong>Can a homeowners' association restrict rentals after a buyer closes?</strong></summary>
<p>Section 720.306(1)(h) of the Florida Statutes says a governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title after the effective date or who consents. The same paragraph says an association may amend its governing documents to prohibit or regulate rental agreements for a term of less than six months and may prohibit the rental of a parcel more than three times in a calendar year. Those amendments apply to all parcel owners.</p>
</details>

<details>
<summary><strong>Who can ask a homeowners' association for an estoppel certificate?</strong></summary>
<p>Section 720.30851 says the association shall issue an estoppel certificate within 10 business days after receiving a written or electronic request from a parcel owner or the parcel owner's designee, or from a parcel mortgagee or the parcel mortgagee's designee. Each association shall designate on its website a person or entity with a street or e-mail address for receipt of requests. The certificate must be provided by hand delivery, regular mail or e-mail on the date of issuance.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:25:01 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/bunnell-short-term-rental-rules-for-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for Deltona Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-deltona-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>The City of Deltona's Comprehensive Emergency Management Plan, dated November 2023, names 2022 as the city's most intense hurricane season. Hurricanes Ian and Nicole traversed the city as Category 1 storms just 43 days apart. The plan says Hurricanes Charley in 2004, Ian and Nicole in 2022 were the most recent storms to impact the city with hurricane-force winds. It also says all of these storms over the last twenty years had major impacts on homes and infrastructure. For Deltona listings, see <a href="http://www.adamscameron.com/deltona-florida-real-estate-and-homes.html">Deltona</a>.</p>

<p>The sources below are the City of Deltona, Volusia County, the State of Florida and the Florida Statutes, all read on November 17, 2026. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-flood-zones-flood-insurance-check-an-address">Deltona Flood Zones and Flood Insurance</a>.</p>

<h2>What the city's own pages say about storms, lakes and flooding</h2>

<p>The plan states that Deltona is vulnerable to high winds, heavy rains and hail that accompany tropical storms and hurricanes. It describes the city as 45 square miles with approximately 64 lakes within its boundaries. Lake Monroe borders the south. Unincorporated Volusia County borders the east. Lake Helen and unincorporated Volusia County border the north. The west is bordered by I-4, Orange City, DeBary and unincorporated Volusia County.</p>

<p>The plan says the city is vulnerable to heavy rains because of possible flooding from the 64 lakes and numerous low-lying areas. It says high winds associated with hurricanes, tornadoes and severe storms can damage structures and mobile homes in the city. It states that significant portions of Volusia County's flood maps were updated and became effective on September 29, 2017. It counts 5,646 parcels and 4,524 buildings in the floodplain. The plan also states that the most powerful recorded tornado to impact the city was an EF3.</p>

<p>The City's Flood Preparedness page gives a share of the city by flood zone. It says nearly 22 percent of Deltona is in an A, AE or X flood zone under the September 29, 2017 FEMA maps, with no AH zones present in the city. The page says a Special Flood Hazard Area is not limited to the neighborhood of water bodies, low areas or wetlands. It also exists near areas of potential flooding, such as closed basins that appear to be uplands. The page says residents along lakes, dry lake beds, retention areas, forested wetlands or ditches, or within a closed basin, may have portions of their lots within a Special Flood Hazard Area. The page puts it this way: it is incumbent upon the property owner to verify the location of the boundary in relation to their lot.</p>

<p>Volusia County's Flood Zone and Risk Information page says every property in the county is located within a flood zone designated by FEMA, and the county has no authority in assigning the zones. The page says flooding can happen anywhere regardless of zone. It lists elevation, proximity to water, drainage characteristics and ground saturation as factors in flood risk. It says 25 percent of flood claims come from outside high-risk flood zones. It describes Zone X unshaded as minimal flood risk, but not zero. It also says flood damage is not covered by standard homeowners or renters insurance.</p>

<p>The City's page names streets where it bought properties. It says the four hurricanes in 2004 and Tropical Storm Faye in 2008 caused tremendous flooding. It says the City purchased repetitive loss properties clustered along Beechdale Drive, Springwood Lane and Ft. Smith Boulevard. The same page says there are four repetitive loss properties in the city. A City progress report dated April 29, 2024 says there are 6 repetitive flood loss properties.</p>

<p>That 2024 report is the City's annual progress report under the Community Rating System. It names the credited plan as the Volusia County Multi-Jurisdictional Local Mitigation Strategy, which includes the Volusia County Floodplain Management Plan dated January 2020. City Council adopted it unanimously on July 20, 2020 under Resolution No. 2020-40. A copy is available from the Public Works Department at 255 Enterprise Road, phone 386-878-8998. The report says the City has submitted 6 mitigation projects to FEMA under the Hazard Mitigation Grant Program. It says implementation is somewhat behind schedule due to lack of matching funds by the homeowners, and that the local match has hindered the homeowners' participation. It adds that homeowners have been informed about the Transform386 Program administered by Volusia County, which the report says is allocating CDBG-DR funds to assist flood-impacted households to repair and rebuild.</p>

<p>The City's Flood Preparedness page says Deltona holds a Community Rating System Class 9 rating. The page says that qualifies the City for a 5 percent discount in the premium cost of flood insurance for National Flood Insurance Program policies issued or renewed in Special Flood Hazard Areas on or after May 1, 2015. The page says the Flood Disaster Protection Act requires the purchase of flood insurance to receive federal or federally-backed insurance for acquisition or construction of buildings in a Special Flood Hazard Area. It says homeowner's insurance does not cover flooding. For a property outside a Special Flood Hazard Area, the page says a Preferred Risk Policy is available, and that the rating discount does not apply to it.</p>

<p>The City's Theresa Basin Flood Control Study page describes a drainage study commissioned by the Public Works Department. The basin is an approximately 35-square-mile watershed that includes the eastern half of Deltona. Doyle Rd (County Road 4162) bounds it on the south and Interstate 4 on the west. DeLand and Lake Helen lie to the north, and the Deep Creek Basin to the east. The whole watershed lies within the St. Johns River Water Management District.</p>

<p>The page calls the basin hydrologically closed. Stormwater drains to a series of interconnected lakes that generally can only recover through groundwater recharge and evapotranspiration. The page says Hurricanes Ian and Nicole in 2022 raised water levels in the chain of lakes by up to 3.5 feet and resulted in widespread, persistent flooding that did not fully recede until the spring of 2023. The study's goals include updating the City's stormwater models to include development since 2016 and updating the 100-year flood zone maps to supplement existing FEMA products or support amendment of current FEMA maps. A public meeting was set for January 31, 2024 at 6:00 pm.</p>

<p>The City's Stormwater Division page describes the division. The division handles stormwater system construction and storm emergency services. It has a contractual relationship with Volusia County for those services, including pumping and debris removal. It restores the functionality of open ditches by cleaning and removing obstructive vegetation under the heading "Save the Swales!" Its listed duties include reporting all complaints of insufficient drainage flow in swales immediately for action. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-septic-vs-sewer-what-buyers-must-check">Deltona Septic vs. Sewer: What Buyers Must Check</a>.</p>

<h2>Alerts, evacuation, shelters and supplies</h2>

<p>The City runs an emergency text alert system powered by Everbridge. Its page says residents will only receive text alerts for situations that significantly impact public safety or daily life. Routine notifications, community events and promotional messages are not sent. The examples listed are road closures, hurricane warnings and other severe weather alerts, water main breaks, emergency construction projects, boil water notices, health alerts, sinkholes and hazardous materials situations. The page links a sign-up.</p>

<p>The City's Hurricane Preparedness page lists phone numbers. Deltona's Citizen Information Center is 386-878-8510 and is only activated during storms. Volusia County's Citizen Information Center is 866-345-0345. Florida Power and Light is 800-468-8243 and Duke Energy is 800-228-8485. The page says to report power outages by texting OUT to 57801. For a copy of the Comprehensive Emergency Management Plan it gives 386-575-6901.</p>

<p>The City's plan says decisions about evacuating Deltona or any of its neighborhoods, subdivisions or areas are made by the senior City official present at the emergency operations center. It calls evacuation of people from within the city the dual responsibility of the City of Deltona and Volusia County. The City may recommend voluntary evacuation or may order a mandatory evacuation of threatened or impacted areas. Orders may be issued before, during or after an emergency event. Special facilities or special subdivisions may be ordered to evacuate before or after the general population. The plan places the emergency operations center at City Hall, 2345 Providence Blvd, with the Fire Department Headquarters at 1685 Providence Blvd as the alternate.</p>

<p>Volusia County's Know Your Zone page sets out who evacuates. It says to evacuate if you live in the hurricane evacuation zone. It says the same for a low-lying, flood prone area, including homes along river basins. It says the same for a mobile home, substandard housing, a recreational vehicle or a campsite. Local officials may order one of three evacuation levels, A, BC or DE, and the levels correspond to the flooding that is likely to occur. The page says residents of a mobile home or recreational vehicle must evacuate for all evacuation levels regardless of where they are. It says failure to obey an evacuation order is a violation of Florida law.</p>

<p>The State of Florida's Know Your Zone page designates evacuation zones from A to F and says Zone A is typically the most vulnerable and the most likely to evacuate first. It says not all evacuation zones are always ordered. It says that if an evacuation order is not issued for an area and the house is not in an evacuation zone, a resident may consider sheltering in place. It also says that the greatest threat to life from a hurricane is storm surge flooding. Its answer on home strength reads in part that it is the responsibility of the homeowner to know if their home is strong enough to withstand a hurricane, and that generally homes built after 2002 include features that make them more resilient to hurricanes. The state names the most important precaution as protecting the areas where wind can enter.</p>

<p>The county's evacuation page gives instructions for both choices. For evacuating, it lists knowing where you are going, taking a map showing two routes, notifying family, friends or caregivers, securing the home and property, taking emergency supplies and not delaying. For staying home, it lists staying in the designated safe room, staying away from windows and glass doors, turning off electricity at the main fuse or breaker box if flooding threatens, and running a generator outside the house with appliances connected directly to the generator. The page states that back-feeding generators have killed power company line workers. For mobile homes it lists maintaining tie-down straps and anchors and checking straps for rust or corrosion.</p>

<p>The same page describes bridges. When an evacuation is ordered, the east-bound lanes of bridges close to traffic. The west-bound lanes remain open until sustained winds exceed 39 miles per hour, and then all lanes close. The page names storm surge as the most deadly of hurricane hazards and says it can reach seven feet above sea level in a Category 1 hurricane and as much as 28 feet above sea level in a Category 5 hurricane.</p>

<p>The City's plan says shelters for the general public and for people with special needs have been designated as public schools within the county. It says Volusia County is responsible for their activation, staffing and deactivation and that there are no formal agreements between the City and the county for the use of a Deltona facility. The plan adds that the county has designated primary and secondary evacuation shelters outside of the storm surge area. They may be designated Tier I for immediate opening or Tier II for overflow, and activations depend on whether the county is an impact area, a host area or both.</p>

<p>The county's Shelter Information page says that during an emergency not all shelters will open at once, and that shelters open based on demand. It lists the Volusia County emergency preparedness app, www.volusia.org/PIN, Emergency Management on social media and the toll-free Citizens Information Hotline at 866-345-0345, which is only activated during an emergency. The page defines a Shelter Information Point as a central location to direct evacuees to shelters in Deltona. It defines a Special Needs Shelter as one for evacuees who are elderly, physically, mentally or sensory disabled, visually or hearing impaired, or who require oxygen. It states that hospitals are not shelters and that special needs shelters are not for people who need 24-hour dedicated care, a hospital bed, a ventilator, other complex care, or isolation patients. The page says residents who need supplemental oxygen or who are physically, mentally or sensory disabled should register for the Special Needs Shelters program.</p>

<p>The same page says evacuees may need to stay at a shelter for 24 to 72 hours. General population shelters do not provide cots, and the page recommends a beach chair and sleeping pad. For people with only minutes the page lists prescription medications, eyeglasses and dentures, a flashlight, batteries, a radio, a first aid kit, bottled water, a change of clothes, a sleeping bag or bedroll and pillow for each household member, and car keys. The Volusia County School Board and Votran provide free rides to general public shelters, with pickup at all regular Votran bus stops. The page says all Votran bus stops are evacuation assembly points during a declared emergency evacuation order.</p>

<p>The City's Emergency Kit page lists supplies for a minimum of 72 hours. For water it gives at least one gallon per person per day for three days for drinking and sanitation. It lists a battery operated radio, a flashlight and extra batteries, a whistle, a first aid kit, an ABC type fire extinguisher, cash or traveler's checks and a map of the area for locating shelters. For documents it lists a will, insurance policies, contracts, deeds, stocks and bonds, and an inventory of valuable household goods, kept in a secure and waterproof bag. For pets it lists food and water for 72 hours, medicine and medical records, a collar with ID tag, a crate or carrier and updated microchip information.</p>

<p>After a storm, the plan says the City operates a Point of Distribution with Volusia County, a location from which relief supplies such as food, water, ice and tarps are distributed. The primary location is the Sports Complex at 1236 Saxon Blvd. The alternates are The Center at 1640 Dr. Martin Luther King Blvd. and Wes Crile Park at 1537 Norbert Terrace. On reentry, the plan says the City may continue to restrict access to damaged or destroyed areas, properties and structures by homeowners and others during and after the emergency response period. It lists property owners, insurance adjustors and claims inspectors and pet owners among the categories for early reentry. It says reentry of evacuees or other personnel may be allowed under special circumstances at the discretion of the City's Incident Commander. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deltona-fl-neighborhoods-costs-and-what-to-know">Living in Deltona, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>The house itself: roofs, permits, insurance forms, disclosure and debris</h2>

<p>Section 553.844 of the Florida Statutes is titled Windstorm loss mitigation, requirements for roofs and opening protections. In the 2026 statutes, subsection (3)(a) says that for site-built, single-family residential structures a roof replacement must incorporate secondary water barriers and strengthening or correcting of roof-decking attachments and fasteners. Subsection (3)(b) applies to a building in the wind-borne debris region with an insured value of 300,000 dollars or more. If the building is uninsured or insured value is not documented, it applies at a just valuation of 300,000 dollars or more for ad valorem taxation. In that case a roof replacement must incorporate roof-to-wall connection techniques.</p>

<p>Subsection (2)(b)3 says the cost of improvements is intended not to exceed approximately 15 percent of the cost of reroofing. It says roof-to-wall connections shall not be required unless evaluation and installation of connections at gable ends or all corners can be completed for 15 percent of the cost of roof replacement. Subsection (3)(c) covers permit-required activity applied for on or after July 1, 2008 with an estimated cost of 50,000 dollars or more, not including roof covering replacement or repair work associated with the prevention of degradation of the residence. For a building in the wind-borne debris region with an insured value or just valuation of 750,000 dollars or more, that activity must include opening protections as required for new construction. Subsection (5) says that if a roofing system built, repaired or replaced under the 2007 Florida Building Code or a later edition has 25 percent or more repaired, replaced or recovered, only the repaired, replaced or recovered portion must be constructed under the code in effect.</p>

<p>The City's Building Services Division states when a permit is required. A permit is required when an owner or authorized agent intends to construct, enlarge, alter, repair, move, demolish or change occupancy of a building or structure. It is also required to erect, install, enlarge, alter, repair, remove, convert or replace an electrical, gas, mechanical or plumbing system regulated by the Florida Building Code or the National Electrical Code. The division lists building, electrical, plumbing, mechanical (AC systems), roofing and demolition among the common permit types. It says doing work without a permit can lead to fines, failed inspections, or having to redo the work.</p>

<p>Applicants are a licensed contractor or authorized permit runner, or the owner of a non-rented property that will not be for sale or rent for a full year after final inspections, called an owner-builder under Florida Statute 489.103. The division's page lists an online self-service portal for permits, available 24/7 for permits submitted after July 16, 2019, and it gives 386-575-6900 for scheduling inspections. The office is at 2345 Providence Boulevard and the phone number is 386-878-8660. For a Certificate of Completion, property owners listed on the permit visit in person with valid identification, and non-owners submit a public records request through the City Clerk. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/10/28/deltona-new-construction-permits-impact-fees-and-the-certificate-of-occupancy">Deltona New Construction: Permits, Impact Fees and the Certificate of Occupancy</a>.</p>

<p>The City's Flood Preparedness page says Elevation Certificates showing finished construction elevations for all newly constructed or substantially improved buildings are on file and available through the City Building Department at 386-878-8100. Planning and Development Services, at 386-878-8600, provides Flood Insurance Rate Map information and is the repository for the FIRM maps.</p>

<p>Contractor payment rules appear on a City page that quotes Section 713.135 of the 2024 Florida Statutes. The permit card carries a printed warning that failure to record a notice of commencement may result in paying twice for improvements. The applicant must file a copy of the notice of commencement before the first inspection if the direct contract is greater than five thousand dollars. The subsection does not apply to a direct contract to repair or replace an existing heating or air-conditioning system in an amount less than fifteen thousand dollars. Without the filing, the issuing authority may not perform or approve subsequent inspections until the applicant files a copy. The DBPR summary on the same page says a Release of Lien is a written statement that removes the property from the threat of lien.</p>

<p>Section 627.711 of the 2026 Florida Statutes says an insurer shall notify the applicant or policyholder of a personal lines residential property insurance policy, at issuance and at each renewal, of the availability and range of each premium discount, credit, other rate differential or reduction in deductibles for properties on which windstorm loss-reduction fixtures or construction techniques can be or have been installed. The same section directs the Financial Services Commission to develop a uniform mitigation verification inspection form for insurers to use when policyholders submit it for wind discounts.</p>

<p>An insurer shall accept the form as valid when it is signed by one of a listed group. The group is a licensed home inspector who has completed at least 3 hours of approved hurricane mitigation training and a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer, a licensed professional architect, or any other individual or entity recognized by the insurer as possessing the necessary qualifications. The person signing must inspect the structures personally, not through employees or other persons. The statute allows licensed engineers and contractors to authorize a direct employee who is not an independent contractor and who has the requisite skill, knowledge and experience.</p>

<p>The sale contract carries a flood disclosure. Section 689.302 says a seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods and that the buyer is encouraged to discuss separate flood insurance coverage with the buyer's insurance agent. The seller marks whether the seller has knowledge of any flooding that has damaged the property during the seller's ownership. The seller marks whether a claim relating to flood damage was filed with an insurance provider, including the National Flood Insurance Program. The seller also marks whether assistance for flood damage was received, including from the Federal Emergency Management Agency. For the form, flooding means a general or temporary condition of partial or complete inundation of the property caused by the overflow of inland or tidal waters, the unusual and rapid accumulation of runoff or surface waters from an established water source such as a river, stream or drainage ditch, or sustained periods of standing water resulting from rainfall.</p>

<p>Debris rules sit with the City and the county. The City's Storm Debris Collection page asks that debris be separated into piles of vegetation and construction and demolition debris, such as shingles and fencing. It asks that bagged storm debris not be co-mingled in the piles and that sidewalks not be blocked. The county statement on the page says bagged debris will not be collected and hazardous debris such as paint and tires will not be picked up. It says debris should not cover storm drains or be placed near fire hydrants, power lines and mailboxes. The page defines the public right-of-way as the area of residential property that extends from the street to the sidewalk, ditch, utility pole or easement. It says contractors hired for large tree debris or household damage are required by law to dispose of debris properly and cannot place it in the right-of-way. The City's information line is 386-878-8510.</p>

<p>The plan describes the order of road clearing. Priority roadways are opened for emergency vehicles and evacuation traffic in the order of main thoroughfares, then feeder roads, then neighborhoods. Roadways are the responsibility of the Florida Department of Transportation, Volusia County and the City. The plan states that the City has a policy of having one or more pre-season contracts with private sector debris management companies in place for activation when needed. On damage assessment, the plan says county teams are responsible for damage assessment for private property in both incorporated and unincorporated areas, and each municipality is responsible for deploying its own teams if personnel are available.</p>

<p>For recovery help, the City's FEMA page lists the FEMA helpline at 1-800-621-3362. The City's Disaster Case Management Services page, written about flooding that followed Hurricane Ian, says the services remain available even though the registration deadline has passed. It gives Family Endeavors, Inc at 407-487-2362 as the contact for Volusia residents.</p>

<p>The City's plan counts 5,646 parcels and 4,524 buildings in the floodplain, and the City's page puts nearly 22 percent of the city in an A, AE or X zone. Volusia County says every property is in a FEMA zone and 25 percent of flood claims come from outside high-risk zones. The state says it is the homeowner's responsibility to know if a home is strong enough. A seller must provide the Section 689.302 flood disclosure at or before the time the sales contract is executed. For Deltona listings, see <a href="http://www.adamscameron.com/deltona-florida-real-estate-and-homes.html">Deltona</a>. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/your-deltona-property-tax-bill-line-by-line-2026">Your Deltona Property Tax Bill, Line by Line</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What does the Section 689.302 flood disclosure ask a Deltona seller?</strong></summary>
<p>Section 689.302 of the Florida Statutes requires a seller to complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods. The seller marks whether the seller has knowledge of flooding that damaged the property during the seller's ownership. The seller marks whether a flood damage claim was filed with an insurance provider, including the National Flood Insurance Program. The seller also marks whether assistance for flood damage was received, including from the Federal Emergency Management Agency.</p>
</details>
<details>
<summary><strong>Does a Deltona address have to be in a mapped flood zone to flood?</strong></summary>
<p>Volusia County says every property in the county is located within a FEMA flood zone and that flooding can happen anywhere regardless of zone. The county says 25 percent of flood claims come from outside high-risk flood zones. The City of Deltona says nearly 22 percent of the city is in an A, AE or X flood zone under the September 29, 2017 FEMA maps. The City also says a Special Flood Hazard Area can exist near closed basins that appear to be uplands, and that the property owner is responsible for verifying the boundary in relation to the lot.</p>
</details>
<details>
<summary><strong>Who decides whether Deltona residents evacuate?</strong></summary>
<p>The City's Comprehensive Emergency Management Plan, dated November 2023, says evacuation of people from within Deltona is the dual responsibility of the City of Deltona and Volusia County. It says the senior City official present at the emergency operations center makes the City's evacuation decisions. The City may recommend voluntary evacuation or order a mandatory evacuation of threatened or impacted areas. The county's evacuation page says local officials may order one of three levels, A, BC or DE, and that failure to obey an evacuation order is a violation of Florida law.</p>
</details>
<details>
<summary><strong>Which shelters serve Deltona in a hurricane?</strong></summary>
<p>The City's plan says shelters for the general public and for people with special needs are designated as public schools within Volusia County, and that Volusia County is responsible for their activation, staffing and deactivation. The county's Shelter Information page says not all shelters open at once and that shelters open based on demand. It lists the Volusia County emergency preparedness app, www.volusia.org/PIN and the Citizens Information Hotline at 866-345-0345, which is only activated during an emergency. The page defines a Shelter Information Point as a central location to direct evacuees to shelters in Deltona.</p>
</details>
<details>
<summary><strong>What does Florida law require when a roof is replaced on a single-family home?</strong></summary>
<p>Section 553.844 of the 2026 Florida Statutes says that for site-built, single-family residential structures a roof replacement must incorporate secondary water barriers and strengthening or correcting of roof-decking attachments and fasteners. For a building in the wind-borne debris region with an insured value of 300,000 dollars or more, or a just valuation of that amount if uninsured, a roof replacement must also incorporate roof-to-wall connection techniques. The statute says roof-to-wall connections are not required unless evaluation and installation can be completed for 15 percent of the cost of roof replacement.</p>
</details>
<details>
<summary><strong>Who can sign the wind mitigation form an insurer uses for discounts?</strong></summary>
<p>Section 627.711 of the 2026 Florida Statutes says an insurer shall accept the uniform mitigation verification form as valid when signed by a licensed home inspector with at least 3 hours of approved hurricane mitigation training and a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer, a licensed professional architect, or any other individual or entity the insurer recognizes as qualified. The person signing must inspect the structures personally, not through employees or other persons, with the exception the statute gives for licensed engineers and contractors.</p>
</details>
<details>
<summary><strong>What does the City of Deltona say about debris after a storm?</strong></summary>
<p>The City's Storm Debris Collection page asks that debris be separated into piles of vegetation and construction and demolition debris, that bagged debris not be co-mingled in the piles and that sidewalks not be blocked. The county statement on the page says bagged debris will not be collected and hazardous debris such as paint and tires will not be picked up. It also says debris should not cover storm drains or be placed near fire hydrants, power lines and mailboxes. The City's information line is 386-878-8510.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:24:44 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-deltona-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[South Daytona New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/south-daytona-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>South Daytona's Code of Ordinances lists six impact fees with single-family amounts: transportation, water, sewer, recreational, fire and police. The code sets payment of those fees at or before the issuance of the building permit. Volusia County has its own impact fees, and the county's FAQ says its payments are due before the issuance of a Certificate of Occupancy. The sections below go through the permit package, the fee lines and the certificate of occupancy for new homes in <a href="http://www.adamscameron.com/south-daytona-florida-real-estate-and-homes.html">South Daytona</a>.</p>

<p>The details come from the City of South Daytona's Building and Community Development pages, its permit forms, the city's Code of Ordinances on Municode, the Volusia County impact fee pages and the Florida Statutes. Each amount and date is the one printed in the document on November 17, 2026. Dollar amounts are written in words.</p>

<h2>The Permit Package and Who Handles It</h2>

<p>The City of South Daytona's Building page lists two duties for the department. The department provides plan review and required inspections for all permitted construction projects. It also checks licensing and registrations for all permit applications, using the Volusia County Licensing Program through an interlocal agreement.</p>

<p>The Community Development page lists these department duties. The department drafts and maintains the Comprehensive Plan and the Land Development Regulations, reviews development plans and issues development orders. It receives building permit applications, assures that contractors are properly licensed and insured, reviews plans for compliance with the Florida Building Code, routes applications to various departments for review, issues permits, performs inspections and maintains records. The page says reviews and approvals are governed by the city's adopted Comprehensive Plan, Land Development Code, Future Land Use and Zoning Maps, and state law and regulations.</p>

<p>The Building page includes two instructions. If there is a question about whether a permit is required, the page says to always check in advance. It also says to always use licensed contractors for all proposed work on the property. Under the heading "Always Check Before Building," the page says to start with zoning, through Community Development, to see if what you want to do is feasible and/or allowed.</p>

<p>Section 553.79(1)(a) says it is unlawful for any person, firm, corporation or governmental entity to construct, erect, alter, modify, repair or demolish any building in the state without first obtaining a permit from the appropriate enforcing agency, upon payment of the reasonable fees that agency adopts. In South Daytona, Section 5-20 of the Code of Ordinances adopts the Florida Building Code as the building code of the city. A copy of the current edition is filed in the office of the city clerk and is available for public inspection during regular business hours.</p>

<p>The Building page sets the survey rule for a new project. A new or addition project needs signed and sealed surveys, and the page gives 3 for commercial and 2 for residential. If the property is in a FEMA-designated special flood hazard area, two copies of completed, signed and sealed elevation certificates are required as part of the submittal package.</p>

<p>For new structures and additions, the page lists plans and documents "including but not limited to" the following. A completed permit application. The occupancy classification, occupant load, type of construction and level of alteration, if applicable. Elevation views for all sides. Footing or monolithic slab details. The roof truss layout and engineering. A typical wall section demonstrating a continuous load path. Buck details and weather proofing of the openings. Energy calculations. A completed product approval sheet for all exterior components and cladding. A Volusia County impact fee statement.</p>

<p>The city's Building Permit Application carries a June 2026 footer. It has boxes for residential or commercial and a yes or no line for a permit exemption request. It has a flood zone line with the choices X-Shaded, X-Un Shaded, A and AE, and a declared project cost line that says to include labor and materials. The building information section asks for square feet of living area, square feet of other area and total added square feet. Separate sections cover electrical, mechanical and HVAC, plumbing, gas, generator and solar, sign, and fire work. Office-use boxes verify that the contractor is current with Volusia County Contractor Licensing and that the property owner is listed on the Volusia County Property Appraiser.</p>

<p>The application also says a Notice of Commencement is required for any project over five thousand dollars, and for HVAC systems over fifteen thousand dollars. The city's Notice of Commencement form is given in accordance with Chapter 713, Florida Statutes. It asks for the tax parcel number, the full legal description, a general description of the improvement, owner information, the contractor, a surety (payment bond), the lender, and the persons designated to receive notices. Its expiration date is one year from recording unless a different date is specified.</p>

<p>The application carries a warning. It reads, in capitals, that failure to record a Notice of Commencement may result in the owner paying twice for improvements to the property. It also says the notice must be recorded and posted on the job site before the first inspection, and it tells an owner who intends to obtain financing to consult a lender or an attorney before recording. The Notice of Commencement form carries its own warning to the owner that payments made by the owner after the expiration of the notice are considered improper payments under Chapter 713.</p>

<p>The state statute behind the form is section 713.13(1)(a). It says an owner or the owner's authorized agent, before actually commencing to improve any real property, shall record a notice of commencement in the clerk's office and post either a certified copy or a notarized statement that the notice has been filed for recording, except for an improvement exempt under section 713.02(5). Under section 713.13(7), a lender must record the notice of commencement before disbursing any construction funds to the contractor, and posting remains the owner's obligation.</p>

<p>Once the department notifies the applicant that permits are ready to be issued, the Building page says it is the applicant's responsibility to make payment and notify the Building Department once payment has been made. The city then emails the permit and the stamped documents. The page says the applicant must print them and have them on site before the first inspection.</p>

<p>The city's Community Rating System page states the flood rules for permits. It says to always contact Community Development before you build on, alter, regrade or put fill on your property, and that a building permit is required to ensure that projects do not cause flooding problems. It says new buildings in the flood plain must be protected from flood damage and that the building codes require new buildings to sit at least one foot above the base flood elevation.</p>

<p>The same page sets a 50 percent rule. If the cost of reconstruction, rehabilitation, addition or other improvements to a building equals or exceeds 50 percent of the building's assessed tax value, the building must meet the same construction requirements as a new building. Improvements that are cumulative over ten years and exceed 50 percent of the building value must meet the new codes. The page says the assessed value of the structure, as listed by the Volusia County Property Appraiser's office, is determined before the improvement is started. It adds that the city may be able to provide a FEMA elevation certificate for structures built after 1991 and located inside special flood hazard areas. See also <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/south-daytona-flood-zones-flood-insurance-guide">South Daytona Flood Zones & Flood Insurance Guide</a>.</p>

<h2>Permit Fees and the Six City Impact Fees</h2>

<p>The city's fees sit in Chapter 21, the Consolidated Fee Schedule. Section 21-12 covers building permits and inspection fees, and the text read for this guide carries Ordinance No. 2025-15, adopted September 23, 2025. It includes a sentence that permit fees shall increase by 2 percent every October 1, starting in the year 2020.</p>

<p>The base fee runs by the valuation of the work. For a valuation of 0 to 3,000 dollars, the fee is fifty-five dollars and twenty cents. For 3,001 to 15,000 dollars, it is fifty-five dollars and twenty cents for the first 3,000 dollars plus eight dollars and sixty-six cents for each additional 1,000 dollars or fraction thereof. For 15,001 to 100,000 dollars, it is one hundred sixty-one dollars and twenty cents for the first 15,000 dollars plus seven dollars and fifty-eight cents for each additional 1,000 dollars or fraction thereof. For 100,000 to 500,000 dollars, it is six hundred fifty-six dollars and ninety-three cents for the first 100,000 dollars plus four dollars and thirty-two cents for each additional 1,000 dollars or fraction thereof. At 500,001 dollars and above, it is two thousand four hundred twenty-three dollars and forty-six cents for the first 500,000 dollars plus two dollars and sixteen cents for each additional 1,000 dollars or fraction thereof.</p>

<p>The schedule also has a double fee line and reinspection fees. Under "Double fee penalty," any person who commences work without first obtaining a proper permit is assessed a double permit fee plus one hundred eight dollars and twenty-four cents upon application for the permit. Reinspection fees must be paid before the reinspection. The first reinspection is fifty-five dollars and twenty cents. The second for the same violation is sixty-six dollars and twenty-four cents. The third or any later reinspection for the same violation is two hundred sixty-four dollars and ninety-eight cents or the amount under Florida Statute 553.80, whichever is greater.</p>

<p>The impact fees are in the same chapter. The six single-family amounts are listed below by section.</p>

<p>Section 21-13 lists the transportation impact fee for a residential single-family unit at eight hundred thirty-eight dollars per dwelling unit. It lists an apartment at five hundred eighty dollars and fifty-four cents, a residential condominium or townhouse at four hundred twenty-seven dollars and sixty cents and a mobile home within a park at two hundred ninety-five dollars and ninety-three cents. Section 18-9 says the transportation article was adopted under Florida Statutes chapter 166 and the City Charter, applies throughout the City of South Daytona, and has the purpose of ensuring that new development bears a proportionate share of the reasonably anticipated costs of new roads and road system expansion created by the new development.</p>

<p>Section 21-14 lists the water impact fee and the sewer impact fee separately. Each is seven hundred ninety-three dollars and seventy-two cents per dwelling unit for a residential single-family home. Each is also seven hundred ninety-three dollars and seventy-two cents per dwelling unit for multi-family, including condominium and townhouse. Section 20-16 defines a water and sewer impact fee as a new building's contribution toward its equitable share of the cost of capital improvements required to serve new users. Section 20-18 reserves water service impact fee proceeds for supply, transmission, storage and distribution. It reserves sewer service impact fee proceeds for interceptors, force mains, sewer mains and pump stations.</p>

<p>Section 21-15 lists the recreational impact fee at eight hundred eighty-five dollars and fifteen cents per unit for a single family residence, for multi-family residential and for mobile homes. Section 5-304 says that fee is to be paid for each residential dwelling unit to be constructed in the city after the adoption of the section, which the code calls new development.</p>

<p>Section 21-16 lists the fire impact fee at three hundred seventy-eight dollars and forty-five cents per unit for a single family residence and three hundred twenty-one dollars and thirty-three cents per unit for multi-family residential. Section 21-17 lists the police impact fee at six hundred eighty-five dollars and seventy-eight cents per unit for a single family residence and the same amount for multi-family residential. Section 21-18 lists a reclaimed water impact fee of three hundred eighty-eight dollars and eleven cents per connection.</p>

<p>Adding the six single-family amounts gives four thousand three hundred seventy-four dollars and eighty-two cents. That sum is computed for this guide and is not a figure the city publishes. The six amounts are transportation at eight hundred thirty-eight dollars, water at seven hundred ninety-three dollars and seventy-two cents, sewer at seven hundred ninety-three dollars and seventy-two cents, recreational at eight hundred eighty-five dollars and fifteen cents, fire at three hundred seventy-eight dollars and forty-five cents and police at six hundred eighty-five dollars and seventy-eight cents.</p>

<p>Sections 21-13 through 21-17 each carry an editor's note about the Consumer Price Index. The note says the fees increase annually by the CPI for the Southeast Region, that the annual increase first goes into effect on October 1, 2020, and that the fees adjust automatically on the same day each year without further action from the city council. The note adds that the annually adjusted amounts are incorporated in the schedule for the convenience of the public and ease of reference. The text read for this guide carries Ordinance No. 2025-15 as its source.</p>

<p>The code states when these fees are paid. Section 18-11(a)(1) says the person applying for the building permit shall pay the transportation impact fee before the building permit is issued. The city then issues an impact fee statement to the applicant that sets forth the amount paid. Section 20-18 says the water and sewer impact fees shall be paid before building permit issuance. Section 5-308 says the recreational fee is paid upon issuance of a building permit. Sections 8.5-41, 8.5-61 and 8.5-71 set the fire and police impact fees at payment before, or upon, issuance of the building permit. Sections 8.5-41 and 8.5-61 say the fire fee is paid directly to the city, and Section 8.5-41 says the same for the police fee. Section 8.5-41(e) adds that the payment of those fees is in addition to any other fees, charges or assessments of the city due for the issuance of a building permit.</p>

<p>The obligation runs with the land. Sections 8.5-41(b) and 18-11(a)(1) both say so. Section 18-11 adds that if the transportation fee is not paid before permit issuance, the city may collect it with interest, and that the unpaid fee remains a lien coequal with the lien of all state, district, county and municipal taxes until paid. An administrative penalty of five percent per month, to a maximum of twenty-five percent of the fees unpaid when due, applies under Section 18-11(d)(2).</p>

<p>The code also covers permits that expire. Under Section 8.5-41(c), if a building permit for an impact construction expires before completion, the applicant may apply within ninety days of the expiration for a refund of the police impact fee and the fire impact fee. Failure to apply in time waives any right to a refund. The city retains two percent of the fee to offset the cost of administering the refund. A permit later issued for the same property pays the fees again. Section 18-13(a) says that if a building permit expires and no construction has been commenced, the fee payer is entitled to a refund of the initial total transportation impact fee paid, except that the municipality may retain a portion of the fee.</p>

<p>Section 20-18 also sets a time limit on water and sewer permits. Under that section, permits issued upon payment of water impact fees, and permits for connection to the sanitary sewer system upon payment of sewer impact fees, are valid for six months. After that they become void, and the fees paid are not refunded if construction has not commenced. If construction starts within the six months, the permit remains valid only so long as construction is diligently pursued to completion. Otherwise the permit becomes void and the fee is not refunded.</p>

<p>The utility connection charges are separate lines. Section 21-21 sets the fee for connection to the city's water system, for water entering the sewer system, by meter size. A 5/8 by 3/4 inch meter is two thousand two hundred sixty-six dollars and six cents and a 1 inch meter is two thousand eight hundred seventy-one dollars and ninety-six cents, and larger meters up to 8 inches carry higher fees. For all multifamily units, including condominiums and apartments, the additional connection fee is three hundred forty-nine dollars and fifty-six cents per unit. Consumption charges in Section 21-20 also apply. Section 21-25 sets the sanitary sewer connection charge for a single family dwelling unit at five hundred forty-five dollars and thirty-one cents. It says that where a private disposal system is being used before connection to the city sewer system, the fee is one-half of the listed amount.</p>

<h2>County Impact Fees, Inspections and the Certificate of Occupancy</h2>

<p>Volusia County runs a separate impact fee program. Its page says the program exists to finance the cost of new roads, schools, parks, fire services and emergency medical services necessitated by new development activity within the county. The county lists five growth-related impact fees. They are Transportation (roads), Education (schools), Parks & Recreation, Emergency Medical Services and Fire Rescue. The program is based at 123 W. Indiana Ave., Room 200, in DeLand, with the email impactfees@volusia.gov and the phone number (386) 736-5924.</p>

<p>The county's FAQ states who owes impact fees and when they are due. An impact fee is assessed and due from anyone who builds a new residence or commercial building or changes the use of an existing building. Impact fee payments are due before the issuance of a Certificate of Occupancy. The county's fee schedules page says schedules are based on the application date of the building permit, and that the county does not accept prepayment of impact fees.</p>

<p>For a project inside a city, the county FAQ says applications can be submitted on the Connect Live web portal, by email to impactfees@volusia.gov, or in person at the DeLand office. A completed application is uploaded, and the bottom of the application must be signed by city staff before it is uploaded to Connect Live.</p>

<p>The county accepts cash, check or credit card, and applicable fees may apply for cards. Online payment runs through Connect Live, where the payer must be a registered user and must be listed as the applicant on the permit. Payment can also be made at the Volusia County Treasury and Billing office in the Historic Courthouse, 125 W. New York Ave., Room 120, in DeLand. Checks are payable to County of Volusia. The county says partial payments are not accepted, but a payment can be made for each use separately in its entirety. Its example is paying road impact fees first and school impact fees later.</p>

<p>The county's 2026 Residential Impact Fee Schedule states that fees are effective June 3, 2026. It has one column for unincorporated Volusia County and one for incorporated cities. A parcel-location table on the schedule says Lake Helen, Pierson and Oak Hill pay fees (1), (2), (3), (4) and (5), and that all city jurisdictions pay fees (1), (2), (4) and (5). In the incorporated column, the Fire and Local Park lines show a dash. The lines that carry amounts are Thoroughfare Road, Emergency Medical Services, Cultural/Rec District/Coastal Park and Schools.</p>

<p>For a single-family detached home, the incorporated column runs in five size bands. For 1,200 square feet or less, the road fee is four thousand eight hundred sixty-four dollars, EMS is fifty-seven dollars and forty-one cents, the district and coastal park fee is five hundred twenty-seven dollars, schools is seven thousand twenty-two dollars and seventy cents, and the total is twelve thousand four hundred seventy-one dollars and eleven cents. For 1,201 to 1,700 square feet, the road fee is five thousand ninety-seven dollars, EMS is sixty-five dollars and ninety-three cents, the park fee is six hundred six dollars, schools is seven thousand twenty-two dollars and seventy cents, and the total is twelve thousand seven hundred ninety-one dollars and sixty-three cents.</p>

<p>For 1,701 to 2,200 square feet, the road fee is five thousand four hundred sixty-four dollars, EMS is sixty-nine dollars and ninety-seven cents, the park fee is six hundred forty-four dollars, schools is seven thousand twenty-two dollars and seventy cents, and the total is thirteen thousand two hundred dollars and sixty-seven cents. For 2,201 to 3,000 square feet, the road fee is five thousand eight hundred thirty-five dollars, EMS is seventy-three dollars and fifty-five cents, the park fee is six hundred seventy-five dollars, schools is seven thousand twenty-two dollars and seventy cents, and the total is thirteen thousand six hundred six dollars and twenty-five cents. For a home greater than 3,000 square feet, the road fee is six thousand two hundred fifteen dollars, EMS is eighty dollars and seventy-three cents, the park fee is seven hundred forty-two dollars, schools is seven thousand twenty-two dollars and seventy cents, and the total is fourteen thousand sixty dollars and forty-three cents.</p>

<p>Section 163.31801 is titled the Florida Impact Fee Act. It lists minimums for impact fees adopted or increased after July 1, 2026. Under section 163.31801(4), a local government that adopts and collects an impact fee by ordinance must, at a minimum, base the calculation on a demonstrated-need study that is plan-based and uses the most recent and localized data available within 4 years of the current impact fee update. It must also keep a separate accounting fund, limit administrative charges for collection to actual costs, and give notice at least 90 days before the effective date of an ordinance imposing a new or increased impact fee. The statute also says collection of the impact fee may not be required to occur earlier than the date of issuance of the building permit for the property subject to the fee.</p>

<p>The city's Roof Inspection Affidavit says that beginning June 1, 2021, the required roof inspections are dry-in, roof sheathing affidavit and final inspection. It says roof inspection requests will be a dry-in and a completed roof, and that the Roof Sheathing Affidavit must be on site during inspections. The affidavit certifies the roof deck attachment and fasteners according to Section 611.7.1 of the Florida Building Code, Existing Building. Inspections are requested at (386) 322-3020, Option 1, or through the city's online permit database. The cutoff time for scheduling next-day inspections is 3:00 pm.</p>

<p>Three texts address the certificate of occupancy. The first is the city's own. Section 5-2 of the Code of Ordinances says no new building shall be occupied and no electric utilities turned on until the building is inspected and approved by the building official. It says the building official will not make a final inspection of any premises until it has received the necessary electrical, plumbing, air conditioning, heating and fire inspections and approval by the authorized city inspectors. When the final building inspection has been satisfactorily completed, the chief building official will authorize the turn on of the electric utilities and issue a certificate of occupancy for the premises.</p>

<p>The second is the definition. Section 18-6 defines a certificate of occupancy as the official document or permit issued by the city evidencing the completion of construction of a building in accordance with all applicable codes and its legal entitlement to permanent occupancy and use.</p>

<p>The third is the state timing rule. Section 553.791(16)(a) says that no more than 10 business days, or for a permit related to single-family or two-family dwellings no more than 2 business days, after receipt of a request for a certificate of occupancy and the applicant's presentation of a certificate of compliance and approval of all other government approvals required by law, including payment of all outstanding fees, the local building official shall issue the certificate or provide notice of any incomplete forms or documents. Section 553.791(1)(q) defines a request for a certificate of occupancy as a properly completed and executed application for the certificate, a certificate of compliance from the private provider required under subsection (15), any applicable fees, and any documents the local building official requires to determine that the fee owner has secured all other government approvals required by law. Under paragraph (b), if no notice of incomplete forms is provided within those time periods, the request is automatically granted and deemed issued as of the next business day. The written certificate must be provided within 10 days after it is automatically granted and issued.</p>

<p>Section 21-19 sets an interim proprietary and general services fee from issuance of the Certificate of Occupancy until January 1 at eight dollars for each 2,500 square feet or portion thereof. It says the fee is paid monthly and included with the city utility bill.</p>

<p>Section 95.11(3)(b) ties a time period to the certificate. Under that section, an action founded on the design, planning or construction of an improvement to real property runs from the earliest of the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy or a certificate of completion, or the date of abandonment of construction if not completed. When the action involves a latent defect, the time runs from when the defect is discovered or should have been discovered with due diligence. In any event, the action must be commenced within 7 years after that date. The statute says that correction or repair of completed work, whether under warranty or otherwise, does not extend the period.</p>

<p>Section 501.1375 covers the buyer's deposit in a contract with a building contractor or developer for a one-family or two-family dwelling. The contractor or developer must notify the buyer that any deposit, up to 10 percent of the purchase price, shall, unless waived in writing by the buyer, be deposited in an escrow account. The statute names a savings and loan association, bank or trust company, a Florida Bar attorney, a licensed Florida real estate broker and a title insurance company authorized in Florida as the places the escrow may be held. A building contractor or developer under the statute excludes a person who sells or constructs less than 10 units per year statewide. The statute defines default as the failure of the buyer to close after issuance of the certificate of occupancy or the failure to comply with any of the buyer's obligations under the purchase contract.</p>

<p>Section 192.042(1) sets the assessment date. It says real property is assessed on January 1 of each year, and that improvements or portions not substantially completed on January 1 shall have no value placed on them. The statute defines substantially completed to mean that the improvement, or some self-sufficient unit within it, can be used for the purpose for which it was constructed. See also <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/south-daytona-property-tax-bill-line-by-line-2026">South Daytona Property Tax Bill, Line by Line (2026)</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption: How to File and What It Saves You</a>.</p>

<p>Section 5-5 of the city code sets a time limit on permits. It says all approvals of construction applications, plans, specifications and permits are valid for a period not to exceed twelve consecutive months following the date of approval or issuance. Failure to obtain final inspection approval before the building permit expires is a violation of the city's Code of Ordinances. The property owner is cited to appear before the code enforcement board. If the board gives additional time, the city issues a building permit for that period.</p>

<h2>The Bottom Line</h2>

<p>South Daytona's code lists six single-family impact fees, transportation, water, sewer, recreational, fire and police, and sets their payment at or before the issuance of the building permit. The six amounts add up to four thousand three hundred seventy-four dollars and eighty-two cents in a sum computed for this guide. Volusia County's 2026 schedule lists its own road, EMS, park and school fees for a home in a city, and the county says those are due before the Certificate of Occupancy is issued. The city's code says a new building shall not be occupied until the building official has inspected and approved it and the chief building official has issued the certificate of occupancy. Under section 553.791(16)(a), the building official has no more than 2 business days, for a permit related to a single-family dwelling, after receipt of a request for a certificate of occupancy, as the statute defines that request, and the applicant's presentation of a certificate of compliance and approval of all other government approvals required by law, to issue the certificate or give notice of incomplete forms or documents. See also <a href="http://www.adamscameron.com/south-daytona-florida-real-estate-and-homes.html">South Daytona</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-south-daytona-fl-neighborhoods-costs-and-what-to-know">Living in South Daytona, FL: Neighborhoods, Costs and What to Know</a>.</p>

<p>Short answers to common questions, drawn from the city documents, the county pages and the statutes above.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Where do I apply for a new home permit in South Daytona?</strong></summary>
<p>The City of South Daytona's Building page says permit applications are emailed to the department, with applications and documents in separate PDF files. The Building Department is at 1672 S Ridgewood Ave, South Daytona, FL 32119. The city's Building Permit Application carries a June 2026 footer, and the Roof Inspection Affidavit lists the Building Department at 386-322-3020. The Community Development page lists 386-322-3022 and says the department receives building permit applications, assures that contractors are properly licensed and insured, reviews plans for compliance with the Florida Building Code and issues permits.</p>
</details>
<details>
<summary><strong>Which impact fees does South Daytona list for a single-family home?</strong></summary>
<p>Chapter 21 of the Code of Ordinances lists six per-unit amounts for a residential single-family home. Transportation is eight hundred thirty-eight dollars. The water impact fee is seven hundred ninety-three dollars and seventy-two cents and the sewer impact fee is seven hundred ninety-three dollars and seventy-two cents. Recreational is eight hundred eighty-five dollars and fifteen cents. Fire is three hundred seventy-eight dollars and forty-five cents and police is six hundred eighty-five dollars and seventy-eight cents. The six add up to four thousand three hundred seventy-four dollars and eighty-two cents, a sum computed for this guide that the city does not publish. Sections 21-13 through 21-17 each carry a note that the fees increase annually by the Consumer Price Index, and the text read carries Ordinance No. 2025-15.</p>
</details>
<details>
<summary><strong>When does South Daytona collect its impact fees?</strong></summary>
<p>The code ties payment to the building permit. Section 18-11(a)(1) says the person applying for the permit shall pay the transportation impact fee before the permit is issued. Section 20-18 says the water and sewer impact fees shall be paid before building permit issuance. Section 5-308 says the recreational fee is paid upon issuance of a building permit. Sections 8.5-41, 8.5-61 and 8.5-71 set the fire and police fees at payment before, or upon, issuance of the permit. Section 8.5-41(b) and Section 18-11(a)(1) both say the obligation runs with the land.</p>
</details>
<details>
<summary><strong>What does Volusia County charge in impact fees for a single-family home in a city?</strong></summary>
<p>Volusia County's 2026 Residential Impact Fee Schedule, effective June 3, 2026, has an incorporated city column with road, EMS, district and coastal park, and school lines. For a single-family detached home of 1,200 square feet or less the total is twelve thousand four hundred seventy-one dollars and eleven cents. For 1,201 to 1,700 square feet it is twelve thousand seven hundred ninety-one dollars and sixty-three cents. For 1,701 to 2,200 square feet it is thirteen thousand two hundred dollars and sixty-seven cents. For 2,201 to 3,000 square feet it is thirteen thousand six hundred six dollars and twenty-five cents. For more than 3,000 square feet it is fourteen thousand sixty dollars and forty-three cents. The county says its payments are due before the issuance of a Certificate of Occupancy.</p>
</details>
<details>
<summary><strong>Who issues the certificate of occupancy in South Daytona, and what has to happen first?</strong></summary>
<p>Section 5-2 of the Code of Ordinances says the chief building official issues the certificate of occupancy after the final building inspection has been satisfactorily completed. The building official will not make a final inspection until it has received the necessary electrical, plumbing, air conditioning, heating and fire inspections and approval by the authorized city inspectors. The section also says no new building shall be occupied and no electric utilities turned on until the building is inspected and approved by the building official.</p>
</details>
<details>
<summary><strong>How long does a South Daytona building permit last?</strong></summary>
<p>Section 5-5 of the city code says approvals of construction applications, plans, specifications and permits are valid for a period not to exceed twelve consecutive months following the date of approval or issuance. Failure to obtain final inspection approval before the permit expires is a violation of the city's Code of Ordinances, and the owner is cited to appear before the code enforcement board. Section 553.79, Florida Statutes, says a single-family dwelling permit expires 1 year after issuance or on the effective date of the next edition of the Florida Building Code, whichever is later.</p>
</details>
<details>
<summary><strong>What flood rules apply to a new building in South Daytona?</strong></summary>
<p>The city's Community Rating System page says the building codes require new buildings to sit at least one foot above the base flood elevation. The Building page says that when a property is in a FEMA-designated special flood hazard area, two copies of completed, signed and sealed elevation certificates are required as part of the submittal package. The city's Permit Exemption Policy is not available for property partly or entirely in a flood hazard area as defined by the Florida Building Code.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:24:27 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/south-daytona-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for South Daytona Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-south-daytona-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Volusia County sorts hurricane evacuations into three levels, written A, BC and DE. The county says local officials may order one of the three depending on the track and strength of a threatening hurricane. The levels correspond to the flooding that is likely to occur during a hurricane. This guide draws on the City of <a href="http://www.adamscameron.com/south-daytona-florida-real-estate-and-homes.html">South Daytona</a>'s own pages, Volusia County emergency pages, the State of Florida's Know Your Zone page and the Florida Statutes.</p>

<p>Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-south-daytona-fl-neighborhoods-costs-and-what-to-know">Living in South Daytona, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>Evacuation levels, alerts and shelters</h2>

<p>The county's evacuation plan page calls storm surge the most deadly of hurricane hazards. It describes storm surge as salt water flooding that rushes over coastal and river areas and destroys homes and businesses. The same page says surge can reach seven feet above sea level in a category 1 hurricane. It says surge can reach as much as 28 feet above sea level in a category 5 hurricane. The page adds that hurricanes are categorized on a scale of one to five depending on the strength of the winds.</p>

<p>The county page lists three groups who evacuate. The first is anyone who lives in the hurricane evacuation zone. The second is anyone who lives in a low-lying, flood prone area, including homes along river basins. The third is anyone who lives in a mobile home, substandard housing, a recreational vehicle or a campsite. The page links an interactive Evacuation Zone Map. The county states that failure to obey an evacuation order is a violation of Florida law.</p>

<p>The State of Florida's Know Your Zone page uses colored zones A to F. The state describes the colored zones as flood zones and asks residents to find whether an address is in one of them. It says Zone A is generally the most vulnerable and the most likely to be evacuated first. It also says not all evacuation zones are always ordered.</p>

<p>The state's page answers a question about staying or leaving. It says the greatest threat to life from a hurricane is storm surge flooding. It says residents in an ordered evacuation zone, a low-lying flood area or a mobile home should follow all evacuation orders. For people not in an ordered evacuation zone, a low-lying flood prone area, a mobile home or an unsafe structure, the state says it "may be safer to stay in your home." The state says it is the homeowner's responsibility to know whether the home is strong enough to withstand a hurricane. It says homes built after 2002 generally include features that make them more resilient to hurricanes.</p>

<p>The county gives a list for people who evacuate. It says to know where you are going, whether that is family, friends, a hotel or motel, or a public shelter. It says to take a map showing two routes to reach your destination, to notify family, friends and caregivers of your location, to secure your home and property, to take your emergency supplies and not to delay your evacuation.</p>

<p>The county gives a second list for people who are not required to evacuate. It says to take the necessary precautions to protect your home and property, to check your disaster supply kit, to stay in your designated safe room during the event and to stay away from windows and glass doors. It says to turn off the electricity at the main fuse or breaker box if flooding threatens. It says to run your generator outside the house and connect your appliances directly to the generator, not to the fuse box or incoming power line. The county states that back-feeding generators have killed power company line workers.</p>

<p>The county describes mobile homes and recreational vehicles separately. It says residents of these structures must evacuate for all evacuation levels regardless of where they are. It says these structures are extremely vulnerable to hurricane winds. Mobile homes have flat sides and are lightweight, so the construction does not allow the proper transfer of the wind load through the supports into the foundation and ground. The county asks mobile home residents to maintain tie-down straps and anchors, check straps for rust or corrosion and protect windows and doors.</p>

<p>Alerts come through several channels. The Volusia County Emergency Management app has a home screen with social media posts, push notifications and news blogs. It has a map with weather radar, emergency shelter information, evacuation zones and evacuation routes. It has an emergency plan feature with a checklist, emergency contacts and the ability to share location with a group of users. It can send National Weather Service alerts as push notifications, and residents can submit damage reports through it. The county also lists AlertVolusia telephone notifications. The county says that if you have a cell phone or unlisted telephone number, you are not in its database and will not receive emergency messages unless you sign up. The county lists Florida 511 for real-time traffic information.</p>

<p>Shelters work on demand. The county says Volusia County has many public shelter locations that can be opened according to each disaster. During an emergency not all shelters open at once, and they open based on demand. The county says evacuees may need to stay at a shelter for 24 to 72 hours. General population shelters do not provide cots, and the county recommends a comfortable beach chair and sleeping pad. The county says shelters are not responsible for lost or stolen items. Directions to open shelters are in the Volusia County Emergency Management app.</p>

<p>The county's shelter pages describe transportation. The Volusia County School Board and Votran provide free rides to general public shelters, with pick up at all regular Votran bus stops. The county's special needs page says all Votran bus stops are evacuation assembly points during a declared emergency evacuation order. It says bus space is limited and carry-on items are limited to a pillow, blanket and one carry-on bag no larger than 22 by 16 by 8 inches.</p>

<p>The county runs a Special Needs Shelters program. The county says physically, mentally and sensory disabled residents and those who need supplemental oxygen should register with Volusia County Emergency Management. It says the program provides assistance during evacuations. It says special needs shelters are not for isolation patients or people who need 24-hour dedicated care, a hospital bed, a ventilator or other complex care. The county says hospitals are not shelters.</p>

<h2>What the City of South Daytona publishes about storms and flooding</h2>

<p>The City's Community Rating System page names the causes of flooding in South Daytona. It says there are two sources. The first is the Halifax River, which may overflow its banks during severe storms and high tides. The second is downpours of rain. The page gives Tropical Storm Gordon in 1994 and the hurricanes in 2004 as examples. It says flood water can cover many blocks up to four or five feet deep. It says County and City-owned canals have also been prone to flooding.</p>

<p>The same page makes a statement about the City's spending and the limits of it. The City says it has spent millions of dollars on stormwater drainage improvements. The City then says flooding will always be a possibility throughout the area due to its coastal location near sea level. For more detail on flood maps and flood insurance, see <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/south-daytona-flood-zones-flood-insurance-guide">South Daytona Flood Zones and Flood Insurance Guide</a>.</p>

<p>The City explains how storm information reaches residents. The page says the City has an interlocal agreement with Volusia County and other municipalities. The agreement provides for coordination of the emergency management plans of all communities and for the prompt dissemination of information concerning storms and flooding. The page says local television and radio stations also provide information, and that their representatives are on the emergency response teams at the County Command Center during emergencies. It lists the radio stations WNDB 1150 AM, WKRO 93.1 FM, WHOG 95.7 FM, WVYB 103.3 FM and WLOV 99.5 FM. It lists the television stations WESH Channel 2, WKMG Channel 6, WFTV Channel 9, WCFN Channel 13, WOFL, WDSC Channel 15 and Univision. It also lists the National Weather Service and Volusia County Emergency Management.</p>

<p>The City's page includes its own storm guidance. Before the storm, it says that if a home is well constructed and local authorities have not called for evacuation, residents should stay home and make emergency preparation. It says anyone told to evacuate should follow all instructions from local authorities and follow safe evacuation routes to shelter. It says a personal evacuation plan should provide for pets, personal hurricane supplies and insurance papers. The supplies it lists are food, medicine, a first-aid kit, a battery-powered radio, flashlights and extra batteries. It says that when evacuating, people should take property identification and important personal papers and documents.</p>

<p>When a flood threatens, the City's page lists these actions: to sandbag to reduce erosion and scouring, to raise furniture above flood protection levels, to create floodway openings in non-habitable areas, such as garage doors, and to seal off sewer lines to the dwelling to prevent the backflow of sewer waters. The page also lists ways to protect a building, including relocation of a building, floodwalls or berms, and retrofitting. It describes retrofitting as elevation of the structure above flood protection levels, construction of barriers and dry flood proofing. The page says six inches of water can knock a person off their feet and says "Turn Around, Don't Drown!"</p>

<p>On flood insurance, the City's page says South Daytona participates in the National Flood Insurance Program. It says property losses due to flooding are not covered under most standard homeowners' insurance policies. It says there is usually a 30-day waiting period before a flood insurance policy takes effect. It says flood insurance is available to everyone, even if the property has previously been flooded. It says most regular policies do not cover contents such as furniture. For wind-related insurance, see <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a>.</p>

<p>The City's Community Rating System page describes the drainage system. It says Public Works inspects and maintains city-owned ditches and canals. Dumping in ditches or canals violates City Ordinance Section 10-9. The City says even grass clippings and branches can accumulate and block stormwater flow. It says Reed Canal allows flood waters to flow from the inner city to the Halifax River. It says stormwater retention areas draw stormwater from adjacent subdivisions and store it until it is absorbed back into the ground. It says that during major storms the City has the capability of pumping water from canals and retention areas to relieve neighborhood flooding.</p>

<p>The City Manager's stormwater update in the October to December 2026 City newsletter describes stormwater in the City. It says the home builders of the 1950s and 60s did not envision the massive rain events of 2022 and 2024. It says several neighborhoods were built without stormwater ponds. In those neighborhoods, excessive stormwater was designed to collect in the streets until nearby inlets could drain it away. The City Manager says the City is correcting these deficiencies neighborhood by neighborhood, with the goal of keeping water out of the homes in South Daytona.</p>

<p>The newsletter names four large projects funded by the Volusia County Transform 386 program, which it calls the Big 4. They are the Lantern Park Stormwater Pond, the Aspen Stormwater Pond Expansion in the Big Tree Village subdivision, the Sherwood Forest Stormwater Pond and the Stevens Canal Bank Stabilization.</p>

<p>The newsletter lists further projects. Construction has begun on the Pope Avenue Stormwater System Improvement project. The project involves two backflow preventers, pipe work and a stormwater pumping station. The newsletter says it should be completed in May 2027, ahead of next year's hurricane season, and that Volusia County's Community Development Block Grant program funds it. Other items include the Melodie Park stormwater pond, the replacement of Lift Station #5 on Violet Street, a stormwater pond design for Brian Avenue and a pump station replacement design at the Park of Honor. The newsletter also reports a legislative appropriation of 375,000 dollars to replace stormwater backflows and another 375,000 dollars to rehabilitate sewer lines.</p>

<p>The City's Stormwater System Improvements page posts dated updates. On September 15, 2026, City crews repaired a backflow preventer in Stevens Canal. The page says backflow preventers help prevent water from flowing back into the drainage system when canal water levels rise. Other posts describe cleaning and televising stormwater pipes and basins at Teague Street and Magnolia Avenue and at Jacobs Road, cleaning basins on Colfax Drive and cleaning the drainage ditch along New York Avenue. A post says the Florida Department of Transportation cleaned Nova Canal, with weekday lane closures on Nova Road from Big Tree Road to Beville Road on November 2 to 13, 2026. The page asks residents to report a damaged storm grate or blocked drain to Public Works at 386-322-3080.</p>

<p>Other City pages give further details. The Fire Department page says it serves more than 12,000 residents over just over 3.2 square miles, with one fire or rescue station and 13 full-time firefighters. It says the department currently maintains a Class 2 Insurance Services Office rating. The Water and Sewer page says a waterline on a City right-of-way, up to and including the water meter, is the City's to repair. It says a break from the hand valve on the house side of the meter to the house is the property owner's responsibility. It says a sewer backup or clog from the property line to the house is the property owner's responsibility. After hours, weekends or holidays, the page says to call Police Dispatch at 386-323-3568.</p>

<h2>Building, permits and flood rules in South Daytona</h2>

<p>The City's Building page lists what new structures and additions must submit. The list includes a roof truss layout and engineering, a typical wall section demonstrating a continuous load path, buck details and weather proofing of the openings, and a completed product approval sheet for all exterior components and cladding. The page says signed and sealed surveys are required for new or addition projects. It says that if the property is in a FEMA-designated special flood hazard area, two copies of signed and sealed elevation certificates are required.</p>

<p>The Community Development page says the department reviews plans for compliance with the Florida Building Code, issues permits, performs inspections and maintains records. The phone number is 386-322-3022. The page links the 2035 Comprehensive Plan, a zoning and future land use map, the Code of Ordinances, the Land Development Code and the Volusia County Flood Map Viewer, which contains parcels, streets and municipal boundaries with FEMA DFIRM data.</p>

<p>The City's CRS page sets rules for building in the flood plain. It says to always contact the Community Development Department before you build on, alter, regrade or put fill on your property. It says new buildings in the flood plain must be at least one foot above the base flood elevation. It says that if the cost of reconstruction, rehabilitation, addition or other improvements equals or exceeds 50% of the building's assessed tax value, the building must meet the same construction requirements as a new building. It says substantially damaged buildings must also be brought up to the same standards. It says the assessed value is the value listed by the Volusia County Property Appraiser's office, determined before the improvement is started.</p>

<p>The CRS page says the Community Development Department at City Hall, 1672 S Ridgewood Avenue, can show where a property sits on the FEMA flood maps. It says to call 386-322-3020 to obtain a flood zone determination or to have an inspector visit the property to review flooding problems. It says the City may also be able to provide a FEMA elevation certificate for structures built after 1991 and located inside special flood hazard areas.</p>

<p>A permit exemption policy took effect on July 1, 2026, under HB 803. Property owners or an owner's contractor may request an exemption from the building permit for work valued at less than seven thousand five hundred dollars on the owner's single-family dwelling. The City says the exemption is not available for work on property partially or entirely in a flood hazard area as defined by the Florida Building Code. It is not available for any electrical, plumbing, structural, mechanical or gas work. Projects may not be divided into multiple projects to qualify. The request is made in writing and includes a copy of the contract or other documentation describing the nature and value of the work.</p>

<h2>Florida law on roofs, wind discounts, grants, associations and flood disclosure</h2>

<p>Section 553.844 of the Florida Statutes covers windstorm loss mitigation. Subsection (1) says the Legislature finds that recent hurricanes demonstrated the effectiveness of the Florida Building Code in reducing property damage to buildings constructed in accordance with its requirements. It says the same hurricanes exposed a vulnerability of some construction undertaken before the Code was implemented. Subsection (2)(b) lists techniques for site-built, single-family residential structures built before the Code. They are gable-end bracing, secondary water barriers for roofs, roof-to-wall connections, strengthening or correcting roof-decking attachments and fasteners during reroofing, and adding or strengthening opening protections.</p>

<p>Subsection (3) sets rules for site-built, single-family residential structures. A roof replacement must incorporate the techniques for secondary water barriers and for roof-decking attachments and fasteners. In the wind-borne debris region, a roof replacement must also incorporate roof-to-wall connection techniques when the insured value is 300,000 dollars or more. If the building is uninsured or insured value is not documented, the just valuation for ad valorem taxation of 300,000 dollars or more applies instead. Subsection (2)(b) says roof-to-wall connections are not required unless evaluation and installation at gable ends or all corners can be completed for 15 percent of the cost of roof replacement.</p>

<p>Subsection (3)(c) covers opening protections. Any activity requiring a building permit, not including roof covering replacement or repair work associated with the prevention of degradation of the residence, applied for on or after July 1, 2008, with an estimated cost of 50,000 dollars or more, must include opening protections as required for new construction. That applies to a building in the wind-borne debris region with an insured value of 750,000 dollars or more, or, if uninsured or undocumented, a just valuation of 750,000 dollars or more. Subsection (5) says that if a roofing system built, repaired or replaced under the 2007 Florida Building Code or any later edition is 25 percent or more repaired, replaced or recovered, only the repaired, replaced or recovered portion must be built to the Code in effect.</p>

<p>Section 627.711 covers premium discounts for hurricane loss mitigation. Subsection (1) says an insurer shall clearly notify the applicant or policyholder of any personal lines residential property insurance policy, at issuance and at each renewal, of the availability and range of each premium discount, credit, other rate differential or reduction in deductibles. These apply to properties on which fixtures or construction techniques demonstrated to reduce loss in a windstorm can be or have been installed or implemented.</p>

<p>Subsection (2)(a) says the uniform mitigation verification inspection form is used by all insurers when submitted by policyholders for wind discounts. An insurer shall accept the form when it is signed by one of six types of inspector. They are a licensed home inspector with at least three hours of approved hurricane mitigation training who passed a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer, a licensed professional architect, or any other individual or entity the insurer recognizes. Subsection (3) says the person signing must inspect the structures personally and attest to that inspection. Subsection (8) says knowingly providing a false or fraudulent form to obtain a discount is a misdemeanor of the first degree.</p>

<p>Section 215.5586 establishes the My Safe Florida Home Program within the Department of Financial Services. The statute says it does not create an entitlement and that implementation is subject to annual legislative appropriations. For an inspection, the home must be a single-family unit on an individual parcel, detached or attached and not exceeding three stories. It must be site-built and owner-occupied, and the applicant must be granted a homestead exemption under chapter 196. The statute says the initial inspection includes a report on recommended improvements, a range of cost estimates and information on estimated premium discounts.</p>

<p>The same section sets grant criteria. The home must have been built before January 1, 2008, must have an insured value of 700,000 dollars or less and must have had an initial program inspection in the 24 months before the application. The statute says recommended improvements that grants may fund include exterior doors, garage doors, windows, skylights, reinforcing roof-to-wall connections, improving roof-deck attachment strength, installing secondary water resistance and replacing the roof covering. See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption: How to File and What It Saves You</a>.</p>

<p>Section 720.3035(6) covers hurricane protection in homeowners' associations. It applies to all homeowners' associations regardless of when the community was created. The board or an architectural committee must adopt hurricane protection specifications for each structure or improvement on a parcel governed by the association, and the specifications must comply with the applicable building code. Notwithstanding the governing documents, the board or committee may not deny an application for installation, enhancement or replacement of hurricane protection by a parcel owner that conforms to the specifications. It may require adherence to an existing unified building scheme regarding external appearance.</p>

<p>Section 718.113(5) covers hurricane protection in condominiums. It applies to all residential and mixed-use condominiums regardless of when created. Each board must adopt hurricane protection specifications for each building, and the specifications must comply with the applicable building code. The statute says installation, maintenance, repair, replacement and operation of hurricane protection in accordance with the subsection is not a material alteration or substantial addition to the common elements. The board may, subject to section 718.3026 and the approval of a majority of voting interests, install or require unit owners to install hurricane protection that complies with or exceeds the building code. The vote is set forth in a certificate recorded in the public records of the county.</p>

<p>The statute adds further rules. If compliant hurricane protection was previously installed, the board may not install or require the same type unless it reached the end of its useful life or is necessary to prevent damage. A vote is not required if the declaration makes installation, maintenance, repair and replacement the association's responsibility or requires unit owners to install hurricane protection. If approval is required by the documents, a board may not refuse a unit owner's installation or replacement that conforms to the board's specifications. Unless the declaration provides otherwise, a unit owner is not responsible for the cost of removal or reinstallation of hurricane protection when removal is necessary for association maintenance, and the association reimburses or credits the owner if the owner does it. See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-a-condo-in-florida-under-the-new-condo-laws-a-volusia-county-guide">Buying a Condo in Florida Under the New Condo Laws: A Volusia County Guide</a>.</p>

<p>Section 689.302 covers flood disclosure. A seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods. It states that the buyer is encouraged to discuss separate flood insurance coverage with the buyer's insurance agent. The seller checks three items. The first is knowledge of any flooding that damaged the property during the seller's ownership. The second is whether a claim was filed with an insurance provider, including the National Flood Insurance Program. The third is whether the seller received assistance for flood damage, including from the Federal Emergency Management Agency.</p>

<p>See also <a href="http://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-port-orange-home-buyers">Hurricane Readiness for Port Orange Home Buyers</a>.</p>

<p>Volusia County uses evacuation levels A, BC and DE, and the State of Florida uses zones A to F. The county says failure to obey an evacuation order is a violation of Florida law. The City of South Daytona publishes a flood warning system description, storm guidance, a building page and a flood zone determination service at 386-322-3020. The City's newsletter lists stormwater projects, with the Pope Avenue project set for completion in May 2027. Section 689.302 requires the seller's flood disclosure at or before the time the sales contract is executed. See <a href="http://www.adamscameron.com/south-daytona-florida-real-estate-and-homes.html">South Daytona</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What are the hurricane evacuation levels in Volusia County?</strong></summary>
<p>Volusia County says local officials may order one of three evacuation levels, written A, BC and DE, depending on the track and strength of a threatening hurricane. The county says the levels correspond to the flooding that is likely to occur during a hurricane. The State of Florida's Know Your Zone page uses zones A to F and says Zone A is generally the most vulnerable and the most likely to be evacuated first. The state also says not all evacuation zones are always ordered. The county states that failure to obey an evacuation order is a violation of Florida law.</p>
</details>
<details>
<summary><strong>How does Volusia County describe shelters?</strong></summary>
<p>The county says Volusia County has many public shelter locations that can be opened according to each disaster. Not all shelters open at once, and they open based on demand. Evacuees may need to stay at a shelter for 24 to 72 hours. General population shelters do not provide cots, and the county recommends a beach chair and sleeping pad. The Volusia County School Board and Votran provide free rides to general public shelters, with pick up at regular Votran bus stops. The Citizens Information Hotline is 866-345-0345 and is only activated during an emergency.</p>
</details>
<details>
<summary><strong>What does the City of South Daytona say about stormwater projects?</strong></summary>
<p>The City Manager's update in the October to December 2026 City newsletter says several neighborhoods were built without stormwater ponds. It says the City is correcting these deficiencies neighborhood by neighborhood, with the goal of keeping water out of homes. The newsletter names four large projects funded by the Volusia County Transform 386 program, called the Big 4. It says the Pope Avenue Stormwater System Improvement project should be completed in May 2027, ahead of next year's hurricane season. The newsletter is the source for those statements.</p>
</details>
<details>
<summary><strong>What does South Daytona require before building or improving in a flood plain?</strong></summary>
<p>The City's Community Rating System page says to always contact the Community Development Department before you build on, alter, regrade or put fill on your property. It says new buildings in the flood plain must be at least one foot above the base flood elevation. It says that if the cost of improvements equals or exceeds 50% of the building's assessed tax value, the building must meet the same construction requirements as a new building. The City's permit exemption policy, effective July 1, 2026, is not available for work on property partially or entirely in a flood hazard area.</p>
</details>
<details>
<summary><strong>What does Florida law say about wind discounts on home insurance?</strong></summary>
<p>Section 627.711 says an insurer shall clearly notify the applicant or policyholder of any personal lines residential property insurance policy, at issuance and at each renewal, of the availability and range of each premium discount, credit, other rate differential or reduction in deductibles for properties with fixtures or construction techniques demonstrated to reduce windstorm loss. The uniform mitigation verification inspection form is used by all insurers when submitted by policyholders for wind discounts. The form must be signed by a person who inspected the structures personally and who falls within the listed inspector types.</p>
</details>
<details>
<summary><strong>Can a homeowners' association or condominium board refuse hurricane protection?</strong></summary>
<p>Section 720.3035(6) says a homeowners' association board or architectural committee may not deny an application for installation, enhancement or replacement of hurricane protection by a parcel owner that conforms to the specifications the board adopted. Section 718.113(5) says that, if approval is required by the documents, a condominium board may not refuse a unit owner's installation or replacement that conforms to the board's specifications. Both statutes require the board to adopt hurricane protection specifications that comply with the applicable building code.</p>
</details>
<details>
<summary><strong>What must a seller disclose about flooding?</strong></summary>
<p>Section 689.302 of the Florida Statutes requires the seller to complete and provide a flood disclosure at or before the time the sales contract is executed. The seller checks whether the seller has knowledge of any flooding that damaged the property during the seller's ownership, whether a flood claim was filed with an insurance provider, including the National Flood Insurance Program, and whether the seller received assistance for flood damage, including from the Federal Emergency Management Agency. The form also states that homeowners' insurance policies do not include coverage for damage resulting from floods.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:24:10 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-south-daytona-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[South Daytona Septic vs Sewer: What Buyers Check]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/south-daytona-septic-vs-sewer-what-buyers-check]]>
        </link>
        <description>
            <![CDATA[<p>The South Daytona code requires an owner to hook up to the city sanitary sewer, or pay a monthly sewer availability charge while continuing to use a private sewage disposal system, when city sewer is available within 100 feet of the residence. The code belongs to the City of <a href="http://www.adamscameron.com/south-daytona-florida-real-estate-and-homes.html">South Daytona</a>. The rule sits in Chapter 20 of the city Code of Ordinances, titled Water and Sewer Service. Chapter 8 of the same code also refers to septic tanks. Florida Statutes sections 381.0065, 381.00655 and 403.067 add state rules for septic systems and sewer connections. The city's Water and Sewer page and Utility Billing page are also cited below.</p>

<h2>What the South Daytona code says about sewer and septic</h2>

<p>Chapter 20 of the South Daytona Code of Ordinances is titled Water and Sewer Service. Article III covers water. Article IV covers sewers and runs from Section 20-52 to Section 20-60. Article V covers water and sewer billing. Article VI covers the extension of the water and sewer system. A footnote to Article IV lists three cross references. They are outhouses prohibited in Section 8-6, sanitary sewer system in subdivisions in Section 15-40, and rates outside of city limits in Section 20-39.</p>

<p>The Municode page for the code says it is the Code of Ordinances for the City of South Daytona, Florida, codified through Ordinance No. 2026-02, adopted March 10, 2026, in Supplement No. 85. The page says its online content was updated on May 22, 2026. It also says the code "may not reflect the most current legislation adopted by the Municipality."</p>

<p>Section 20-53 is titled Connection required for new construction. It applies to the owner, tenant or occupant of each lot or parcel within the city that abuts a street or other public way containing a sanitary sewer served or which may be served by the city sewer system. It also applies if sanitary sewer service is available within 100 feet of any part of the lot. It covers a lot on which a building shall be constructed for residence, commercial or industrial use. That person shall, at the owner's expense, connect the building with the sanitary sewer within 30 days after the construction of the building and before occupancy.</p>

<p>Section 20-58 is titled Connection after sewer becomes available. Paragraph (a) covers any owner, tenant or occupant of a lot or parcel in the city on which a building has been erected and which has city sanitary sewer available. For a nonresidential property, the sewer must be within 100 feet of any part of the property. For a residential property, it must be within 100 feet of the residence. That person is required to either hook up to the city sanitary sewer system or pay a monthly sewer availability charge if the person continues to use the private sewage disposal system.</p>

<p>Paragraph (b) of Section 20-58 sets the timing. Hookup to the sanitary sewer system is required upon failure of the private sewage disposal system and within 180 days after written notice by the city. A monthly sewer availability charge is paid by any owner, tenant or occupant continuing to use a private sewage system. The code calculates that charge at the minimum billing less the wholesale cost to the city of the 1,000 treated gallons included in the minimum bill.</p>

<p>Paragraph (c) of Section 20-58 covers failure to connect. Failure to hook up after the due notice constitutes a misdemeanor and is punishable as provided by the provisions of the Code. The section history lists Ordinance No. 86-22, Ordinance No. 87-8, adopted April 28, 1987, and Ordinance No. 96-04, adopted March 26, 1996.</p>

<p>Section 20-59 is titled Innovative sewer systems. It says nothing in the article precludes the city from using experimental sewage systems, such as the system commonly known as the "septic tank effluent pumping system."</p>

<p>Chapter 8 of the code includes Section 8-1, which adopts the rules promulgated by the Florida State Department of Health and Rehabilitative Services under Chapter 381, Florida Statutes, known as "The Sanitary Code of Florida," as the sanitary code of the city. Section 8-3 lists conditions that constitute prima facie evidence of maintaining a nuisance injurious to health and a violation of the Code. Paragraph (b) of that list reads "Improperly built or maintained septic tanks, water closets." Section 8-4 makes it unlawful for any person, organization or corporation to commit, create, keep, maintain or permit to be kept any sanitary nuisance or any nuisance injurious to health within the city.</p>

<p>Section 8-6 is titled Outhouses prohibited. It reads "No outhouse toilets shall be hereafter built or constructed in the city." Section 8-7 says the provisions of the chapter are enforced by any police officer of the city or by any state or county health officer, his agents and deputies.</p>

<p>Article III of Chapter 20 has two sections on wells and water connections. Section 20-38 is titled Connections to wells. It makes it unlawful for any person to connect to, or use the water from, any well in the plumbing of any house or building except where a city water connection is not available. It also allows well water for an air conditioning or cooling system, and in commercial businesses where the well is not connected into pipes of the city water supply. Section 20-41 covers connection after water service becomes available. It applies to an owner of a lot that abuts a street or other public right-of-way or easement containing water service, where water service is available within 100 feet of any part of the lot and a structure has been constructed for residential, commercial or industrial purposes. That owner is required to hook up to the city water system at the owner's expense within 180 days after written notice by the city. Failure to connect constitutes a second degree misdemeanor, subject to the penalties in section 1-9 of the city Code.</p>

<h2>Sewer lines, charges and who repairs what</h2>

<p>The city's Water and Sewer page says the Utilities Division maintains approximately 40 miles of water distribution lines and 35 miles of sewer lines. It says "The City purchases its water from and transfers its sewage to the City of Daytona Beach." The page says the Public Works Department currently maintains 22 pump or lift stations throughout the city. Wastewater is collected from residences in gravity mains. Those gravity mains connect to various pump or lift stations that transport the sewage to the City of Daytona Beach for treatment. The page says each lift station has an alarm system that warns when the station is being overloaded.</p>

<p>Section 20-74 sets who repairs a sewer line. It is titled Waterline breaks, sewer line breaks or clogs, responsibility for repair. Paragraph (3) says all sewer lines located on any public right-of-way or easement, when the sewer line has been dedicated to the city, are the sole responsibility of the city. That covers the line up to and including the sewer laterals and cleanout, if any, located at the property line. The city repairs those at the city's expense. Paragraph (4) says any sewer line break or clog from the property line to the service address is the responsibility of the property owner.</p>

<p>Paragraph (5) of Section 20-74 covers a service call. If the city is called and the break or clog is determined to be on the property owner's side, the property owner is billed as outlined in Chapter 21 of the city code for a service call. The city does not repair the break or clog and notifies the owner. The city's Water and Sewer page also describes this. It says sewer lines on any public right-of-way, up to and including the sewer laterals and clean-outs located on the property line, are the responsibility of the city for repair. It says any sewer line backup or clog from the property line to the house is the responsibility of the property owner. It says "The City cannot repair a break or clog if it is on the homeowner's side." It also says the city will not reimburse costs if a person calls a plumber or other repair service and it is later determined to be on the city's side.</p>

<p>The Water and Sewer page lists the Public Works Department as open Monday through Friday, 8 am to 4:30 pm, at 386-322-3080. It says that after normal business hours, on weekends or on holidays, residents may call Police Dispatch to report the problem. Dispatch contacts the Public Works on-call employee.</p>

<p>The city's Utility Billing page says the Utility Billing Department mails monthly statements for water, sewer, garbage and stormwater services. It says "Sewer charges are billed in equivalent to water consumption." Under Section 20-52(a), the sewer rate, fee and charge is paid by the owner, tenant or occupant of each lot or parcel connected with the sewer system. It is based or computed upon the quantity of water used on or about the lot or parcel, as determined by the water meter reading. Under Section 20-70, as cited on the Utility Billing page, utility bills are due 20 days after the bill date. The page lists Customer Service at 386-322-3002.</p>

<p>Section 20-52(b) says the base rate for consumptive charges for the city sewer system within the city limits is established and amended by resolution adopted by the city council. The minimum monthly service charge is the service delivery charge plus the consumption charge for the first 1,000 gallons times the number of units.</p>

<p>Section 20-52(c) describes a pass-through charge. An increase or decrease in the charges for the consumption of sewer within the city's service area passes through to customers on a cent-for-cent basis equal to the adjustment charged to the city by the City of Daytona Beach. The code ties this to the contract providing for water and sewer treatment service between the City of Daytona Beach and the City of South Daytona, executed June 1, 1994, as amended. The pass-through is identified separately on each customer's bill. It adjusts annually on June 1.</p>

<p>Section 20-52(d) authorizes an annual adjustment to the availability charge and the sewer delivery charge equal to the Consumer Price Index as determined by the U.S. Department of Labor Statistics for the Southeast Region for All Consumer Goods. It uses the 12 months ending on August 31 before the effective date. The annual increase first goes into effect on October 1, 2025. It adjusts automatically on the same day in future years.</p>

<p>Section 20-52(e) covers rental and lease property with city sewer service. If the city has had problems with delinquent accounts or nonpayment, the city may require the owner of the property to pay the monthly utility bill. If service is discontinued to a property for any reason, service is not restored until all delinquent and current charges are paid, except as required by Florida Statutes section 180.135.</p>

<p>Connection charges have their own sections. Section 20-54 says connection charges for connections to the city sanitary sewer system are as outlined in Chapter 21 of the city code. Section 20-56 says all connection charges under the article are paid at the time of, and as a condition precedent to, connection to the sanitary sewer system. Section 20-57 says permits issued for sanitary sewer service connections are valid for six months after issuance. A permit expires at the end of the sixth month unless the work authorized has been commenced within that period. The community development director is directed to cancel permits when work is not diligently continued after commencement. Fees which have been paid are not refunded when a permit becomes invalid or is canceled. Section 20-55 sets a sewer tap fee of ninety-one dollars for developers of subdivisions who install the utilities at their own expense. It applies only to such developers and not to their grantees or assigns.</p>

<p>Section 20-60 covers pretreatment. It adopts by reference Section 7.2(P) of the City of Daytona Beach Land Development Code, under the Wholesale Water, Wastewater, and Refuse Water Services Agreement with the City of Daytona Beach. The same section says the introduction of industrial waste into the City of South Daytona sanitary sewer system is prohibited.</p>

<p>The Utility Billing page also describes a lien search. It says a lien search may be ordered through an online portal. The page says the search "includes open permits, code enforcement cases, and outstanding utility balances." It says the request "does not include recorded liens." It says liens against the property are recorded with the Volusia County Clerk of Court.</p>

<h2>Extending the sewer system under Article VI</h2>

<p>Article VI of Chapter 20 is titled Extension of Water and Sewer System. Section 20-84 says the article establishes procedures to facilitate the orderly expansion of the city's water and sewer systems. It also provides alternatives for funding the expansion by those benefiting. Section 20-85 says a city water or sewer extension project may be constructed by the city or by one or more property owners.</p>

<p>Section 20-86 covers who pays when the city builds. The city may construct an extension at the sole expense of one or more property owners, or in whole or in part at city expense. If the project is at the sole expense of owners, the city manager prepares or approves a plan with an estimated cost. Before any expenses are incurred, the owners agreeing to bear the expense pay the total estimated cost to the city. They also agree in writing to pay on demand any additional expenses actually incurred. The funds go into a special extension project trust account. After completion, any remaining funds are refunded to the contributing owners in proportion to their contribution. If the city manager determines a project is to be built in whole or in part at city expense, the city manager submits a description, estimated cost and feasibility analysis to the council for approval.</p>

<p>Section 20-87 covers a project built by property owners. The city manager may authorize an extension to be constructed by one or more benefitting property owners. The owner applies in writing with a detailed scope, a feasibility analysis, an estimate of projected operation and maintenance cost, and projected revenue. The owner also files detailed plans and specifications. The city manager has 30 days from the filing of the detailed plans and specifications to approve or deny. That period may be extended by mutual written agreement. The city manager may deny an application if the project fails to comply with a requirement of the Code or authorized city regulations, or if the project will result in an economic operating loss to the city. A property owner may appeal a denial to the council.</p>

<p>Section 20-88 says a sewer extension to any area not served, and not to be concurrently served, by the city's water system may be initiated only after approval by the council.</p>

<p>Section 20-89(a) says plans and specifications for sewer, water or drainage extension projects comply with established city standards and carry the seal of a registered professional engineer. For a project not designed and constructed by the city, the owner files as-built plans and an affidavit of periodic and final inspections by a registered professional engineer. The owner also obtains final project approval from the city manager. Section 20-90 says an owner constructing an extension provides a performance bond of not less than 100 percent of the estimated cost. The owner also agrees to maintain and rectify defects in the facilities for one year, running from the date the facilities are completely installed and accepted by the city, accompanied by a bond.</p>

<p>Section 20-92 covers the building sewer. Every building sewer or water line installed in connection with an extension project under the article terminates at the owner's property line. The property owner installs it and connects it to the building plumbing at his expense. Section 20-93 says actual interconnection of an extension with the existing city system is prevented until the extension project has been fully inspected and approved and all other conditions for extension of service have been met. Section 20-95 says the portions of an extension project located in or on a public right-of-way, city-owned property or a public easement become property of the city upon installation.</p>

<h2>What Florida law adds on top of the city code</h2>

<p>Florida Statutes section 381.0065 governs onsite sewage treatment and disposal systems, which the Florida Department of Environmental Protection calls OSTDS and commonly refers to as septic systems. Paragraph (1)(b) states the Legislature's intent. Where a publicly owned or investor-owned sewerage system is not available, the department issues permits for construction, installation, modification, abandonment or repair of onsite systems under the conditions in the section and its rules. The Legislature also intends that the installation and use of onsite systems not adversely affect public health or significantly degrade groundwater or surface water.</p>

<p>The word "available" has a state definition. Section 381.0065(2)(a) says a publicly owned or investor-owned sewerage system is available when it is capable of being connected to the plumbing of an establishment or residence, is not under a Department of Environmental Protection moratorium, and has adequate permitted capacity to accept the sewage to be generated. For a residential subdivision lot, a single-family residence or an establishment with an estimated sewage flow of 1,000 gallons per day or less, the definition also requires that a gravity sewer line to maintain gravity flow from the property's drain to the sewer line exists in a public easement or right-of-way that abuts the property line. A low pressure or vacuum sewage collection line qualifies in those areas approved for low pressure or vacuum collection. For an establishment with an estimated flow exceeding 1,000 gallons per day, a sewer line, force main or lift station exists in a public easement or right-of-way that abuts the property or is within 50 feet of the property line.</p>

<p>Section 381.00655 covers connection to a sewerage system. Paragraph (1)(a) says the owner of a properly functioning onsite system, excluding an approved onsite graywater system, must connect to an available publicly owned or investor-owned sewerage system within 365 days after written notification by the owner of the sewerage system that it is available for connection. The sewerage system must notify the onsite system owner of the availability. At least one year before the date the system becomes available, it notifies the affected owner of the anticipated availability and that the owner will be required to connect within one year of actual availability. The owner has the option of prepaying the amortized value of required connection charges in equal monthly installments over a period not to exceed two years from the date of the initial notification of anticipated availability.</p>

<p>Paragraph (1)(b) covers a system that needs repair. The owner of an onsite system that needs repair or modification to function in a sanitary manner, or to comply with the state septic sections or rules, must connect to an available sewerage system within 90 days after written notification from the department. In hardship cases, on request of the owner, the department may approve an extension of not more than 90 days. The department may approve only one extension.</p>

<p>Paragraph (2)(a) says the local governing body may provide that a connection fee charged by an investor-owned sewerage system may be paid without interest in monthly installments over a period not to exceed five years from the date the system becomes available, if it determines the owner has demonstrated a financial hardship. The criteria take into account net worth, income and financial needs. Paragraph (2)(b) says a publicly owned or investor-owned sewerage system may, with the approval of the department, waive the requirement of mandatory onsite sewage disposal connection if it determines the connection is not required in the public interest due to public health considerations. Paragraph (3) encourages local governmental agencies that receive grants or loans from the department to offset the cost of connecting onsite systems to sewerage systems to notify eligible owners of the funding while funds remain available. It also encourages them to maintain a publicly available website about the funds and how an owner may apply.</p>

<p>Section 403.067(7)(a)10. applies inside a basin management action plan area, a reasonable assurance plan or a pollution reduction plan. It says the installation of new onsite systems in such an area is prohibited where connection to a publicly owned or investor-owned sewerage system is available as defined in section 381.0065(2)(a). On lots of one acre or less in such an area where a sewerage system is not available, installation of enhanced nutrient-reducing systems, or other systems that achieve at least 65 percent nitrogen reduction, is required. Section 381.0065(2)(f) defines an enhanced nutrient-reducing system as one approved by the department as capable of meeting or exceeding a 50 percent total nitrogen reduction before disposal of wastewater in the drainfield, or at least 65 percent total nitrogen reduction combined from the tank or tanks and drainfield.</p>

<p>Section 381.0065(4) is the permit rule. A person may not construct, repair, modify, abandon or operate an onsite system without first obtaining a permit approved by the department. A construction permit is valid for 18 months after issuance and may be extended by the department for one 90-day period under department rules. A repair permit is valid for 90 days after issuance. An operating permit must be obtained before the use of any aerobic treatment unit or if the establishment generates commercial waste. The operating permit for an aerobic treatment unit is valid for two years and must be renewed every two years.</p>

<p>The same subsection covers building permits and occupancy. A municipality or political subdivision may not issue a building or plumbing permit for any building that requires the use of an onsite system unless the owner or builder has received a construction permit for the system from the department. A building or structure may not be occupied, and no municipality, political subdivision or state or federal agency may authorize occupancy, until the department approves the final installation of the system. A municipality or political subdivision may not approve any change in occupancy or tenancy of a building that uses an onsite system until the department has reviewed the use of the system with the proposed change, approved the change, and amended the operating permit.</p>

<p>Paragraphs (4)(a) and (4)(b) set lot rules for subdivisions and lots that use onsite systems. Under paragraph (a), lots with a minimum area of at least one-half acre, and a minimum dimension or mean of at least 100 feet on the street side, may be developed with a regulated water system and onsite systems. The projected daily sewage flow may not exceed an average of 1,500 gallons per acre per day. Satisfactory drinking water must be obtainable, and all distance and setback, soil condition, water table elevation and related requirements must be met. Under paragraph (b), subdivisions and lots using a public water system may use onsite systems with no more than four lots per acre. The projected daily sewage flow may not exceed an average of 2,500 gallons per acre per day. Paragraph (d) says paragraphs (a) and (b) do not apply to any proposed residential subdivision with more than 50 lots, or to any proposed commercial subdivision with more than five lots, where a publicly owned or investor-owned sewage treatment system is available.</p>

<h2>Sales, remodeling and inspections of septic systems</h2>

<p>Section 381.0065(4)(v) addresses a real estate transaction. It says any permit issued and approved by the department for the installation, modification or repair of an onsite system shall transfer with the title to the property in a real estate transaction. A title may not be encumbered at the time of transfer by new permit requirements by a governmental entity for an onsite system which differ from the permitting requirements in effect at the time the system was permitted, modified or repaired. The paragraph says "An inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction." It also says the paragraph does not affect a septic tank phase-out deferral program implemented by a consolidated government as defined in section 9, Article VIII of the State Constitution of 1885.</p>

<p>The permit itself can also be transferred between persons. If all information pertaining to the siting, location and installation conditions or repair of an onsite system remains the same, a construction or repair permit may be transferred to another person. The transferee files, within 60 days after the transfer of ownership, an amended application providing all corrected information and proof of ownership of the property. The statute says a fee is not associated with the processing of this supplemental information.</p>

<p>Section 381.0065(4)(z) addresses remodeling. An existing-system inspection or evaluation and assessment, or a modification, replacement or upgrade of an onsite system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition or modification may not cover any part of the existing system or encroach upon a required setback or the unobstructed area. The local health department reviews and verifies a floor plan and site plan submitted by a remodeler that shows the location of the system. The statute says a verification of the location of a system is not an inspection or evaluation and assessment of the system. The review and verification must be completed within seven business days after the local health department receives the floor plan and site plan. If it is not completed in that time, the addition or modification is, for the purposes of the paragraph, approved.</p>

<p>Section 381.0065(8) covers private provider inspections. Paragraph (a) says that notwithstanding any other law, ordinance or policy, the owner of an onsite system, or a contractor upon the owner's written authorization, may hire a private provider to perform an inspection that follows applicable regulatory requirements. Paragraph (b) says an inspection required under the section may not be conducted by the private provider, or the authorized representative of the private provider, that installed the system.</p>

<p>Section 381.0065(5)(a) covers entry. Department personnel who have reason to believe noncompliance exists may at any reasonable time enter the premises permitted under sections 381.0065 through 381.0066. The statute says "premises" does not include a residence or private building. To gain entry to a residence or private building, the department must obtain permission from the owner or occupant or secure an inspection warrant from a court of competent jurisdiction.</p>

<h2>Who permits septic systems in Florida counties</h2>

<p>The Department of Environmental Protection's Onsite Sewage Program page says septic systems are used for wastewater disposal by approximately 30% of Florida's population. It estimates 2.6 million systems in operation. It says "Permitting and inspection of OSTDS is handled by the Environmental Health section of the Florida Department of Health in each county." It also says that effective July 1, 2021, the department is responsible for implementing the Florida Statutes and regulations applicable to onsite systems. Under Florida's Clean Waterways Act of 2020, the page says the county health department offices continue to do the permitting and inspection for septic tanks.</p>

<p>City Hall is at 1672 S Ridgewood Avenue, South Daytona, and its telephone number is 386-322-3000. Utility Billing lists its hours as 8:00am to 4:30pm.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-south-daytona-fl-neighborhoods-costs-and-what-to-know">Living in South Daytona, FL: Neighborhoods, Costs and What to Know</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/south-daytona-flood-zones-flood-insurance-guide">South Daytona Flood Zones & Flood Insurance Guide</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/south-daytona-property-tax-bill-line-by-line-2026">South Daytona Property Tax Bill, Line by Line (2026)</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/11/17/daytona-beach-septic-vs-sewer-what-buyers-check">Daytona Beach Septic vs Sewer: What Buyers Check</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-septic-vs-sewer-what-buyers-must-check">Deltona Septic vs Sewer: What Buyers Must Check</a></p>

<h2>The bottom line</h2>

<p>Section 20-58 of the South Daytona code sets the sewer rule for an existing building. City sanitary sewer within 100 feet of the residence means a hookup, or a monthly sewer availability charge for an owner who continues to use a private sewage disposal system. Hookup is required upon failure of the private system and within 180 days after written notice by the city. State law adds a 365-day connection rule after written notification that a sewerage system is available, and a 90-day rule for a system that needs repair. State law also says a septic permit transfers with the title and that an inspection may not be mandated by a governmental entity at the point of sale. These rules appear in the code of <a href="http://www.adamscameron.com/south-daytona-florida-real-estate-and-homes.html">South Daytona</a> and in Florida Statutes.</p>

<p>The city repairs the sewer line up to and including the lateral and cleanout at the property line. The owner is responsible from the property line to the house. The city transfers its sewage to the City of Daytona Beach, and sewer charges are billed in equivalent to water consumption.</p>

<h2>Frequently Asked Questions</h2>

<p>The answers below come from the code and statute sections described above.</p>

<details>
<summary><strong>What does the South Daytona code say about connecting to city sewer?</strong></summary>
<p>Section 20-58 of the South Daytona code covers a lot with a building on it and city sanitary sewer available within 100 feet. For a residential property the 100 feet is measured to the residence, and for a nonresidential property to any part of the property. The owner, tenant or occupant must either hook up or pay a monthly sewer availability charge while continuing to use a private sewage disposal system. Hookup is required upon failure of the private system and within 180 days after written notice by the city. Failure to hook up after due notice is a misdemeanor.</p>
</details>

<details>
<summary><strong>Does the monthly sewer availability charge apply if a septic system still works?</strong></summary>
<p>Section 20-58(a) says an owner, tenant or occupant with city sewer available within 100 feet must either hook up or pay a monthly sewer availability charge if the person continues to use the private sewage disposal system. Section 20-58(b) says the charge is calculated at the minimum billing less the wholesale cost to the city of the 1,000 treated gallons included in the minimum bill. Section 20-52(d) says the availability charge adjusts each year by the Consumer Price Index, starting October 1, 2025.</p>
</details>

<details>
<summary><strong>Who repairs a sewer line break or clog in South Daytona?</strong></summary>
<p>Section 20-74 says the city repairs sewer lines on a public right-of-way or dedicated easement, up to and including the sewer laterals and cleanout located at the property line. A sewer line break or clog from the property line to the service address is the property owner's responsibility. If the city is called and the problem is on the owner's side, the owner is billed for a service call under Chapter 21 and the city does not repair it. The city's Water and Sewer page lists Public Works at 386-322-3080.</p>
</details>

<details>
<summary><strong>Does a septic permit stay with a house when it sells?</strong></summary>
<p>Section 381.0065(4)(v) says any permit issued and approved by the department for the installation, modification or repair of an onsite system transfers with the title to the property in a real estate transaction. A title may not be encumbered at the time of transfer by new permit requirements that differ from the requirements in effect when the system was permitted, modified or repaired. The paragraph also says an inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction.</p>
</details>

<details>
<summary><strong>What deadline does state law set for connecting to sewer?</strong></summary>
<p>Section 381.00655(1)(a) says the owner of a properly functioning onsite system must connect to an available sewerage system within 365 days after written notification by the sewerage system owner that it is available. Section 381.00655(1)(b) says the owner of a system that needs repair or modification to function in a sanitary manner must connect to an available sewerage system within 90 days after written notification from the department. The department may approve one extension of not more than 90 days in hardship cases. The South Daytona code separately uses 180 days after written notice by the city.</p>
</details>

<details>
<summary><strong>Can a septic home be remodeled without inspecting the system?</strong></summary>
<p>Section 381.0065(4)(z) says an existing-system inspection or evaluation and assessment, or a modification, replacement or upgrade of the system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition or modification may not cover any part of the existing system or encroach upon a required setback or the unobstructed area. The local health department reviews a floor plan and site plan and must complete the review within seven business days after receiving them.</p>
</details>

<details>
<summary><strong>Who permits a septic system in a Florida county?</strong></summary>
<p>The Department of Environmental Protection's Onsite Sewage Program page says permitting and inspection of septic systems is handled by the Environmental Health section of the Florida Department of Health in each county. The page says that effective July 1, 2021, the department is responsible for implementing the Florida Statutes and regulations applicable to these systems. Under Florida's Clean Waterways Act of 2020, the county health department offices continue to do the permitting and inspection for septic tanks.</p>
</details>

<details>
<summary><strong>Does a lien search show utility balances on a South Daytona property?</strong></summary>
<p>The city's Utility Billing page says a lien search ordered through the online portal includes open permits, code enforcement cases and outstanding utility balances. The page says the request does not include recorded liens. It says liens against the property are recorded with the Volusia County Clerk of Court.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:23:53 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/south-daytona-septic-vs-sewer-what-buyers-check]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for Edgewater Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-edgewater-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Volusia County sorts hurricane evacuations into three levels, written A, BC and DE. The county says local officials may order one of the three levels depending on the track and strength of a threatening hurricane. The levels correspond to the flooding that is likely to occur during a hurricane. The State of Florida uses colored zones lettered A to F. The City of Edgewater's flood pages, its permit and drainage pages and three Florida statutes add local and state rules for <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater homes for sale</a>. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-edgewater-fl-neighborhoods-costs-and-what-to-know">Living in Edgewater, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>Evacuation levels, zones and shelters</h2>

<p>The county's evacuation plan page opens with three statements. It says to evacuate if you live in the hurricane evacuation zone. It says to evacuate if you live in a low-lying, flood prone area, and it adds that this includes homes along river basins. It says to evacuate if you live in a mobile home, substandard housing, a recreational vehicle or a campsite. The page links an interactive Evacuation Zone Map.</p>

<p>The same page calls storm surge the most deadly of hurricane hazards. It describes storm surge as salt water flooding that rushes over coastal and river areas near where the eye of the hurricane strikes, destroying homes and businesses. It says hurricanes are categorized on a scale of one to five depending on the strength of the winds. It says storm surge can reach seven feet above sea level in a category 1 hurricane and as much as 28 feet above sea level in a category 5 hurricane. The City's Know Your Flood Hazard page states that the highest percentage of all tropical cyclone deaths are due to flooding. It says storm surge and large waves produced by hurricanes pose the greatest threat to life and property along the coast.</p>

<p>The state's Know Your Zone page asks residents to know whether they live in an evacuation zone, a low-lying flood prone area, a mobile home or an unsafe structure. It says these areas and buildings are most likely to be evacuated. The lookup asks you to type in your address, and the page describes the colored evacuation zones as flood zones. The state says evacuation zones are designated from A to F and that, generally, Zone A is the most vulnerable and the most likely to be evacuated first. It also says not all evacuation zones are always ordered. If an evacuation order is not issued for an area and the house is not in an evacuation zone, the state says a resident may consider sheltering in place.</p>

<p>The county page states that failure to obey an evacuation order is a violation of Florida law. It states that people who live in a mobile home or recreational vehicle must evacuate for all evacuation levels regardless of where they are. It explains that mobile homes have flat sides and are lightweight. It says this type of construction does not allow the proper transfer of the wind load through the supports into the foundation and ground. It asks that tie-down straps and anchors be maintained regularly and that straps be checked for rust or corrosion.</p>

<p>The state's frequently asked questions add three points. The first is that the greatest threat to life from a hurricane is storm surge flooding. The second is that it is the responsibility of the homeowner to know if the home is strong enough to withstand a hurricane. The state adds that, generally, homes built after 2002 include features that make them more resilient to hurricanes. The third is that the most important precaution to reduce damage to a home and property is to protect the areas where wind can enter. The state says to strengthen the exterior so that wind and debris do not tear large openings in it.</p>

<p>Bridges are covered on the county page. When an evacuation is ordered, the east-bound lanes of bridges close to traffic. The west-bound lanes remain open until sustained winds exceed 39 miles per hour. At that point all lanes close.</p>

<p>For people who evacuate, the county page lists several steps. They are to know where you are going, whether that is family, friends, a hotel or motel, or a public shelter. They are to take a map showing two routes to reach the destination. They are to notify family, friends and caregivers of your location. They are to secure the home and property, take emergency supplies and not delay the evacuation. For people staying home, the page lists these steps. They are to take precautions to protect the home and property and to check the disaster supply kit. They are to stay in the designated safe room during the event and to stay away from windows and glass doors. They are to turn off the electricity at the main fuse or breaker box if flooding threatens.</p>

<p>The county page includes a generator warning. It says to run a generator outside the house and connect appliances directly to the generator. It says not to connect the generator directly to the fuse box or incoming power line. The page states that back-feeding generators have killed power company line workers. The City's Protect Yourself From the Hazard page lists using a generator outside among its after-flood steps.</p>

<p>Shelters are covered on a separate county page. Volusia County has many public shelter locations that can be opened according to each particular disaster or emergency. During an emergency, not all shelters open at once. Shelters open based on demand. The county lists the Volusia County emergency preparedness app, www.volusia.org/PIN and Emergency Management on Facebook and Twitter as ways to stay informed about openings. It lists a toll-free Citizens Information Hotline at 866-345-0345 and states that the hotline is only activated during an emergency. The county's Flood Information brochure lists Volusia County Emergency Management at 386-254-1500.</p>

<p>The shelter page says evacuees may need to stay at a shelter for 24 to 72 hours. It says space is limited, so only essential items are advised. General population shelters do not provide cots. The page recommends a beach chair and a sleeping pad. Its list of items includes special dietary food, snacks, water, bedding, ear plugs, extra clothing, medications and medical supplies, toiletries, a flashlight and batteries, and something to pass the time. For people with only minutes to pack, the page lists prescription medications, eyeglasses and dentures.</p>

<h2>Flood zones, elevation and flood insurance in Edgewater</h2>

<p>The City's Floodplain Management page says that under the National Flood Insurance Program, FEMA provides Flood Insurance Rate Maps, called FIRMs, that are used to determine areas that are more prone to flooding. The maps identify special flood hazard areas, which have a 1% or greater risk of flooding in any given year. They also identify low to moderate risks. The City's page says that flood risks vary from property to property even in the same neighborhood. It directs readers to FEMA's Map Service Center at msc.fema.gov to search an address. It also lists a Flood Information Line, 386-424-2400 extension 1502, answered Monday through Friday from 8:00 a.m. to 4:30 p.m.</p>

<p>The county's flood page states that every property in Volusia County is located within a flood zone designated by FEMA, and the county has no authority in assigning the zones. The county says flooding can happen anywhere, regardless of zone. It says flood risk also depends on the elevation of the home against the base flood elevation and on ground saturation. It states that 25% of flood claims come from outside high-risk flood zones. The City's Insure Your Property page says that from 2014 to 2018, policyholders outside the special flood hazard areas filed over 40% of all National Flood Insurance Program flood insurance claims.</p>

<p>The City's Know Your Flood Hazard page says Edgewater has several types of flood zones within city limits. A property's zone can be found on the City map, at FEMA's map service center, or by contacting the Building Department. The page says a FIRMette is a full-scale section of a FIRM that you create yourself and format to fit standard printer paper. Full FIRM panels measure 36 by 25.875 inches. The page links a tutorial.</p>

<p>The same page describes zone types. Zone X (shaded) is an area of moderate flood hazard, usually between the limits of the 100-year and 500-year floods. Zone X (unshaded) is an area of minimal flood hazard. Zone A carries a 1% annual chance of flooding and a 26% chance of flooding over the life of a 30-year mortgage, with no base flood elevations shown. Zone AE is the base floodplain with base flood elevations provided. Zones V and VE are coastal areas with a 1% or greater chance of flooding plus additional hazards from storm waves. The City states that in communities that participate in the National Flood Insurance Program, mandatory flood insurance purchase requirements apply to the high-risk zones.</p>

<p>The page also names three flood hazards found in Edgewater. Localized flooding can happen in or outside of special flood hazard areas. The City lists factors that may influence it, namely low-lying areas, severe amounts of rainfall over a short period, poor drainage and drain blockage of retention and detention areas. River flooding occurs when river levels rise and overflow their banks. The City says heavy rainfall, high tide, hurricanes and tropical storms, or a combination, can cause it. It says areas of land along the Indian River Lagoon are more susceptible to this hazard. The third hazard is storm surge and coastal inundation from tropical and non-tropical systems. The City says storm surges undermine building foundations by constant agitation of the water piled high by the tropical cyclone.</p>

<p>Elevation records have their own page. Edgewater retains elevation certificates for finished construction on buildings built partially or wholly within a special flood hazard area, for the life of the building. The City posts a list, and the file name on the page reads list_of_elevation_certs_mar2022. Copies come from the Building Department at 386-424-2400 extension 1515 or at buildingdept@cityofedgewater.org. The City describes the Elevation Certificate as a National Flood Insurance Program tool. It is used to show compliance with community floodplain management ordinances, to determine the proper insurance premium rate, and to support a Letter of Map Amendment or a Letter of Map Revision based on fill. The City says the certificate is required to rate Post-FIRM buildings in the listed A and V zones. It says the certificate is not required for Pre-FIRM buildings unless the building is rated under the optional Post-FIRM rules.</p>

<p>The City's Insure Your Property page states that most standard homeowner's insurance policies do not cover damage caused by flooding. It states that a property in a special flood hazard area with a federally backed mortgage is required by law to have flood insurance. It states that flood insurance policies typically take 30 days to go into effect. Its coverage table lists building coverage of two hundred fifty thousand dollars and contents coverage of one hundred thousand dollars for a single-family home. The page also describes the Community Rating System. It says the City entered the program in October of 1990 and currently has a Class 7 rating. It says this class achieves a 15% reduction in the cost of flood insurance for policyholders in special flood hazard areas and 5% for all other policyholders.</p>

<p>On construction, the City's Protect Your Property from the Hazard page says the best way to protect a building is to locate it outside a special flood hazard area. It says the second best option is to raise a structure, including its appliances and utilities, higher than the base flood elevation. The page states that the current building code requires residential properties in special flood hazard areas to be raised 1 foot above an established base flood elevation. It calls that a minimum and says raising it higher may be allowable. It says elevation may be required for properties that have had substantial damage or substantial improvements. Its list of protective measures includes covering windows with plywood or approved shutter systems during high speed wind events and raising or floodproofing utilities at least 1 foot above the base flood elevation. The list also names flood vents, sealing cracks and gaps, sloping the yard away from buildings, keeping gutters clean, sandbags at entrances, and photos or a video walk-through of belongings. The page says the measures need to be tailored to each property and names an insurance agent, architect, engineer and contractor as professionals to consult.</p>

<p>The City's Land Development Code, in the version the City posts as updated July 2026, carries the flood ordinance in Section 21-42. It adopts by reference the Flood Insurance Study for Volusia County dated September 29, 2017, with its amendments, and the FIRMs. It says the studies and maps are on file at Development Services, 104 North Riverside Drive. It says no structure or land may be located, extended, converted or structurally altered within an identified special flood hazard area without compliance. The ordinance adds that no grandfathering provisions are allowed for lots of record, platted subdivisions, etc. It also says that where field surveyed topography prepared by a Florida licensed professional surveyor, or digital topography accepted by the community, indicates ground elevations below the closest applicable base flood elevation, even in an area not mapped as a special flood hazard area, the area is considered a flood hazard area. The ordinance's warning states that the degree of flood protection it requires is the minimum reasonable for regulatory purposes and that larger floods can and will occur.</p>

<p>The code defines two terms that carry a 50 percent threshold. Substantial damage is damage of any origin where the cost of restoring the building to its before-damaged condition would equal or exceed 50 percent of its market value before the damage occurred. Substantial improvement is any repair, reconstruction, rehabilitation, addition or other improvement whose cost equals or exceeds 50 percent of the market value before the work starts. The code adds that if a structure has incurred substantial damage, any repairs are considered substantial improvement regardless of the actual repair work performed.</p>

<p>The ordinance also sets rules for certain structures in flood hazard areas. Accessory structures may sit below the elevations the Florida Building Code requires if they are used only for parking or storage, are one story and not larger than 600 square feet, and have flood openings. They must be anchored against flotation, collapse and lateral movement. They must use flood damage-resistant materials below the base flood elevation plus 1 foot, and their mechanical, plumbing and electrical systems must sit at or above that same level. Manufactured homes in flood hazard areas are installed by a licensed installer and are not permitted as new installations in floodways. They go on permanent, reinforced foundations. The code says their anchoring is in addition to applicable state and local anchoring requirements for wind resistance. Above-ground tanks must sit at or above the design flood elevation on a supporting structure. The code also requires compensatory storage for fill placed in a special flood hazard area below the base flood elevation, measured cup for cup at each 1-foot contour interval.</p>

<h2>Permits, drainage and Florida roof, wind-discount and disclosure law</h2>

<p>Edgewater enforces the 8th Edition (2023) Florida Building Codes and the 2020 edition of the National Electric Code. City staff perform plan reviews, give code interpretations, issue permits and perform inspections for work that includes single-family residences, additions, alterations, repairs, pools, screen enclosures, doors and windows, fences, sheds and re-roofs. The City posts separate permit forms for a generator, for a re-roof by a contractor, for a re-roof by an owner, for window, door, truss and shutter change-outs, and for tree removal. The window and door form lists the permit types Windows and Doors, and the classes of work Single Story Structure, Two Story or More, and Mobile Home. The generator, re-roof and window forms state that for direct contracts of five thousand dollars or greater a current certified copy of the recorded Notice of Commencement must be submitted. With a permit number, a user can schedule, reschedule or cancel an inspection online at any hour. The phone number is 386-427-3279, option 2, and a live representative answers Monday to Friday from 8:00 a.m. to 4:30 p.m., excluding legal holidays.</p>

<p>The City's Right of Way, Stormwater and Fill Application states that the first one-half inch of runoff from the entire site must be maintained on lots smaller than 10,890 square feet. It states that one inch of runoff must be retained on larger lots. Retention areas have a maximum depth of six inches and side slopes of 6:1 or flatter, and they are sodded. Rain gutter downspouts discharge to a retention area. The form says properties in areas of the City with a designated storm water system, and it names the Florida Shores areas as an example, must grade the property toward the City right-of-way where possible. It also says no storm water shall run off to adjacent property owners.</p>

<p>The City's Stormwater page describes the system the Stormwater Division maintains. It lists more than 4000 acres of drainage basin area, approximately 1,000 catch basins and control structures, 170 wet and dry retention ponds, 14.6 miles of pipe, 25 miles of major canals and 130 miles of secondary swales. The page says the division approves and inspects stormwater permits. It says the division is on standby during any hurricane or natural disaster and is on call all year round for any emergency. The page places the division in the Environmental Services Department.</p>

<p>Two City news posts from fall 2026 describe drainage and wastewater work. The post dated September 28, 2026 says Public Works and Utilities is installing approximately 700 feet of 8-inch pipe that will provide a direct pumping route from Duck Lake to the 18th Street Canal. It says pumping previously required moving water west into a smaller canal. It says the pipe does not create a traditional outfall. The post dated October 2, 2026 says staff were inspecting manholes and addressing inflow and infiltration, which occurs when groundwater or rainwater enters the wastewater system through cracks, joints or other openings. It says crews repair sections by installing a liner inside existing pipes. It says inflow and infiltration is particularly important during periods of heavy rainfall.</p>

<p>A 2021 progress report on the City's floodplain management plan states that Edgewater adopted the plan through Resolution 2015-R-24 on July 20, 2015. It lists the goal of preventing new development in the floodplain from increasing runoff and reports it as achieved through the floodplain development ordinance, the building permitting process and storm water management plans. It reports that newsletters are mailed annually to all residences in the floodplain areas. It lists completed projects at Lamont and Hubbell Street, Thomas Street, and Monson and Riverview Drive. It lists the Hart Avenue project as awarded HMGP funds and DEO Grant funds, with design completed. It lists the G-2 and G-11 canal project, from 10th Street to Shangri-La Canal, as awarded HMGP funds and a DEO-CDBG-MIT grant, with conceptual design plans complete. The report is dated 2021.</p>

<p>Section 553.844 of the Florida Statutes says that for site-built, single-family residential structures a roof replacement must incorporate secondary water barriers and the strengthening or correcting of roof-decking attachments and fasteners. For a building in the wind-borne debris region as defined in s. 1609.2 of the International Building Code (2006) with an insured value of three hundred thousand dollars or more, or the same just valuation if uninsured or without documentation of insured value, a roof replacement must also incorporate roof-to-wall connection techniques. The same section says the cost of such retrofits is intended not to exceed approximately 15 percent of the cost of reroofing. It says roof-to-wall connections are not required unless evaluation and installation can be completed for 15 percent of the cost of roof replacement. It states that if a roof built, repaired or replaced under the 2007 Florida Building Code or later is 25 percent or more repaired, replaced or recovered, only that portion must meet the code in effect. It also says that permit-required work applied for on or after July 1, 2008, with an estimated cost of fifty thousand dollars or more, must include opening protections as required for new construction in the wind-borne debris region where the insured value, or the just valuation if uninsured, is seven hundred fifty thousand dollars or more, not counting roof covering replacement or repair.</p>

<p>Section 627.711 covers wind discounts. It says an insurer must clearly notify the applicant or policyholder of a personal lines residential property insurance policy, at issuance and at each renewal, of the availability and range of each premium discount, credit, other rate differential or reduction in deductibles for fixtures or construction techniques demonstrated to reduce windstorm loss. It sets a uniform mitigation verification inspection form that all insurers use when policyholders submit it for wind discounts. An insurer accepts a form signed by a licensed home inspector with at least 3 hours of approved hurricane mitigation training and a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer, or a licensed professional architect. The insurer also accepts a form from another individual or entity the insurer recognizes. The statute says the person signing must inspect the structures personally.</p>

<p>Section 689.302 covers the seller's flood disclosure. A seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods. It says the buyer is encouraged to discuss separate flood insurance with the buyer's insurance agent. The seller then marks whether the seller has knowledge of flooding that damaged the property during the seller's ownership. The seller marks whether the seller filed a flood damage claim, including a claim with the National Flood Insurance Program. The seller marks whether the seller received assistance for flood damage, including from FEMA.</p>

<p>For related Edgewater topics, see <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-flood-zones-and-flood-insurance-check-an-address">Edgewater Flood Zones and Flood Insurance: Check an Address</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-canal-and-river-lots-permits-utilities-flood">Edgewater Canal and River Lots: Permits, Utilities, Flood</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/28/edgewater-new-construction-permits-impact-fees-and-the-certificate-of-occupancy">Edgewater New Construction: Permits, Impact Fees and the Certificate of Occupancy</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-edgewater-fl-utilities-trash-and-permits">Moving to Edgewater, FL: Utilities, Trash and Permits</a>.</p>

<p>Volusia County names three evacuation levels, A, BC and DE, and the state uses zones A to F. The state's lookup asks for an address. The City's Flood Information Line is 386-424-2400 extension 1502, and FEMA's Map Service Center at msc.fema.gov shows a property's flood zone. Section 689.302 requires the seller's flood disclosure at or before the time the sales contract is executed. See <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater</a>.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What are the Volusia County hurricane evacuation levels?</strong></summary>
<p>The county's evacuation plan page says local officials may order one of three evacuation levels, A, BC or DE, depending on the track and strength of a threatening hurricane. These are called Hurricane Evacuation Categories, and they correspond to the flooding that is likely to occur during a hurricane. The page says to evacuate if you live in the hurricane evacuation zone, in a low-lying, flood prone area including homes along river basins, or in a mobile home, substandard housing, recreational vehicle or campsite. It also states that failure to obey an evacuation order is a violation of Florida law.</p>
</details>
<details>
<summary><strong>How does the State of Florida number its evacuation zones?</strong></summary>
<p>The state's Know Your Zone page says evacuation zones are designated from A to F. It says that, generally, Zone A is the most vulnerable and the most likely to be evacuated first. It says not all evacuation zones are always ordered. If an evacuation order is not issued for an area and the house is not in an evacuation zone, the state says a resident may consider sheltering in place. The lookup asks you to type in your address, and the page describes the colored evacuation zones as flood zones.</p>
</details>
<details>
<summary><strong>Where does the City of Edgewater say a property's flood zone can be found?</strong></summary>
<p>The City's Know Your Flood Hazard page says a property's flood zone can be found by searching the City map, by using FEMA's map service center, or by contacting the Building Department. The City's Floodplain Management page asks readers to search an address at msc.fema.gov or call the Flood Information Line at 386-424-2400 extension 1502, Monday through Friday from 8:00 a.m. to 4:30 p.m. The City also says flood risks vary from property to property even in the same neighborhood.</p>
</details>
<details>
<summary><strong>What does the City of Edgewater say about flood insurance and the Community Rating System?</strong></summary>
<p>The City's Insure Your Property page says most standard homeowner's insurance policies do not cover damage caused by flooding. It says a property in a special flood hazard area with a federally backed mortgage is required by law to have flood insurance, and that flood insurance policies typically take 30 days to go into effect. The page says the City entered the Community Rating System in October of 1990 and currently has a Class 7 rating. It says that class achieves a 15% reduction in the cost of flood insurance for policyholders in special flood hazard areas and 5% for all other policyholders.</p>
</details>
<details>
<summary><strong>What does Edgewater's Land Development Code say about substantial damage and substantial improvement?</strong></summary>
<p>The code defines substantial damage as damage of any origin where the cost of restoring the building to its before-damaged condition would equal or exceed 50 percent of its market value before the damage occurred. It defines substantial improvement as any repair, reconstruction, rehabilitation, addition or other improvement whose cost equals or exceeds 50 percent of the market value before the work starts. The code adds that if a structure has incurred substantial damage, any repairs are considered substantial improvement regardless of the actual repair work performed.</p>
</details>
<details>
<summary><strong>What flood disclosure does Florida require a seller to give a buyer?</strong></summary>
<p>Section 689.302 of the Florida Statutes says a seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods. The seller marks whether the seller has knowledge of flooding that damaged the property during the seller's ownership. The seller also marks whether the seller filed a flood damage claim, including with the National Flood Insurance Program, and whether the seller received assistance for flood damage, including from FEMA.</p>
</details>
<details>
<summary><strong>Which permit forms does the City of Edgewater post for generators, re-roofs and windows?</strong></summary>
<p>The City posts a Generator Permit, a Re-Roof Contractor Permit, a Re-Roof Owner Permit and a Window, Door, Truss and Shutters Change Out form. The window and door form lists the permit types Windows and Doors. The generator, re-roof and window forms state that for direct contracts of five thousand dollars or greater a current certified copy of the recorded Notice of Commencement must be submitted. With a permit number, inspections can be scheduled online at any hour. The phone number is 386-427-3279, option 2.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:23:35 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-edgewater-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Edgewater Septic vs Sewer: What a Buyer Checks]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/edgewater-septic-vs-sewer-what-a-buyer-checks]]>
        </link>
        <description>
            <![CDATA[<p>The Edgewater Code of Ordinances says a septic tank may be used only on a property designated for single-family residential use whose boundaries are located more than 200 feet from the sewer line. That rule is Section 10-90, and it applies in <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater</a>. The same section says properties with more than two residential dwellings or any non-residential use shall connect to city sewer regardless of the 200-foot rule. The sources are the city's Code of Ordinances on Municode, the Land Development Code PDFs on the city website, the city's posted fee resolution, Florida Statutes sections 381.0065 and 381.00655, the Florida Department of Environmental Protection and the Florida Department of Health in Volusia County.</p>

<h2>What the Edgewater code says about sewer and septic</h2>

<p>Chapter 10 of the Code of Ordinances is titled Health, Sanitation, Property Maintenance and Code Enforcement. Article V of that chapter is titled Sewage Disposal. Section 10-90 is titled Sanitary disposal methods, required generally. It says every residence and building in which human beings reside, are employed or congregate shall be required to have a sanitary method of disposing of human excrement. The section names two methods. One is a sanitary water closet that is connected with the city sewer. The other is a connection to an approved type of septic tank.</p>

<p>The next two sentences of Section 10-90 say a septic tank may be used only on properties designated for single-family residential use, and those property boundaries must be located more than 200 feet from the sewer line. Properties with more than two residential dwellings or any non-residential use shall connect to city sewer regardless of the 200-foot rule. The section history lists Ordinance No. 2014-O-10, adopted June 2, 2014.</p>

<p>Section 10-91 is titled Same, rented premises. It says it is unlawful for any person owning or leasing any premises in the city to permit the disposal of any human excrement on any property, leased or rented by that person or the person's agent, except in a sanitary water closet.</p>

<p>Chapter 19 of the Code of Ordinances is titled Utilities and Services. Article III of Chapter 19 covers wastewater and runs from Section 19-30 through Section 19-39. Section 19-32 is titled Owners, occupants of property abutting wastewater system required to connect. Its first sentence says the owners or occupants of lots or parcels abutting on a wastewater main, or which can use the services and facilities of the wastewater system of the city, are required to connect with and use the services and facilities of that system.</p>

<p>Section 19-32 then sets the timing. The connection shall be made prior to the certificate of occupancy being issued. The connection shall be made by the owners or occupants of all lots or parcels which are located within 100 feet of such wastewater mains. If the unit was already occupied when service was made available, the connections shall be made within 90 days of the date of notification from the city that service is available.</p>

<p>The section adds three more statements. Where extensions to the wastewater system are needed, the owner shall be responsible for all engineering, permitting and construction costs. No person shall be required to cross private property of another to make the connection. The owner shall be liable for all impact fees, connection fees and deposits required. The history line lists Ordinance No. 2012-O-05, adopted June 4, 2012.</p>

<p>The code contains a 200-foot figure in Section 10-90 and a 100-foot figure in Section 19-32. Section 10-90 states the 200-foot figure in its sentence on septic tanks. Section 19-32 states the 100-foot figure in its sentence on which lots must connect. Each section carries its own wording, and this guide reports each as written.</p>

<p>Article VIII of Chapter 19 is titled Greater Edgewater Water, Wastewater and Reclaimed Water Service Area. Section 19-101 creates, under Florida Statutes section 180.02, an area defined as the City of Edgewater, Wastewater and Reclaimed Water Service Area, for the purpose of delivering water, wastewater and reclaimed water services. Section 19-102 says the service area includes the property in Volusia County attached as Exhibit A, which is on file in the office of the city clerk. Section 19-105 says the legal description by metes and bounds is on file with the city clerk and available for inspection and copying.</p>

<p>Section 19-103 says the Greater Edgewater service area shall not extend for more than five miles from the corporate limits of the city. Section 19-104 says none of the service area includes any area within the city limits of any other incorporated municipality.</p>

<p>Section 19-107 is titled Water and wastewater availability. Paragraph (a) says that, to the full extent permitted by law, all buildings and structures located or constructed on property in the service area and adjacent to a public right-of-way or easement that has a water main or gravity sanitary wastewater located in it are required to connect with and use the city water and wastewater systems. The paragraph makes exceptions for paragraphs (b) and (c).</p>

<p>Paragraph (b) defines adjacent. A water main or gravity sanitary wastewater is considered adjacent or available to a property when it is located anywhere in a public right-of-way or easement adjoining the property. It is not considered available in a state road right-of-way unless it is located on the same side of the paved roadway as the property to be served. When the main is available, the property is billed a water service availability charge and/or a wastewater service availability charge as set by resolution of the city council. That service availability charge is credited toward the development fee at the time the building is connected.</p>

<p>Paragraph (c) is about wells and covers water, not wastewater. If a water main is adjacent or available and a building is connected to an individual well, the building is required to connect to the city water system when the well system fails, becomes contaminated or experiences a dry well condition, or when a permit is requested from the Volusia County Health Department or other appropriate authority for a replacement well. The connection is made no later than 90 days from the date of notification.</p>

<p>Section 19-9 covers requests for service beyond the limits of the present systems. It says the city determines whether to provide service based on economic, public health and system integrity considerations. If the application is determined to be economically unfeasible, service may still be provided if the persons requesting it pay all costs. The city council has the power to authorize extensions on whatever terms it determines. The section also says the policy of the city may be to limit expansion or extension of the utility systems it owns.</p>

<p>Section 8-19.2 of Chapter 8 contains a septic reference that applies only after a housing emergency is declared. For temporary housing units on single-family or two-family parcels, it says water and wastewater service must be properly connected to a functioning water service and sanitary sewer system or septic system in accordance with codes in effect at the time. If connection to a functioning service is not feasible, other water and wastewater services may be used subject to Volusia County Health Department approval.</p>

<h2>Connections, fees and billing in the city code</h2>

<p>Section 19-33 is titled Unauthorized connections prohibited. Paragraph (a) says it is unlawful for any person to tap, cut or in any way use any line, branch or part of the municipal wastewater collection and wastewater treatment facilities without a written permit issued by the city and without payment of all fees required by the city for the use of those facilities.</p>

<p>Paragraph (b) says a separate and independent building wastewater connection shall be provided for every building. It makes one exception. Where one building stands at the rear of another on an interior lot and no private wastewater line is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway, the front building connection may be extended to the rear building and the whole considered one building wastewater connection. For that case the paragraph says the city does not and will not assume any obligation or responsibility for damage caused by or resulting from the single connection.</p>

<p>Paragraph (c) says old building wastewater laterals may be used in connection with new buildings only when they are found to meet all requirements of the section and city standards. It says any tests required to ensure compliance are at the owner's expense.</p>

<p>Section 19-34 covers wastewater impact fees and the connection charge. Impact fees are established by resolution of the city council and are based on a new user's contribution toward its equitable share of the cost of capital improvements required to serve new users. Wastewater connection charges are required for each wastewater connection, based on fees established by resolution. If a lateral service needs to be installed, the property owner is billed by the city for the actual cost of labor and materials to install the lateral. Charges outside the city equal the corresponding inside-city charge plus a surcharge allowed by state statutes and set by resolution.</p>

<p>The fee resolution posted on the city's Building Permit Fees page is Resolution 2026-R-24, with Exhibit A. The posted copy shows a blank adoption date and shows some figures struck and replaced. This guide uses only figures that appear once. In the Chapter 19 schedule, the resolution lists a wastewater connection charge of one hundred seventy-five dollars. Its Section 21-327 on sewer capital charges sets, from February 3, 2021, a charge of three thousand forty-two dollars per equivalent residential unit under Ordinance No. 2019-O-25.</p>

<p>The same Section 21-327 says those who have previously prepaid the existing sewer capacity charges are exempt from paying the sewer capital charge, and it names the Florida Shores assessment area in parentheses as the example. It also says properties in the southern end of the utility service area that will be connected to the sewer system of Volusia County shall be charged the prevailing impact fees of Volusia County.</p>

<p>The resolution defines an equivalent residential unit this way: one ERU is equal to 204 gallons per day of water and 204 gallons per day of sewer service. The Land Development Code gives the same definition in Article II. Code Section 19-31 says each single-family residence served by the city through a single wastewater service and/or water meter shall be one equivalent residential unit. Section 19-31(e) covers changes. If a building permit is issued for an existing connection which will increase wastewater demand, or if a building changes from residential to nonresidential occupancy, the net change in gallons generated is computed by subtracting the old gallons generated from the total gallons generated in the entire facility, and the fee is assessed on the number of new gallons generated.</p>

<p>The resolution's plumbing permit schedule says that before a permit is issued for any plumbing, sewer or drainage work or installation for which a permit is required, the listed fee shall be paid. The minimum plumbing permit fee is fifty dollars. The plumbing fee as part of a new residential building permit is ninety-five dollars per dwelling unit. All other plumbing permits, such as additions and alterations, are fifty dollars base fee plus seven dollars per fixture.</p>

<p>Section 19-35 covers wastewater utility service fees. The fees become effective upon construction of all connections to the wastewater system serving the lot or parcel, or upon the availability of the wastewater system to serve the lot or parcel. For new construction, the fees accrue upon issuance of the certificate of occupancy. Section 19-35(b) says the established fees apply irrespective of whether the customer is using the service. Section 19-36 says wastewater service charges are based on water consumption as determined by the monthly water meter readings, and that wastewater rates are as established by resolution of the city council. Section 19-5 says no water, wastewater, reclaimed water, stormwater or solid waste service is furnished free of charge, and that a minimum bill is rendered whether service is used or not.</p>

<p>The resolution's Section 19-2 schedule repeats the minimum bill point. It says there is a minimum monthly base charge for water, sewer, reclaimed water if available, solid waste and stormwater whether the residence or building is occupied or vacant, based on services available at that location. It also lists a reserved capacity charge per ERU per month for sewer for a property not connected within twelve months of readiness to serve. The posted copy shows two figures for that line.</p>

<p>For residential deposits, the resolution says deposits for water and for sewer are based on credit score as verified by the On-Line Utility Exchange. The green light deposit is zero dollars for each of water and sewer, the yellow light deposit is fifty dollars for each, and the red light deposit is one hundred dollars for each. The resolution also says that if the deed or final settlement statement is provided by the seller of the property, the buyer will be charged the maximum deposit and service charge.</p>

<p>Code Section 19-2(a) puts responsibility on the owner. The owner of each property receiving utility services is responsible for all fees, rates or charges relating to utilities and services for the property, regardless of whether the residence or building is occupied by the owner and regardless of the date or means by which the owner came into ownership, unless the city has contracted with the owner's tenant at the owner's request.</p>

<p>Section 19-3 covers unpaid fees. The city may place liens on properties for all unpaid utility bills, including consumption, when the account is in the owner's name and/or the property is occupied by the owner. Such liens are superior to the interest of any owner, lessee, tenant, mortgagee or other person except the lien of state, county and municipal taxes, and are on a parity with those tax liens. If a fee is in default for 30 days or more, the unpaid balance, accrued interest, attorneys' fees and costs may be recovered and the lien may be foreclosed in the manner provided by state law for the foreclosure of mortgages on real property. Section 19-6(b) says customers who have an outstanding bill at one location shall not be served utilities at a new location until all charges and fees on the previous account are paid.</p>

<p>Section 19-6(c) applies where the city has opted to use the non-ad valorem assessment method of collection for stormwater. Before the building department issues a certificate of occupancy on a residential dwelling or commercial structure, the builder or owner pays the annual solid waste and stormwater assessment. The assessment is prorated for the month the certificate of occupancy is applied for and covers the remainder of the fiscal year, which runs October 1 through September 30.</p>

<p>Section 19-8 is titled Maintenance of plumbing system. The tenant or property owner, as agreed in the lease, maintains and repairs the water, wastewater and reclaimed service from the privately owned plumbing system to the city distribution lines. In the absence of a lease provision, the owner is responsible. For a wastewater line obstruction, the section lists grease, toys and diapers as examples, and says the tenant or owner hires a private plumbing contractor at their sole cost. Failure to keep the wastewater pipe, which is the pipe leading from the plumbing system to the city main, cleaned and maintained gives the city the right to discontinue potable water service until the pipe is cleaned and maintained properly.</p>

<p>Section 19-37 prohibits making or maintaining any connection with any public or private wastewater line whereby a suffocating corrosive, inflammable or explosive liquid gas, vapor, substance or material may be conveyed into it. Section 19-38(a) says no person shall do any act which may impair or obstruct the flow to any public or private wastewater line or clog up any appurtenance, or place in it any substance, solid or liquid, other than the waste products for which wastewater lines are provided. Section 19-39 says a violation of Sections 19-30 through 19-38 is a misdemeanor punished by a fine approved by resolution of the city council, and that each day a violation continues is a separate offense.</p>

<h2>What the Land Development Code says about utilities, wells and floods</h2>

<p>The city's Land Development Code is posted as PDFs on cityofedgewater.org. The city's Land Development Code page lists the full code as updated July 2026. The code's cover says Revised and Amended July 2026. Article V of the code is titled Site Design Criteria, and Section 21-51 in that article is titled Utilities.</p>

<p>Section 21-51.02 sets the general requirements. Paragraph b says all new development shall connect to the City's water and sewer system. It adds that temporary package plants may be permitted if City-owned water and sewer collection and distribution system improvements are planned. Paragraph c says all new development shall be required to connect to the reclaimed water system, if available, and that drylines may be required for future reclaimed water system service. Paragraph f says all development shall pay the adopted City and County impact and development fees. Paragraph j says all utility lines, including wastewater, potable water and reclaim water, in new residential developments shall be installed underground.</p>

<p>Article XI of the code is the Concurrency Management System. Section 21-134.01 covers sanitary sewer, solid waste, drainage and potable water facilities. It says the standard is met if a development order is issued subject to the condition that, at the time of the certificate of occupancy or its functional equivalent, the necessary facilities and services are in place and available. It also names two other routes. One is an enforceable development agreement under Chapter 163 of the Florida Statutes. The other is an agreement or development order issued under Chapter 380 of the Florida Statutes. Section 21-136.04 says the demand for sanitary sewer shall be 95 gallons per capita per day.</p>

<p>Article XIII covers subdivisions. Its preliminary plat requirements include the proposed sewer collection system, with its general location, elevation, size, lift station location and connection to the existing City system. The construction plan requirements include a Sanitary Sewer Plan showing location, elevations, size, lift station locations, service laterals and specifications.</p>

<p>Article XVII covers development and impact fees. Section 21-327.01 states the intent of the sewer capital charges. The intent is to compensate the city for costs incurred in providing sewage treatment facilities, effluent disposal facilities and pumping stations and extending sewage collection lines to a point of reasonable availability for connection to the City sewer system. The section says that nothing in it shall be construed to obligate the City to extend sewer services to any lands within its sewer system territory. It sets the allocation of the charge at 60 percent for the treatment capacity charge and 40 percent for the collection capacity charge. Section 21-327.02 says the city maintains copies of the extension policy for inspection by any property owner, developer, builder or prospective consumer desiring information on all elements of the cost of connecting to the sewer facilities, and that it maintains as-built information on its sewer facilities for providing reasonable information on their location.</p>

<p>Article IV of the code contains Section 21-43, titled Wellfield Protection. Section 21-43.02 establishes primary and secondary potable water wellfield protection zones. The primary zone is a 500-foot radius from the well and the secondary zone is a 1,000-foot radius. The section says a permit is required for any development or occupational use within the wellfield protection zone. Section 21-43.04 is titled Wellfield Protection Zone Standards, and item e.4 says septic disposal systems are prohibited in both protection zones. The city's Public Works page says the city's water source is ground water from fourteen wells drawing from the Floridan Aquifer.</p>

<p>Article IV also contains the flood damage prevention rules in Section 21-42. Under the permits provision of Section 21-42.02, floodplain development permits and building permits include a condition that all other applicable state or federal permits be obtained before commencement of the permitted development. The list includes the Florida Department of Health for onsite sewage treatment and disposal systems under Florida Statutes section 381.0065 and Chapter 64E-6 of the Florida Administrative Code.</p>

<p>Section 21-42.04 covers flood resistant development. Its provision on sanitary sewage facilities says all new and replacement sanitary sewage facilities, private sewage treatment plants including all pumping stations and collector systems, and on-site waste disposal systems shall be designed in accordance with the standards for onsite sewage treatment and disposal systems in Chapter 64E-6 of the Florida Administrative Code and ASCE 24 Chapter 7. The stated purpose is to minimize or eliminate infiltration of floodwaters into the facilities, discharge from the facilities into flood waters, and impairment of the facilities and systems.</p>

<h2>What Florida law adds on top of the city code</h2>

<p>Section 381.0065 of the 2025 Florida Statutes is titled Onsite sewage treatment and disposal systems, regulation. Its legislative intent says that where a publicly owned or investor-owned sewerage system is not available, the department shall issue permits for the construction, installation, modification, abandonment or repair of onsite sewage treatment and disposal systems. In that section, the department is the Department of Environmental Protection.</p>

<p>The statute defines the word available. A sewerage system is available when it is capable of being connected to the plumbing of an establishment or residence, is not under a Department of Environmental Protection moratorium, and has adequate permitted capacity to accept the sewage to be generated by the establishment or residence. The statute then adds a location test. For a residential subdivision lot, a single-family residence or an establishment with an estimated sewage flow of 1,000 gallons per day or less, a gravity sewer line, or a low pressure or vacuum sewage collection line in areas approved for it, must exist in a public easement or right-of-way that abuts the property line. For an establishment with an estimated sewage flow exceeding 1,000 gallons per day, a sewer line, force main or lift station must exist in a public easement or right-of-way that abuts the property or is within 50 feet of the property line as accessed via existing rights-of-way or easements.</p>

<p>The city code and the statute each state their own test. Edgewater Section 19-107(b) treats a main as adjacent or available when it is located anywhere in a public right-of-way or easement adjoining the property. Section 10-90 uses a 200-foot figure for septic use. Section 19-32 uses a 100-foot figure for connection. Section 381.0065 uses the abutting test and the capacity and moratorium conditions described above.</p>

<p>Section 381.00655 is titled Connection of existing onsite sewage treatment and disposal systems to central sewerage system, requirements. Paragraph (1)(a) says the owner of a properly functioning onsite sewage treatment and disposal system, excluding an approved onsite graywater system, must connect the system or the building's plumbing to an available publicly owned or investor-owned sewerage system within 365 days after written notification by the owner of the sewerage system that the system is available for connection. The sewerage system must notify the owner of the availability. No less than one year before the date the sewerage system will become available, it must notify the affected owner of the anticipated availability and that the owner will be required to connect within one year of actual availability.</p>

<p>The same paragraph gives the owner the option of prepaying the amortized value of required connection charges in equal monthly installments over a period not to exceed two years from the date of the initial notification of anticipated availability. It also says nothing in the paragraph limits the power of a municipality or county to enforce other laws for the protection of the public health and safety.</p>

<p>Paragraph (1)(b) covers a system that needs repair. The owner of a system that needs repair or modification to function in a sanitary manner, or to comply with Sections 381.0065 through 381.0067 or rules adopted under them, must connect to an available sewerage system within 90 days after written notification from the department. In hardship cases the department may approve an extension of not more than 90 days, and it may approve only one extension.</p>

<p>Subsection (2) of Section 381.00655 contains paragraph (2)(a), which allows the local governing body to provide that a connection fee charged by an investor-owned sewerage system may be paid without interest in monthly installments over a period not to exceed five years from the date the system becomes available, if it determines the owner has demonstrated a financial hardship. Paragraph (2)(b) says a publicly owned or investor-owned sewerage system may, with the approval of the department, waive the requirement of mandatory onsite sewage disposal connection if it determines that connection is not required in the public interest due to public health considerations.</p>

<p>Back in Section 381.0065, subsection (4) says a person may not construct, repair, modify, abandon or operate an onsite sewage treatment and disposal system without first obtaining a permit approved by the department. A construction permit is valid for 18 months after the date of issuance and may be extended for one 90-day period. A repair permit is valid for 90 days after issuance. An operating permit must be obtained before the use of any aerobic treatment unit or if the establishment generates commercial waste. The operating permit for an aerobic treatment unit is valid for two years and must be renewed every two years.</p>

<p>The statute addresses what happens to a permit when ownership changes. If all information pertaining to the siting, location and installation conditions or repair of a system remains the same, a construction or repair permit may be transferred to another person if the transferee files, within 60 days after the transfer of ownership, an amended application providing all corrected information and proof of ownership of the property. A fee is not associated with the processing of that supplemental information.</p>

<p>Paragraph (4)(v) states three rules in one paragraph. Any permit issued and approved by the department for the installation, modification or repair of a system shall transfer with the title to the property in a real estate transaction. A title may not be encumbered at the time of transfer by new permit requirements by a governmental entity for a system which differ from the permitting requirements in effect at the time the system was permitted, modified or repaired. An inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction. The paragraph adds that it does not affect a septic tank phase-out deferral program implemented by a consolidated government as defined in Section 9, Article VIII of the State Constitution of 1885.</p>

<p>Subsection (8) covers private provider inspections. The owner of a system, or a contractor on the owner's written authorization, may hire a private provider to perform an inspection that follows applicable regulatory requirements. An inspection may not be conducted by the private provider, or the provider's authorized representative, that installed the system. A private provider may be an environmental health professional certified under Section 381.0101, a master septic tank contractor registered under part III of Chapter 489, a professional engineer licensed under Chapter 471 who has passed all parts of the Onsite Sewage Treatment and Disposal System Accelerated Certification Training, or a person working under the supervision of such an engineer who has passed the same training.</p>

<p>The statute also regulates who may do the work. A person may not contract to construct, modify, alter, repair, service, abandon or maintain any portion of a system without being registered under part III of Chapter 489. A property owner who personally performs construction, maintenance or repairs to a system serving his or her own owner-occupied single-family residence is exempt from registration for that work. Subsection (2)(f) defines an enhanced nutrient-reducing system as one approved by the department as capable of meeting or exceeding a 50 percent total nitrogen reduction before disposal of wastewater in the drainfield, or at least a 65 percent total nitrogen reduction combined from the tank or tanks and the drainfield.</p>

<h2>Who permits septic systems in Volusia County and who runs Edgewater's sewer</h2>

<p>The Florida Department of Environmental Protection's Onsite Sewage Program page says onsite sewage treatment and disposal systems, commonly referred to as septic systems, are used for wastewater disposal by approximately 30 percent of Florida's population. It gives an estimate of 2.6 million systems in operation, which it says is 12 percent of the United States' septic systems. It says permitting and inspection of these systems is handled by the Environmental Health section of the Florida Department of Health in each county.</p>

<p>The same page says that, effective July 1, 2021, the department is responsible for implementing the Florida Statutes and regulations applicable to these systems. It says that under Florida's Clean Waterways Act of 2020, the county health department offices will continue to do the permitting and inspection for septic tanks.</p>

<p>The Florida Department of Health in Volusia County has a page titled OSTDS Septic and Sewer Systems under Environmental Public Health. The page says the program ensures that systems are properly designed, constructed and maintained through permitting and inspection. It links to approved tanks and manufacturers, forms and publications, and online permitting and processing. The Environmental Public Health phone number on the page is 386-822-6280.</p>

<p>The city's Public Works and Utilities page says the department's services include the maintenance of streets, right-of-ways, sidewalks, water, sewer and stormwater systems. The department is at 300 Dale Street, Edgewater, FL 32132. Its phone is 386-424-2400, extension 4007, and its hours are Monday through Friday, 7:00 a.m. to 3:30 p.m. The page lists an after-hours on-call emergency contact at (386) 424-2490 and an email address of publicworks@cityofedgewater.org.</p>

<p>The Utility Customer Service page says the city services over 12,700 utility accounts monthly. Its list of duties includes setting up or terminating new owner or tenant accounts. The office is at 104 North Riverside Drive, Edgewater, FL 32132. Its phone is 386-424-2400, extension 4000, and its hours are Monday through Friday, 8 a.m. to 4:30 p.m.</p>

<p>The city also posts an online Water And Wastewater Service Application. The form asks whether the applicant is an owner or a contractor, whether the request is to create a new service or change existing services, and whether the construction type is single-family residential, multi-family residential, commercial or other. The services requested are water, wastewater, reclaimed water, or adjusting an existing irrigation-only service. The form asks for the project parcel ID, the project address, the subdivision the property is located in, and the meter size requested.</p>

<p>The city's wastewater collection system is the subject of an October 2, 2026 city news post titled Looking Below the Surface: How Edgewater is Addressing Inflow and Infiltration. The post says staff were inspecting manholes and addressing inflow and infiltration, commonly referred to as I&I, within the wastewater collection system. It says I&I occurs when groundwater or rainwater enters the wastewater system through cracks, joints or other openings in pipes and infrastructure. It says crews repair sections of the system by installing a liner inside existing pipes.</p>

<p>The city's Wastewater Treatment Division page reports that the division averaged 1.31 million gallons per day of sewage treated for the quarter shown. It reports 2.07 million gallons per day of daily reclaimed processing for the same quarter, including 0.78 million gallons per day of reclaim augmentation.</p>

<h2>The bottom line</h2>

<p>In <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater</a>, Section 10-90 of the Code of Ordinances allows a septic tank only on a property designated for single-family residential use whose boundaries are more than 200 feet from the sewer line. Properties with more than two residential dwellings or any non-residential use shall connect to city sewer regardless of the 200-foot rule. Section 19-32 requires connection by owners or occupants of lots abutting a wastewater main or within 100 feet of one, before the certificate of occupancy, and within 90 days of city notification if the unit was already occupied. Section 19-107, to the full extent permitted by law, requires buildings in the Greater Edgewater service area that are adjacent to a right-of-way or easement holding a water main or gravity sanitary wastewater to connect, and treats a main anywhere in an adjoining right-of-way or easement as adjacent.</p>

<p>Florida law adds a 365-day connection clock after written notice of availability, a 90-day clock for a system that needs repair, a permit that transfers with the title, and a rule that a governmental entity may not mandate an inspection of a system at the point of sale. The Land Development Code prohibits septic disposal systems in both wellfield protection zones. The Florida Department of Health in Volusia County lists 386-822-6280 for Environmental Public Health, and the city's Utility Customer Service lists 386-424-2400, extension 4000.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-edgewater-fl-neighborhoods-costs-and-what-to-know">Living in Edgewater, FL: Neighborhoods, Costs and What to Know</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-edgewater-fl-utilities-trash-and-permits">Moving to Edgewater, FL: Utilities, Trash and Permits</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-canal-and-river-lots-permits-utilities-flood">Edgewater Canal and River Lots: Permits, Utilities, Flood</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-flood-zones-and-flood-insurance-check-an-address">Edgewater Flood Zones and Flood Insurance: Check an Address</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/11/17/flagler-beach-septic-vs-sewer-what-a-buyer-checks">Flagler Beach Septic vs Sewer: What a Buyer Checks</a></p>

<h2>Frequently Asked Questions</h2>

<p>The answers below come from the code and statute sections described above.</p>

<details>
<summary><strong>When does the Edgewater code allow a septic tank?</strong></summary>
<p>Section 10-90 of the Code of Ordinances says a septic tank may be used only on properties designated for single-family residential use whose boundaries are located more than 200 feet from the sewer line. It says properties with more than two residential dwellings or any non-residential use shall connect to city sewer regardless of the 200-foot rule. The section also says every residence and building in which human beings reside, are employed or congregate must have either a sanitary water closet connected with the city sewer or a connection to an approved type of septic tank.</p>
</details>

<details>
<summary><strong>What does Section 19-32 say about connecting to city sewer?</strong></summary>
<p>Section 19-32 says the owners or occupants of lots or parcels abutting on a wastewater main, or which can use the services and facilities of the city wastewater system, are required to connect. The connection shall be made prior to the certificate of occupancy being issued and by the owners or occupants of all lots or parcels located within 100 feet of the mains. If the unit was already occupied when service was made available, the connection shall be made within 90 days of the date of notification from the city that service is available.</p>
</details>

<details>
<summary><strong>How long does a septic owner have to connect once sewer is available under state law?</strong></summary>
<p>Section 381.00655(1)(a) of the 2025 Florida Statutes says the owner of a properly functioning onsite system must connect to an available sewerage system within 365 days after written notification by the owner of the sewerage system that it is available for connection. Paragraph (1)(b) says the owner of a system that needs repair or modification must connect within 90 days after written notification from the department, with one extension of not more than 90 days possible in hardship cases.</p>
</details>

<details>
<summary><strong>Does a septic permit transfer to a new owner, and can the city require an inspection at sale?</strong></summary>
<p>Section 381.0065(4)(v) says any permit issued and approved by the department for the installation, modification or repair of a system shall transfer with the title to the property in a real estate transaction. It also says an inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction. Section 381.0065(4) separately says a construction or repair permit may be transferred if the transferee files an amended application and proof of ownership within 60 days after the transfer of ownership.</p>
</details>

<details>
<summary><strong>Are septic systems allowed near Edgewater's drinking water wells?</strong></summary>
<p>Section 21-43.02 of the Land Development Code establishes a primary wellfield protection zone with a 500-foot radius from the well and a secondary zone with a 1,000-foot radius. Section 21-43.04 says septic disposal systems are prohibited in both protection zones. The city's Public Works page says its water source is ground water from fourteen wells drawing from the Floridan Aquifer.</p>
</details>

<details>
<summary><strong>Which fees does the posted Edgewater fee resolution list for sewer?</strong></summary>
<p>The posted Resolution 2026-R-24 lists a wastewater connection charge of one hundred seventy-five dollars and, from February 3, 2021, a sewer capital charge of three thousand forty-two dollars per equivalent residential unit under Ordinance No. 2019-O-25. It lists a plumbing fee of ninety-five dollars per dwelling unit as part of a new residential building permit. The posted copy has a blank adoption date and shows struck and replaced figures for monthly rates. Code Section 19-34 says a lateral that needs to be installed is billed at actual cost of labor and materials.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:23:17 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/edgewater-septic-vs-sewer-what-a-buyer-checks]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for DeLand Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-deland-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Volusia County's evacuation plan uses three evacuation levels, written A, BC and DE, and the county says local officials may order one of them depending on the track and strength of a threatening hurricane. The City of DeLand, Volusia County, the State of Florida and the Florida Statutes publish the hurricane rules restated below for <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a>.</p>

<p>It draws on the city's Alert DeLand, Fire Department, Public Works, building permit and permit exemption pages, on Volusia County Emergency Management pages, on the state's Know Your Zone, shelter, hurricane season and flood insurance pages, and on sections 553.844, 627.711 and 689.302 of the Florida Statutes. The pages cited were read on November 17, 2026. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-flood-zones-and-insurance-how-to-check-an-address">DeLand Flood Zones and Insurance: How to Check an Address</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a>.</p>

<h2>Evacuation levels, bridges, shelters and alerts</h2>

<p>Volusia County's Know Your Zone page says to evacuate if you live in the hurricane evacuation zone. It says the same for a low-lying, flood prone area, and it adds the words "including homes along river basins." It also says to evacuate from a mobile home, substandard housing, a recreational vehicle or a campsite. The page links an interactive Evacuation Zone Map.</p>

<p>The county's Know Your Zone page defines storm surge. It calls storm surge the most deadly of hurricane hazards and says it is salt water flooding that rushes over coastal and river areas. The county says surge can reach seven feet above sea level in a category 1 hurricane and as much as 28 feet above sea level in a category 5 hurricane. The state's Know Your Zone page says the greatest threat to life from a hurricane is storm surge flooding.</p>

<p>The county names the evacuation levels A, BC and DE and calls them Hurricane Evacuation Categories. It says they correspond to the flooding likely to occur during a hurricane. The state page uses zones. It says evacuation zones are designated A to F. It says Zone A is generally the most vulnerable and the most likely to be evacuated first, and that Zone F is most likely to be evacuated last. The state also says not all evacuation zones are always ordered. The county says a mobile home or recreational vehicle must evacuate for all evacuation levels regardless of its location. The county adds that failure to obey an evacuation order is a violation of Florida law.</p>

<p>The county page describes mobile homes. It says mobile homes have flat sides and are lightweight. It says this type of construction does not allow the proper transfer of the wind load through the supports into the foundation and ground. The county's list for mobile homes is to seek shelter elsewhere when threatened by a major storm, to maintain tie-down straps and anchors regularly, to check straps for rust or corrosion, and to protect windows and doors.</p>

<p>For leaving, the county lists these steps. Know where you are going, whether that is family, friends, a hotel or motel, or a public shelter. Take a map showing two routes to reach your destination. Notify family, friends and caregivers of your location. Secure your home and property. Take your emergency supplies. Do not delay your evacuation. The county page on hurricanes also says to decide now where you will stay if an evacuation order is issued, and to arrange to stay with friends or relatives who live well inland if possible. The state's Know Your Zone page says the safest and easiest option may be to stay with friends or family who live outside the evacuation zone or in a stronger house.</p>

<p>For staying home, the county's list applies to people who are not required to evacuate. It says to take precautions to protect the home and property, check the disaster supply kit, stay in the designated safe room, stay away from windows and glass doors, turn off the electricity at the main fuse or breaker box if flooding threatens, and run a generator outside the house with appliances connected directly to the generator. The county states that a generator should not be connected directly to the fuse box or incoming power line, and that back-feeding generators have killed power company line workers.</p>

<p>The state's Know Your Zone page also addresses sheltering in place. It says that if an evacuation order is not issued for your area and your house is not in an evacuation zone, you may consider sheltering in place. The same page says it is the responsibility of the homeowner to know if the home is strong enough to withstand a hurricane. It says homes built after 2002 generally include features that make them more resilient to hurricanes. It names one precaution as the most important for reducing damage to the home and property, which is protecting the areas where wind can enter.</p>

<p>Two county pages describe bridges. The Know Your Zone page says that when an evacuation is ordered, the east-bound lanes of bridges will close to traffic. It says west-bound lanes remain open until sustained winds exceed 39 miles per hour, at which point all lanes will be closed. The county's hurricanes page says all bridges will be locked down when winds reach a sustained speed of 39 miles per hour or a land evacuation is ordered. That page adds that before a complete lockdown, drawbridges will be raised on the hour for 15 minutes when boat traffic is present.</p>

<p>Shelters are described on a separate county page. Volusia County says it has many public shelter locations that can be opened according to each disaster, that not all of them open at once, and that they open based on demand. The county says evacuees may need to stay at a shelter for 24 to 72 hours. It says general population shelters do not provide cots and that a comfortable beach chair and sleeping pad are recommended. It says hospitals are not shelters. The People and Pet Shelter, where people and pets are housed in the same location, is at the Fairgrounds only. The county runs special needs shelters through a registration program with Volusia County Emergency Management.</p>

<p>The state's shelter page says Florida has two types of shelters, general population shelters and special needs shelters. It says the best place to shelter for every Floridian is outside the evacuation area, in a safe and secure structure, with family and friends. It says people going to a general population shelter should bring some of their own supplies, such as bed linens or blankets, clothing, toiletries and personal medications. It says an emergency plan should list area and regional shelters with directions, with several destinations in different directions.</p>

<p>The county also describes transportation to shelters. The Volusia County School Board and Votran provide free rides to general public shelters, with pickup at all regular Votran bus stops. The county says all Votran bus stops are evacuation assembly points during a declared emergency evacuation order. The Votran number for West Volusia is 386-943-7050.</p>

<p>The City of DeLand says it has implemented Alert DeLand, an emergency public notification system. The city says the program allows it to contact the entire community or to target specific areas for an emergency or for urgent situations that require the public's immediate attention, such as hurricane or tornado warnings, road closures and missing person cases. The city says users choose how to receive alerts, on a home or business phone, a mobile phone, email, text messages or more, based on their settings. Volusia County's flood page lists a sign-up for AlertVolusia Emergency Notification Alerts. The county's emergency preparedness app includes weather alerts and current conditions, preparedness checklists, shelter status, the locations of the nearest open shelter and sandbags, evacuation information and push notifications. The county says the Citizens Information Hotline, 866-345-0345, is activated only during an emergency.</p>

<p>The city's Fire Department publishes a list of hurricane safety links. The list has five items, which are Sign Up for Alert DeLand, a Disaster Supply Kit Checklist, Plan and Prepare, Volusia County Emergency Management and the Florida Division of Emergency Management. The department's services page lists Emergency Preparedness for disasters as well as man-made emergencies. It also lists an Emergency Management Plan PDF. The state's hurricane season page says Floridians are encouraged to have at least 7 days of supplies, including food, water, medicine and batteries. The county's shelter information page says re-entry to evacuated areas will be authorized based on public safety, security and the operational needs of search and rescue teams, and that the policy will be announced through the news media.</p>

<h2>Rain, runoff and flood insurance rules</h2>

<p>The county's hurricanes page says a hurricane has winds of at least 74 mph. It calls hurricanes the most common disaster threat for Florida, with an annual posted season of June 1 through Nov. 30. The page says hurricanes can cause coastal and inland hazards. For inland areas it lists continuous rainfall and run-off from high ground causing flooding in low-lying areas. It also says inland areas on high ground normally experience damage from winds and wind-blown debris. The page says hurricanes can spawn tornadoes and may disrupt transportation systems, gas, fresh water supplies and electricity.</p>

<p>The county's hurricanes page mentions Hurricane Irma. It says Hurricane Irma struck on Sept. 10 and that more than 4,800 homes, businesses and government facilities were impacted at a time when many people were still recovering from Hurricane Matthew. The state's hurricane season page says Hurricanes Helene and Milton made landfall in Florida in 2024 within two weeks of each other.</p>

<p>The city's Stormwater page describes local water. The city says DeLand receives about 31 inches of precipitation annually. It says the water either soaks into the ground or flows overland to ditches, streams or ponds. The city says most of the runoff in DeLand flows to Little Haw Creek, although some flows to Lake Winnemissett or to streams that lead to the St Johns River. The city requires detention and retention facilities with all new development projects. It says these facilities temporarily store stormwater runoff and release it through a designed outlet structure. It says the storm sewer system routes runoff quickly off streets and away from buildings or other structures. It also says the local storm sewer system includes infiltration inlets, called dry-wells, and that when stormwater enters a dry-well it infiltrates into the surrounding ground with no discharge to a stream or other surface water body.</p>

<p>The city's Streets and Storm Water Maintenance page describes stormwater maintenance. The Storm Water Division is responsible for drainage pipes, retention areas, street sweeping and stormwater pump stations within the City right-of-way. The city says the division sweeps approximately 2,700 curb miles each year and that only streets with curbs and gutters are swept routinely. It says the division follows a bi-yearly cleaning schedule for more than 178 miles of City maintained drainage pipes and that some pipes are cleaned monthly. The page directs problems in the stormwater system to the main line for Public Works at 386-626-7190. The city's Public Works page says the Storm Water division is separately accounted for in an enterprise fund.</p>

<p>Volusia County calls flooding the most frequent and costly natural hazard in the county area. It bases that on the Volusia County Multi-Jurisdictional Local Mitigation Strategy, which identifies thirteen individual hazards. The county's flood page says to use the FEMA mapping center to find a flood zone, and to contact Building and Code Administration at 386-626-6591 about historical flooding, localized drainage issues, repetitive loss areas and topographic issues. For a flooding problem in unincorporated Volusia County, the page lists Public Works, Road and Bridge at 386-822-6422 and says site visits are made upon request. The county's flood maps page says current Flood Risk products are effective February 19, 2014, September 29, 2017 and August 7, 2018. It says inland high-risk zones are labeled A or AE and coastal high-risk zones with additional storm surge risk are labeled VE. It also says its own map information is not survey accurate and that independent verification is recommended. The county page on flood maps says the 100-year flood is the flood elevation that has a 1 percent chance of being equaled or exceeded each year. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-flood-zones-and-insurance-how-to-check-an-address">DeLand Flood Zones and Insurance: How to Check an Address</a>.</p>

<p>Several insurance statements appear on county and state pages. The county says most standard homeowner's insurance policies do not cover flooding from rising water. The state says most insurance policies do not cover flooding and that flood insurance is available to homeowners, business owners, condo unit owners and renters. The county says most flood insurance policies have a 30-day waiting period, and the state says many policies take upwards of 30 days after purchase to take effect. The county's hurricanes page adds a statement it attributes to officials. It says it takes 30 days after purchase for a flood insurance policy to take effect and that if a hurricane is within 500 miles of Florida, flood insurance policies will not be written. The county says some flood insurance policies are transferable when buying and selling a home. It says that in a condominium association, a master policy does not usually cover the inside of the unit or its contents.</p>

<p>The state's flood insurance page says one inch of flood water can cause more than 25,000 dollars in damage. It says private providers may have higher limits or broader coverage compared to National Flood Insurance Program policies. It also describes federal assistance. The page says that if your area has not received a Presidential Disaster Declaration, you will not receive federal assistance. If one is declared, the page says the average payout by FEMA's Individuals and Households Program is only about 5,100 dollars in Florida, and that National Flood Insurance Program claim payments average around 29,000 dollars.</p>

<p>Florida law adds a disclosure to the sale. Section 689.302 of the Florida Statutes says a seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods and that the buyer is encouraged to discuss separate flood insurance coverage with the buyer's insurance agent. The seller marks whether there is knowledge of flooding that has damaged the property during the seller's ownership, whether a claim relating to flood damage has been filed, including with the National Flood Insurance Program, and whether assistance for flood damage has been received, including from FEMA. The statute defines flooding as the overflow of inland or tidal waters, the unusual and rapid accumulation of runoff or surface waters from any established water source such as a river, stream or drainage ditch, and sustained periods of standing water resulting from rainfall.</p>

<p>The county adds a rule for repairs. It says substantial improvements or repairs equal to or greater than 50 percent of a home's market value must meet current Florida Building Code standards and comply with the local floodplain ordinance. It says an Elevation Certificate may be on file in the Building and Code Administration division. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deland-fl-neighborhoods-costs-and-what-to-know">Living in DeLand, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>Roofs, openings, permits and the July 2026 exemption rules</h2>

<p>The City of DeLand's building permit page says the Building Division processes all building permits for projects within the city limits. It says that for a project in unincorporated Volusia County, the permit comes from the Building Department of Volusia County. The page says the 8th Edition (2023) Florida Building Codes, the 7th Edition Florida Fire Prevention Code and the 2020 National Electric Code are effective for all permits applied for on or after December 31, 2023. It says permit application status may be obtained through the city's Accela Citizen Portal, in accordance with section 553.79 of the Florida Statutes.</p>

<p>The city makes a statement about permits and sales. It says permits are necessary to satisfy insurance requirements and to protect the health, safety and welfare of citizens. It says work completed without the proper permits could result in complications when selling the home, such as preventing the sale until the work is compliant with current city and building codes, in addition to the risk of incurring fines. The Building Division page adds that it is a felony in Florida to perform contracting work without a valid license, citing section 489.12(1)(f), and that unlicensed work can be reported to Building@deland.org or 386-626-7007.</p>

<p>The city's permit page lists roof inspections. The city says permits are required for re-roofing. It says inspections for the re-nailing of the sheathing, if required, the underlayment and the final inspection are mandatory. The city allows a one-time pass if inspections are missed, as long as all of the inspections are verified by a licensed Florida Engineer or Architect and the affidavit is approved by the Building Official. The city says a second pass is not allowed. It says that if a second miss happens, all of the work that was done will be required to be removed and installed in the proper order with passing inspections.</p>

<p>Section 553.844(3) says the Florida Building Commission shall adopt rules that require or otherwise clarify that, for site-built, single-family residential structures, a roof replacement must meet the following. Under (3)(a), a roof replacement must incorporate secondary water barriers and strengthening or correcting of roof-decking attachments and fasteners. Section 553.844(3)(b) adds a rule for a building located in the wind-borne debris region as defined in section 1609.2 of the International Building Code (2006). If its insured value is 300,000 dollars or more, or its just valuation for ad valorem taxation is 300,000 dollars or more when it is uninsured, a roof replacement must incorporate roof-to-wall connection techniques. Section 553.844(2)(b)3 says roof-to-wall connections are not required unless evaluation and installation of connections at gable ends or all corners can be completed for 15 percent of the cost of roof replacement. Section 553.844(5) says that if a roof built, repaired or replaced under the 2007 Florida Building Code or a later edition is 25 percent or more repaired, replaced or recovered, only the repaired, replaced or recovered portion must be built to the code in effect.</p>

<p>Section 627.711 covers insurance discounts for wind features. Under subsection (1), an insurer must notify an applicant or policyholder of a personal lines residential property policy, at issuance and at each renewal, of the availability and range of each premium discount, credit, other rate differential or reduction in deductibles for properties with fixtures or construction techniques demonstrated to reduce windstorm loss. Under subsection (2)(a), a uniform mitigation verification inspection form is used by all insurers when submitted by policyholders for wind discounts. An insurer accepts a form signed by a licensed home inspector with at least 3 hours of approved hurricane mitigation training and a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer, a licensed professional architect, or any other individual or entity the insurer recognizes. Under subsection (3), the person who signs must inspect the structures personally, with an exception for direct employees of engineers and contractors. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a>.</p>

<p>The city's permit page lists several permit types. Under Accessory Building or Structure, it lists fences, retaining walls, pools, screen enclosures, decks, gazebos, pergolas, sheds, detached garages, carports, patios and driveways. Under Building Renovation, it lists Functional Shutters and Window Door Replacement. Under Electric, it lists Generator and a Generator Permit Checklist. Its additional resources list a Florida Product Approval Specification Sheet. The county's hurricanes page names securing the windows and doors of the home and bracing the roof and garage doors among the preparation actions.</p>

<p>The city also publishes two permit exemptions that took effect on July 1, 2026. The city's page says Florida House Bill 803 creates them for certain residential projects. The page says the exemptions apply only when all applicable requirements are met and that if a project does not qualify, a building permit is still required.</p>

<p>Exemption number one covers owners of single-family homes and their contractors performing qualifying work valued at less than 7,500 dollars. The city lists examples that may qualify, including interior painting, drywall replacement, flooring or tile replacement not involving a shower pan, cabinet replacement that does not involve plumbing or electrical work, fence installation with zoning review still required, and storage sheds of 120 square feet or smaller with zoning review still required. The city lists work that still needs a permit regardless of value. It names electrical work, plumbing work, mechanical work, gas work and structural work. It also names any work on property located partially or entirely within a Flood Hazard Area as defined by the Florida Building Code. The city's definition of structural work includes additions or alterations to the home's main wind force resisting system or load-bearing elements. It also includes products requiring Florida Product Approval to resist wind pressures, which the city lists as exterior window replacement, exterior door replacement, exterior siding, re-roofing involving structural components or roofing systems, screen enclosures, accessory structures and freestanding masonry walls. The city says a project cannot be divided into smaller projects to stay below the threshold.</p>

<p>Exemption number two covers temporary flood panels and hurricane barriers. The city says these may be installed without a building permit only if every requirement is met. The exemption does not apply to a property within a Special Flood Hazard Area. The wall or barrier must be non-load-bearing and non-habitable. It must be installed on a single-family dwelling, a two-family dwelling or a townhouse. It must be intended to reduce or prevent storm surge or floodwaters from entering the structure or property. A contractor licensed under Part I of Chapter 489, Florida Statutes, must complete the installation. The installation must comply with local zoning, drainage, easement and setback requirements. The city says that if any one requirement is not met, a permit is required.</p>

<p>To request either exemption, the city says the owner or contractor submits a written request to the Building Division through the city's electronic permit submittal system. The request includes a completed Permit Exemption Request Form, a copy of the signed contract or documentation showing the nature and value of the work, and plans or drawings when applicable. The city's legal notice says that under section 553.79 of the Florida Statutes, the city has no legal duty to the property owner, the contractor or their successors or assigns for work performed under either exemption. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/28/deland-new-construction-permits-impact-fees-and-the-certificate-of-occupancy">DeLand New Construction: Permits, Impact Fees and the Certificate of Occupancy</a>.</p>

<h2>After the storm: power lines, debris and collection</h2>

<p>The City of DeLand's Public Works Emergency Management page begins with the challenges that follow storms. It says the aftermath of rainstorms, floods, hurricanes and tornadoes presents a number of challenges. It names loss of electrical power, flooding, downed trees, trash and debris, and blocked roadways as part of the obstacles. The city says the conditions can be localized or citywide.</p>

<p>The city describes the order of work. It says that its first priority is safety. Supervisors assess the area affected and develop a plan of action. After the appropriate authorities have determined that the area is safe for workers, crews and City contractors begin clearing public roadways. The city says crews cannot clear a roadway until Duke Energy addresses downed power lines, and that downed wires should be reported to Duke Energy at 800-228-8485. The city says that as Public Works receives calls from residents, crews are dispatched to clear blocked roadways when weather conditions will allow.</p>

<p>The city's page states who handles debris. The city says that depending on the magnitude of the storm, interim measures may be taken when clearing public roads, and that debris may be piled on road shoulders as crews continue to clear roadways. It says downed tree debris originating from private property should be removed and properly disposed of by the property owner. It says removal and disposal of city-owned roadside tree debris will be completed after all roadways have been opened. The city's Tree Division page says the division is responsible for the maintenance of the city's more than 7,000 right-of-way trees and trees on city property.</p>

<p>The city lists phone numbers by situation. Trees blocking City-maintained roadways are called in to the Public Works office during normal working hours, 8 am to 5 pm, at 386-626-7190. After hours emergencies are reported to 386-626-7251. The page says residents in the unincorporated areas of Volusia County contact the Road and Bridge office of Volusia County Public Works at 386-822-6422 for debris removal or tree work. It says residents who live along a state road contact the local maintenance office for the Florida Department of Transportation at 386-740-3400. The city's Public Works phone number is 386-626-7195 and its after hours line is 386-626-7169, available from 5 pm to 8 am.</p>

<p>The city's page also covers flood-damaged belongings. It says that to dispose of flood damaged appliances and furniture, residents contact the city's solid waste hauler at 386-774-6162 to schedule a bulk item collection. It says the disposal of building materials, construction and demolition debris from flood-damaged homes is the responsibility of the property owner and should go to an acceptable landfill site. The city says residents contact the Solid Waste Division of Volusia County Public Works at 386-943-7889 for disposal locations.</p>

<p>The city's Solid Waste page describes regular collection. It says the city currently uses GFL Environmental Inc. for solid waste, yard waste and recyclable collections. Garbage goes in one 96-gallon or 64-gallon cart and recycling in one 64-gallon cart. Yard waste is one cubic yard per week, tied in bundles or contained in a private container, with each piece a maximum of 4 feet long by 6 inches in diameter and a maximum weight of 75 pounds per container. Bulk collection is up to 3 cubic yards picked up weekly on the same day as solid waste pickup. Materials must be out for collection by 6 am. The Emergency Management page says Public Works will attempt to have the hauler collect all refuse on the scheduled collection days, but that storm debris may cause delays in some areas. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-deland-utilities-trash-permits-month-1">Moving to DeLand: Utilities, Trash and Permits in Month One</a>.</p>

<p>The city makes a request about movement during and after major weather events. Public Works encourages residents to stay home if at all possible. If residents must travel, the city says they should make every effort to use major thoroughfares that have been cleared of debris. Public Works requests that residents keep parked cars off of main streets to speed up debris removal operations. The city says this is also necessary to prevent accidents and to keep primary and secondary streets clear for ambulance, police and fire vehicles.</p>

<p>Volusia County's flood page lists safety statements for floodwater. It says to turn around, do not drown, and that more people drown in their cars than anywhere else. The county says floodwater may be contaminated and electrically charged. It says everything that gets wet should be cleaned and disinfected because floodwater can contain sewage and chemicals. The county's emergency preparedness app also aids the damage assessment process. Residents can submit damage reports along with picture documentation.</p>

<h2>Bottom line</h2>

<p>The City of DeLand publishes Alert DeLand, a Fire Department hurricane safety list and a Public Works page for the days after a storm. Volusia County names the evacuation levels A, BC and DE, says it will set up hurricane shelters at key locations and lists the bridge rules. The state writes the evacuation zones A to F and gives the 7-day supply figure. The Florida Statutes set the seller's flood disclosure at or before the time the sales contract is executed, and they set the roof replacement techniques in section 553.844. For homes in <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a>, those four sources are the ones this guide used.</p>

<p>The city's July 1, 2026 exemption page keeps a permit requirement for structural work, for products requiring Florida Product Approval to resist wind pressures and for any work within a Flood Hazard Area. Roof work carries mandatory inspections on the city's page. Flood insurance carries a 30-day waiting period on the county pages and upwards of 30 days on the state page. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/11/17/deland-property-tax-bill-line-by-line-2026-rates">DeLand Property Tax Bill Line by Line (2026 Rates)</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What are the evacuation levels in Volusia County?</strong></summary>
<p>Volusia County says that, depending on the track and strength of a threatening hurricane, local officials may order one of three evacuation levels, written A, BC or DE. The county calls them Hurricane Evacuation Categories and says they correspond to the flooding likely to occur during a hurricane. The state's Know Your Zone page writes evacuation zones as A to F and says Zone A is generally the most vulnerable and the most likely to be evacuated first. The state also says not all evacuation zones are always ordered. The county page links an interactive Evacuation Zone Map.</p>
</details>
<details>
<summary><strong>When do bridges close during a hurricane evacuation?</strong></summary>
<p>Volusia County's Know Your Zone page says that when an evacuation is ordered, the east-bound lanes of bridges will close to traffic. The page says west-bound lanes remain open until sustained winds exceed 39 miles per hour, at which point all lanes will be closed. The county's hurricanes page says all bridges will be locked down when winds reach a sustained speed of 39 miles per hour or a land evacuation is ordered, and that drawbridges will be raised on the hour for 15 minutes when boat traffic is present before a complete lockdown.</p>
</details>
<details>
<summary><strong>Who clears the roads and removes debris after a storm in DeLand?</strong></summary>
<p>The City of DeLand says Public Works crews and city contractors begin clearing public roadways after the appropriate authorities determine the area is safe. The city says crews cannot clear a roadway until Duke Energy addresses downed power lines, and that downed wires are reported to Duke Energy at 800-228-8485. Downed tree debris from private property is removed and disposed of by the property owner, according to the city. Trees blocking City-maintained roadways are called in to Public Works at 386-626-7190 during working hours and at 386-626-7251 after hours.</p>
</details>
<details>
<summary><strong>Does homeowners insurance cover flood damage, and how long does a flood policy take to start?</strong></summary>
<p>Volusia County says most standard homeowner's insurance policies do not cover flooding from rising water, and the state says most insurance policies do not cover flooding. The county says most flood insurance policies have a 30-day waiting period. The state says many policies take upwards of 30 days after purchase to take effect. The county's hurricanes page adds a statement attributed to officials that if a hurricane is within 500 miles of Florida, flood insurance policies will not be written. The state says flood insurance is available to homeowners, business owners, condo unit owners and renters.</p>
</details>
<details>
<summary><strong>What does the Florida flood disclosure ask a seller?</strong></summary>
<p>Section 689.302 of the Florida Statutes says a seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The seller marks whether there is knowledge of flooding that has damaged the property during the seller's ownership, whether a claim relating to flood damage has been filed, including with the National Flood Insurance Program, and whether assistance for flood damage has been received, including from the Federal Emergency Management Agency. The statute defines flooding to include the overflow of inland or tidal waters and sustained periods of standing water resulting from rainfall.</p>
</details>
<details>
<summary><strong>Which work still needs a permit under DeLand's July 1, 2026 exemption rules?</strong></summary>
<p>The City of DeLand says that under Exemption number one, a permit is still required, regardless of project value, for electrical work, plumbing work, mechanical work, gas work, structural work and any work on property located partially or entirely within a Flood Hazard Area as defined by the Florida Building Code. The city lists exterior window replacement, exterior door replacement, exterior siding, re-roofing involving structural components or roofing systems, screen enclosures, accessory structures and freestanding masonry walls as structural work. Exemption number two for temporary flood panels does not apply within a Special Flood Hazard Area.</p>
</details>
<details>
<summary><strong>What inspections does DeLand require for a re-roof?</strong></summary>
<p>The City of DeLand says permits are required for re-roofing. The city says inspections for the re-nailing of the sheathing, if required, the underlayment and the final inspection are mandatory. A one-time pass is allowed if inspections are missed, as long as all of the inspections are verified by a licensed Florida Engineer or Architect and the affidavit is approved by the Building Official. The city says a second pass is not allowed. If a second miss happens, all of the work that was done will be required to be removed and installed in the proper order with passing inspections.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:23:00 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/hurricane-readiness-for-deland-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[DeLand Septic vs Sewer: What a Buyer Checks]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/deland-septic-vs-sewer-what-a-buyer-checks]]>
        </link>
        <description>
            <![CDATA[<p>To the fullest extent permitted by law, buildings and structures on property in the DeLand water and wastewater service area that are adjacent to a public right-of-way or easement holding a water main or gravity sanitary sewer are required to connect with and use the city's water and wastewater systems, except as provided in paragraphs (b) and (c). If a gravity sanitary sewer is adjacent or available to a property and a building on it is connected to a septic tank system, the building will be required to connect to the city's wastewater system when the septic tank fails or a permit is requested from the Volusia County Health Department or other appropriate authority for a septic tank or drainfield replacement. This is Section 30-7 of Chapter 30, titled Utilities, in the <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a> Code of Ordinances. This guide restates that chapter, Florida Statutes sections 381.0065, 381.00655 and 403.067, the City of DeLand's utility and fee pages, the Florida Department of Environmental Protection and the Florida Department of Health in Volusia County. The Municode page for the code reads "Codified through Ordinance No. 2025-17, adopted October 20, 2025. (Supp. No. 15)" and shows online content updated on June 30, 2026.</p>

<h2>What Chapter 30 of the DeLand code says about sewer and septic</h2>

<p>Section 30-1 says the chapter may be cited as the "Utilities Ordinance of the City of DeLand, Florida." Section 30-5 creates the "DeLand water and wastewater service area" under authority of section 180.02, Florida Statutes. The legal description of the land in Volusia County included in that area is on file with the city clerk and available for inspection and copying. The same section says the City of DeLand is the exclusive provider of water and wastewater services within the area.</p>

<p>Section 30-7 covers water and sewer service availability, requirement for connection and annexation. Paragraph (a) says that to the fullest extent permitted by law, all buildings and structures located or constructed on property in the service area, and adjacent to a public right-of-way or easement that has a water main or gravity sanitary sewer in it, are required to connect with and use the services and facilities of the city water and wastewater systems.</p>

<p>Paragraph (b) defines availability. A water main or gravity sanitary sewer is considered adjacent or available to a property when it is located anywhere in a public right-of-way or easement adjoining the property. It is not considered available in a state road right-of-way unless it is located on the same side of the paved roadway as the property to be served.</p>

<p>Paragraph (c) covers wells and septic tanks. If a water main is adjacent or available and a building is connected to an individual well, the building will be required to connect to the city water system when the well system fails, becomes contaminated or experiences a dry well condition, or when a permit is requested from the Volusia County Health Department or other appropriate authority for a replacement well. For septic, the text reads: "If a gravity sanitary sewer is adjacent or available to a property, and a building or structure located on that property is connected to a septic tank system, then that building or structure will be required to be connected to the City of DeLand's wastewater system when the septic tank fails or a permit is requested from the Volusia County Health Department or other appropriate authority for a septic tank or drainfield replacement."</p>

<p>Paragraph (d) ties service to annexation. No person is provided water or wastewater service by the city unless the property to be served is within city limits, or the owner has petitioned for annexation or executed a covenant to support annexation and has paid a fee set by the finance department to defray the cost of advertising the annexation ordinance and recording the covenant. The covenant is recorded in the public records and is binding on the property owner and the owner's heirs, successors and assigns. A property is annexed only if it is contiguous to city limits. The city commission at all times retains the discretion to reject any annexation petition, and a rejection does not prevent the petition from being accepted at a later date.</p>

<p>Paragraph (f) says the City of DeLand provides potable water and wastewater service to the area described in a utility service agreement between Volusia County and the City of DeLand dated July 14, 1994, in accordance with that agreement and the code. The Municode page lists Ordinance No. 2026-10, adopted April 20, 2026, under "Adopted Ordinances Not Yet Codified." It amends Section 30-7 by revising the reference to the Utility Service Area Agreement between the City of DeLand and Volusia County to reflect the amendment to that agreement.</p>

<p>Section 30-42 is titled "Use of public sewers required." It says every premises must have at least one toilet kept clean and in a sanitary working condition, and that no person disposes of human excrement except in a toilet. It makes it unlawful to discharge wastewater or other polluted waters to any natural outlet within the city, except where suitable treatment has been provided in accordance with later provisions of the chapter. Paragraph (d) says: "Except as hereinbefore provided, it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of wastewater." Paragraph (e) requires the owner of a house, building or property used for human occupancy, employment, recreation or other purposes, abutting a street, alley or right-of-way in which a public sanitary sewer of the city is now located or may in the future be located, to install suitable toilet facilities at the owner's expense. Paragraph (f) says sinks, dishwashing machines, lavatories, basins, shower baths, bathtubs, laundry tubs, washing machines and similar fixtures shall be connected to the public sewer, but where no sewer is available, septic tanks or other private subsurface disposal facilities approved by the health officer may be used. Paragraph (g) says customers shall be notified when sewer and water is available as described in section 30-7.</p>

<p>Section 30-43 is titled "Private wastewater disposal." It opens by saying that where a public sanitary sewer is not available, the building sewer shall be connected to a private wastewater disposal system complying with the chapter. Paragraphs (a) and (b) say septic tanks shall be constructed, repaired, altered, enlarged and maintained in accordance with plans and specifications approved by the health officer, and that no person constructs, repairs, alters or enlarges a septic tank without that approval and a valid permit. Paragraph (c) says the type, capacities, location and layout of a private system shall comply with all regulations of the Department of Environmental Protection and the Florida Department of Health. It adds that no permit shall be issued for a private system employing subsurface soil absorption facilities where the area of the lot is less than 20,000 square feet, and that no septic tank or cesspool shall be permitted to discharge to any natural outlet.</p>

<p>Paragraph (d) says no septic tank or other subsurface disposal facility shall be installed where a public sewer is accessible to the premises unless authorized by the city engineer. Paragraph (e) says: "At such time as a public sewer becomes available to a property served by a private wastewater disposal system that has failed, a direct connection shall be made to the public sewer within 30 days after notice of availability." It then says any septic tanks, cesspools and similar facilities shall be cleaned of sludge and filled with suitable materials. Paragraph (f) says the owner operates and maintains the private facilities in a sanitary manner at all times, at no expense to the city.</p>

<h2>What Florida law says about septic and sewer</h2>

<p>Florida Statutes section 381.0065 regulates onsite sewage treatment and disposal systems. The 2026 text says that where a publicly owned or investor-owned sewerage system is not available, the Department of Environmental Protection issues permits for the construction, installation, modification, abandonment or repair of those systems. The statute defines "available" for a sewerage system. The system must be capable of being connected to the plumbing of the residence, must not be under a Department of Environmental Protection moratorium, and must have adequate permitted capacity to accept the sewage the residence will generate. For a single-family residence with an estimated sewage flow of 1,000 gallons per day or less, a gravity sewer line, or a low pressure or vacuum collection line in areas approved for those, must also exist in a public easement or right-of-way that abuts the property line.</p>

<p>Section 381.00655 sets a connection deadline. The owner of a properly functioning system, other than an approved onsite graywater system, must connect to an available publicly owned or investor-owned sewerage system within 365 days after written notification from the sewerage system's owner that it is available. The sewerage system must notify the owner of that availability. No less than one year before the date the system becomes available, it notifies the affected owner of the anticipated availability and that connection will be required within one year of actual availability. The owner has the option of prepaying the amortized value of required connection charges in equal monthly installments over a period not to exceed two years from the date of the initial notification of anticipated availability.</p>

<p>A second deadline applies to a system that needs repair. The owner of a system that needs repair or modification to function in a sanitary manner, or to comply with sections 381.0065 through 381.0067 or the rules adopted under them, must connect to an available sewerage system within 90 days after written notification from the department. In hardship cases, on request, the department may approve an extension of not more than 90 days, and only one extension. Section 381.00655(2) provides the following. A local governing body may provide that a connection fee charged by an investor-owned sewerage system be paid without interest in monthly installments over a period not to exceed five years, if it determines the owner has demonstrated a financial hardship. A publicly owned or investor-owned sewerage system may, with the approval of the department, waive the mandatory connection requirement if it determines connection is not required in the public interest due to public health considerations.</p>

<p>The permit rules sit in section 381.0065(4). A person may not construct, repair, modify, abandon or operate a system without first obtaining a permit approved by the department. A construction permit is valid for 18 months and may be extended for one 90-day period. A repair permit is valid for 90 days. An operating permit must be obtained before the use of any aerobic treatment unit or if the establishment generates commercial waste, and the operating permit for an aerobic treatment unit is valid for two years. A municipality or political subdivision may not issue a building or plumbing permit for a building that requires a system unless the owner or builder has received a construction permit for the system from the department, except as provided in paragraph (a). A building or structure may not be occupied until the department approves the final installation.</p>

<p>Paragraph (4)(x) addresses a sale. It says: "Any permit issued and approved by the department for the installation, modification, or repair of an onsite sewage treatment and disposal system shall transfer with the title to the property in a real estate transaction." A title may not be encumbered at the time of transfer by new permit requirements by a governmental entity that differ from the permitting requirements in effect when the system was permitted, modified or repaired. The paragraph also says an inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction. Separately, a construction or repair permit may be transferred to another person if the siting, location, installation and repair information is unchanged and the transferee files an amended application with proof of ownership within 60 days after the transfer of ownership. The statute says a fee is not associated with processing that supplemental information.</p>

<p>Paragraph (4)(bb) covers remodeling. An existing-system inspection or evaluation, or a modification, replacement or upgrade of the system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition may not cover any part of the existing system or encroach upon a required setback or the unobstructed area. The local health department reviews a floor plan and site plan, and the review must be completed within seven business days after receipt, or the addition is approved for the purposes of the paragraph. The statute defines a bedroom as a room that can be used for sleeping and that, for a site-built dwelling, has at least 70 square feet of conditioned space, is located along an exterior wall, has a closet and a door or an entrance where a door could be reasonably installed, and has an emergency means of escape and rescue opening to the outside.</p>

<h2>The Volusia Blue Spring plan and septic systems in DeLand</h2>

<p>The Department of Environmental Protection adopted the Volusia Blue Spring Basin Management Action Plan by Final Order, OGC Case No. 25-1043, dated June 27, 2025, with the plan itself dated June 2025. The plan area comprises 69,046 acres and takes in portions of the City of DeBary, the City of DeLand, the City of Deltona and the City of Lake Helen, all of the City of Orange City, and a portion of unincorporated Volusia County. The Priority Focus Area comprises 44,239 acres and includes the City of Orange City and portions of Volusia County, the City of DeLand, the City of DeBary and the City of Deltona.</p>

<p>The plan states the following policies for septic systems. For new systems, it says Florida law and the remediation plan prohibit new onsite systems on lots of one acre or less within the plan boundary, unless the systems are enhanced nutrient-reducing systems or other wastewater treatment systems that achieve at least 65 percent nitrogen reduction. Section 403.067(7)(a)10. of the Florida Statutes says the installation of new systems within a basin management action plan area is prohibited where connection to a sewerage system is available, as defined in section 381.0065(2)(a). It says that on lots of one acre or less where a sewerage system is not available, enhanced nutrient-reducing systems or other systems achieving at least 65 percent nitrogen reduction are required. Section 381.0065(2)(f) defines an enhanced nutrient-reducing system as one approved by the department as capable of meeting or exceeding a 50 percent total nitrogen reduction before disposal in the drainfield, or at least 65 percent total nitrogen reduction combined from the tank or tanks and drainfield.</p>

<p>For existing systems, the plan says that within the Priority Focus Area, any system on a lot of one acre or less that requires a permit to modify or replace an existing system under Chapter 62-6 of the Florida Administrative Code must connect to sewer if available. If sewer is not available, the system must be upgraded or replaced to meet enhanced nutrient-reducing requirements that achieve at least 65 percent nitrogen reduction, unless sewer connections will be available based on a project listed in the plan. The plan says all systems subject to this policy must include enhanced nitrogen treatment by 2038.</p>

<p>The plan's project table lists these City of DeLand projects. Project DL-06, the Spring Hill Sewer Retrofit Project Phase 3, is typed as an onsite system phase out and shows a status of completed, in 2021. Project DL-07, the Spring Hill Sewer Retrofit Project Phase 4, is described as a septic to sewer retrofit for 120 septic tanks, with a status of planned, an estimated completion date of 2027 and a cost estimate of 4,200,000 dollars. Project DL-09, the Longleaf Plantation LP-1 Sewer Retrofit Project, is a septic to sewer retrofit for 70 septic tanks, with a status of planned, an estimated completion date of 2029 and a cost estimate of 2,737,800 dollars. Project DL-08, named WRF Conversion to AWTP Project, is described as an upgrade of the Wiley M. Nash to an AWT and capacity increase of 2 MGD, with a status of underway and an estimated completion date of 2026. The plan also says local governments can develop programs to help fund the added cost of upgrading existing systems, can apply for competitive grant funding from the Department's programs, and may adopt ordinances that add requirements for enhancement of septic systems.</p>

<h2>City fees, the Spring Hill program and who permits septic systems</h2>

<p>The City of DeLand's Water and Sewer Connections page, under the city's Building department pages, describes a conversion from a residential well to the city potable water and sewer system. It lists set application fees that are non-refundable. The fee is thirty dollars for residential existing, thirty-five dollars for residential new construction and fifty dollars for commercial. The covenant processing fee is one hundred ten dollars. Variable fees on the page are impact fees calculated by fixture units or water meter size under Chapter 30, Section 20, meter cost that depends on meter size, extension fees determined by utilities upon verification if they apply, the connection from the potable meter or sewer lateral to the home, the cost to abandon and cap a well if abandoning, and the cost of a county or Department of Health permit.</p>

<p>The city's 2026 impact fee sheet, printed "Effective 10/01/2026," lists sewer at 366 dollars per fixture unit and water at 318 dollars and 75 cents per fixture unit. Ordinance No. 2026-22, adopted September 21, 2026, says it becomes effective on October 1, 2026. Its text says the development fee for new construction, and when service is extended to existing dwellings, commercial or other property, is due and payable upon application for water or sewer service, and that the fee is charged separately for water and sewer connections. It says a residential unit is equivalent to 20 fixture units, and its text prints 7,320 dollars per equivalent residential unit for wastewater with all residential units charged one unit. Computed, 20 fixture units at 366 dollars per fixture unit is 7,320 dollars.</p>

<p>A sewer connection assistance program in the Spring Hill area is listed on the city's site. The Spring Hill Grants page says the Spring Hill Community Redevelopment Agency and the City of DeLand are accepting applications from those living on or around Adelle Avenue, or within the Spring Hill CRA, and that required impact fees for wastewater hookup will be fully paid. The undated procedures PDF lists open streets that include Adelle, Salisbury, Mathis, Ida, Green, Spring, Carrol, Miles, Lisbon Parkway, Vermont, Carver and Napoleon, among others, as long as a line runs by the property. It says the average assistance awarded to an approved applicant is two thousand dollars, including abandonment and connection, paid to the plumbing contractor, and that the owner obtains at least two quotes from a licensed plumbing company.</p>

<p>The Department of Environmental Protection's Onsite Sewage Program page says septic systems are used for wastewater disposal by approximately 30 percent of Florida's population, with an estimated 2.6 million systems in operation, and that permitting and inspection is handled by the Environmental Health section of the Florida Department of Health in each county. The Florida Department of Health in Volusia County lists 386-822-6280 for Environmental Public Health and links to approved tanks and manufacturers, forms and publications, and online permitting and processing. The city's Water and Sewer Connections page links septic permit information on the Florida Department of Health in Volusia County website.</p>

<p>See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-flood-zones-and-insurance-how-to-check-an-address">DeLand Flood Zones and Insurance: How to Check an Address</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-taxes-utilities-and-the-city-vs-county-line">DeLand Taxes, Utilities and the City vs County Line</a>. Also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deland-fl-neighborhoods-costs-and-what-to-know">Living in DeLand, FL: Neighborhoods, Costs and What to Know</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-deland-utilities-trash-permits-month-1">Moving to DeLand: Utilities, Trash, Permits, Month 1</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/28/deland-new-construction-permits-impact-fees-and-the-certificate-of-occupancy">DeLand New Construction: Permits, Impact Fees and the Certificate of Occupancy</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/11/17/deland-property-tax-bill-line-by-line-2026-rates">Your DeLand Property Tax Bill, Line by Line</a>.</p>

<h2>The bottom line</h2>

<p>DeLand Section 30-7 requires a building on septic in the DeLand water and wastewater service area, with a gravity sewer adjacent or available to the property, to connect to the city system when the septic tank fails or a replacement permit is requested. Section 30-43(e) sets 30 days after notice of availability for a failed private system, and section 381.00655 sets 365 days after written notice for a properly functioning one. A permit issued and approved by the department for a septic system's installation, modification or repair transfers with the title, and a governmental entity may not mandate an inspection of a system at the point of sale. Inside the Volusia Blue Spring plan area, a new system on a lot of one acre or less is prohibited unless it is an enhanced nutrient-reducing system or other system achieving at least 65 percent nitrogen reduction. The city's pages list its connection fees and the Spring Hill assistance program, and the Department of Environmental Protection's page says permitting and inspection is handled by the Environmental Health section of the Florida Department of Health in each county. This is the <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a> code and Florida law as written.</p>

<p>The questions below restate what the DeLand code, the Florida Statutes and the city's pages say about septic and sewer.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>When does a DeLand septic tank have to connect to city sewer?</strong></summary>
<p>Section 30-7(c) of the DeLand code says that if a gravity sanitary sewer is adjacent or available to a property, a building on it connected to a septic tank system, is required to connect to the city wastewater system when the septic tank fails or a permit is requested for a septic tank or drainfield replacement. Section 30-43(e) sets 30 days after notice of availability for a failed private system. Florida Statutes section 381.00655 sets 365 days after written notification for a properly functioning system, and 90 days after written notification from the department for a system that needs repair.</p>
</details>

<details>
<summary><strong>Does a septic permit transfer with the house in DeLand?</strong></summary>
<p>Florida Statutes section 381.0065(4)(x) says any permit issued and approved by the department for the installation, modification or repair of an onsite sewage treatment and disposal system shall transfer with the title to the property in a real estate transaction. It says a title may not be encumbered at transfer by new permit requirements that differ from those in effect when the system was permitted, modified or repaired. It also says an inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction.</p>
</details>

<details>
<summary><strong>Who permits a septic system in DeLand?</strong></summary>
<p>DeLand Section 30-43(a) and (b) say septic tanks are built to plans and specifications approved by the health officer, and that no person constructs, repairs, alters or enlarges a septic tank without that approval and a valid permit. The Department of Environmental Protection's Onsite Sewage Program page says permitting and inspection is handled by the Environmental Health section of the Florida Department of Health in each county. The Florida Department of Health in Volusia County lists 386-822-6280 for Environmental Public Health.</p>
</details>

<details>
<summary><strong>What sewer impact fee figures does the City of DeLand list?</strong></summary>
<p>The city's impact fee sheet, printed effective 10/01/2026, lists sewer at 366 dollars per fixture unit. Ordinance No. 2026-22 says a residential unit is equivalent to 20 fixture units, and its text prints 7,320 dollars per equivalent residential unit for wastewater. Computed, 20 fixture units at 366 dollars per fixture unit is 7,320 dollars. The ordinance says the development fee is due and payable upon application for water or sewer service and is charged separately for water and sewer connections.</p>
</details>

<details>
<summary><strong>Does the Volusia Blue Spring plan area include part of DeLand?</strong></summary>
<p>The Volusia Blue Spring Basin Management Action Plan area includes portions of the City of DeLand, and its Priority Focus Area includes portions of the City of DeLand. The plan says new septic systems on lots of one acre or less within the plan boundary must be enhanced nutrient-reducing systems or other systems achieving at least 65 percent nitrogen reduction. Within the Priority Focus Area, a system on a lot of one acre or less that needs a permit to modify or replace it must connect to sewer if available, or be upgraded to at least 65 percent nitrogen reduction.</p>
</details>

<details>
<summary><strong>Is there help paying for a sewer connection in DeLand?</strong></summary>
<p>The Spring Hill Grants page says the Spring Hill Community Redevelopment Agency and the City of DeLand are accepting applications from those living on or around Adelle Avenue, or within the Spring Hill CRA, and that required impact fees for wastewater hookup will be fully paid. The page lists 386-740-0808 for the Dr. Joyce M. Cusack Resource Center.</p>
</details>

<details>
<summary><strong>Can a home on septic be remodeled without upgrading the septic system?</strong></summary>
<p>Florida Statutes section 381.0065(4)(bb) says an existing-system inspection or evaluation, or a modification, replacement or upgrade of the system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition may not cover any part of the existing system or encroach upon a required setback or the unobstructed area. The local health department reviews a floor plan and site plan and must complete the review within seven business days after receipt, or the addition is approved for the purposes of the paragraph.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 21:22:43 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/deland-septic-vs-sewer-what-a-buyer-checks]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[DeLand Property Tax Bill, Line by Line (2026 Rates)]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/deland-property-tax-bill-line-by-line-2026-rates]]>
        </link>
        <description>
            <![CDATA[<p>Millage code 012 (DeLand) carried a 2026 total rate of 18.0607 mills, which is 18.0607 dollars of tax for every 1,000 dollars of taxable value. That total is made up of twelve line items across six taxing authorities, drawn from the Volusia County Property Appraiser's 2026 final rate sheet, final CRA report and proposed-rate listing (computed count). The total was 18.2289 mills in 2025, so the 2026 figure is 0.1682 mills lower (computed).</p>

<p>See <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand homes for sale</a>. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deland-fl-neighborhoods-costs-and-what-to-know">Living in DeLand, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>The 2026 DeLand rate sheet, line by line</h2>

<p>Florida law defines a mill as one one-thousandth of a United States dollar. The Property Appraiser's formula multiplies taxable value by the millage rate and divides by 1,000 to reach the gross taxable taxes. The Tax Collector's page says one mill equals 1 dollar per 1,000 dollars of property value. The same page says the Property Appraiser establishes the value while the Volusia County Council, the Volusia County School Board, city commissioners and other levying bodies set the millage rates. The Property Appraiser's code list shows millage code 012 as DeLand. Each mill is 100 dollars on 100,000 dollars of taxable value (computed), and the figures below use that amount. They are arithmetic on published rates and not a quote for any address.</p>

<p>Here are the twelve 2026 lines for code 012, in dollars for each 100,000 dollars of taxable value (computed).</p>

<ul>
<li><strong>Volusia County General Fund, 3.1007 mills:</strong> 310.07 dollars.</li>
<li><strong>Volusia County Law Enforcement Fund, 1.5994 mills:</strong> 159.94 dollars.</li>
<li><strong>Volusia County Library, 0.3697 mills:</strong> 36.97 dollars.</li>
<li><strong>Volusia Echo, 0.2000 mills:</strong> 20.00 dollars.</li>
<li><strong>Volusia Forever, 0.2000 mills:</strong> 20.00 dollars.</li>
<li><strong>School Board required local effort, 2.9950 mills:</strong> 299.50 dollars.</li>
<li><strong>School Board discretionary, 0.7480 mills:</strong> 74.80 dollars.</li>
<li><strong>School Board capital improvement, 1.5000 mills:</strong> 150.00 dollars.</li>
<li><strong>West Volusia Hospital Authority, 0.9575 mills:</strong> 95.75 dollars.</li>
<li><strong>St. Johns River Water Management District, 0.1793 mills:</strong> 17.93 dollars.</li>
<li><strong>Florida Inland Navigation District, 0.0270 mills:</strong> 2.70 dollars.</li>
<li><strong>City of DeLand Operating, 6.1841 mills:</strong> 618.41 dollars.</li>
</ul>

<p>The total is 18.0607 mills, or 1,806.07 dollars for each 100,000 dollars of taxable value (computed). The county's operating lines add to 5.0698 mills, the same figure as the County Operating column on the sheet (computed). The sheet's county voter approved debt service column reads 0.4000, which matches Volusia Echo at 0.2000 plus Volusia Forever at 0.2000 (computed). The three school lines add to 5.2430 mills, against 5.2790 in 2025 (computed). The Florida Department of Revenue's 2025 Taxing Authority Code Description sheet names the lines of the 2025 DeLand row, including West Volusia Hospital Authority, St Johns River Water Management, Florida Inland Navigation District and DeLand Operating.</p>

<p>The DeLand row on the 2026 sheet has empty cells in the Fire District, Mosquito Control, Municipal Service Districts and Ponce Inlet and Port Authority columns. The County - Westside row, code 100, lists a Fire District line of 3.5990 and Municipal Service Districts at 1.6956, has no municipal entry and totals 17.1712.</p>

<p>Shares of the 18.0607 total are computed as follows. The City of DeLand line is 34.2 percent. The county lines are 30.3 percent, the school lines are 29.0 percent, the hospital line is 5.3 percent and St. Johns River plus Inland Navigation is 1.1 percent (rounded).</p>

<p>Three lines changed between 2025 and 2026. The Volusia County General Fund went from 3.2007 to 3.1007 mills, a change of minus 0.1000. The School Board's required local effort went from 3.0310 to 2.9950, a change of minus 0.0360. The West Volusia Hospital line went from 0.9897 to 0.9575, a change of minus 0.0322. The DeLand Operating line stayed at 6.1841 in both years. Together the three changes are minus 0.1682 mills, which is the whole move from 18.2289 to 18.0607 (computed). On the Property Appraiser's proposed-rate listing, the County General Fund's 2026 rolled-back figure is 3.1007, the same number as the final rate. It shows DeLand Operating at a rolled-back 6.0217 and a proposed 6.1841, which it labels plus 2.7 percent over rolled back.</p>

<p>The Property Appraiser's millage summary gives the final code 012 total for each year back to 1994. The 2013 total was 24.9513 mills and the 2018 total was 22.5101. The 2024 total was 18.4144, the 2025 total was 18.2289 and the 2026 total is 18.0607. From 2013 to 2026 the total fell by 6.8906 mills (computed).</p>

<p>Here is a labeled assumption, not a real home. Suppose a property has 200,000 dollars of taxable value. At the 2026 rates the City of DeLand line is 1,236.82 dollars, the county operating lines are 1,013.96 dollars and the two voted lines are 80.00 dollars. The school lines are 1,048.60 dollars, the hospital line is 191.50 dollars, St. Johns River is 35.86 dollars and Inland Navigation is 5.40 dollars. The total is 3,612.14 dollars, which is 18.0607 times 200 (computed).</p>

<h2>What the city, the CRA districts and the non-ad valorem roll add</h2>

<p>The City Commission adopted its 2026-27 operating rate in Resolution 2026-48, a final rate of 6.1841 mills. The resolution states that the rate is 2.70 percent more than the rolled-back rate of 6.0217 mills. It records that the County Property Appraiser certified a gross taxable value for operating purpose of 3,838,682,009 dollars. The final public hearing was held at 7:00 p.m. on September 21, 2026 in the City Hall Commission Chambers, and the resolution was passed that day. Section 1 repeals Resolution 2026-45, which had adopted a tentative rate. The resolution recites that section 200.065(2) of the Florida Statutes requires it to state the percent by which the rate exceeds the rolled-back rate. The gap between 6.1841 and 6.0217 is 0.1624 mills (computed). For 2025, Resolution 2025-72 adopted the same 6.1841 mills, which that resolution states was 2.46 percent more than a rolled-back rate of 6.0358 mills. It was passed on September 15, 2025. The City's Millage Rate page lists the adopted and tentative resolutions back to fiscal year 2017-18.</p>

<p>The City's Budget Summary for fiscal year 2026-2027 lists ad valorem taxes at 6.1841 mills. It shows 22,099,020 dollars in the General Fund, 969,779 dollars in special revenue funds and 1,126,715 dollars in the capital projects fund, for 24,195,514 dollars in all funds. The three amounts add to the all-funds figure (computed). The same summary shows a voted debt millage of 0.0000. Its top line states that the proposed operating budget expenditures are 5.9 percent more than last year's total operating expenditures. The City's Budget Resolution page lists Resolution 2026-49 as the adopted budget for fiscal year 2026-27.</p>

<p>The City's Utility Billing page says Utility Billing provides monthly billing and collection of water, sewer, storm water and garbage collection services. The City's Solid Waste page says the City uses GFL Environmental Inc. for solid waste, yard waste and recyclable collections and that billing is applied through the utility bill. The City's Stormwater page says the City requires detention or retention facilities with all new development projects.</p>

<p>By statute, a non-ad valorem assessment means only those assessments that are not based on millage and that can become a lien against a homestead as permitted in section 4, Article X of the State Constitution. The Tax Collector's guide to the bill says ad valorem taxes and non-ad valorem assessments are listed separately and combined into the total amount due. The Property Appraiser's 2026 non-ad valorem roll summary lists three entries under the City of DeLand. The file sits in the final folder and carries the heading 2026 Proposed Non-Ad Valorem Assessment Roll Summary.</p>

<ul>
<li><strong>Cresswind CDD:</strong> 414 parcels, a rate shown as varies, and a total of 608,012.30 dollars.</li>
<li><strong>Blue Lake Woods lighting:</strong> 50 parcels at 111.77 dollars, for 5,588.50 dollars.</li>
<li><strong>Glenwood Springs lighting:</strong> 213 parcels at 62.48 dollars, for 13,308.24 dollars.</li>
</ul>

<p>The City of DeLand section of the roll totals 677 parcels and 626,909.04 dollars, which matches the sum of the three entries (computed). The county section of the same roll lists Volusia County Garbage at 303.00 dollars on 46,860 parcels and Volusia County Stormwater at 96.00 dollars per ERU on 55,688 parcels. The volusia.org Solid Waste page says residents of the unincorporated areas receive waste services through the County's Solid Waste Division and are charged an annual 303 dollar non-ad-valorem assessment per residential unit. The holiday notice on that page defines unincorporated as outside all city limits. The Property Appraiser's Amendment 3 page says homestead exemptions reduce taxable value for ad valorem taxation but do not reduce non-ad valorem assessments. The Property Appraiser's tax estimator says its estimate does not include non-ad valorem fees such as storm water and solid waste.</p>

<p>The Property Appraiser's code list includes code 99 for DeLand Downtown C.R.A. and codes 87M and 87C for Spring Hill C.R.A., municipal and county. The 2026 final CRA report lists DeLand - Downtown as CRA ID 383, which began in 1984 and shows a year end of 2036. The report gives the CRA's 2026 taxable value as 115,806,157 dollars against a base-year value of 20,034,463 dollars. The incremental value is 95,771,694 dollars on 275 parcels. The CRA millage rate is 12.2417 mills for 2026, down from 12.3739 in 2025. The 12.2417 is the sum of the County General Fund, Law Enforcement Fund, Echo and Forever lines, the West Volusia Hospital line and the DeLand Operating line (computed). The report lists total 2026 CRA payments of 1,113,788 dollars, against 1,122,325 dollars in 2025, a change of minus 0.8 percent. The report lists DeLand - Spring Hill - Incorporated as CRA ID 395, which began in 2004 and ends in 2044, with 376 parcels. The City's Community Redevelopment Trust page states: "The Community Redevelopment Trust's goal is implementing to reduce blight and increase economic development in the designated area, thus increasing property values and quality of life." That page lists adopted FY 26-27 budgets for the Downtown CRA and the Spring Hill CRA.</p>

<p>Another DeLand guide is <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-taxes-utilities-and-the-city-vs-county-line">DeLand Taxes, Utilities and the City vs County Line</a>.</p>

<h2>From value to bill: exemptions, caps, Amendment 3 and the calendar</h2>

<p>The Property Appraiser describes three values. Just or market value is set first each year from market information including sales, and the status of a property on January 1 establishes value for the entire year. Assessed value is the value after an assessment cap such as Save Our Homes, and taxable value is assessed value less exemptions. The same FAQ says that because of the Save Our Homes cap and the non-homestead cap, it is not possible to compare taxes or assessed values with your neighbors.</p>

<p>Under section 196.031, a person who on January 1 has legal or beneficial title to real property and in good faith makes it a permanent residence, or the permanent residence of another or others legally or naturally dependent upon the person, is entitled to an exemption up to an assessed valuation of 25,000 dollars. That exemption is from all taxation except assessments for special benefits. A second exemption of up to 25,000 dollars applies to assessed valuation greater than 50,000 dollars for all levies other than school district levies. The statute adjusts that second amount each January 1 using the Consumer Price Index when the change is positive. The Department of Revenue lists the maximum at 25,722 dollars for 2025 and 26,411 dollars for 2026. The Property Appraiser's Amendment 3 page puts the 2026 homestead exemption at up to 51,411 dollars, made up of 25,000 dollars on all millages including school and 26,411 dollars on non-school millages.</p>

<p>Here is a second labeled assumption, not a real home. Take an assessed value of 250,000 dollars with the homestead exemption and the 2026 DeLand rates. The school taxable value is 225,000 dollars, and at 5.2430 mills the school tax is 1,179.68 dollars. The non-school taxable value is 250,000 minus 25,000 minus 26,411, or 198,589 dollars, and at 12.8177 mills (the 18.0607 total minus the 5.2430 school lines, computed) that tax is 2,545.45 dollars. The total is 3,725.13 dollars. The same 250,000 dollars with no exemption at 18.0607 mills is 4,515.18 dollars, which is 790.05 dollars more. These figures are computed from published rates and are not a quote for any address.</p>

<p>Section 193.155 says a homestead's annual reassessment change may not exceed the lower of 3 percent of the prior year's assessed value or the percentage change in the Consumer Price Index. The Department of Revenue lists the cap at 2.7 percent for 2026, 2.9 percent for 2025 and 3.0 percent for 2024. The statute also says that if the assessed value exceeds just value, the assessed value is lowered to just value. It says property assessed under that section is assessed at just value as of January 1 of the year following a change of ownership, with exceptions the statute lists. A change of ownership means any sale, foreclosure or transfer of legal title or beneficial title in equity to any person, except as listed. The Property Appraiser's FAQ says that when a property is sold, the cap is removed and the new owner establishes a new base year for the cap.</p>

<p>For nonhomestead residential property of nine or fewer dwelling units, section 193.1554 limits the annual change in assessed value, for levies other than school district levies, to 10 percent of the prior year's assessed value after the first year. That section also assesses the property at just value as of January 1 of the year following a change of ownership or control. The Property Appraiser's FAQ says the non-homestead cap does not apply to school tax levies.</p>

<p>The Property Appraiser's FAQ says that a homestead exemption showing in the records of a recently purchased property is the previous owner's exemption for the current tax year. It says the new owner must file for the owner's own homestead exemption by March 1 if the property is the primary residence. Any change in title, including a deed that adds a name, removes a name or places the property in a trust, requires a new application by March 1. Regular filing runs January 2 to March 1, and pre-filing for the coming year runs March 2 to December 31. Section 196.011 makes failure to apply on or before March 1 a waiver of the exemption privilege for that year, except as provided in subsections (8) and (9). The FAQ says exemptions may be renewed automatically each January as long as title and residency status do not change. It also says the exemption does not transfer to a new residence, and that portability lets an owner move up to 500,000 dollars of Save Our Homes benefit to a new homestead within three years of giving up the previous homestead. Portability uses form DR-501T, a separate application filed in addition to the homestead application by March 1 of the year after the previous homestead was abandoned. The FAQ says a late exemption application can be filed on or before the 25th day after the TRIM notice is mailed, with a letter explaining the extenuating circumstances. The Property Appraiser's office is at 123 W. Indiana Ave., Room 102, DeLand, and its phone number is 386-736-5901. The City's historic-property page says owners of qualifying properties who have met all requirements receive an exemption of 100 percent of the increase in assessed value of City of DeLand ad valorem taxes that results from restoration, renovation or rehabilitation, for ten years beginning January 1 once all criteria are met, with the amount determined by the Property Appraiser.</p>

<p>Section 689.261 requires that a prospective purchaser of residential property be presented a disclosure summary at or before execution of the contract. The summary reads: "BUYER SHOULD NOT RELY ON THE SELLER'S CURRENT PROPERTY TAXES AS THE AMOUNT OF PROPERTY TAXES THAT THE BUYER MAY BE OBLIGATED TO PAY IN THE YEAR SUBSEQUENT TO PURCHASE." It adds that a change of ownership or property improvements triggers reassessments of the property that could result in higher property taxes. Beginning February 1, 2027, any property visible on a listing platform must include the estimated ad valorem taxes, and if a tax estimator is used, the current owner's ad valorem assessment or taxes may not be used. The Property Appraiser's tax estimator uses 2026 final millage rates and lists DeLand as area 012.</p>

<p>Each August the Property Appraiser mails a Notice of Proposed Property Taxes, known as the TRIM notice. Section 200.069 requires its first page to read NOTICE OF PROPOSED PROPERTY TAXES, DO NOT PAY, THIS IS NOT A BILL. The statute says each taxing authority may amend or alter its proposals at the public hearing. A petition to the Value Adjustment Board on a valuation issue may be filed, as to valuation issues, at any time during the taxable year on or before the 25th day after the property appraiser mails the notice (section 194.011). The Property Appraiser's page lists a non-refundable 40 dollar filing fee and describes the special magistrate hearing as informal.</p>

<p>Taxes are due and payable November 1 or as soon after as the certified roll is received, and the Tax Collector's page says tax statements are mailed on or about November 1. The discount is 4 percent in November (section 197.162 adds "or within 30 days after the sending of the original tax notice"), 3 percent in December, 2 percent in January, 1 percent in February and zero in March. The Tax Collector's page says taxes become delinquent on April 1 and adds a 3 percent minimum mandatory charge at that point. Section 197.333 sets delinquency on April 1 following the year assessed or immediately after 60 days have expired from the mailing of the original tax notice, whichever is later. The page lists March 31 as the last day for payment without penalty and April 30 as the deadline for new installment plan applications. Section 197.122 makes taxes a first lien, superior to all other liens, from January 1 of the year they were levied until they are discharged by payment or barred. The Tax Collector's bill guide says failure to receive a tax notice does not excuse failure to pay or extend the early payment discount. The Tax Collector's installment page says the plan applies when the estimated tax is more than 100 dollars. Section 197.222 sets the quarterly payments for June 30, September 30, December 31 and March 31, with discounts of 6, 4.5 and 3 percent on the first three and none on the last. The installment page also says mortgage companies are obligated to pay taxes in November to obtain the maximum discount for their accounts. The Tax Collector's office is the Office of Will Roberts - Tax Collector, phone 386-736-5938.</p>

<p>The Property Appraiser's Amendment 3 page says Florida voters approved Amendment 3 in the November 3, 2026 General Election and that it takes effect January 1, 2027. The page says the change will first be reflected on the August 2027 TRIM notices and the tax bills delivered in November 2027. For homestead property the amendment keeps a 25,000 dollar exemption on school millages. For non-school millages it provides up to 150,000 dollars beginning January 1, 2027 and up to 250,000 dollars beginning January 1, 2028. Permanent Florida residents as of December 31, 2026 are eligible for the larger amounts beginning in 2027, subject to the Florida Constitution. Individuals who establish residency on or after January 1, 2027 begin at 50,000 dollars for non-school taxes and become eligible for the larger exemption after four years, first applying on January 1 of the fifth year. Save Our Homes, portability and the widow, senior, veteran and disability exemptions do not change. For non-homestead property the assessment limit for non-school taxes falls from 10 percent to 5 percent, and school taxes continue to be uncapped and based on just value. The page says the changes affect taxable value and not tax rates, and that future bills may also be affected by millage rates, non-ad valorem assessments and fees set by taxing authorities. It says actual savings cannot be determined until implementing legislation is finalized and future tax rates are established. Its own table shows an increase in exempt value of 98,589 dollars for 2027 and 198,589 dollars for 2028, with estimated savings of about 1,164 dollars and 2,345 dollars at the 2025 countywide average non-school rate of 11.8092 mills. Applying that same method to the DeLand non-school rate of 12.8177 mills, 98,589 dollars comes to 1,263.68 dollars (computed, assuming the full exemption and 2026 rates). The page states that the office does not support or oppose any constitutional amendment.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption: How to File and What It Saves You</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/amendment-3-in-volusia-county-what-florida-s-property-tax-vote-means-for-homeowners-and-buyers">Amendment 3 in Volusia County: What Florida's Property Tax Vote Means for Homeowners and Buyers</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-property-taxes-explained-for-buyers">Volusia County Property Taxes Explained for Buyers</a>.</p>

<p><strong>Bottom line.</strong> The 2026 rate for DeLand code 012 is 18.0607 mills across twelve lines, and the City of DeLand line is 6.1841 mills of it. The total fell 0.1682 mills from 2025 through the County General Fund, the School Board's required local effort and the West Volusia Hospital line (computed). The Property Appraiser's 2026 non-ad valorem roll summary, headed Proposed, lists Cresswind CDD and two lighting entries under the City of DeLand. Under section 196.011, exemption applications are due on or before March 1, tax statements are mailed on or about November 1, and the discount steps from 4 percent in November to zero in March. Amendment 3 first reaches bills in November 2027. See <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand homes for sale</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What is the 2026 property tax rate for a home in the City of DeLand?</strong></summary>
<p>The Volusia County Property Appraiser's 2026 final sheet lists millage code 012 DeLand at 18.0607 mills, which is 18.0607 dollars for every 1,000 dollars of taxable value. The lines are County Operating 5.0698, county voter approved debt service 0.4000, School 5.2430, St. Johns River Water Management District 0.1793, Florida Inland Navigation District 0.0270, Hospital Operating 0.9575 and the City of DeLand at 6.1841. The same sheet lists the County - Westside row, code 100, at 17.1712.</p>
</details>
<details>
<summary><strong>Which line on the DeLand rate is set by the city?</strong></summary>
<p>The City of DeLand Operating line is 6.1841 mills, adopted in Resolution 2026-48. The resolution states the rate is 2.70 percent more than the rolled-back rate of 6.0217 mills. The final public hearing was held at 7:00 p.m. on September 21, 2026, and the resolution was passed that day. The 2025 rate was also 6.1841 mills, according to Resolution 2025-72.</p>
</details>
<details>
<summary><strong>How did the DeLand total change between 2025 and 2026?</strong></summary>
<p>The code 012 total went from 18.2289 mills in 2025 to 18.0607 mills in 2026, a drop of 0.1682 (computed). The County General Fund fell 0.1000, the School Board's required local effort fell 0.0360 and the West Volusia Hospital line fell 0.0322. The DeLand Operating line stayed at 6.1841 in both years.</p>
</details>
<details>
<summary><strong>What non-ad valorem assessments does the 2026 roll list for the City of DeLand?</strong></summary>
<p>The Property Appraiser's 2026 non-ad valorem roll summary lists three entries under the City of DeLand. They are Cresswind CDD with 414 parcels, Blue Lake Woods lighting with 50 parcels and Glenwood Springs lighting with 213 parcels. The section totals 626,909.04 dollars on 677 parcels. The file sits in the final folder and carries the heading 2026 Proposed Non-Ad Valorem Assessment Roll Summary.</p>
</details>
<details>
<summary><strong>When is the homestead exemption application due, and does a purchase carry the seller's exemption?</strong></summary>
<p>Section 196.011 says an application for exemption is due on or before March 1, and failure to apply is a waiver of the exemption privilege for that year, with exceptions in subsections (8) and (9). The Property Appraiser's FAQ says a homestead exemption showing on a recently purchased property is the previous owner's exemption for the current tax year. It says the new owner must file for the owner's own exemption by March 1 if the property is the primary residence.</p>
</details>
<details>
<summary><strong>When are DeLand tax bills mailed, and what are the discount steps?</strong></summary>
<p>The Volusia County Tax Collector says tax statements are mailed on or about November 1. Early payment discounts are 4 percent in November, 3 percent in December, 2 percent in January and 1 percent in February, with none in March. The Tax Collector's page says taxes become delinquent on April 1, at which time a 3 percent minimum mandatory charge is added. The Tax Collector lists March 31 as the last day for payment without penalty.</p>
</details>
<details>
<summary><strong>What does Amendment 3 change and when does it reach a tax bill?</strong></summary>
<p>The Property Appraiser's Amendment 3 page says voters approved it on November 3, 2026 and that it takes effect January 1, 2027. It will first be reflected on the August 2027 TRIM notices and the tax bills delivered in November 2027. It provides up to 150,000 dollars of homestead exemption on non-school millages beginning in 2027 and up to 250,000 dollars beginning in 2028, and school millages keep the 25,000 dollar exemption. For non-homestead property it lowers the assessment limit for non-school taxes from 10 percent to 5 percent.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 20:50:15 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/deland-property-tax-bill-line-by-line-2026-rates]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Edgewater Short-Term Rental Rules for Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/edgewater-short-term-rental-rules-for-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Exact-phrase searches on November 17, 2026 for "short-term rental," "short term rental" and "vacation rental" returned zero hits in the city's Code of Ordinances on Municode. A text search of the full Land Development Code PDF, revised and amended July 2026, returned zero matches for the same three phrases. The Land Development Code defines a bed and breakfast and a motel, its Table III-2 describes a Tourist Commercial district, and the city runs a business tax receipt and certificate of use program. The sections below set out those published rules for <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater</a>.</p>

<h2>What Edgewater's codes define and list</h2>

<p>Edgewater's Municode library holds one code product, the Code of Ordinances, with a latest updated date of October 15, 2026. Exact-phrase searches of that code on November 17, 2026 for "vacation rental," "short-term rental," "short term rental" and "bed and breakfast" each returned zero hits.</p>

<p>The table of contents of the Code of Ordinances lists Chapter 21, Land Development Code. Section 21-1 says a new chapter 21 of the City Code is known as the Land Development Code. It says the chapter is attached to Ordinance No. 2000-O-12, as amended, as exhibit A and incorporated by reference. It says the Land Development Code shall contain all city regulations concerning zoning, subdivision and use of land within the city, and concerning compatibility between adjacent land uses.</p>

<p>The city's Land Development Code page lists Articles I through XX as separate documents. It also lists a full Land Development Code document updated in July 2026. The cover of the full document reads "Revised and Amended July 2026." The PDF's creation date is July 12, 2026. Page footers inside the document carry different ordinance numbers by article. Article II pages read 2026-O-06 and Article III pages read 2018-O-28.</p>

<p>A text search of the full Land Development Code for "short-term rental," "short term rental" and "vacation rental" on November 17, 2026 returned zero matches. The phrase "short-term rental" appears once in the document, inside the definition of a bed and breakfast.</p>

<p>Article II defines a bed and breakfast as a house or portion thereof where lodging rooms are available for short-term rental and meals may be provided to the guests renting the rooms and where the operator of the establishment lives on the premises.</p>

<p>Article II defines a motel as a building, or group of buildings, which contains sleeping accommodations for transient occupancy and may have individual entrances from outside the building to serve each such sleeping unit. Motels may have one or more dining rooms, restaurants or cafes as accessory uses. For the purposes of the code, motel and hotel have the same meaning, and the entry for hotel reads see "Motel."</p>

<p>Article II also defines a dwelling as any building or portion thereof designed or used exclusively for residential living occupancy. It defines residential activity as any structure, or portion thereof, that is used for residential purposes, including those customary and accessory residential activities. It defines a conditional use as a use within a zoning district that may be permitted, pursuant to express standards and criteria, which are consistent with the Comprehensive Plan.</p>

<p>Section 19-90 of the Code of Ordinances, the water conservation definitions, says nonresidential landscape irrigation means the irrigation of landscape not included within the definition of residential landscape irrigation, such as that associated with public commercial and industrial property, including commercial or transient housing units, hotel and motel units and public medians and rights-of-way.</p>

<h2>Districts, the use table and the conditional use permit</h2>

<p>Table III-2 of the Land Development Code describes each zoning district. The Tourist Commercial district, B-4, is described as intended for short term waterfront accommodations for visitors and accessory uses, and it may include residential mixed use. The minimum parcel size listed for B-4 is 2 acres. The Highway Commercial district, B-3, is described as intended for high volume highway related commercial uses, with no minimum parcel size.</p>

<p>The same table describes the residential districts. R-1, R-2 and R-3 are each described as single family residential at 1.0 to 4.0 units per net acre, with minimum lots of 12,000, 10,000 and 8,625 square feet in that order. R-4 is described as medium density residential at 4.1 to 8.0 units per net acre, covering single family, duplex, apartments and townhouses. R-5 is described as high density residential at 8.1 to 12.0 units per net acre, covering the same four types.</p>

<p>The same table also describes planned unit development districts. The Business Planned Unit Development district, BPUD, is described as intended for mixed commercial and limited multifamily residential with a single development plan. The Residential Planned Unit Development district, RPUD, is described as intended for mixed residential, personal service and limited retail commercial with a single development plan. The Mixed Use Planned Unit Development district, MUPUD, is described as intended for innovative mixed use developments to include, but not be limited to, commercial, light industrial and residential.</p>

<p>Section 21-33.01 explains how to read the use table, which is Table III-3. It says that if a use is not present in a given square in the matrix, that use is not permitted in that zoning district. It says changes to the list of uses, the zoning districts or the permitted, conditional or accessory status of a given land use can only be made by completing the Land Development Code amendment process described in Article IX. The section adds that the footnotes in Table III-3 refer to special criteria described in Section 21-34.</p>

<p>Section 21-33.02 says a P in the matrix means the use is permissible in that district as a matter of right, subject to satisfactory compliance with the project design standards in the code and any applicable site plan review requirements. The same section says the list of permitted uses cannot be all inclusive. It says the uses described in Table III-3 shall be interpreted by the Development Services Director or Planning Director to include other uses that have similar impacts to those listed. Any dispute or request regarding interpretations is resolved by the City Manager, subject to an appeal to the City Council. The section also says all permitted uses or businesses requiring business tax receipts shall operate from within a permanent structure.</p>

<p>Section 21-33.03 says a C in the matrix means the use is permitted in that district only after satisfactory completion of the conditional use process described in Article IX, or the satisfactory completion of a Planned Unit Development. Compliance with the Article V design standards and the Article XI concurrency requirements must also be achieved before a project starts. Section 21-33.04 says an A means a use that is incidental, related, appropriate and clearly subordinate to the existing principal permitted use.</p>

<p>Table III-3 has a row for Bed and Breakfast and a row for Hotel/Motel. The Bed and Breakfast row carries footnote 3. It shows a C in R-1, RPUD, BPUD, MUPUD and SCD/PUD, and a P in B-3 and B-4. The other district columns have no letter in that row. Footnote 3 reads see Bed and Breakfast, Section 21-34.08 for details.</p>

<p>The Hotel/Motel row shows a P in B-3 and B-4. It shows a C in BPUD, CC, MUPUD and SCD/PUD. The other district columns have no letter in that row, including R-1 through R-5.</p>

<p>Section 21-34.08 sets four requirements for bed and breakfasts. First, bed and breakfast accommodations, as defined in Section 21-20, require off-street parking at 1 space per bedroom, plus residential parking requirements. Second, landscaping is to be provided as required for hotel and motel uses. Third, the section lists one sign not to exceed six square feet. Fourth, a City Business Tax Receipt is required.</p>

<p>In the code's parking schedule, a bed and breakfast is listed at 1 space per each room rented plus residential requirements. A hotel or motel is listed at 1 space for each bedroom unit plus 1 per 2 employees. For residential single family, duplex and mobile home, the schedule lists 2 spaces per unit. For residential institutional and multi-family, it lists 2 spaces per unit plus 1 guest space for every 3 units.</p>

<p>Section 21-36.02 covers accessory uses. Paragraph (a) says no accessory structure or use is permitted on any lot that does not have an established principal use conforming to the code. Paragraph (d) says accessory buildings shall not be rented or otherwise used as a dwelling unit.</p>

<p>The conditional use permit process is in Section 21-92. Section 21-92.01 says the permit applies to subsequent property owners operating the same business or engaging in the same use, unless the conditions of approval say otherwise. Section 21-92.02 says no application can be approved unless the property is in a zoning district consistent with Table III-3.</p>

<p>Section 21-92.03 lists the procedure. Public notice is as provided in current Florida Statutes. Upon receipt of a complete application and relevant supporting material, the Development Services Department will schedule a review by the Technical Review Committee (TRC). Following that review, a staff report including findings of fact and a staff recommendation is provided to the Planning and Zoning Board. The Planning and Zoning Board provides findings of fact regarding its decision to approve, deny or modify the applicant's request. The Planning and Zoning Board decision is final unless appealed to the City Council within 15 days.</p>

<p>Section 21-92.04 sets the decision criteria. To approve a permit, the Planning and Zoning Board must make a finding of fact that the permit is consistent with applicable land development regulations for the zoning district in which the property is located, is compatible with existing and proposed uses in the adjacent area, and meets the Concurrency Management System requirements of Article XI. Section 21-92.05 says a permit may set reasonable time limits, renewal conditions or operational restrictions, and may require site plan review.</p>

<p>Section 21-92.06 says a permit expires 120 days after it is issued if a building permit or certificate of occupancy has not been issued by that date. Section 21-92.07 says a denied permit is not eligible for resubmission for one year after the date of final denial by the Planning and Zoning Board or by the City Council, if appealed. Section 21-92.08 says an appeal of a City Council decision on a conditional use permit goes to the Circuit Court.</p>

<h2>City receipts, state licensing, taxes and associations</h2>

<p>Chapter 11 of the Code of Ordinances covers business tax receipts. Section 11-1 levies a business tax for the privilege of engaging in or managing any business, profession or occupation within the city. It applies to any person who maintains a permanent business location or branch office within the city, and to any person who does not qualify under those subsections and who transacts any business commerce where such tax is not prohibited by the United States Constitution.</p>

<p>Section 11-2 says it is unlawful to engage in or manage any business, profession or occupation in the city without a current business tax receipt. It says no person, firm or corporation may open any business to the public until they have applied for and procured a certificate of use for each business location or premise. All businesses are required to obtain both a business tax receipt and a certificate of use for each location.</p>

<p>Section 11-9(a) says no person, firm or corporation shall engage in or manage any business, profession, trade, amusement or industry in the city without first applying for and procuring a certificate of use for each location or premise. Certificates of use are not issued until a new business inspection is completed at the location or premise and found to comply with all requirements of the code of the city and all applicable laws and regulations.</p>

<p>Section 11-3(a) sets the timing. Business tax receipts are sold by the city beginning July 1 of each year. They are due and payable on or before September 30 of each year and expire on September 30 of the succeeding year. For each receipt obtained for any new business after April 1 of each year, one-half of the applicable annual business tax is paid.</p>

<p>The business tax schedule in Section 11-7 has an item numbered (2) titled accommodations for rent, apartments, motels, motor courts, cottages, hotels, boardinghouses, etc. Its tiers are 1 to 2 rental units, 3 to 10, 11 to 20, 21 to 30, 31 to 40, and each additional unit. The first tier is printed "n/c," and each later tier carries an amount that this guide does not repeat. The line adds that a license must be taken out for all rental units whether used or unused. It also says the license does not permit a dining room without a restaurant license.</p>

<p>Municode lists Section 11-9.1 as Reserved. The section list for Chapter 11, Article I reads Section 11-8 Punishment for violation, Section 11-9 Certificate of use required, Section 11-9.1 Reserved and Section 11-10 Definitions. A copy of Ordinance No. 2018-O-23 on the city's Legistar site is a redline. Its recitals say Chapter 11, Article I was being amended and restated to reflect the creation of a residential rental inspection program and changes to the fees and taxes associated with business tax receipts. In that document the section numbered 11-9.1 is titled Accommodations for rent, Residential. Municode's history lines for Section 11-1 cite Ordinance No. 2018-O-23, adopted September 10, 2018.</p>

<p>Step 1 of the city's Starting A Business page is titled Verify Zoning. It names the Development Services Department, 386-424-2400, ext. 1502, for verifying zoning and permitted land uses before signing a lease or purchasing property. Step 4 is titled Contact Development Services. It says zoning changes sometimes occur once a property changes ownership, and that only Development Services can give the correct zoning regulations. Development Services is at 139 E Park Avenue, Edgewater, FL 32132, 386-424-2400 X 1503.</p>

<p>Step 3 of the same page says a Business Tax Receipt is required for all businesses and is paid annually. It says the City Council has adopted a Certificate of Use Program for all businesses located within the city, which gives the city the ability to conduct life safety inspections. There is one form for home based businesses and one form for non-home based businesses. The Finance Department is at 104 N Riverside Drive, 386-424-2400 X 1305. The page says any profession that requires a state regulated license, and any contractor requiring a Volusia County Specialty License, must have those prior to being issued a Business Tax License in Edgewater.</p>

<p>The city's New Business Information and Application Guide says any person, firm or corporation engaging in or managing any profession or occupation based within the city, including home based businesses, needs a Business Tax Receipt. It says all businesses are required to obtain a Certificate of Use for each business location. The guide says the location must be zoned properly for the type of business operation, and that other zoning requirements such as parking, landscaping and screening may apply. It says home-based businesses may only offer services that are conducted away from the home, over the telephone or Internet, or a mobile business.</p>

<p>Step 7 of the Starting A Business page says every person who rents living accommodations located in Volusia County for a period of six months or less must register with the county. Step 8 says that effective January 1, 2024, the ordinance requiring a Volusia County business tax receipt is repealed, and a county business tax receipt is no longer required for any business located within Volusia County. For questions about whether a city receipt is required, the page says to contact the city in which the business is physically located.</p>

<p>The city's Code Enforcement page says the division addresses matters involving property maintenance, zoning, signs, vehicles, noise, building activity, land development and other community standards. It describes a balanced approach that includes routine proactive observations throughout the community and the investigation of reported complaints. It says that when violations are not corrected, the city may take formal enforcement action as authorized by law. The page menu lists Contact Code Enforcement, Search Case Status and Landlord/Tenant Law in Florida.</p>

<p>The city's Lien Search and Payoff Request page says the city has partnered with Orange Lien Data, LLC to process lien search requests. It says the complete property address, owner names and parcel ID numbers are required for all searches of outstanding municipal liens, code enforcement liens and outstanding utility balances. Lien searches are only good for 30 days from the effective date. The page text carries the date November 1, 2019.</p>

<p>The Florida Statutes cover public lodging, taxes and associations. Section 509.032(7)(a) says the regulation of public lodging establishments and public food service establishments, including sanitation standards, inspections, training and testing of personnel, and matters related to the nutritional content and marketing of foods offered in such establishments, is preempted to the state. The paragraph does not preempt the authority of a local government or local enforcement district to conduct inspections of public lodging and public food service establishments for compliance with the Florida Building Code and the Florida Fire Prevention Code.</p>

<p>Section 509.032(7)(b) says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. The paragraph does not apply to any local law, ordinance or regulation adopted on or before June 1, 2011. Paragraph (c) says paragraph (b) does not apply to any local law, ordinance or regulation exclusively relating to property valuation as a criterion for vacation rental if the local law is required to be approved by the state land planning agency pursuant to an area of critical state concern designation.</p>

<p>Section 509.242(1)(c) says a vacation rental is any unit or group of units in a condominium or cooperative, or any individually or collectively owned single-family, two-family, three-family or four-family house or dwelling unit, that is also a transient public lodging establishment but is not a timeshare project. Section 509.013(12) says transient occupancy means occupancy that is temporary. It includes the occupancy of a dwelling unit at a hotel, motel, vacation rental, bed and breakfast inn or timeshare project, unless a written rental or lease agreement expressly states that the dwelling unit is the sole residence of the guest. Section 509.013(11) defines a transient establishment as a public lodging establishment rented or leased to guests by an operator for transient occupancy.</p>

<p>Section 509.242(1)(f) says a bed and breakfast inn is a family home structure, with no more than 15 sleeping rooms, which has been modified to serve as a transient public lodging establishment. It provides the accommodation and meal services generally offered by a bed and breakfast inn, and it is recognized as one in the community in which it is situated or by the hospitality industry. Section 509.242(1)(b) says a motel is a public lodging establishment that offers rental units with an exit to the outside of each unit, daily or weekly rates, off-street parking for each unit, a central office on the property with specified hours of operation, a bathroom or connecting bathroom for each rental unit, and at least six rental units, and which is recognized as a motel in the community in which it is situated or by the industry.</p>

<p>Section 509.241(1) says each public lodging establishment and public food service establishment shall obtain a license from the division. The license may not be transferred from one place or individual to another. It is a misdemeanor of the second degree for such an establishment to operate without a license. The statute says local law enforcement shall provide immediate assistance in pursuing an illegally operating establishment.</p>

<p>The Division of Hotels and Restaurants at DBPR keeps an easily searchable online database of licensed vacation rentals. It gives the location address of every vacation rental condo or dwelling currently licensed by the division and refreshes daily. The division's application list includes Vacation Rental, Condo, for a single unit or group of units rented transiently in a condominium or cooperative. It also lists Vacation Rental, Dwelling, for single-family homes, townhouses, duplexes, triplexes or quadruplexes rented transiently. License holders can add or remove rental unit addresses through the department's online account service, and changes are reflected in the public database within 24 hours.</p>

<p>Tax rules sit in chapter 212 and in the county tax. Section 212.03(1)(a) says every person is exercising a taxable privilege who engages in the business of renting, leasing, letting or granting a license to use any living quarters or sleeping or housekeeping accommodations in, from, or a part of, or in connection with any hotel, apartment house, roominghouse, tourist or trailer camp, mobile home park, recreational vehicle park, condominium or timeshare resort. Section 212.03(7)(c) exempts the rental of facilities intended primarily for rental as a principal or permanent place of residence. The rental of such facilities that primarily serve transient guests is not exempt. The department considers a facility as primarily serving transient guests unless the owner makes a verified declaration on a department form that more than half of the total rental units available are occupied by tenants who have a continuous residence in excess of 3 months.</p>

<p>Section 125.0104(3)(a)1. says every person who rents, leases or lets for consideration any living quarters or accommodations in any hotel, apartment hotel, motel, resort motel, apartment, apartment motel, roominghouse, mobile home park, recreational vehicle park, condominium or timeshare resort for a term of 6 months or less is exercising a privilege subject to taxation under that section, unless the accommodations are exempt under chapter 212.</p>

<p>Volusia County describes its Tourist and Convention Development Tax as a local option transient rental tax collected by the county. Every person who rents, leases or lets for consideration any living quarters for a term of 6 months or less is exercising a taxable privilege. The county page says that if you rent a bed, room, apartment, house, condo, hotel, motel, recreational vehicle or watercraft for a term of 6 months or less, you are responsible for collecting and remitting the tax. Registration is online, at treasury@volusia.org, or at 386-943-7085. The page also says registration and payment of taxes does not guarantee compliance with other state and local laws, and it asks readers to contact their city and county zoning departments to determine whether short-term rentals are permitted in their area and for what duration.</p>

<p>The county's Report a Rental Evader page cites sections 125.0104 and 212 of the Florida Statutes. It says a taxable property owner who fails or refuses to charge and collect the taxes from the person paying any rental or lease is, in addition to being personally liable for the payment of the tax, guilty of a misdemeanor in the first degree, punishable by a definite term of imprisonment not to exceed 1 year. It says repeat offenses may constitute a felony. The page has an anonymous report form, and it says the information given will not be shared with anyone outside the Treasury and Billing Division.</p>

<p>Section 196.061(1) of the Florida Statutes says the rental of all or substantially all of a dwelling previously claimed to be a homestead for tax purposes constitutes the abandonment of that dwelling as a homestead. The abandonment continues until the dwelling is physically occupied by the owner. The paragraph adds that abandonment of the homestead after January 1 of any year does not affect the homestead exemption for that particular year unless the property is rented for more than 30 days per calendar year for 2 consecutive years. The statute's history line cites section 15 of chapter 2026-239, and a note says the amendments to sections 196.015 and 196.061 operate retroactively to January 1, 2026 and first apply to the 2026 ad valorem tax roll. Subsection (2) of the section lists persons to whom the section does not apply.</p>

<p>Section 720.306(1)(h) says a governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title to the parcel after the effective date of the governing document or amendment, or to a parcel owner who consents to it, individually or through a representative. The next subparagraph says an association may amend its governing documents to prohibit or regulate rental agreements for a term of less than 6 months and may prohibit the rental of a parcel for more than three times in a calendar year. Those amendments apply to all parcel owners.</p>

<p>Section 718.110(13) says an amendment prohibiting unit owners from renting their units, altering the duration of the rental term, or specifying or limiting the number of times unit owners are entitled to rent their units during a specified period applies only to unit owners who consent to the amendment and unit owners who acquire title to their units after the effective date of that amendment.</p>

<p>Section 720.401(1)(a) says a prospective parcel owner in a community must be presented a disclosure summary before executing the contract for sale. Item 2 of the form reads that there have been or will be recorded restrictive covenants governing the use and occupancy of properties in the community.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-edgewater-fl-neighborhoods-costs-and-what-to-know">Living in Edgewater, FL: Neighborhoods, Costs and What to Know</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-property-tax-bill-2026-lines-explained">Edgewater Property Tax Bill: 2026 Lines Explained</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-flood-zones-and-flood-insurance-check-an-address">Edgewater Flood Zones and Flood Insurance: Check an Address</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption: How to File and What It Saves You</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-a-condo-in-florida-under-the-new-condo-laws-a-volusia-county-guide">Buying a Condo in Florida Under the New Condo Laws: A Volusia County Guide</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/11/17/south-daytona-short-term-rental-rules-for-home-buyers">South Daytona Short-Term Rental Rules for Home Buyers</a>.</p>

<h2>Bottom line</h2>

<p>A text search of <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater</a>'s Land Development Code returned zero matches for short-term rental, short term rental and vacation rental. The code defines a bed and breakfast and a motel, and its Table III-3 lists Bed and Breakfast and Hotel/Motel by zoning district. The Tourist Commercial district, B-4, is described as intended for short term waterfront accommodations for visitors. Section 21-33.01 says a use not present in a given square in the matrix is not permitted in that district, and the city's Starting A Business page says only Development Services can give the correct zoning regulations.</p>

<p>Section 11-2 says all businesses are required to obtain both a business tax receipt and a certificate of use for each location, and Municode lists Section 11-9.1 as Reserved. Section 509.241(1) says a license from the division may not be transferred from one place or individual to another. Volusia County's Tourist and Convention Development Tax applies to rentals of living quarters for a term of 6 months or less. Section 509.032(7)(b) says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals, and that this paragraph does not apply to any local law, ordinance or regulation adopted on or before June 1, 2011. Section 196.061(1) treats the rental of all or substantially all of a dwelling previously claimed to be a homestead as abandonment of the homestead.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Does Edgewater's code have a short-term rental rule?</strong></summary>
<p>Exact-phrase searches on November 17, 2026 for "vacation rental," "short-term rental" and "short term rental" returned zero hits in the Code of Ordinances on Municode. A text search of the full Land Development Code returned zero matches for "short-term rental," "short term rental" and "vacation rental," and the phrase "short-term rental" appears once, inside the definition of a bed and breakfast. The city's Starting A Business page says only Development Services can give the correct zoning regulations.</p>
</details>

<details>
<summary><strong>What does the Land Development Code say about a bed and breakfast?</strong></summary>
<p>Article II defines a bed and breakfast as a house or portion thereof where lodging rooms are available for short-term rental and meals may be provided to the guests renting the rooms and where the operator of the establishment lives on the premises. Table III-3 shows a C in R-1, RPUD, BPUD, MUPUD and SCD/PUD and a P in B-3 and B-4. Section 21-34.08 requires off-street parking at 1 space per bedroom plus residential parking requirements, landscaping as for hotel and motel uses, one sign not over six square feet, and a City Business Tax Receipt.</p>
</details>

<details>
<summary><strong>What do the Land Development Code tables say about the B-4 Tourist Commercial district?</strong></summary>
<p>Table III-2 describes B-4 as intended for short term waterfront accommodations for visitors and accessory uses, and it may include residential mixed use, with a minimum parcel size of 2 acres. In Table III-3, the Hotel/Motel row shows a P in B-3 and B-4, and the Bed and Breakfast row shows a P in B-3 and B-4. Section 21-33.01 says a use not present in a given square in the matrix is not permitted in that district.</p>
</details>

<details>
<summary><strong>What does Edgewater's business tax schedule say about accommodations for rent?</strong></summary>
<p>Section 11-7 has an item for accommodations for rent, apartments, motels, motor courts, cottages, hotels, boardinghouses, etc., with tiers by number of rental units. The first tier, 1 to 2 rental units, is printed "n/c." The line says a license must be taken out for all rental units whether used or unused. Section 11-2 says all businesses are required to obtain both a business tax receipt and a certificate of use for each location. Municode lists Section 11-9.1 as Reserved.</p>
</details>

<details>
<summary><strong>Can a Florida public lodging license be transferred?</strong></summary>
<p>Section 509.241(1) of the Florida Statutes says each public lodging establishment shall obtain a license from the division, and that the license may not be transferred from one place or individual to another. It is a misdemeanor of the second degree for an establishment to operate without a license. The division keeps a searchable online database of licensed vacation rentals by address that refreshes daily.</p>
</details>

<details>
<summary><strong>What does Volusia County's Tourist and Convention Development Tax cover?</strong></summary>
<p>The county describes its Tourist and Convention Development Tax as a local option transient rental tax. Every person who rents, leases or lets for consideration any living quarters for a term of 6 months or less is exercising a taxable privilege. The county page says registration and payment of taxes does not guarantee compliance with other state and local laws.</p>
</details>

<details>
<summary><strong>What does renting a homestead home do to the homestead exemption?</strong></summary>
<p>Section 196.061(1) says the rental of all or substantially all of a dwelling previously claimed to be a homestead for tax purposes constitutes the abandonment of that dwelling as a homestead. The abandonment continues until the dwelling is physically occupied by the owner. Abandonment after January 1 of any year does not affect the exemption for that year unless the property is rented for more than 30 days per calendar year for 2 consecutive years.</p>
</details>

<details>
<summary><strong>What do the statutes say about association rental amendments?</strong></summary>
<p>Section 720.306(1)(h) says an association may amend its governing documents to prohibit or regulate rental agreements for a term of less than 6 months and may prohibit the rental of a parcel for more than three times in a calendar year, and those amendments apply to all parcel owners. Other rental amendments enacted after July 1, 2021 apply only to a parcel owner who acquires title after the effective date or who consents. For condominiums, section 718.110(13) says a rental amendment applies only to unit owners who consent and unit owners who acquire title after the effective date.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 20:49:58 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/edgewater-short-term-rental-rules-for-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Daytona Beach Septic vs Sewer: What Buyers Check]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/daytona-beach-septic-vs-sewer-what-buyers-check]]>
        </link>
        <description>
            <![CDATA[<p>The Daytona Beach Land Development Code requires the owner of a property used for human occupancy, employment or recreation, and abutting a street, alley or right-of-way with a public sewer, to connect within 90 days after official notice, if the public sewer is within 200 feet of the property line. The code covers property in <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach</a>. The sources are the city's Land Development Code and Code of Ordinances on Municode, the city's fee documents, Florida Statutes sections 381.0065, 381.00655 and 403.067, the Florida Department of Environmental Protection and the Florida Department of Health in Volusia County.</p>

<h2>What the Daytona Beach code says about sewer and septic</h2>

<p>The sewer rules sit in the Land Development Code, Article 7, titled Environmental Requirements. Section 6 of that article is titled Sanitary Sewer System, and a footnote in it says the utilities cross reference is Chapter 98. The Municode page for the Land Development Code said its online content was updated on July 7, 2026.</p>

<p>Section 6.5 is titled Use of public sewers required. Paragraph (a) says it is unlawful to place, deposit or permit to be deposited in any unsanitary manner on public or private property within the city, or in any area under the jurisdiction of the city, any human or animal excrement, garbage, grease, oil or other objectionable waste. Paragraph (b) says it is unlawful to discharge to any natural outlet or storm sewer within the city, or in any area under the jurisdiction of the city, any sewage or other polluted waters.</p>

<p>Paragraph (c) says that except as the section provides, it is unlawful to construct or maintain any privy, privy vault, septic tank, cesspool or other facility intended or used for the disposal of sewage. Paragraph (c) opens with the words "except as herein provided."</p>

<p>Paragraph (d) sets the connection duty. It says the owner of every house, building or property used for human occupancy, employment, recreation or other purposes, situated within the city and abutting on any street, alley or right-of-way in which a public sanitary or combined sewer of the city is now located or may in the future be located, is required at his expense to install suitable toilet facilities and to connect them directly with the proper public sewer. The deadline is within 90 days after the date of official notice to do so. The duty applies if the public sewer is within 200 feet of the property line. The section history for this paragraph is Ordinance No. 13-88, dated April 3, 2013.</p>

<p>Section 6.6 is titled Private sewage disposal. Paragraph (a) says that where a public, sanitary or combined sewer is not available within 200 feet of the property line, the building sewer will be connected to a private sewage disposal system that complies with the section.</p>

<p>The rest of Section 6.6 sets conditions for a private system. Paragraph (b) says that before construction of a private sewage disposal system begins, the owner will obtain a permit from Volusia County. Paragraph (c) says a private system will not begin operating until the installation is completed to the satisfaction of Volusia County. Paragraph (d) says the type, capacities, location and layout of a private system will comply with all recommendations of the FDEP. It adds that no private sewage disposal system employing subsurface soil absorption facilities will be permitted unless it conforms to all current regulations, and that no septic tank or cesspool will be permitted to discharge to any natural outlet.</p>

<p>Paragraph (e) is the rule for a property that already has a septic tank. It says that at such time as a public sewer becomes available to a property served by a private sewage disposal system, a direct connection will be made to the public sewer within 365 days. It also says any septic tanks, cesspools and similar private sewage disposal facilities will be abandoned and filled with suitable material. The city code uses 90 days after official notice in Section 6.5(d) and 365 days after a public sewer becomes available in Section 6.6(e).</p>

<p>Paragraph (f) says the owner will operate and maintain the private sewage disposal facilities in a sanitary manner at all times, at no expense to the city. Paragraph (g) says nothing in the article will be construed to interfere with any additional requirements that may be imposed by health agencies. The section history for Section 6.6 lists Ordinance No. 04-331, dated July 21, 2004, and Ordinance No. 13-88, dated April 3, 2013.</p>

<p>Section 6.4 defines terms used in the sewer article. It defines septic tank waste as any sewage from holding tanks such as vessels, chemical toilets, campers, trailers and septic tanks. It defines sewage as human excrement and gray water, such as household showers and dishwashing operations.</p>

<h2>Building sewers, city charges and the availability statement</h2>

<p>Section 6.7 is titled Building sewers and connections. Paragraph (a) says no unauthorized person will uncover, make any connection with or opening into, use, alter or disturb any public sewer or appurtenance without first obtaining an administrative permit. The application will be supplemented by any plans, specifications or other information necessary. A permit and inspection fee will be paid to the city at the time the application is filed.</p>

<p>Paragraph (b) puts the cost on the owner. It says all costs and expenses incidental to the installation of the building sewer will be borne by the owner, and that the owner will indemnify the city against any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.</p>

<p>Paragraph (c) says a separate and independent building sewer will be provided for every building. It makes one exception. Where one building stands at the rear of another on an interior lot, and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer. The paragraph also says old building sewers may be used in connection with new buildings only when they meet all requirements.</p>

<p>Paragraph (d) lists construction requirements. The size, slope, alignment and materials of construction of a building sewer, and the methods used in excavating, placing the pipe, jointing, testing and backfilling the trench, conform to the building and plumbing codes or other applicable rules of the city. In the absence of code provisions, or in amplification of them, the procedures in the appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 apply. Whenever possible, the building sewer is brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by the building drain will be lifted by an approved means and discharged to the building sewer.</p>

<p>The same paragraph says the connection of the building sewer to the public sewer conforms to the requirements of the building and plumbing codes or other applicable rules of the city. The paragraph also refers to exterior foundation drains, areaway drains and other sources of surface runoff or groundwater, in connection with a building sewer or building drain connected directly or indirectly to a public sanitary sewer.</p>

<p>Paragraph (e) says the applicant for the building sewer permit will notify the city when the building sewer is ready for inspection and connection to the public sewer, and that the connection will be made under the supervision of the city. Paragraph (f) says all excavations for building sewer installation will be adequately guarded with barricades and lights so as to protect the public from hazard. It also says streets, sidewalks, parkways and other public property disturbed in the course of the work will be restored in a manner satisfactory to the city. The section carries a cross reference to Chapter 22 on buildings and building regulations.</p>

<p>Chapter 98 of the Code of Ordinances covers utilities. The Municode page for the Code of Ordinances showed the code codified through Ordinance No. 2026-59, enacted February 18, 2026, Supplement No. 78, with online content updated on June 15, 2026. The page also says the code may not reflect the most current legislation adopted by the municipality.</p>

<p>Section 98-34 is titled Free sewer service prohibited. It says there shall be no free services rendered by the city sewer system, and that all customers of the services and facilities of the sewer system shall pay for the connection to and use of those services, infrastructure and facilities at the established rates. It also says all customers shall be billed a base fee, as approved by city resolution, for sewer service even if no service is actually used during the month. Section 98-35 says the rates, fees and charges for the use of the city sewer system, paid by the customer of each lot or parcel connected with the sewer system, are based or computed upon the quantity of water used on or about the lot or parcel, as determined by gauging or metering.</p>

<p>Section 98-32 covers the annual adjustment referenced in Section 98-31. It says the adjustment applies automatically to all billings dated on or after October 1 of the year in which the adjustment is made. For fiscal years commencing on October 1, 2022, the adjustment equals the percentage increase in the water, sewer and trash collection services series of the CPI-U, from July 1 of the preceding calendar year until June 30 of the present calendar year. The section adds that the city commission may adopt an ordinance specifically superseding that formula.</p>

<p>The city's utility rates packet effective October 1, 2026 says utility rates increased by a CPI of 4.2 percent. It says the connection and capital facilities fees, set under Ordinance 2023-45, were increased by a CPI of 4.2 percent effective October 1, 2026. The packet's wastewater page, headed new rates effective 10/01/2026 for all zones, lists a single family residential wastewater base fee of eleven dollars and eleven cents for all meter sizes. It lists wastewater usage at ten dollars and eighty-six cents per 1,000 gallons. For a property using city sewer services where the water system is not available, it lists a sewer only flat fee of seventy-six dollars and forty-three cents. The packet's deposit page lists a wastewater deposit of one hundred twenty-two dollars for a three-quarter-inch single family residential meter, and says that where there is no wastewater meter at the location, the deposit is based on the size of the water meter.</p>

<p>The connection fee figures below come from the city fee sheet marked updated and effective October 1, 2025. Its sewer fees section lists a wastewater tap fee for a standard installation, any connection, of two thousand two hundred nine dollars. It lists five hundred forty dollars for mains and services installed by property owners. The sheet says complex wastewater taps will be charged actual costs if those costs exceed the existing wastewater tap fee. A section of the same sheet is titled Wastewater Connection, Sewer Capital Facilities Fees, updated December 1, 2025. It lists three thousand five hundred one dollars for a single family residence and two thousand eight hundred one dollars per dwelling unit for multi-family residential. The sheet's sewer connection deposit for a three-quarter-inch connection is one hundred eighteen dollars. The 2025 figures predate the 2026 packet.</p>

<p>The city also has a Utility Service Application, with a phone number of (386) 671-8140. It asks whether the property is within the city limits, whether it has access to a paved street, whether it is residential or commercial, whether it is new construction or an existing facility, and whether a building permit is currently issued. The form includes a sewer section that city personnel complete. The entries are sewer available per as-built or personal knowledge, sewer available per field check, the inch main available, or no sewer available, with a date. The form says there is no charge for this availability statement.</p>

<p>The form also has lines for the sewer tap fee, the impact fee, which it labels the capital facilities fee, the deposit and other fees. It says that following payment of the necessary fees, it is anticipated that the requested sewer or water service can be made available to serve the subject property. Its notes say approval does not exempt development of the site from concurrency reviews that may be required before the issuance of any future development permits.</p>

<p>The Utility Billing office is at 301 S. Ridgewood Ave., Room 176, Daytona Beach, FL 32114. Its phone is (386) 671-8100, and its hours are Monday through Friday, 8 a.m. to 4:30 p.m. The city's utility billing page lists payment at codb.us/payutilitybill.</p>

<h2>What Florida law adds on top of the city code</h2>

<p>Section 381.0065 of the 2025 Florida Statutes regulates onsite sewage treatment and disposal systems. The Department of Environmental Protection's Onsite Sewage Program page says these systems are commonly referred to as septic systems. The section's legislative intent says that where a publicly owned or investor-owned sewerage system is not available, the department shall issue permits for the construction, installation, modification, abandonment or repair of these systems under the conditions in the section and in rules. It says the installation and use of onsite systems must not adversely affect the public health or significantly degrade the groundwater or surface water. The statute defines the department as the Department of Environmental Protection.</p>

<p>The statute defines when a sewerage system is available. Available means the system is capable of being connected to the plumbing of an establishment or residence, is not under a Department of Environmental Protection moratorium, and has adequate permitted capacity to accept the sewage to be generated. For a residential subdivision lot, a single-family residence or an establishment with an estimated sewage flow of 1,000 gallons per day or less, it also requires that a gravity sewer line to maintain gravity flow from the property's drain, or a low pressure or vacuum collection line in areas approved for it, exists in a public easement or right-of-way that abuts the property line. For an establishment with an estimated flow above 1,000 gallons per day, it requires a sewer line, force main or lift station in a public easement or right-of-way that abuts the property or is within 50 feet of the property line.</p>

<p>Section 381.00655 covers the connection of existing systems. It says the owner of a properly functioning system, excluding an approved onsite graywater system, must connect the system or the building's plumbing to an available publicly owned or investor-owned sewerage system within 365 days after written notification by the sewerage system owner that the system is available. It requires the sewerage system to notify the owner of the availability. No less than one year before the date the system will become available, it must notify the affected owner of the anticipated availability and that connection will be required within one year of actual availability. The owner has the option of prepaying the amortized value of required connection charges in equal monthly installments over a period not to exceed two years from the date of the initial notification of anticipated availability.</p>

<p>Section 381.00655 also sets a 90-day clock. The statute says the owner of a system that needs repair or modification to function in a sanitary manner, or to comply with sections 381.0065 through 381.0067 or the rules under them, must connect to an available sewerage system within 90 days after written notification from the department. In hardship cases, on request of the owner, the department may approve an extension of not more than 90 days. The department may approve only one extension.</p>

<p>The local governing body may provide that a connection fee charged by an investor-owned sewerage system may be paid without interest in monthly installments over a period not to exceed five years from the date the sewerage system becomes available, if it determines the owner has demonstrated a financial hardship. The criteria account for the owner's net worth, income and financial needs. A publicly owned or investor-owned sewerage system may, with the approval of the department, waive the requirement of mandatory connection if it determines connection is not required in the public interest due to public health considerations. The statute also encourages local governmental agencies that receive department grants or loans for connection costs, while those funds remain available, to identify eligible owners, notify them of the funding and maintain a public website about it.</p>

<p>Back in Section 381.0065, subsection (4) governs permits. A person may not construct, repair, modify, abandon or operate an onsite system without first obtaining a permit approved by the department. A construction permit is valid for 18 months and may be extended for one 90-day period. A repair permit is valid for 90 days. An operating permit must be obtained before the use of any aerobic treatment unit or if the establishment generates commercial waste. The operating permit for an aerobic treatment unit is valid for two years and is renewed every two years.</p>

<p>The statute also covers building and plumbing permits and occupancy. A municipality or political subdivision may not issue a building or plumbing permit for any building that requires an onsite system unless the owner or builder has received a construction permit for the system. A building may not be occupied, and no governmental agency may authorize occupancy, until the department approves the final installation. A municipality may not approve any change in occupancy or tenancy of a building that uses an onsite system until the department has reviewed the use of the system with the proposed change, approved the change and amended the operating permit.</p>

<p>The statute also regulates who may do the work. A person may not contract to construct, modify, alter, repair, service, abandon or maintain any portion of an onsite system without being registered under part III of chapter 489. A property owner who personally performs construction, maintenance or repairs on a system serving his or her own owner-occupied single-family residence is exempt from the registration requirement but is subject to all permitting requirements. The owner of an aerobic treatment unit system must maintain a current maintenance service agreement with a permitted maintenance entity. That entity inspects the unit at least twice each year, and the owner must allow the department to inspect at least annually.</p>

<p>Subsection (4)(v) addresses a real estate transaction. The statute says any permit issued and approved by the department for the installation, modification or repair of a system shall transfer with the title to the property in a real estate transaction. It also says a title may not be encumbered at the time of transfer by new permit requirements by a governmental entity that differ from the requirements in effect when the system was permitted, modified or repaired. It also says an inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction.</p>

<p>A construction or repair permit may be transferred to another person if all information about siting, location, installation conditions or repair remains the same. The transferee files, within 60 days after the transfer of ownership, an amended application providing corrected information and proof of ownership. The statute says a fee is not associated with processing that supplemental information. Subsection (4)(x) also says a system that serves a property that is foreclosed upon is not considered abandoned.</p>

<p>Another subsection allows an owner to hire a private provider for an inspection that follows the applicable regulatory requirements. The inspection may not be conducted by the private provider that installed the system. The eligible providers are an environmental health professional certified under section 381.0101, a master septic tank contractor registered under part III of chapter 489, a professional engineer licensed under chapter 471 who has passed the Accelerated Certification Training, or a person working under the supervision of such an engineer who has passed that training. The owner or contractor gives the department notice at the time of the permit application, or by 2 p.m. local time two business days before the first scheduled department inspection.</p>

<p>Section 381.0065(4)(z) says an existing-system inspection or evaluation and assessment, or a modification, replacement or upgrade of the system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition may not cover any part of the existing system or encroach upon a required setback or the unobstructed area. The local health department reviews and verifies a floor plan and site plan submitted by a remodeler, showing the location of the system and the distance. A verification of the location is not an inspection or evaluation of the system. The review must be completed within seven business days after the local health department receives the plans. If it is not completed in that time, the remodeling addition is approved for the purposes of the paragraph.</p>

<p>The statute defines a bedroom. A bedroom is a room that can be used for sleeping and that, for site-built dwellings, has at least 70 square feet of conditioned space, is located along an exterior wall, has a closet and a door or an entrance where a door could reasonably be installed, and has an emergency means of escape and rescue opening to the outside under the Florida Building Code. For manufactured homes the minimum is 50 square feet of floor area under United States Department of Housing and Urban Development standards. A room may not be considered a bedroom if it is used to access another room except a bathroom or closet. The definition does not include a hallway, bathroom, kitchen, living room, family room, dining room, den, breakfast nook, pantry, laundry room, sunroom, recreation room, media room or exercise room.</p>

<p>The statute sets distances for systems permitted before June 21, 2022. They may not be placed closer than 75 feet from a private potable well, 50 feet from any nonpotable well, 75 feet from the mean high-water line of a tidally influenced surface water body, 75 feet from the mean annual flood line of a permanent nontidal surface water body, or 10 feet from any storm sewer pipe. For the storm sewer pipe, the setback applies to the maximum extent possible and in no instance may be less than 5 feet. For subdivisions and lots using a public water system, onsite systems may be used if there are no more than four lots per acre, the projected daily sewage flow does not exceed an average of 2,500 gallons per acre per day, and all distance, setback, soil condition and water table requirements are met.</p>

<p>The statute says soil maps from the United States Department of Agriculture Soil Conservation Service, data from the State of Florida water management districts and Federal Emergency Management Agency flood insurance maps shall be used to identify flood-prone areas. The statute also says it does not limit the power of a municipality or county to enforce other laws for the protection of the public health and safety.</p>

<p>Section 403.067 adds a rule for basin management action plan areas. It says the installation of new onsite systems within a basin management action plan area adopted under that section, a reasonable assurance plan or a pollution reduction plan is prohibited where connection to a publicly owned or investor-owned sewerage system is available as defined in section 381.0065(2)(a). On lots of one acre or less within such an area where sewerage is not available, the statute requires an enhanced nutrient-reducing system or another system that achieves at least 65 percent nitrogen reduction. Section 381.0065 defines an enhanced nutrient-reducing system as one the department approves as capable of at least 50 percent total nitrogen reduction before disposal in the drainfield, or at least 65 percent combined from the tank or tanks and drainfield.</p>

<h2>Who permits septic systems in Volusia County</h2>

<p>The Daytona Beach code says the owner obtains a permit from Volusia County for a private sewage disposal system. The Florida Department of Environmental Protection's Onsite Sewage Program page says permitting and inspection of these systems is handled by the Environmental Health section of the Florida Department of Health in each county. It says that effective July 1, 2021, the department is responsible for implementing the Florida Statutes and regulations applicable to these systems. It says that under Florida's Clean Waterways Act of 2020 the county health department offices continue to do the permitting and inspection for septic tanks. It says permitting in the Panhandle counties and Marion County is now addressed by the department.</p>

<p>The Florida Department of Health in Volusia County has a page titled OSTDS Septic and Sewer Systems under Environmental Public Health. The page says the program ensures that systems are properly designed, constructed and maintained through permitting and inspection. It lists the Environmental Public Health phone number as 386-822-6280. It links to approved tanks and manufacturers, forms and publications, and online permitting and processing. The Department of Environmental Protection lists OSTDS_Feedback@FloridaDEP.gov and 850-245-4070 for its Onsite Sewage Program in Tallahassee. The Department of Environmental Protection page says about 30 percent of Florida's population uses septic systems, with an estimated 2.6 million systems in operation.</p>

<h2>The bottom line</h2>

<p>In <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach</a>, Section 6.5(d) of the Land Development Code requires connection to a public sewer within 90 days after official notice if the sewer is within 200 feet of the property line. Section 6.6(a) provides for a private sewage disposal system where a public sewer is not available within 200 feet. Section 6.6(e) requires a direct connection within 365 days when a public sewer becomes available to a property served by a private system, and the septic tank is abandoned and filled with suitable material. Section 6.5(c) says it is unlawful to construct or maintain a septic tank except as the article provides.</p>

<p>State law defines available, sets 365-day and 90-day connection clocks and sets permit rules. A permit issued and approved by the department for the installation, modification or repair of an onsite system transfers with the title to the property in a real estate transaction. The statute says an inspection of a system may not be mandated by a governmental entity at the point of sale in a real estate transaction. The city's availability statement carries no charge, and the Utility Billing office is at (386) 671-8100. The Florida Department of Health in Volusia County lists 386-822-6280 for Environmental Public Health.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/daytona-beach-neighborhoods-beachside-mainland-golf-and-55-communities">Daytona Beach Neighborhoods: Beachside, Mainland, Golf and 55+ Communities</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-daytona-beach-utilities-trash-and-first-month">Moving to Daytona Beach: Utilities, Trash and First Month</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/daytona-beach-flood-zones-how-to-check-any-address">Daytona Beach Flood Zones: How to Check Any Address</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-septic-vs-sewer-what-buyers-must-check">Deltona Septic vs Sewer: What Buyers Must Check</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/11/17/flagler-beach-septic-vs-sewer-what-a-buyer-checks">Flagler Beach Septic vs Sewer: What a Buyer Checks</a></p>

<h2>Frequently Asked Questions</h2>

<p>The answers below come from the code and statute sections described above.</p>

<details>
<summary><strong>What does the Daytona Beach code say about connecting to city sewer?</strong></summary>
<p>Section 6.5(d) of the Land Development Code says the owner of a property used for human occupancy, employment or recreation, abutting a street, alley or right-of-way with a public sanitary or combined sewer, must install suitable toilet facilities and connect them directly with the public sewer within 90 days after official notice. It applies if the public sewer is within 200 feet of the property line. Section 6.6(e) says that when a public sewer becomes available to a property served by a private system, a direct connection will be made within 365 days.</p>
</details>

<details>
<summary><strong>What happens to the septic tank after a sewer connection?</strong></summary>
<p>Section 6.6(e) of the Land Development Code says any septic tanks, cesspools and similar private sewage disposal facilities will be abandoned and filled with suitable material once the direct connection to the public sewer is made. State law says a person may not abandon an onsite system without first obtaining a permit approved by the Department of Environmental Protection.</p>
</details>

<details>
<summary><strong>What is the difference between the city code and state law on when sewer is available?</strong></summary>
<p>The city code uses 200 feet from the property line in Sections 6.5(d) and 6.6(a). State law defines available as capable of being connected, not under a Department of Environmental Protection moratorium, and having adequate permitted capacity. For a single-family residence with an estimated flow of 1,000 gallons per day or less, it also requires a gravity sewer line, or a low pressure or vacuum line in approved areas, in a public easement or right-of-way that abuts the property line.</p>
</details>

<details>
<summary><strong>Does a septic permit stay with a house when it sells?</strong></summary>
<p>State law says any permit issued and approved by the department for the installation, modification or repair of an onsite system shall transfer with the title to the property in a real estate transaction. A title may not be encumbered at the time of transfer by new permit requirements that differ from the requirements in effect when the system was permitted, modified or repaired. The statute also says an inspection of a system may not be mandated by a governmental entity at the point of sale.</p>
</details>

<details>
<summary><strong>Can an existing septic system be added to or remodeled around?</strong></summary>
<p>State law says an existing-system inspection or evaluation, or a modification, replacement or upgrade of the system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition may not cover any part of the existing system or encroach upon a required setback or the unobstructed area. The local health department reviews a floor plan and site plan, and must complete the review within seven business days after receiving the plans.</p>
</details>

<details>
<summary><strong>Who permits a septic system in Volusia County?</strong></summary>
<p>The Daytona Beach code says the owner obtains a permit from Volusia County before construction of a private sewage disposal system. The Department of Environmental Protection's Onsite Sewage Program page says permitting and inspection is handled by the Environmental Health section of the Florida Department of Health in each county. The Florida Department of Health in Volusia County lists 386-822-6280 for Environmental Public Health.</p>
</details>

<details>
<summary><strong>Is there a charge for the city's sewer availability statement?</strong></summary>
<p>The city's Utility Service Application says there is no charge for the availability statement. City personnel complete a sewer section with entries such as sewer available per as-built or personal knowledge, sewer available per field check, the inch main available, or no sewer available. The form lists a tap fee, an impact fee called the capital facilities fee, a deposit and other fees, and says approval does not exempt development of the site from concurrency reviews.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 20:49:41 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/daytona-beach-septic-vs-sewer-what-buyers-check]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Port Orange Condo Milestone Inspections and SIRS: What a Condo Buyer Checks]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/port-orange-condo-milestone-inspections-and-sirs-what-a-condo-buyer-checks]]>
        </link>
        <description>
            <![CDATA[<p>Florida law requires a milestone inspection for a condominium building of three or more habitable stories by December 31 of the year the building reaches 30 years of age. Section 553.899 of the Florida Statutes sets the rule for a condominium building in <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange</a> and elsewhere in Florida. Section 718.112 sets a second requirement, the structural integrity reserve study.</p>

<p>The facts below come from the 2026 Florida Statutes, the City of Port Orange Building page, the Department of Business and Professional Regulation (DBPR) condominium pages, and the Volusia County Property Appraiser home page.</p>

<h2>The milestone inspection: who needs one, and when</h2>

<p>The statute begins with a finding. The Legislature found that a statewide structural inspection program for aging condominium and cooperative buildings is necessary to ensure that such buildings are safe for continued use.</p>

<p>The inspection applies to an owner of a building that is three habitable stories or more in height as determined by the Florida Building Code. The building must be subject, in whole or in part, to the condominium form of ownership as a residential condominium under chapter 718. Chapter 718 defines a residential condominium as a condominium of two or more units, any of which are intended for use as a private temporary or permanent residence, with stated exceptions for primarily commercial or industrial use.</p>

<p>The deadline is December 31 of the year in which the building reaches 30 years of age. Age is counted from the date the certificate of occupancy was issued. The inspection then repeats every 10 years. If the certificate of occupancy date is not available, the statute uses the date of occupancy evidenced in any record of the local building official.</p>

<p>The statute sets initial dates by when a building reached 30 years of age. A building that reached 30 years of age before July 1, 2022 had to have its initial milestone inspection performed before December 31, 2024. A building that reaches 30 on or after July 1, 2022 and before December 31, 2024 must have its initial inspection performed before December 31, 2025. The statute's history line cites ch. 2022-269, ch. 2023-203, ch. 2024-244 and ch. 2025-175.</p>

<p>The statute lets the local enforcement agency determine that local circumstances require an earlier date. The statute names environmental conditions such as proximity to salt water, as defined in section 379.101, as an example. Where the agency makes that determination, the inspection is due by December 31 of the year the building reaches 25 years of age, and every 10 years thereafter.</p>

<p>The agency may also extend the initial deadline. The statute allows an extension on a showing of good cause by the owner that the inspection cannot be timely completed. The example it gives is an owner that has contracted with an architect or engineer when the inspection cannot reasonably be completed before the deadline. The agency may also accept a report by a licensed engineer or architect for a structural integrity and condition inspection performed before July 1, 2022, if the inspection and report substantially comply. An accepted report is deemed a milestone inspection for chapters 718 and 719, and the deadline for the next 10-year inspection is based on the date of the accepted inspection. The association must still comply with the unit owner notice requirements.</p>

<p>Section 553.899 does not apply to a single-family, two-family, three-family or four-family dwelling with three or fewer habitable stories above ground.</p>

<h2>What the inspection is, who performs it, and what the report says</h2>

<p>The statute defines a milestone inspection as a structural inspection of a building, including load-bearing elements and the primary structural members and primary structural systems as defined in section 627.706. An architect licensed under chapter 481 or an engineer licensed under chapter 471 performs it. The stated purposes are attesting to the life safety and adequacy of the structural components and, to the extent reasonably possible, determining the general structural condition of the building as it affects safety.</p>

<p>The statute also says what the inspection is not. Its purpose is not to determine whether an existing building complies with the Florida Building Code or the firesafety code. A team of professionals may provide the services, with an architect or engineer acting as the registered design professional in responsible charge, and all work and reports signed and sealed by the appropriate qualified team member. DBPR's inspections page states that a milestone inspection is a structural inspection of an aging building used to determine if substantial structural deterioration exists.</p>

<p>The inspection has two phases. Phase one is a visual examination of habitable and nonhabitable areas of the building, including the major structural components, with a qualitative assessment of the structural conditions. If no signs of substantial structural deterioration are found, phase two is not required.</p>

<p>Phase two must be performed if substantial structural deterioration is identified in phase one. It may involve destructive or nondestructive testing at the inspector's direction, and it may be as extensive or as limited as necessary to assess areas of structural distress. When choosing testing locations, the inspector must give preference to locations that are the least disruptive and most easily repairable while still representative of the structure. Within 180 days after submitting a phase one report, the inspector must submit a phase two progress report to the local enforcement agency with a timeline for completion.</p>

<p>The report has required contents. It must bear the seal and signature of the engineer or architect, and it must indicate the manner and type of inspection. It must identify any substantial structural deterioration, describe its extent and identify recommended repairs. It must state whether unsafe or dangerous conditions, as those terms are defined in the Florida Building Code, were observed. It must recommend remedial or preventive repair for items that are damaged but are not substantial structural deterioration, and it must identify any items requiring further inspection. The inspector submits a sealed copy with a separate summary of at minimum the material findings and recommendations to the association, to any other owner of a portion of the building outside the condominium, and to the building official of the local government.</p>

<h2>The notice clock, the repair clock, and who pays</h2>

<p>The sequence starts with the local enforcement agency. When it determines that a building must have a milestone inspection, it gives written notice to the association by certified mail, return receipt requested. DBPR states that the local enforcement agency is responsible for notifying a building's owners that an inspection is required.</p>

<p>The association then has 14 days after receiving the notice to notify unit owners of the required inspection and to provide the date by which it must be completed. Notice may be given by electronic submission to owners who consent, or by posting on the association's website.</p>

<p>Phase one must be completed within 180 days after the owner or owners receive the written notice. The statute defines completion as the engineer or architect submitting the inspection report by e-mail, United States Postal Service or commercial delivery service to the local enforcement agency.</p>

<p>After the report is received, the association has 45 days. Within that time it must distribute the inspector-prepared summary to each unit owner, regardless of the findings or recommendations, by United States mail or personal delivery and by electronic transmission to owners who consented. It must post the summary in a conspicuous place on the condominium property. It must publish the full report and the summary on the association's website if the association is required to have one.</p>

<p>The statute also addresses repairs. A county commission or municipal governing body must adopt an ordinance requiring the association and any other owner to schedule or commence repairs for substantial structural deterioration within a specified timeframe after the local enforcement agency receives a phase two report. The statute adds that repairs must be commenced within 365 days after receiving the report. If an owner fails to submit proof that repairs have been scheduled or have commenced, the local enforcement agency must review and determine whether the building is unsafe for human occupancy. The statute also lets a local enforcement agency prescribe timelines and penalties for compliance.</p>

<p>Cost falls on the association for the parts it maintains. The report must be arranged by the association and by any owner of a portion of the building that is not part of the condominium. The association is responsible for all costs associated with the inspection that are attributable to the portions of the building it is responsible to maintain under its governing documents. Section 718.112 repeats that the association must arrange the inspection, is responsible for ensuring compliance with section 553.899, and that willful and knowing failure to have the inspection performed is a breach of the officers' and directors' fiduciary relationship to the unit owners.</p>

<h2>The structural integrity reserve study and the budget that follows it</h2>

<p>The second requirement sits in section 718.112(2)(g). A residential condominium association must have a structural integrity reserve study completed at least every 10 years after the condominium's creation for each building on the condominium property that is three habitable stories or higher in height, as determined by the Florida Building Code. Chapter 718 defines the study as a study of the reserve funds required for future major repairs and replacement of the condominium property.</p>

<p>DBPR's FAQ says a milestone inspection is a structural inspection of the building, including the load-bearing elements, and that a structural integrity reserve study is a budget planning tool based on a visual inspection.</p>

<p>The minimum list of items is set by statute. The study covers the roof, the structure including load-bearing walls and other primary structural members and systems, fireproofing and fire protection systems, plumbing, electrical systems, waterproofing and exterior painting, and windows and exterior doors. It also covers any other item whose deferred maintenance expense or replacement cost exceeds twenty-five thousand dollars, or the inflation-adjusted amount set by the division, whichever is greater, if the failure to replace or maintain that item negatively affects the listed items, as determined by the visual inspection portion of the study. The division adjusts the threshold annually using the Consumer Price Index for All Urban Consumers and, by February 1, 2026 and annually afterward, must post the adjusted amount on its website.</p>

<p>The study is based on a visual inspection of the condominium property. An engineer licensed under chapter 471, an architect licensed under chapter 481, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts must perform or verify it. A design professional or contractor who bids to perform the study must disclose in writing an intent to bid on related repair services.</p>

<p>The study has required contents. It must identify each item visually inspected and state the estimated remaining useful life and the estimated replacement cost or deferred maintenance expense of each. It must provide a reserve funding plan or schedule with a recommended annual reserve amount. It must include a recommendation based on a baseline funding plan in which reserve funding for each budget year is sufficient to maintain the reserve cash balance above zero. It may recommend other types of schedules, provided each is sufficient to meet the association's maintenance obligation.</p>

<p>Section 718.112(2)(g) sets dates. An association existing on or before July 1, 2022 that is controlled by unit owners other than the developer had to complete its study by December 31, 2025 for each building of three stories or higher. An association required to complete a milestone inspection on or before December 31, 2026 may complete the study simultaneously with the inspection. In no event may a study be completed after December 31, 2026. DBPR's FAQ states the same limit.</p>

<p>Within 45 days after receiving the study, the association must take two steps. It must distribute a copy to each unit owner or deliver a notice that the completed study is available for inspection and copying upon written request. It must also provide the division with a statement that the study was completed and provided or made available to each unit owner. An officer or director must sign an affidavit acknowledging receipt of the completed study, and willful and knowing failure to complete a required study is a breach of fiduciary relationship under section 718.111(1). DBPR states that, as of July 1, 2024, a completed SIRS Reporting Form is submitted electronically within 45 days of the study being completed, that submissions are reflected in its database within one business day, and that only complete submissions are displayed.</p>

<h2>The study and the association's budget</h2>

<p>The budget must include reserve accounts for capital expenditures and deferred maintenance. The statute names roof replacement, building painting and pavement resurfacing regardless of amount, and any other item over twenty-five thousand dollars or the inflation-adjusted amount, whichever is greater. The amount reserved is computed using a formula based on estimated remaining useful life and estimated replacement cost or deferred maintenance expense.</p>

<p>For an association required to obtain a study, the reserve amount for the listed items must be based on the findings and recommendations of the most recent study. For items with an estimated remaining useful life of greater than 25 years, or where useful life is not readily ascertainable, replacement costs need not be reserved, but the deferred maintenance expense recommended by the study must be reserved.</p>

<p>If the study was performed before the association approved a special assessment or secured a line of credit or loan, the study must be updated to reflect the funding method selected. The association must obtain an updated study before adopting any budget in which funding from regular assessments, special assessments, lines of credit or loans does not align with the funding plan from the most recent version of the study.</p>

<h2>What a condominium buyer receives in a resale</h2>

<p>Section 718.503 lists what a buyer under contract for a resale unit receives from the seller, at the seller's expense. The list is the declaration of condominium, the articles of incorporation, the bylaws and rules, an annual financial statement and annual budget, and the inspector-prepared summary of the milestone inspection report if applicable. It also includes the association's most recent structural integrity reserve study or a statement that the association has not completed one, the turnover inspection report for a turnover inspection performed on or after July 1, 2023, and the document titled Frequently Asked Questions and Answers required by section 718.504. The buyer is also entitled to a governance form from the seller. The division provides that form, and its subjects include the role of the board, owners' rights to inspect and copy records, and the responsibility of owners for regular and special assessments and the consequences of failure to pay them.</p>

<p>The resale contract carries a cancellation clause. Each resale contract entered into after July 1, 1992 must contain, in conspicuous type, either a clause acknowledging receipt of the listed documents more than 7 days, excluding Saturdays, Sundays and legal holidays, before the contract was executed, or a clause that the agreement is voidable by delivering written notice of intent to cancel within 7 days, excluding Saturdays, Sundays and legal holidays, after execution and receipt of the documents. The voidable clause states that any purported waiver of these rights is of no effect and that the right to void terminates at closing. A contract that does not conform is voidable at the purchaser's option before closing.</p>

<p>Contracts entered into after December 31, 2024 carry an added statement. If the association is required to have a milestone inspection, a turnover inspection report or a study and has not completed it, the contract must say so in conspicuous type. If the association is not required to have a milestone inspection or a study, the contract must say that in conspicuous type. If the association has completed them, a resale contract must contain in conspicuous type either an acknowledgment clause or a 7-day voidable clause that refers to the milestone summary, the turnover report and the most recent study.</p>

<h2>Records, estoppel and assessments</h2>

<p>Section 718.111 sets the association's official records. They include the declaration and amendments, the bylaws, the articles, the current rules, the minutes, a current roster of unit owners, all current insurance policies, management and other contracts, accounting records, the current question and answer sheet under section 718.504, and all building permits. Structural integrity reserve studies must be kept at least 15 years after completion. Inspection reports described in section 553.899, and any other inspection report relating to a structural or life safety inspection of condominium property, must be kept for 15 years after receipt.</p>

<p>Official records are open to inspection by any association member and by a person authorized by a member as a representative, and the association may not require a member to demonstrate any purpose or state any reason. Records are made available to a unit owner within 45 miles of the condominium property or within the county within 10 working days after a written request. A renter has a right to inspect and copy only the declaration, the bylaws and rules, and the inspection reports described in sections 553.899 and 718.301(4)(p).</p>

<p>Section 718.111 sets consequences for delay. Failure to provide records within 10 working days after a written request creates a rebuttable presumption that the association willfully failed to comply. Minimum damages are fifty dollars per calendar day for up to 10 days, beginning on the 11th working day after receipt of the request. In response to a written request, the association must simultaneously provide a checklist of all records made available and must identify any official records not made available. The association keeps the checklist for 7 years.</p>

<p>Section 718.116 provides for an estoppel certificate. Within 10 business days after a written or electronic request from a unit owner or the owner's designee, or from a unit mortgagee or the mortgagee's designee, the association must issue it. Each association designates on its website a person or entity for receipt of requests. The certificate states the regular periodic assessment and the date it is paid through, an itemized list of assessments, special assessments and other moneys owed on the issuance date, and an itemized list of additional assessments and special assessments scheduled to become due during the effective period. It also states whether a capital contribution, resale or transfer fee is due, whether there is an open rule violation, whether board approval of the transfer is required, whether a right of first refusal exists, and contact information for the association's insurance.</p>

<p>The certificate has an effective period of 30 days if hand delivered or sent electronically, and 35 days if sent by regular mail. An association waives the right to collect moneys in excess of the amounts stated from a person who in good faith relies on the certificate. If the association fails to deliver the certificate within 10 business days, no fee may be charged for it. The fee may not exceed two hundred fifty dollars if no delinquent amounts are owed on the date of issue.</p>

<p>Section 718.116 addresses liability for assessments. A unit owner, regardless of how title was acquired, is liable for all assessments that come due while the owner holds the unit. The owner is jointly and severally liable with the previous owner for all unpaid assessments that came due up to the time of transfer of title. Unpaid assessments bear interest at the rate in the declaration, and at 18 percent per year if the declaration has none. If the declaration or bylaws provide for it, the association may also charge an administrative late fee of up to the greater of twenty-five dollars or 5 percent of each delinquent installment. Chapter 718 defines a special assessment as any assessment levied against a unit owner other than the assessment required by a budget adopted annually.</p>

<h2>Port Orange: the city offices and the county records</h2>

<p>The City of Port Orange Building Division sits in the Community Development Department. Its page states that the division receives building permit applications for all structures ranging from commercial buildings to residential homes and fences, and reviews construction plans to assure compliance with Florida Building Code requirements and local regulations. Permit construction inspections are conducted to make sure construction is in accordance with approved plans and all applicable construction codes.</p>

<p>The page gives these contacts. The Building Official is Al Tischler at 386-506-5627. The Building Permit, Inspection and Business Tax line is 386-506-5602. The Community Development Department main line is 386-506-5600, and the office is at 1000 City Center Circle, Port Orange, FL 32129, with lobby hours Monday through Friday, 8:00am to 4:00pm.</p>

<p>DBPR states that a milestone inspection can be performed by a licensed architect, an engineer, or a team of professionals, and it lists eight specific structural elements in a study. DBPR's FAQ states that complaints against architects or engineers related to the failure to properly perform the milestone inspection or the study go to the Board of Architecture and Interior Design or the Florida Board of Professional Engineers, and that the division handles the procedural requirements. The FAQ also states that, as of July 1, 2025, the division's jurisdiction over unit owner complaints includes the procedural completion of studies and milestone inspections, completion of repairs required by an inspection, and study reporting requirements. Complaints can be submitted by mail or through an online form. DBPR's study reporting page gives the division's phone number as (954) 202-6831.</p>

<p>Section 718.1265 addresses emergencies. In response to damage or injury caused by, or anticipated in connection with, an emergency for which a state of emergency is declared in the locale, the board may exercise listed powers unless the declaration, articles or bylaws specifically prohibit them. The powers include implementing a disaster plan that may involve shutting down elevators, electricity, water, sewer or security systems, determining portions of the property unavailable for entry or occupancy, levying special assessments without a vote of the owners, and borrowing money and pledging association assets as collateral to fund emergency repairs without unit owners' approval when operating funds are insufficient. The special powers last only as long as reasonably necessary to protect health, safety and welfare, and they are limited to what is reasonably necessary to mitigate further damage and make emergency repairs.</p>

<p>The same section protects access. During a state of emergency declared by the Governor, an association may not prohibit unit owners and others from accessing the unit and the common and limited common elements for ingress and egress, and when access is necessary in connection with the sale, lease or other transfer of title of a unit or the habitability of the unit. A governmental order, determination or public health directive from the CDC that prohibits access overrides that rule, and the association may impose reasonable restrictions. Section 718.113 separately states that its hurricane protection subsection applies to all residential and mixed-use condominiums in the state, regardless of when the condominium is created, and requires each board to adopt hurricane protection specifications for each building, which must comply with the applicable building code.</p>

<p>The Volusia County Property Appraiser home page lists Real Property Search, Real Property Classic, Real Property Advanced, Personal Property Search, Sales Search and Search By Map, and states that the search runs by name, address, alt key or parcel ID. The office is at 123 W. Indiana Ave., Room 102, DeLand, FL 32720, phone (386) 736-5901, open 7:30 a.m. to 5:00 p.m., Monday through Friday.</p>

<p><strong>Bottom line.</strong> For a residential condominium building of three or more habitable stories, including one in <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange</a>, the statutes set two separate requirements. The milestone inspection is a structural inspection due by December 31 of the year the building reaches 30 years of age, or 25 where the local enforcement agency so determines, and every 10 years after. The structural integrity reserve study is a visual-inspection-based reserve study that may not be completed after December 31, 2026, and the statute set a December 31, 2025 date for unit-owner-controlled associations existing on or before July 1, 2022. Section 718.503 entitles a buyer under contract for a resale unit to the inspector-prepared milestone summary, if applicable, and the association's most recent study or a statement that it has not completed one. A resale contract must contain in conspicuous type either a clause acknowledging receipt of the listed documents more than 7 days before execution or a clause that the agreement is voidable by written notice within 7 days after execution and receipt of the documents.</p>

<p>See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-a-condo-in-florida-under-the-new-condo-laws-a-volusia-county-guide">Buying a Condo in Florida Under the New Condo Laws</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/port-orange-florida-a-buyer-s-guide-to-neighborhoods-and-costs">Port Orange, Florida: A Buyer's Guide to Neighborhoods and Costs</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/townhomes-and-villas-in-port-orange-who-owns-what">Townhomes and Villas in Port Orange</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-flood-zones-and-flood-insurance-for-buyers">Port Orange Flood Zones and Flood Insurance</a>, and <a href="http://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-port-orange-home-buyers">Hurricane Readiness for Port Orange Home Buyers</a>.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What dates apply to a milestone inspection for a condominium building in Port Orange?</strong></summary>
<p>Section 553.899 of the Florida Statutes sets December 31 of the year a building of three or more habitable stories reaches 30 years of age, counted from the certificate of occupancy date, and every 10 years after. The local enforcement agency may determine that local circumstances, such as proximity to salt water, require the inspection by December 31 of the year the building reaches 25 years of age. The statute lets the local enforcement agency extend the initial deadline for good cause.</p>
</details>
<details>
<summary><strong>What is the difference between a milestone inspection and a structural integrity reserve study?</strong></summary>
<p>DBPR's FAQ says a milestone inspection is a structural inspection of the building, including the load-bearing elements, and a structural integrity reserve study is a budget planning tool based on a visual inspection. An architect or engineer performs the milestone inspection. An engineer, an architect, or a certified reserve specialist or professional reserve analyst performs or verifies the study. The study states each item's remaining useful life and replacement cost or deferred maintenance expense and gives a recommended annual reserve amount.</p>
</details>
<details>
<summary><strong>What is the last date for a reserve study under the statute?</strong></summary>
<p>Section 718.112(2)(g) required associations existing on or before July 1, 2022 and controlled by unit owners to complete the study by December 31, 2025. An association required to complete a milestone inspection on or before December 31, 2026 may complete the study simultaneously with the inspection. The statute says that in no event may a study be completed after December 31, 2026. DBPR's FAQ states the same limit.</p>
</details>
<details>
<summary><strong>What documents does a buyer receive on a resale condominium unit?</strong></summary>
<p>Section 718.503 entitles a buyer under contract, at the seller's expense, to the declaration, the articles of incorporation, the bylaws and rules, an annual financial statement and budget, the inspector-prepared summary of the milestone inspection report if applicable, and the association's most recent structural integrity reserve study or a statement that none was completed. The buyer also receives the Frequently Asked Questions and Answers document and a governance form provided by the division.</p>
</details>
<details>
<summary><strong>How long does the cancellation right last on a condominium resale contract?</strong></summary>
<p>Under section 718.503, a resale contract must contain in conspicuous type either a clause acknowledging receipt of the listed documents more than 7 days before execution, or a clause that the agreement is voidable by written notice of intent to cancel within 7 days after execution and receipt of the documents. Saturdays, Sundays and legal holidays are excluded from the count. The statute says any purported waiver is of no effect and the right to void terminates at closing.</p>
</details>
<details>
<summary><strong>How fast must an association answer a request for records or an estoppel certificate?</strong></summary>
<p>Under section 718.111, records are made available to a unit owner within 45 miles of the condominium or within the county within 10 working days after a written request. Failure within 10 working days creates a rebuttable presumption of willful failure, with minimum damages of fifty dollars per calendar day for up to 10 days. Under section 718.116, the association issues an estoppel certificate within 10 business days after a written or electronic request from a unit owner or mortgagee, and no fee may be charged if it is late.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 20:49:23 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/port-orange-condo-milestone-inspections-and-sirs-what-a-condo-buyer-checks]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Flagler Beach Septic vs Sewer: What a Buyer Checks]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/flagler-beach-septic-vs-sewer-what-a-buyer-checks]]>
        </link>
        <description>
            <![CDATA[<p>Flagler Beach city code says a septic tank will be used only if the property is more than 200 feet from the sewer line. That sentence is in the city's Land Development Regulations, and it applies to a property in <a href="http://www.adamscameron.com/flagler-beach-florida-real-estate-and-homes.html">Flagler Beach</a>. The sources are the city code and the 2025 Florida Statutes.</p>

<h2>What the Flagler Beach code says about sewer and septic</h2>

<p>The sewer rules sit in the city's Land Development Regulations, in Appendix A of the Code of Ordinances, under Section 5.03.00 Utilities. The code we read was codified through Ordinance No. 2026-07, adopted May 14, 2026. The sewer sections run from 5.03.51 through 5.03.65, and this guide covers 5.03.53 through 5.03.55 and 5.03.59 through 5.03.62.</p>

<p>Section 5.03.53 is titled Connections required. It says the owner of each lot or parcel in the city, where a building used as a dwelling is or will be situated, shall connect the building to the public sewer facilities of the municipal sewer system and use them within six months following notification to do so. The section covers residential, commercial and industrial use. Notification is by publication of the notice once a week for two consecutive weeks in a newspaper of general circulation in the city.</p>

<p>The same section has a rule for new construction. It says any new construction or unoccupied building shall be required to connect to the sewer system upon occupancy. It adds that new construction commencing after the sewer system serving that property was installed pays a connection fee outlined in Section 5.03.56. Section 5.03.53 also says connections follow rules the city commission adopts from time to time, and that those rules provide for a charge for making a connection in an amount the commission fixes.</p>

<p>Section 5.03.53 says no connection shall be required where the sewer system or line is more than 200 feet from the lot or parcel. Section 5.03.60, titled Sanitary requirements, also uses 200 feet. It says every residence and building where people reside, are employed or congregate must have a sanitary method of disposing of human excrement, either a sanitary water closet connected with the city sewer or an approved type of septic tank. Then it says a septic tank will be used only if the property is more than 200 feet from the sewer line.</p>

<p>Section 5.03.61 says it is unlawful for any person owning or leasing premises in the city to permit the disposal of human excrement on property they lease or rent except in a sanitary water closet where sewage lines are available as defined in Section 5.03.53. Section 5.03.62 is titled Septic tank. It says no septic tank other than those approved by the state department of health and rehabilitative services shall be constructed within the corporate limits of the city, and that no septic tank shall be constructed on properties within the prescribed distances of sewer lines set out in Section 5.03.53. The city code names the state department of health and rehabilitative services. Florida statute names the Department of Environmental Protection, covered below.</p>

<p>Section 5.03.53 says applicants for development on properties within 200 feet of the sewer system or line that do not have access to a stub-up to the city's sewer system are responsible for all costs of extending sewer pipes to the property.</p>

<p>The code also says what happens when an owner does not connect after notice. Under Section 5.03.55, if an owner fails or refuses to connect after notification by the city clerk, the city may make the connection itself and enter the lot to do it. The city may recover the cost, together with reasonable penalties, interest and attorney's fees, by suit. The city also has a lien on the lot for that cost, and the code says the lien is of equal dignity with the liens of state, county and municipal taxes. The city may foreclose it the way state law provides for foreclosing mortgages. A separate paragraph says that a failure to connect after notice is a violation of city ordinance. It can go before the special magistrate or the code enforcement board under Florida Statutes chapter 162.</p>

<p>Section 5.03.54 says the article shall not be construed to require or entitle any person to cross the private property of another to make a sewer connection. Section 5.03.59, titled Connecting old plumbing, says that when it is desirable to connect old plumbing to the city sewer mains, the owner or plumber notifies the city building official. The building official inspects the old plumbing and tells the owner or plumber what alterations are needed to put it in acceptable condition for the connection. A connection made without the building official's approval is subject, upon conviction, to the penalties in the article.</p>

<p>The city's Utility Department page states a mission to provide drinking water and advanced treatment and disposal of wastewater. The department is at 116 S. 3rd Street, Flagler Beach, and the phone is 386-517-2000, press 1. Office hours are Monday through Friday, 8 a.m. to 5 p.m. The email is UB@cityofflaglerbeach.com. For sewer back-ups and broken water or sewer pipes after hours and on weekends, the city lists 386-313-4911, and the dispatcher contacts the city. The department's page also links a Sewer Adjustment Request Form and a Residential Utility Rates page.</p>

<h2>What Florida law adds on top of the city code</h2>

<p>The statutes cited here are the 2025 Florida Statutes. State law defines the word "available" in section 381.0065. Under section 381.0065 of the Florida Statutes, a sewerage system is available when it is capable of being connected to the plumbing of the residence, is not under a Department of Environmental Protection moratorium, and has adequate permitted capacity. For a residential subdivision lot, a single-family residence, or an establishment with an estimated flow of 1,000 gallons a day or less, the definition adds that a gravity sewer line, or a low pressure or vacuum line in areas approved for those, exists in a public easement or right of way that abuts the property line.</p>

<p>Section 5.03.53 says no connection is required where the sewer line is more than 200 feet from the lot. Section 381.0065 defines available, for a single-family residence with an estimated flow of 1,000 gallons a day or less, to include that a gravity sewer line, or a low pressure or vacuum line in areas approved for those, exists in a public easement or right of way that abuts the property line.</p>

<p>State law also sets a clock. Under section 381.00655, the owner of a properly functioning onsite system, excluding an approved onsite graywater system, must connect the system or the building's plumbing to an available public or investor-owned sewerage system within 365 days after written notification from the sewerage system's owner that the system is available. The same section says the sewerage system's owner must notify the affected septic owner of the anticipated availability at least one year before the sewerage system becomes available, and must say that the owner will be required to connect within one year of actual availability. The owner may prepay the amortized value of the required connection charges in equal monthly installments over no more than two years from the date of that first notice.</p>

<p>The same section sets a shorter clock for a system that needs repair or modification to function in a sanitary manner. An owner whose system needs repair or modification to function in a sanitary manner, or to comply with the state septic statutes and rules, must connect to an available sewerage system within 90 days after written notification from the department. In hardship cases the department may approve one extension of not more than 90 days. The statute also lets the local governing body provide that a connection fee charged by an investor-owned sewerage system be paid in monthly installments without interest for up to five years from the date the sewerage system becomes available, if it finds the owner has demonstrated financial hardship. And it says a sewerage system may, with department approval, waive mandatory connection if it is not required in the public interest due to public health considerations.</p>

<p>The statute defines "department" as the Department of Environmental Protection. The same section says a person may not construct, repair, modify, abandon or operate an onsite system without first obtaining a permit approved by the department. A city may not issue a building or plumbing permit for a building that requires an onsite system unless the owner or builder has a construction permit for the system. A building may not be occupied until the department approves the final installation. A city also may not approve a change in occupancy or tenancy of a building that uses an onsite system until the department has reviewed the use of the system with the proposed change, approved it and amended the operating permit.</p>

<p>The statute gives permit lengths. A construction permit is valid for 18 months and may be extended for one 90-day period. A repair permit is valid for 90 days. An operating permit must be obtained before the use of an aerobic treatment unit or if the establishment generates commercial waste. A construction permit may be transferred to another person if the siting, location and installation conditions are unchanged. The transferee files an amended application with proof of ownership within 60 days after the transfer, and the statute says a fee is not associated with processing that information.</p>

<p>The statute also says who may work on a system. A person may not contract to construct, modify, alter, repair, service, abandon or maintain any portion of an onsite system without being registered under part III of chapter 489. An owner who personally performs work on a system serving his or her own owner-occupied single-family residence is exempt from registration, but is still subject to all permitting requirements.</p>

<p>For work seaward of the coastal construction control line established under section 161.053, section 381.0065 says the issuance of a septic permit is contingent on receipt of any required coastal construction control line permit from the department.</p>

<p>The statute defines a bedroom for septic purposes. For a site-built home, a bedroom is a room that can be used for sleeping and has at least 70 square feet of conditioned space. It is along an exterior wall, it has a closet and a door or an entrance where a door could be installed, and it has an emergency means of escape and rescue opening to the outside under the Florida Building Code. The statute says an existing-system inspection, evaluation or assessment, or a modification, replacement or upgrade of the system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition still may not cover any part of the existing system or encroach on a required setback or the unobstructed area. The local health department reviews and verifies the floor plan and site plan, and the statute says verifying a system's location is not an inspection of the system. The review and verification must be completed within seven business days after the local health department receives a floor plan and site plan.</p>

<p>The department's rules include requirements for separation from the water table elevation during the wettest season. And a separate statute, section 403.067, says new onsite systems constructed within a basin management action plan area, a reasonable assurance plan or a pollution reduction plan are prohibited where connection to a public or investor-owned sewerage system is available as defined in section 381.0065. On lots of one acre or less within such an area where sewerage is not available, the statute requires enhanced nutrient-reducing systems or others achieving at least 65 percent nitrogen reduction.</p>

<h2>The Utility Department, DEP Permits and Permit Transfer</h2>

<p>The Flagler Beach Utility Department page states a mission to provide drinking water and advanced treatment and disposal of wastewater. The department is at 116 S. 3rd Street, Flagler Beach, and the phone is 386-517-2000, press 1. Office hours are Monday through Friday, 8 a.m. to 5 p.m. The email is UB@cityofflaglerbeach.com. After hours and on weekends, the city lists 386-313-4911 for sewer back-ups and broken water or sewer pipes.</p>

<p>Under section 381.0065 of the Florida Statutes, a person may not construct, repair, modify, abandon or operate an onsite system without first obtaining a permit approved by the department, and the department is the Department of Environmental Protection. A municipality may not issue a building or plumbing permit for a building that requires an onsite system unless the owner or builder has a construction permit for it. A building may not be occupied until the Department of Environmental Protection approves the final installation. A municipality may not approve a change in occupancy or tenancy of a building that uses an onsite system until the department has reviewed the use of the system with the change, approved it and amended the operating permit.</p>

<p>On permit length, the statute says a construction permit is valid for 18 months and may be extended for one 90-day period, and a repair permit is valid for 90 days. On transfer, the statute says a construction permit may be transferred if the siting, location and installation conditions are unchanged. The transferee files an amended application with proof of ownership within 60 days after the transfer, and the statute says a fee is not associated with the processing of that supplemental information.</p>

<p>On who may do the work, the statute says a person may not contract to construct, modify, alter, repair, service, abandon or maintain any portion of an onsite system without being registered under part III of chapter 489. On the water table, the department's rules include requirements for separation from the water table elevation during the wettest season. On liens, the city code says the city records a lien if a line extension invoice goes unpaid for 30 days after delivery, and that the city also has a lien on the lot for the cost of a connection it makes itself after notice.</p>

<h2>The bottom line</h2>

<p>In <a href="http://www.adamscameron.com/flagler-beach-florida-real-estate-and-homes.html">Flagler Beach</a>, Section 5.03.53 requires the owner of a dwelling to connect within six months following notification. Section 5.03.53 also says no connection is required where the sewer line is more than 200 feet from the lot. Section 5.03.62 says no septic tank shall be constructed on properties within the prescribed distances of sewer lines. Section 5.03.60 says a septic tank will be used only if the property is more than 200 feet from the sewer line. The state adds its own definition of available, its own 365-day and 90-day connection clocks, and its own permit rules for constructing, repairing, modifying, abandoning or operating a system.</p>

<p>The Flagler Beach Utility Department page states a mission to provide drinking water and advanced treatment and disposal of wastewater, and its phone is 386-517-2000, press 1. Section 381.0065 says a septic system needs a permit approved by the Department of Environmental Protection to be constructed, repaired, modified, abandoned or operated. It also says a construction permit may be transferred if siting, location and installation conditions are unchanged, with an amended application and proof of ownership filed within 60 days after the transfer.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/buying-a-home-in-flagler-beach-what-to-know-about-florida-s-small-beach-town">Buying a Home in Flagler Beach: What to Know About Florida's Small Beach Town</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/moving-to-flagler-beach-utilities-trash-and-first-month">Moving to Flagler Beach: Utilities, Trash and First Month</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/oceanfront-homes-in-flagler-beach-control-line-and-dunes">Oceanfront Homes in Flagler Beach: Control Line and Dunes</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/flagler-beach-vacation-rental-rules-for-home-buyers">Flagler Beach Vacation Rental Rules for Home Buyers</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/flagler-beach-flood-zones-and-flood-insurance-for-buyers">Flagler Beach Flood Zones and Flood Insurance for Buyers</a></p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>What does the Flagler Beach Utility Department page say, and what dividing lines do the code and statutes use?</strong></summary>
<p>The Flagler Beach Utility Department page states a mission to provide drinking water and advanced treatment and disposal of wastewater. Its phone is 386-517-2000, press 1, and its hours are Monday through Friday, 8 a.m. to 5 p.m. The city code uses 200 feet from the sewer line in Sections 5.03.53 and 5.03.60. State law defines available by three conditions: the sewerage system is capable of being connected, is not under a Department of Environmental Protection moratorium, and has adequate permitted capacity. For a single-family residence with an estimated flow of 1,000 gallons a day or less, the definition adds that a gravity sewer line, or a low pressure or vacuum line in areas approved for those, exists in a public easement or right of way that abuts the property line.</p>
</details>

<details>
<summary><strong>What do the Flagler Beach code sections say about septic tanks?</strong></summary>
<p>Section 5.03.60 of the city code says a septic tank will be used only if the property is more than 200 feet from the sewer line. Section 5.03.62 says no septic tank shall be constructed on properties within the prescribed distances of sewer lines set forth in Section 5.03.53, and that no septic tank other than those approved by the state department of health and rehabilitative services shall be constructed within the corporate limits. State law also requires a permit approved by the Department of Environmental Protection before a system is constructed, repaired, modified, abandoned or operated.</p>
</details>

<details>
<summary><strong>How long do I have to connect to city sewer after a notice?</strong></summary>
<p>The city code says the owner shall connect within six months following notification, which is by publication of the notice once a week for two consecutive weeks in a newspaper of general circulation in the city. State law, section 381.00655, says the owner of a properly functioning onsite system must connect within 365 days after written notification from the sewerage system owner that the system is available.</p>
</details>

<details>
<summary><strong>Who pays to extend a sewer line to a Flagler Beach lot?</strong></summary>
<p>The city code says applicants for development on properties within 200 feet of the sewer line that do not have access to a stub-up are responsible for all costs of extending sewer pipes to the property. If the city extends the pipes to the property line, it mails the owner by certified mail an invoice for the total cost, including materials, labor and engineering. If the owner does not pay within 30 days of delivery, the city records a lien against the property.</p>
</details>

<details>
<summary><strong>Can a septic construction permit be transferred to another person?</strong></summary>
<p>State law says a construction permit for an onsite system may be transferred to another person if the siting, location and installation conditions are unchanged. The transferee files an amended application with proof of ownership within 60 days after the transfer. The statute says a fee is not associated with processing that information.</p>
</details>

<details>
<summary><strong>What does Florida law say about adding a bedroom and an existing septic system?</strong></summary>
<p>State law says an existing-system inspection or evaluation, or a modification, replacement or upgrade of the system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition may not cover any part of the existing system or encroach on a required setback or the unobstructed area. The local health department reviews the floor plan and site plan. The statute defines a bedroom by size, location, a closet and a door, and an escape opening to the outside.</p>
</details>

<details>
<summary><strong>Does a change in occupancy or tenancy affect a house on septic?</strong></summary>
<p>State law says a city may not approve a change in occupancy or tenancy of a building that uses an onsite system until the Department of Environmental Protection has reviewed the use of the system with the proposed change, approved it and amended the operating permit.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 19:56:08 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/flagler-beach-septic-vs-sewer-what-a-buyer-checks]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Bunnell Property Tax Bill, Line by Line]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/bunnell-property-tax-bill-line-by-line]]>
        </link>
        <description>
            <![CDATA[<p>A property inside the City of Bunnell carried a 2025 tax rate of either 21.6653 or 22.0153 mills, depending on its Flagler County tax area. That is 21.6653 or 22.0153 dollars of tax for every 1,000 dollars of taxable value. The Florida Department of Revenue lists ten Bunnell tax areas, and the difference between the two totals is one line for East Flagler Mosquito Control at 0.3500 mills.</p>

<p>See <a href="http://www.adamscameron.com/bunnell-florida-real-estate-and-homes.html">Bunnell homes for sale</a>. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-bunnell-fl-neighborhoods-costs-and-what-to-know">Living in Bunnell, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>The lines on the Bunnell tax-area rate sheet</h2>

<p>Florida law says a mill is one one-thousandth of a United States dollar. A property with 100,000 dollars of taxable value pays 100 dollars for every mill. Worked figures use 100,000 dollars of taxable value. They are arithmetic on published rates, not a quote for any address.</p>

<p>The Department of Revenue's 2025 Flagler County tax area sheet lists the ten Bunnell areas. Bunnell appears in tax areas 012, 013, 112 and 113, which total 21.6653 mills. It appears in areas 014, 015, 016, 114, 115 and 116, which total 22.0153 mills. The City of Bunnell line is 7.9300 mills in all ten. Here is the 2025 stack for an area with the mosquito line, turned into dollars for each 100,000 dollars of taxable value.</p>

<ul>
<li><strong>City of Bunnell, 7.9300 mills:</strong> 793.00 dollars.</li>
<li><strong>Flagler County, 7.9945 mills:</strong> 799.45 dollars.</li>
<li><strong>County debt, 0.1855 mills:</strong> 18.55 dollars.</li>
<li><strong>School state-law levy, 3.1010 mills:</strong> 310.10 dollars.</li>
<li><strong>School discretionary, 2.2480 mills:</strong> 224.80 dollars.</li>
<li><strong>East Flagler Mosquito Control, 0.3500 mills:</strong> 35.00 dollars.</li>
<li><strong>St. Johns River Water Management District, 0.1793 mills:</strong> 17.93 dollars.</li>
<li><strong>Florida Inland Navigation District, 0.0270 mills:</strong> 2.70 dollars.</li>
</ul>

<p>The total is 2,201.53 dollars for every 100,000 dollars of taxable value. In the four areas without the mosquito line, the total is 2,166.53 dollars. The sheet also prints a Voter Approved Debt line in every Bunnell area, and it reads 0.0000 mills.</p>

<p>The Flagler County operating line is 7.9945 mills and the City of Bunnell line is 7.9300 mills. The city line is 36.0 percent of the 22.0153 total and 36.6 percent of the 21.6653 total. Flagler County has two lines, operating at 7.9945 and debt at 0.1855, and together they come to 8.1800 mills. That is 37.2 percent of the larger total and 37.8 percent of the smaller one. The Flagler County Buzz report on the county's September 3, 2026 hearing calls the county's 8.18 mills the current year's figure.</p>

<p>The School Board has two lines on the sheet. The state-law levy is 3.1010 mills and the discretionary line is 2.2480 mills. Together they make 5.3490 mills, or 24.3 percent of the larger total and 24.7 percent of the smaller one. Two more lines remain. St. Johns River Water Management District is 0.1793 mills and Florida Inland Navigation District is 0.0270 mills. With the mosquito line, those three lines together are 0.5563 mills, or 2.5 percent. Without it, the two come to 0.2063 mills, or 1.0 percent of the 21.6653 total.</p>

<p>Two tax areas carry one more name. Area 014 also lists Bunnell CRA at 0.0000 mills, and area 016 also lists Deer Run CDD at 0.0000 mills. No other Bunnell area lists a district line. By arithmetic, a line printed at zero adds nothing to the 2025 total.</p>

<p>Here is a labeled assumption, not a real home. Suppose a property in an area at 22.0153 mills has 200,000 dollars of taxable value. The city line is 1,586.00 dollars. The county lines are 1,636.00 dollars. The school lines are 1,069.80 dollars. St. Johns River is 35.86 dollars, Inland Navigation is 5.40 dollars and mosquito control is 70.00 dollars. The total is 4,403.06 dollars, which is 22.0153 times 200. FlaglerLive reported in August 2026 that the owner of a 250,000 dollar house with a 50,000 dollar homestead exemption pays 1,586 dollars in Bunnell taxes, the same as the city line above. The same report says that figure does not include county, school and other taxes. At the city's 7.93 mills, 1,586 dollars is the tax on 200,000 dollars of taxable value (our arithmetic).</p>

<h2>2026 city, county and school reports</h2>

<p>The City of Bunnell rate was 7.93 mills for 2025. The workshop minutes of August 8, 2024 record that the budget was prepared with no millage increase and that the proposed millage was recommended to remain at 7.93 mils. The same minutes say that any increase in taxes is from an increase in property values and not higher city taxes or millage rate. The minutes of August 11, 2025 record a motion to set the tentative millage at 7.93 mils and the first budget hearing for September 8, 2025 at 7:00 PM. The city described that proposal as the same millage rate. The 2025 sheet from the Department of Revenue prints 7.9300.</p>

<p>FlaglerLive reported on August 11, 2026 that the Bunnell City Commission had approved its tentative 2026-27 property tax rate and budget at a flat 7.93 dollars per 1,000 dollars of taxable value, the fourth straight year. The same report says the tentative rate is not the final rate, that the commission would approve the final rate in a pair of hearings in September, and that the first hearing was September 14. The report describes the 2026 city rate as tentative.</p>

<p>The 2024 workshop minutes name the debt service payment for the new Administration Facility as the biggest major change in that year's proposed budget. They also name the Police Department as the largest portion of the budget. Separately, FlaglerLive reported in 2026 that the budget carries over 1 million dollars a year in payments on 10 million dollars of debt for the new City Hall and police station. The Department of Revenue sheet lists the Voter Approved Debt line at 0.0000 mills in every Bunnell area.</p>

<p>A Department of Revenue letter to the city gives figures drawn from the Ad Valorem Data Book 2024. The letter, dated April 1, 2025, lists a total just value of 787,554,062 dollars for the city. The assessed value is 601,822,121 dollars and the taxable value is 398,183,871 dollars. The exempt amount is 203,638,250 dollars. The letter gives the percentage of assessed value exempt from taxation as 33.84 percent for Bunnell and 16.51 percent statewide.</p>

<p>The Flagler School Board approved its final millage on September 8, 2026. The Palm Coast Observer reported a total of 5.312 mills, less than the roll-back rate, and a budget of 353,097,566 dollars. Required Local Effort is 3.064 mills, which the Observer calls the 15th consecutive year the state lowered it. The discretionary rate is 1.500 mills and the local capital improvement rate is 0.748 mills, and the Observer says neither has changed in 17 years. The 2025 sheet total for the two school lines was 5.3490, so the 2026 total reported by the Observer is 0.0370 mills lower (our arithmetic).</p>

<p>Flagler County held its first budget hearing on September 3, 2026. The Flagler County Buzz reported a total operating rate of 7.9737 mills, which it said is 0.93 percent below the rollback rate of 8.0486 mills. The total rate including the voter-approved environmentally sensitive lands and judicial center levies is 8.0698 mills, less than the current year's 8.18 mills. The second and final hearing was scheduled for Monday, September 14 at 5:01 p.m. The report describes the county budget as tentative.</p>

<p>The TRIM notice of proposed property taxes includes the capitalized line: DO NOT PAY, THIS IS NOT A BILL. Section 200.069 says the taxing authorities will hold public hearings, and that each taxing authority may amend or alter its proposals at the hearing.</p>

<h2>Taxable value, homestead and reassessment after a sale</h2>

<p>One mill is one dollar for every 1,000 dollars, so each 100,000 dollars of taxable value pays 100 dollars per mill. The Flagler County Tax Collector's FAQ says homestead and other exemption applications are processed by the Property Appraiser's office. The FAQ lists an increase in assessed value or the loss of an exemption as common reasons a tax bill goes up.</p>

<p>A homestead exemption applies when a person who has legal or beneficial title on January 1 makes the property a permanent residence in good faith. The statute grants an exemption from all taxation, except assessments for special benefits, up to an assessed valuation of 25,000 dollars. Section 196.031 adds a second exemption of up to 25,000 dollars on assessed valuation greater than 50,000 dollars. The statute applies it to all levies other than school district levies, and it adjusts that amount each January 1 for inflation. The Department of Revenue lists the maximum at 25,722 dollars for 2025 and 26,411 dollars for 2026.</p>

<p>Here is a second labeled assumption, again not a real home. Take an assessed value of 250,000 dollars with a homestead exemption, the 2025 rates for an area at 22.0153 mills and the 2025 additional exemption of 25,722 dollars. The school taxable value is 225,000 dollars, and at 5.349 mills the school tax is 1,203.53 dollars. The other lines total 16.6663 mills. Their taxable value is 250,000 minus 25,000 minus 25,722, or 199,278 dollars, and the tax is 3,321.23 dollars. The total is 4,524.75 dollars. The two rounded figures above add to 4,524.76 because of rounding. The same assessed value with no exemption, at 22.0153 mills, is 5,503.83 dollars. These examples are assumptions, not real homes.</p>

<p>Save Our Homes limits how fast a homestead assessment can rise. Under section 193.155, each year's change may not exceed the lower of 3 percent of the prior year's assessed value or the percentage change in the Consumer Price Index. The Department of Revenue lists the cap at 2.7 percent for 2026 and 2.9 percent for 2025. Except as the section provides, property assessed under it is assessed at just value as of January 1 of the year following a change of ownership.</p>

<p>Section 193.1554 defines nonhomestead residential property as residential real property that contains nine or fewer dwelling units and does not receive the section 196.031 exemption. For that property, the annual change after the first year may not exceed 10 percent of the prior year's assessed value. Except as the section provides, the property is assessed at just value as of January 1 of the year following a change of ownership or control. The statute defines that change to include any sale, foreclosure or transfer of legal title or beneficial title in equity, and it lists transfers that are not a change of ownership.</p>

<p>Section 689.261 provides a disclosure summary. The summary reads: "BUYER SHOULD NOT RELY ON THE SELLER'S CURRENT PROPERTY TAXES AS THE AMOUNT OF PROPERTY TAXES THAT THE BUYER MAY BE OBLIGATED TO PAY IN THE YEAR SUBSEQUENT TO PURCHASE." It adds that a change of ownership or property improvements triggers reassessments of the property that could result in higher property taxes. The same section says that beginning February 1, 2027, residential real property visible on a listing platform must include its estimated ad valorem taxes. If the estimate comes from a tax estimator or buyer payment calculator, the current owner's assessment or taxes may not be used to calculate it.</p>

<p>The calendar runs on dates in the statutes. An application for exemption is due to the county property appraiser on or before March 1 of each year. Failure to apply by March 1 is a waiver of the exemption privilege for that year, with exceptions the statute lists. A petition to the value adjustment board on a valuation issue is due on or before the 25th day after the property appraiser mails the notice. Taxes are due November 1, or as soon after as the certified roll is received.</p>

<p>The discounts are set by section 197.162. A payment earns 4 percent in November (or within 30 days after the original tax notice), 3 percent in December, 2 percent in January and 1 percent in February. March has no discount. Taxes become delinquent on April 1 following the year they are assessed, or immediately after 60 days from the mailing of the original tax notice, whichever is later. Section 197.122 makes taxes a first lien, superior to all other liens, from January 1 of the year they were levied until they are paid or barred.</p>

<p>The Tax Collector's FAQ answers the question of what to do if you sold the property by saying to notify the Tax Collector's office so a tax bill can be mailed to the new owner. It also says changes to the roll made after the cut-off date, typically July, are not reflected until the following tax year. Homestead and other exemption applications go to the Property Appraiser's office, and the Tax Collector's page lists the Property Appraiser's phone as 386-313-4150. Two other Bunnell guides are <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/bunnell-flood-zones-and-flood-insurance-guide">Bunnell Flood Zones and Flood Insurance Guide</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/bunnell-fl-acreage-zoning-wells-and-septic-for-buyers">Bunnell FL Acreage: Zoning, Wells and Septic for Buyers</a>.</p>

<p><strong>Bottom line.</strong> The 2025 tax-area sheet lists eight lines at 22.0153 mills or seven at 21.6653, not counting the zero-rate lines, and the City of Bunnell line is 7.9300 in every one of the ten tax areas. The school total is 5.3490 and the county total is 8.1800. The reports describe the 2026 city and county rates as tentative, and the Palm Coast Observer reported the school total as final at 5.312. The disclosure summary under section 689.261 tells the buyer not to rely on the seller's current property taxes, the exemption application is due March 1, and the discount steps down each month from November. See <a href="http://www.adamscameron.com/bunnell-florida-real-estate-and-homes.html">Bunnell homes for sale</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What is the property tax rate in the City of Bunnell?</strong></summary>
<p>For 2025, the Florida Department of Revenue lists ten Bunnell tax areas in Flagler County. Four of them total 21.6653 mills and six total 22.0153 mills. The six higher areas include a line for East Flagler Mosquito Control at 0.3500 mills. The City of Bunnell line is 7.9300 mills in all ten areas. The county lines total 8.1800 mills and the school lines total 5.3490 mills. A mill is one one-thousandth of a United States dollar.</p>
</details>
<details>
<summary><strong>What was Bunnell's tentative 2026 city millage?</strong></summary>
<p>FlaglerLive reported on August 11, 2026 that the Bunnell City Commission approved a tentative 2026-27 rate of 7.93 dollars per 1,000 dollars of taxable value, the fourth straight year at that rate. The report says the final rate comes from a pair of September hearings and that the first hearing was September 14. The report describes the 2026 city rate as tentative.</p>
</details>
<details>
<summary><strong>What are the lines in a Bunnell tax area rate?</strong></summary>
<p>The 2025 Department of Revenue sheet lists the City of Bunnell at 7.9300 mills, Flagler County at 7.9945, county debt at 0.1855, the School Board state-law levy at 3.1010 and school discretionary at 2.2480. It also lists St. Johns River Water Management District at 0.1793 and Florida Inland Navigation District at 0.0270. Areas with the mosquito line add East Flagler Mosquito Control at 0.3500. A Voter Approved Debt line prints at 0.0000.</p>
</details>
<details>
<summary><strong>Does the seller's tax bill tell me what I will pay?</strong></summary>
<p>The section 689.261 disclosure summary says the buyer should not rely on the seller's current property taxes as the amount the buyer may owe after purchase. A change of ownership or property improvements triggers reassessments that could result in higher property taxes.</p>
</details>
<details>
<summary><strong>When is the homestead exemption application due in Flagler County?</strong></summary>
<p>Section 196.011 says an application for exemption is filed with the county property appraiser on or before March 1 of each year. Failing to apply by March 1 is a waiver of the exemption privilege for that year, with exceptions the statute lists. The Flagler County Tax Collector's FAQ says homestead and other exemption applications are processed by the Property Appraiser's office. The Property Appraiser's phone number on the Tax Collector's page is 386-313-4150.</p>
</details>
<details>
<summary><strong>When are Flagler County property taxes due, and is there a discount?</strong></summary>
<p>Under section 197.333, taxes are due November 1, or as soon after as the certified roll is received. They become delinquent on April 1 following the year assessed, or after 60 days from the mailing of the original tax notice, whichever is later. Section 197.162 sets the discount at 4 percent in November (or within 30 days after the original tax notice), 3 percent in December, 2 percent in January and 1 percent in February. March has no discount.</p>
</details>
<details>
<summary><strong>How much can my assessed value rise each year?</strong></summary>
<p>On a homestead, section 193.155 caps the yearly change at the lower of 3 percent or the Consumer Price Index change. The Department of Revenue lists the cap at 2.7 percent for 2026 and 2.9 percent for 2025. On nonhomestead residential property with nine or fewer dwelling units that does not receive the section 196.031 exemption, section 193.1554 caps the yearly change at 10 percent after the first year. Except as each section provides, both assess the property at just value as of January 1 of the year after a change of ownership.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 19:55:51 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/bunnell-property-tax-bill-line-by-line]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[South Daytona Short-Term Rental Rules for Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/south-daytona-short-term-rental-rules-for-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Our exact-phrase searches of the South Daytona Code of Ordinances and its Land Development Code on October 28, 2026 for "short-term rental," "short term rental" and "vacation rental" returned no hits for those three phrases. The city does have a rental dwelling business tax receipt, an annual rental inspection and a state license requirement for rentals of less than six months. These rules apply in <a href="http://www.adamscameron.com/south-daytona-florida-real-estate-and-homes.html">South Daytona</a>.</p>

<h2>What the city code says and what it leaves out</h2>

<p>We ran exact-phrase searches for "short-term rental," "short term rental" and "vacation rental" in both the Code of Ordinances and the Land Development Code. Each search returned zero hits.</p>

<p>Section 2.2 of the Land Development Code defines "Accommodation" as any hotel, motel, tourist court, rooming house, or rental unit intended to be used for transient persons or tourists for overnight or temporary lodging. The same section defines "Motel" as a building or a group of buildings in which sleeping accommodations are offered for rental primarily to transients and customarily having individual access from the units to the parking lot.</p>

<p>Section 5.5 is the schedule of zoning district regulations. In the business general commercial district, called BGC, "Hotels and motels" appear on the list of special exceptions. The district's stated purpose is to provide for retail, service and professional business located along arterial roads. The code adds that automotive related uses and certain other types of businesses are permitted as special exceptions in that district.</p>

<p>The two mixed use districts, MUD-1 and MUD-2, also list hotels and motels among their special exceptions. The code describes those districts as intended for areas assigned the comprehensive plan future land use designation of Mixed Use 1 and Mixed Use 2. A development agreement is required there for major projects as determined by the city.</p>

<p>A text search of Section 5.5 for the words "accommodation," "transient" and "tourist" on October 28, 2026 returned no hits.</p>

<p>The city's Business Tax Receipts page tells applicants to email Community Development to check the address and to ensure the business use is permitted within the zoning district. The city lists Community Development at 1672 S. Ridgewood Avenue.</p>

<h2>The rental dwelling business tax receipt and the annual inspection</h2>

<p>The rule that does speak to rentals is in section 16-19, subsection 13, of the Code of Ordinances. It says it shall be unlawful for any owner of residential property to rent or lease, or offer to rent or lease, any dwelling or dwelling unit unless a current local business tax receipt has been issued by the city. It names single-family, duplex, triplex, multi-family, apartment, condominium, or more than one room. A copy of the receipt is to be available at the structure in which the dwelling unit is located.</p>

<p>The subsection also says what counts as a rental. There is no requirement for a written lease or any evidence of monetary payment to establish a rental arrangement. A rental arrangement is presumed to exist when someone is residing in a residential structure who is not the owner and someone with an ownership interest is also not residing there at the same time. The owner can rebut the presumption only by showing that the arrangement qualifies as a mortgage.</p>

<p>The city's page for Business Tax Receipts says any operating business within the city is required to obtain a receipt before opening. The application options are Commercial, Residential (Home-Based), or Rental dwelling. For rental dwellings of less than six months, vacation rentals or month to month rentals, the page says a state license is required, along with a driver's license when submitting the rental application. The page lists a Rental Dwelling Business Tax Receipt Application as a PDF.</p>

<p>The city page says rental dwellings are required to pass a rental inspection and have all fees paid prior to renting the dwelling. The code says each dwelling unit licensed for rental must pass an annual inspection by a city code inspector. Its purpose is to determine compliance with the International Property Maintenance Code, other applicable codes and the supplemental provisions of the subsection. The annual inspection is done in a systematic manner according to administratively determined plans and schedules.</p>

<p>Two inspection rules apply to rentals that are not connected to a public sanitary sewer or a public potable water supply. If a rental is not connected to a public sanitary sewer, the annual inspection includes an assessment of the septic tank system. If the inspector finds the system inadequate, the owner must hire a licensed septic tank contractor to inspect it and repair or replace it if necessary. If a rental is not connected to a public potable water supply, the receipt holder must give the inspector evidence each year that the private water source was tested and found sanitary and potable by a state-certified laboratory. The test must be within three months of the inspection date, and a qualified employee of the city public works department takes the water sample.</p>

<p>The code also sets rules for how inspections are carried out. Only a code inspector designated by the city manager may make them. No law enforcement officer may accompany the inspector unless there is probable cause to believe the inspector's personal safety is at risk. Inspections are made during daylight hours, with two exceptions. One is an appointment made at the lessee's request. The other is two or more earlier daylight attempts that found no adult on the premises authorized to admit the inspector.</p>

<p>The code says the rental housing receipt fee equals the fee for a home business tax receipt. A separate fee is charged for each rental dwelling unit, no matter how many units one owner holds. The owner of record applies in writing to the community development department and lists the address, the classification and the lessee, if there is one. An agent may apply for several receipts with written authorization from each owner. The owner of record application rule excludes apartment buildings of four units or more.</p>

<p>The code says no rental housing receipt or annual housing inspection is required of an owner who occupies a single-family dwelling and rents not more than one room in that building. The code adds that the exception does not excuse the owner from the International Property Maintenance Code or any other applicable code.</p>

<p>Receipts run on the city's fiscal year. The city page says approved receipts are valid from October 1 through September 30. Renewal notices are mailed from mid-July to August, and payment is required on or before September 30 of every fiscal year. The page also states a 3.9% surcharge on debit and credit card payments. The Business Tax Receipts page lists phone 386-322-3021, Monday through Friday, 8:00 am to 4:30 pm, at 1672 S Ridgewood Avenue.</p>

<p>The city's Code Compliance page says a lien search ordered through Orange Data includes open permits, code enforcement cases and outstanding utility balances. It does not include recorded liens.</p>

<h2>State law, the county tax and association rules</h2>

<p>Section 509.032(7)(b) of the Florida Statutes says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. That paragraph does not apply to any local law, ordinance or regulation adopted on or before June 1, 2011.</p>

<p>Section 509.032(7)(a) says the regulation of public lodging establishments, including sanitation standards and inspections, is preempted to the state. The paragraph does not preempt a local government's authority to inspect public lodging for compliance with the Florida Building Code and the Florida Fire Prevention Code.</p>

<p>Section 509.242 says a vacation rental is any unit or group of units in a condominium or cooperative, or any individually or collectively owned single-family, two-family, three-family or four-family house or dwelling unit, that is also a transient public lodging establishment but is not a timeshare project. Section 509.013 defines transient occupancy as occupancy that is temporary. It includes the occupancy of a dwelling unit at a vacation rental unless a written rental or lease agreement expressly states that the dwelling unit is the sole residence of the guest.</p>

<p>Section 509.241 says each public lodging establishment shall obtain a license from the division. The license may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree.</p>

<p>The Division of Hotels and Restaurants keeps a searchable online database of licensed vacation rentals. It gives the address of every vacation rental condo or dwelling currently licensed by the division and refreshes daily.</p>

<p>Section 212.03(1)(c) of the Florida Statutes concerns the tax in chapter 212. It exempts the rental of facilities intended primarily for rental as a principal or permanent place of residence. It says the rental of such facilities that primarily serve transient guests is not exempt.</p>

<p>Volusia County also collects a Tourist and Convention Development Tax. The county describes the tax as a local option transient rental tax. Every person who rents, leases or lets for consideration any living quarters for a term of six months or less is exercising a taxable privilege. Renting a bed, room, apartment, house, condo, hotel, motel and similar for six months or less makes the renter responsible for collecting and remitting this tax. The county page lists online registration, treasury@volusia.gov and 386-943-7085. The county page also carries this sentence: "Registration and payment of taxes does not guarantee compliance with other state and local laws." The same page says to contact the city and county zoning departments to determine whether short-term rentals are permitted in their area and for what duration. The county site also has a "Report a Rental Evader" link.</p>

<p>In a homeowners' association, section 720.306(1)(h) says a governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title after the effective date or who consents. The same paragraph says an association may amend its governing documents to prohibit or regulate rental agreements for a term of less than six months. It may also prohibit the rental of a parcel more than three times in a calendar year. Those amendments apply to all parcel owners.</p>

<p>In a condominium, section 718.110(13) says an amendment prohibiting unit owners from renting, altering the duration of the rental term or limiting the number of times owners may rent in a period applies only to unit owners who consent and unit owners who acquire title after the amendment's effective date.</p>

<p>Section 720.401(1) says a prospective parcel owner in a community must be presented a disclosure summary before executing the contract for sale. If it was not provided before the contract, the purchaser may void the contract by written notice within three days after receipt of the disclosure summary or prior to closing, whichever occurs first. The right may not be waived and ends at closing. The section does not apply to associations regulated under chapters 718, 719, 721 or 723.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-south-daytona-fl-neighborhoods-costs-and-what-to-know">Living in South Daytona, FL: Neighborhoods, Costs and What to Know</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/south-daytona-flood-zones-flood-insurance-guide">South Daytona Flood Zones & Flood Insurance Guide</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/south-daytona-property-tax-bill-line-by-line-2026">South Daytona Property Tax Bill, Line by Line (2026)</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">Closing Costs in Florida: What Buyers and Sellers Pay in Volusia County</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-a-condo-in-florida-under-the-new-condo-laws-a-volusia-county-guide">Buying a Condo in Florida Under the New Condo Laws: A Volusia County Guide</a>.</p>

<h2>Bottom line</h2>

<p>Our searches of South Daytona's codes for short-term rental and vacation rental returned zero hits. The city does require a rental dwelling business tax receipt, a rental inspection and all fees paid before the dwelling is rented, and a state license for rentals of less than six months. The public lodging license under section 509.241 may not be transferred from one place or individual to another. The county tax applies to rentals of six months or less. Section 509.032(7)(b) says a local rule may not regulate duration or frequency of vacation rentals, and that this paragraph does not apply to local laws adopted on or before June 1, 2011. Section 720.306(1)(h) allows an association to amend its governing documents to prohibit or regulate rental agreements for a term of less than six months.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Does South Daytona allow short-term rentals?</strong></summary>
<p>Our searches of both the Code of Ordinances and the Land Development Code on October 28, 2026 for "short-term rental," "short term rental" and "vacation rental" returned no hits for those three phrases. The city does require a rental dwelling business tax receipt and says a state license is required for rentals of less than six months. The city's Business Tax Receipts page tells applicants to email Community Development to check that the business use is permitted within the zoning district.</p>
</details>

<details>
<summary><strong>What does South Daytona require to rent out a dwelling?</strong></summary>
<p>Section 16-19(13) of the Code of Ordinances says it is unlawful for an owner of residential property to rent or offer to rent any dwelling or dwelling unit unless a current local business tax receipt has been issued by the city. The code exempts an owner who occupies a single-family dwelling and rents not more than one room in that building. The city page says approved receipts are valid October 1 through September 30.</p>
</details>

<details>
<summary><strong>Does the rental inspection happen once or every year?</strong></summary>
<p>The code says each dwelling unit licensed for rental must pass an annual inspection by a city code inspector. The city page also says rental dwellings must pass a rental inspection and have all fees paid before the dwelling is rented. For a rental not connected to a public sanitary sewer, the inspection includes an assessment of the septic tank system. For a property not connected to a public potable water supply, the receipt holder must give the inspector evidence that the private water source was tested and found sanitary and potable by a state-certified laboratory within three months of the inspection date.</p>
</details>

<details>
<summary><strong>Can a public lodging license be transferred?</strong></summary>
<p>Section 509.241 of the Florida Statutes says the license from the division may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree. The Division of Hotels and Restaurants keeps a searchable online database of licensed vacation rentals that gives the address of each and refreshes daily.</p>
</details>

<details>
<summary><strong>Can a local law regulate the duration or frequency of vacation rentals?</strong></summary>
<p>Section 509.032(7)(b) says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. That paragraph does not apply to a local law adopted on or before June 1, 2011.</p>
</details>

<details>
<summary><strong>What is the Volusia County tax on rentals of six months or less?</strong></summary>
<p>The county's Tourist and Convention Development Tax is a local option transient rental tax. Every person who rents, leases or lets for consideration any living quarters for a term of six months or less is exercising a taxable privilege. The county says renting a bed, room, apartment, house, condo and similar for six months or less makes the renter responsible for collecting and remitting it. The county page lists online registration and phone 386-943-7085. The county page says registration does not guarantee compliance with other state and local laws.</p>
</details>

<details>
<summary><strong>What do the statutes say about rental amendments by homeowners' and condo associations?</strong></summary>
<p>In a homeowners' association, section 720.306(1)(h) says a rental rule enacted after July 1, 2021 applies only to a parcel owner who acquires title after it takes effect or who consents. An association may regulate rental terms of less than six months and may prohibit renting a parcel more than three times in a calendar year, and those amendments apply to all owners. In a condominium, section 718.110(13) applies a rental amendment only to unit owners who consent and those who acquire title after it takes effect.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 19:55:34 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/south-daytona-short-term-rental-rules-for-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Deltona Short-Term Rental Rules for Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/deltona-short-term-rental-rules-for-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Deltona's zoning chapter does not contain the words "short-term" or "vacation rental." We searched the full text of Chapter 110 on the city's Municode library on October 28, 2026, and neither phrase appears. The Deltona code, Florida Statutes and Volusia County each publish text that applies to renting a home to guests. See <a href="http://www.adamscameron.com/deltona-florida-real-estate-and-homes.html">Deltona</a>.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deltona-fl-neighborhoods-costs-and-what-to-know">Living in Deltona, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>What Deltona's code says, and what it leaves out</h2>

<p>Chapter 110 is the zoning chapter of the Deltona Code of Ordinances. We searched its full page text, about 417,000 characters, for "short-term," "short term," "vacation rental" and "transient." The first three have no hits. "Transient" appears once, as the heading TRANSIENT LODGING in the permitted use table.</p>

<p>We also searched Chapter 70, General Provisions, which runs about 193,000 characters. The words "vacation rental," "short-term," "transient" and "bed and breakfast" have no hits there. The words "hotel" and "motel" appear only inside the definition of an "adult motel."</p>

<p>Section 110-301, Table 110-1, lists the zoning districts. The residential districts are RE-5, RE-1, R1-AAA, R1-AA, R1-A and R1 Single-Family, R-1B Single-Family, R-2 Two-Family (Duplex), RM-1 Multi-Family Medium Density, RM-2 Multi-Family High Density, MH Mobile Home Park and OR Office Residential. The table also lists RP Resource Protection, P Public Use and A Agriculture. The non-residential districts are PB Professional Business, C-1 Retail Commercial, C-2 General Commercial, C-3 Heavy Commercial, I Industrial and EO Enterprise Commercial Overlay.</p>

<p>Under the heading TRANSIENT LODGING in the permitted use table, the row "Motels and hotels" applies. In the C-1 Retail Commercial district that use is conditional. In the C-2 General Commercial district, the C-3 Heavy Commercial district, the CPUD district and the MPUD district it is permitted. The row is blank in every other column of the table.</p>

<p>The permitted use table also has the row "Bed and Breakfast Homestay." The table shows it as a conditional use in the A, RE-5 and RE-1 districts. The RE-1 cell carries a footnote marker. The A district's own text lists "Bed and breakfast homestay" among its conditional uses and refers to section 110-817, which is titled "Conditions applied to conditional uses."</p>

<p>Section 110-817 sets five conditions for a bed and breakfast homestay. The maximum number of guest rooms for bed and breakfast use in the home is five. The owner must reside in the building. Separate cooking facilities are not permitted in the guest room. Each guest room must have private toilet and shower facilities, except where the building is designated as historically significant by the city or the county or is listed on the National Register of Historic Places. In those cases a minimum of one bathroom must be provided exclusively for use by the guests. The minimum bedroom area is 150 square feet.</p>

<p>The permitted-use paragraphs we read (for the P, A, RE-5, RE-1, R1, R-1B, R-2, RM-1 and RM-2 districts) say that no premises shall be used except for the listed uses, "unless approved by the director of planning and development services or designee that are deemed to be similar in character and purposes to those enumerated in this section." The same paragraphs say any decision "may be appealed in accordance with section 74-5(g)."</p>

<p>Section 110-200(a)(5) says: "Any terms defined in the Florida Statutes or the Florida Administrative Code shall be given the same meaning unless a different definition is specifically provided herein."</p>

<p>The online code on October 28, 2026 showed "VERSION: JUN 26, 2026 (CURRENT)."</p>

<h2>The state definitions, the license and the preemption</h2>

<p>Section 509.242(1)(c) of the Florida Statutes says: "A vacation rental is any unit or group of units in a condominium or cooperative or any individually or collectively owned single-family, two-family, three-family, or four-family house or dwelling unit that is also a transient public lodging establishment but that is not a timeshare project."</p>

<p>Section 509.242(1)(f) defines the bed and breakfast inn as "a family home structure, with no more than 15 sleeping rooms, which has been modified to serve as a transient public lodging establishment, which provides the accommodation and meal services generally offered by a bed and breakfast inn, and which is recognized as a bed and breakfast inn in the community in which it is situated or by the hospitality industry."</p>

<p>Section 509.013 defines transient occupancy and transient. Subsection (12) says "Transient occupancy" means occupancy that is temporary. It includes the occupancy of a dwelling unit at a hotel, motel, vacation rental, bed and breakfast inn, or timeshare project, as defined in s. 509.242, unless a written rental or lease agreement expressly states that the dwelling unit is the sole residence of the guest. Subsection (13) says "Transient" means a guest in transient occupancy.</p>

<p>Section 509.241(1) covers the license. Each public lodging establishment shall obtain a license from the division. The license may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree. Licenses are renewed annually.</p>

<p>Section 509.032(7)(b) reads: "A local law, ordinance, or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. This paragraph does not apply to any local law, ordinance, or regulation adopted on or before June 1, 2011."</p>

<p>Paragraph (7)(a) of the same section preempts the regulation of public lodging establishments to the state. It does not preempt a local government's authority to conduct inspections for compliance with the Florida Building Code and the Florida Fire Prevention Code.</p>

<h2>The business tax receipt and the county tax</h2>

<p>Deltona runs a local business tax. Section 22-3 levies it "in the amounts set by resolution and printed in appendix A of this Code for the privilege of having an effective place of business, or engaging in or managing any business, profession or occupation within the city." It applies to any person who maintains a permanent business location or branch office in the city, to any person engaging in or managing any business within the city, and to certain interstate-commerce businesses.</p>

<p>Section 22-4 says: "No person shall engage in, manage, transact, or carry on any business, occupation or profession within the city for which there is a local business tax required by this article or any other provisions of this Code unless such person shall first procure a local business receipt (receipt) to conduct the same from the city." The section also says it is no defense that the licensee did not receive a bill or notice.</p>

<p>Section 22-15(a) says no local business tax receipt is issued until an application has been filed with the planning and development department. The application contains the name, type of business, address and phone number, the owner's name, address and phone number, and the persons to be contacted in case of emergency. It contains alarm system provider information, if applicable, and a description of the business or profession at the specified location or home. It also contains a copy of the certificate, registration or license issued by the state department of professional regulation, if applicable, and a copy of the certificate of competency issued by the building division, if applicable.</p>

<p>Chapter 22 Article I has these section headings: Short title, Definitions, Levy, Required local business receipt, Valid signature, Duty to display, Duplicate license, Term and expiration date, Delinquency and enforcement, Suspension and revocation, Prerequisites for issuance of license, and Exemptions from payment of tax. No heading names vacation rentals or short-term rentals. The chapter's other articles cover late-night businesses, pawnbrokers and secondhand dealers.</p>

<p>Volusia County collects the Tourist and Convention Development Tax. The county describes it as "a local option transient rental tax collected by Volusia County." Every person who rents, leases or lets for consideration any living quarters for a term of 6 months or less is exercising a taxable privilege. If you rent a bed, room, apartment, house, condo, hotel, motel, recreational vehicle, watercraft or similar for 6 months or less, you collect and remit the tax. The county page lists online registration, treasury@volusia.org and 386-943-7085 for registering.</p>

<p>The county page also carries this statement: "Registration and payment of taxes does not guarantee compliance with other state and local laws. Please contact your city and county zoning departments to determine whether short-term rentals are permitted in your area, and if so, for what duration."</p>

<h2>Association rules and the contract</h2>

<p>Section 720.306(1)(h)1. of the Florida Statutes says, except as otherwise provided in that paragraph, a governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title after the effective date or who consents. Section 720.306(1)(h)2. says, notwithstanding subparagraph 1., an association may amend its governing documents to prohibit or regulate rental agreements for a term of less than 6 months and may prohibit the rental of a parcel for more than three times in a calendar year. Those amendments apply to all parcel owners.</p>

<p>Section 718.110(13) says an amendment prohibiting unit owners from renting their units, altering the duration of the rental term, or specifying or limiting the number of times unit owners may rent during a specified period applies only to unit owners who consent to the amendment and unit owners who acquire title after the effective date of that amendment.</p>

<p>Section 720.401(1)(a) says a prospective parcel owner in a community must be presented a disclosure summary before executing the contract for sale. The summary includes the statement that there have been or will be recorded restrictive covenants governing the use and occupancy of properties in the community. If the summary was not provided before the contract, the buyer may cancel by written notice within 3 days after receipt of the summary or prior to closing, whichever occurs first. That right may not be waived and it terminates at closing. Section 720.401(2) says the section does not apply to an association regulated under chapter 718, 719, 721 or 723, and does not apply if disclosure regarding the association is otherwise made in connection with the requirements of those chapters.</p>

<p>Under section 720.30851, within 10 business days after receiving a written or electronic request for an estoppel certificate from a parcel owner or the parcel owner's designee, or a parcel mortgagee or the mortgagee's designee, the association shall issue the estoppel certificate. Each association shall designate on its website a person or entity with a street or e-mail address for receipt of a request.</p>

<h2>Where each rule comes from</h2>

<p>The city sources are Chapter 110 (zoning), Chapter 70 (general provisions) and Chapter 22 (business taxes) of the Deltona Code of Ordinances on Municode. The online code showed the version dated June 26, 2026 when we read it on October 28, 2026. Chapter 110 holds the use table, the districts and the homestay conditions. Chapter 22 holds the local business tax and the receipt application.</p>

<p>The state sources are Florida Statutes sections 509.013, 509.032, 509.241 and 509.242 for the definitions, the preemption and the license, and sections 720.306, 718.110, 720.30851 and 720.401 for associations and the contract. We fetched each from leg.state.fl.us on October 28, 2026.</p>

<p>The county source is the Volusia County Tourist and Convention Development Tax page on volusia.org, fetched October 28, 2026.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/your-deltona-property-tax-bill-line-by-line-2026">Your Deltona Property Tax Bill, Line by Line (2026)</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-flood-zones-flood-insurance-check-an-address">Deltona Flood Zones & Flood Insurance: Check an Address</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-septic-vs-sewer-what-buyers-must-check">Deltona Septic vs Sewer: What Buyers Must Check</a>. Also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">Closing Costs in Florida: What Buyers and Sellers Pay in Volusia County</a>.</p>

<h2>The bottom line</h2>

<p>Deltona's zoning chapter has no use labeled short-term rental or vacation rental, and Chapter 70 has no hits for either phrase. The code shows motels and hotels as conditional in C-1 and permitted in C-2, C-3, CPUD and MPUD, and it lists a bed and breakfast homestay as a conditional use in the A, RE-5 and RE-1 districts with five conditions. State law defines the vacation rental, requires a license for a public lodging establishment, and says a local law may not prohibit vacation rentals or regulate their duration or frequency unless it was adopted on or before June 1, 2011. The county taxes rentals of 6 months or less and says to contact the city and county zoning departments to determine whether short-term rentals are permitted. Association statutes say when an amendment on rentals applies to an owner.</p>

<p>Adams Cameron has served Volusia and Flagler since 1963 and has a <a href="http://www.adamscameron.com/deltona-florida-real-estate-and-homes.html">Deltona real estate</a> page.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What does Deltona's zoning code say about short-term rentals?</strong></summary>
<p>A search of Chapter 110 on October 28, 2026 found no hits for "short-term" or "vacation rental." The table shows motels and hotels as conditional in C-1 and permitted in C-2, C-3, CPUD and MPUD, and a bed and breakfast homestay as a conditional use in the A, RE-5 and RE-1 districts.</p>
</details>
<details>
<summary><strong>What does Florida law say about local bans on vacation rentals?</strong></summary>
<p>Section 509.032(7)(b) says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. The same paragraph says it does not apply to any local law, ordinance or regulation adopted on or before June 1, 2011.</p>
</details>
<details>
<summary><strong>What does Deltona's code say about a local business receipt?</strong></summary>
<p>Section 22-4 says no person shall engage in or carry on any business within the city for which a local business tax is required unless that person first procures a local business receipt from the city. Section 22-15 says the application goes to the planning and development department and includes a description of the business at the specified location or home. Chapter 22 Article I has no heading that names vacation or short-term rentals.</p>
</details>
<details>
<summary><strong>What does Florida law say about licensing a vacation rental?</strong></summary>
<p>Section 509.242(1)(c) defines a vacation rental as any unit or group of units in a condominium or cooperative, or any individually or collectively owned single-family, two-family, three-family, or four-family house or dwelling unit, that is also a transient public lodging establishment but is not a timeshare project. Section 509.241(1) says each public lodging establishment shall obtain a license from the division, and the license may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree.</p>
</details>
<details>
<summary><strong>What does Volusia County tax on short-term rentals?</strong></summary>
<p>The county's Tourist and Convention Development Tax is a local option transient rental tax. Anyone who rents a bed, room, apartment, house or condo for a term of 6 months or less collects and remits it. The county page lists online registration, treasury@volusia.org and 386-943-7085 for registering. The county page says registration and payment do not guarantee compliance with other state and local laws and says to contact your city and county zoning departments.</p>
</details>
<details>
<summary><strong>What do the statutes say about association amendments on rentals?</strong></summary>
<p>Under section 720.306(1)(h)1., except as otherwise provided in that paragraph, a governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title after the effective date or who consents. Section 720.306(1)(h)2. says, notwithstanding subparagraph 1., an association may amend its documents to prohibit or regulate rental agreements for a term of less than 6 months and may prohibit the rental of a parcel for more than three times in a calendar year, and those amendments apply to all parcel owners. Section 718.110(13) says an amendment on renting applies only to unit owners who consent and unit owners who acquire title after the effective date of that amendment.</p>
</details>
<details>
<summary><strong>What do the disclosure summary and estoppel certificate statutes say?</strong></summary>
<p>Section 720.401(1)(a) says a prospective parcel owner in a community must be presented a disclosure summary before executing the contract for sale. If it was not provided first, the buyer may cancel by written notice within 3 days after receipt of the summary or prior to closing, whichever occurs first. Section 720.30851 says the association shall issue an estoppel certificate within 10 business days after a written or electronic request from the parcel owner or designee, or from a parcel mortgagee or designee.</p>
</details>
<details>
<summary><strong>What does Deltona's code say about a bed and breakfast homestay?</strong></summary>
<p>Deltona's use table shows a bed and breakfast homestay as a conditional use in the A, RE-5 and RE-1 districts. The RE-1 cell carries a footnote marker. Section 110-817 sets five conditions: a maximum of five guest rooms, the owner must reside in the building, no separate cooking facilities in the guest room, private toilet and shower facilities in each guest room except where the building is designated as historically significant by the city or the county or is listed on the National Register of Historic Places, in which cases a minimum of one bathroom must be provided exclusively for use by the guests, and a minimum bedroom area of 150 square feet.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 19:55:17 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/deltona-short-term-rental-rules-for-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[New Smyrna Beach New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/new-smyrna-beach-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>No one may live in a new house in New Smyrna Beach until the building official issues a certificate of occupancy. The city code lists four impact fees for a new single-family house, and the four printed base amounts, added together, come to 3,930.61 dollars (computed, not printed). See also our <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach homes for sale</a> page.</p>

<p>Everything here comes from the city's Building and Inspections page, the city's inspection pages, the New Smyrna Beach Code of Ordinances and two Florida statutes. We read each of them on October 28, 2026. The figures below are the base amounts printed in the code text the city's Municode copy showed on October 28, 2026. The code adjusts these fees every October 1 by a CPI formula.</p>

<h2>Who permits a new house and how the permit process runs</h2>

<p>The city's Building and Inspections page says that effective July 1, 2022, Volusia County began performing all permitting, application review, code enforcement and public hearings for properties within unincorporated Volusia County. That change came through the Interlocal Service Boundary Agreement. The page tells residents of an area it marks orange on its map to contact Volusia County. For a building permit in those areas the page lists the county building number as 386-626-6591.</p>

<p>Section 553.79(1)(a) of the Florida Statutes says that, unless otherwise provided by law, it is unlawful for any person, firm, corporation or governmental entity to construct, erect, alter, modify, repair or demolish any building in the state without first obtaining a permit from the appropriate enforcing agency. Section 553.79 also lets the enforcing agency revoke a permit on a determination that the work violates or does not conform to the Florida Building Code. When an agency denies or revokes a permit for non-compliance, the statute says it shall identify the specific plan or project features and the specific code chapters and sections.</p>

<p>The city's Building and Inspections page says that as of January 1, 2024, the State of Florida and the City of New Smyrna Beach are enforcing the 8th Edition 2023 Florida Building Code and the 2020 National Electric Code. Permit applications submitted on or after that date must comply. The division processes requests for construction and inspections, reviews and approves construction plans and inspects construction for compliance with the Florida Building Codes. The office is at 214 Sams Ave., New Smyrna Beach, FL 32168. The page lists hours of 7 a.m. to 4 p.m., Monday to Friday, and an office phone of 386-410-2860.</p>

<p>Permits are filed online. The city's pages say all permits must be submitted through Energov Citizen Self Service at permits.cityofnsb.com. You register and set up an account before you enter a permit. You can submit payment and track the status of the permit in the same system. The permit should list the homeowner and any subcontractors. The city's plans page adds that a certificate of zoning or approved site plan is also on the plan list if applicable.</p>

<p>Section 304.00 of the Land Development Regulations covers the steps. Before any site plan or subdivision is approved, the city planner or a designee must issue a concurrency evaluation. The code says it is issued only after the project meets the concurrency test in Article IV of the regulations. Once an applicant has approval to begin installing the required improvements for a subdivision or site plan, a land clearing and water management permit, also called a site construction permit, is required from the planning and engineering department. That permit expires one year from issuance.</p>

<p>For the building permit, the applicant must first receive a certificate of zoning from the planning and zoning department by providing two copies of an approved site plan. If the site plans do not conform to the land development regulations, the code says no certificate of zoning is issued and the building permit application procedure stops. After the certificate of zoning, the applicant needs engineering approval. For projects other than single-family and duplex dwellings, that approval is a land clearing and water management permit. For single-family and duplex dwellings the code says a stormwater management permit is required and constitutes engineering approval.</p>

<p>The code then lists what the applicant must present to the inspection department to obtain the building permit. There are six items. They are the certificate of concurrency, the certificate of zoning, the engineering approval, receipts indicating that all utility and impact fees are paid, the building plans and application package the building official requires, and the receipt for the building permit fee.</p>

<p>The city's plans page says structural permits normally require plans and that plan check requires two complete sets. The list on the page includes a signed and sealed survey showing existing and proposed structures, a foundation plan, a floor plan, elevations and roof plans, structural framing plans and plumbing, mechanical and electrical plans if applicable. It also lists structural calculations, energy calculations if applicable, a Sea Turtle Protection affidavit if applicable and a right of way permit if applicable. The page says a geotechnical soils report is required for all additions and new building. It adds that the survey must show how surface water will be routed off the site. The page also says Building Department employees, including inspectors, are not permitted to design any portion of your structure.</p>

<p>The city's permit page says a permit expires if work is not started within 180 days of issuance, and that once work has begun the permit expires if work is suspended or abandoned for 180 days or more. The page says to extend a permit, submit a written request for an additional 180 days. The land development regulations state a separate rule. They say a building permit automatically expires if the work has not begun within six months of issuance. They also say a permit expires and is canceled if there has not been substantial performance within two years of issuance. For a Class II or Class III site plan the code defines substantial performance as completion of the exterior envelope of the structure. A certificate of zoning expires within six months of issuance unless a building permit or occupational license has been issued. The city's permit page gives the 180-day periods, and the land development regulations give the six-month and two-year periods.</p>

<p>The code also says that permits and certificates of zoning authorize only the use, arrangement and construction set forth in the approved plans and applications. Use, arrangement or construction at variance is a violation of the regulations.</p>

<p>The city's online permitting page says an owner may apply for a permit and do the work on a single-family or duplex residence for his own use and occupancy and not intended for sale. It says no more than one permit for a new single-family or duplex residence may be issued to an owner in any 24-month period. The owner must come in person, sign and notarize the application and affidavit and prove to the Building Official the knowledge and ability to do the work.</p>

<h2>The impact fees, connection charges and other costs tied to a new house</h2>

<p>Chapter 52 of the Code of Ordinances is the City of New Smyrna Beach Comprehensive Impact Fee Ordinance. Ordinance 50-20, adopted May 26, 2020, repealed the earlier Chapter 52 and enacted the current one. The chapter defines the applicant as the person who applies for a building permit.</p>

<p>The code lists four residential impact fees. The road impact fee, as a net cost per unit, for a single-family detached dwelling unit is 1,752 dollars per dwelling. For a multi-family dwelling in a building of one or two stories it is 1,043 dollars per dwelling, and for a multi-family dwelling in a building of three or more stories it is 632 dollars. The fire protection and emergency services impact fee is 460 dollars per residential dwelling unit. The parks and recreational facilities impact fee is 1,350 dollars per dwelling unit. The law enforcement impact fee is 368.61 dollars per residential dwelling unit. Adding those four single-family base amounts gives 3,930.61 dollars, a total computed from the four base amounts and not printed in the code.</p>

<p>The computed total uses the amounts printed in the code text. Each of the four sections says the fee adjusts automatically every October 1 by the percent change in the Consumer Price Index for all urban consumers, U.S. City Average, all services, over the latest 12-month period as of the previous May 1. No public hearing or commission action is required for the adjustment. Each year the city posts an updated rate schedule to its website, and the code says the schedule is also available at the building department office. The amounts above are the base amounts printed in the code text.</p>

<p>The chapter defines a single-family dwelling unit as a single dwelling unit on an individual lot and not attached to any other dwelling unit. It says that includes detached houses on lots less than 50 feet wide, such as zero lot line homes. It defines condominium to include townhouses and duplexes, and it defines multi-family dwelling unit to include apartments, residential condominiums, townhouses and timeshares.</p>

<p>Section 52-6 says that at the issuance of a building permit for capital facilities impact construction, an applicant shall pay the appropriate impact fees. It says fees are calculated at the rate in effect at the time of payment unless otherwise provided. If an impact fee is not paid at or before the building permit, the code says it shall be collected prior to the issuance of the certificate of occupancy or by another authorized method, unless exempt. The code also says payment is in addition to all other fees, charges or assessments due for the certificate of occupancy or the building permit. The obligation to pay runs with the land.</p>

<p>Florida law has its own rules for impact fees. Section 163.31801 is called the Florida Impact Fee Act. For impact fees adopted or increased after July 1, 2026, it requires a local government to give notice at least 90 days before the effective date of an ordinance imposing a new or increased fee. It says new or increased fees may not apply to current or pending permit applications submitted before the effective date, unless the result is a reduction. It also says collection of an impact fee may not be required to occur earlier than the date of issuance of the building permit. The city code has its own notice rule in section 52-15, which says the effective date of a rate increase is not less than 90 days after a newspaper notice is published.</p>

<p>Section 52-7 lets an applicant who believes the impact is less than the study assumed file an alternative impact fee study with the city manager before the building permit is issued. The filing carries an administrative review fee of 1,500 dollars. The city manager decides within 30 days whether it complies, and the code says a study more than two years old is presumed not to comply. Section 52-11 grants credits for the donation of land or equipment or the construction of capital facilities, subject to the city manager's approval. It gives no credit for land or infrastructure that is internal to a development and required by the land development regulations. Section 52-12 gives an applicant or owner the right to ask for a review hearing before the city commission on the calculation, a denied exemption, a credit dispute or a rejected alternative fee. The request is due within 30 days of written notice and carries an administrative review fee of 500 dollars. An applicant who wants the permit right away pays the fee first, and the payment is deemed under protest and is not a waiver.</p>

<p>Section 52-8 lists exemptions that include the alteration or expansion of an existing dwelling unit that adds no dwelling units, accessory buildings that create no additional impact, and the replacement of a building or dwelling unit on the same lot where no additional square footage or dwelling units are created. For that replacement exemption the code requires official evidence, such as aerial photos, property appraiser data or permit data, that a building of equivalent use existed on the parcel. Section 52-9 adds that when an alteration, expansion or replacement results in a use that generates greater impact, then for per-dwelling-unit fees the fee is the new category's amount less the amount that would have applied before.</p>

<p>The code also covers where the money goes and when it can come back. Each fee goes into its own trust account. Road fees fund capacity-expanding capital improvements to the major road network. The fire, parks and law enforcement fees fund growth-necessitated capital improvements. The code says the funds shall not be used for maintenance or repair. Section 52-17 lets the city keep up to three percent of the fees collected, or its actual cost of administration, whichever is less. Section 52-16 returns a fee to the then-current owner if it has not been spent or committed before the end of the fiscal year after the eighth anniversary of payment. Section 52-6 also has a refund rule. If the fee was paid at or before permit issuance and the permit expires before completion, the applicant may apply for a refund within 90 days of expiration, and failing to apply in time waives the right.</p>

<p>Section 82-115 says a building or sewer connection plumbing permit is not granted until an application for sewer connection has been made with the city and the utilities commission and the utilities commission determines whether public sewerage service is available. If it is available, a connection charge set by the utilities commission must be paid before the permit is issued. Sections 82-115 and 1104.00 name the utilities commission as the body that sets sewer connection charges and standard utility construction details.</p>

<p>Sections 82-196 and 82-201 cover the stormwater drainage utility fee on property with impervious surface. A parcel that seeks a certificate of occupancy or other certificate of completion between June 1 and September 30 must pay in advance, before the certificate issues, the fee for the fiscal year prorated through September 30 plus one full fiscal year, or until the fee is collected on the non-ad valorem assessment roll. A parcel that seeks one between October 1 and the next September 30 pays the fee prorated to the next September 30. The code says fees collected through the building department are due before the certificate of occupancy.</p>

<p>Section 408.01 of the land development regulations provides that residential subdivision plats and site plans in the city are sent to the Volusia County School District. The district reports within 15 working days and may issue a certificate of school concurrency. Subdivisions or lots of ten residential units or fewer are exempt, as is any unit exempted under the Volusia County school facilities impact fee ordinance (section 70-181(a)), and non-residential development is exempt.</p>

<h2>Inspections, the certificate of occupancy and the code's closing rules</h2>

<p>Section 52-2 of the code defines a certificate of occupancy as the official document issued by the city authorizing occupancy of any building or parts thereof. Section 304.00 of the land development regulations says no building shall be occupied and no home shall be lived in until a certificate of occupancy has been issued by the building official. It adds that no certificate shall be issued for an individual building until all required improvements needed to serve it are completely constructed, operational and approved by city officials. Section 1104.00 says the building department shall not issue a certificate of occupancy until required improvements have been inspected and accepted by the responsible department or entity.</p>

<p>For subdivisions, the code adds this rule. Section 304.00 says no certificate of occupancy shall be issued for any homes within a subdivision until all amenities proposed in the subdivision are completed. The code makes one exception. A temporary certificate of occupancy may be issued before the amenities are done for model homes, for the purpose of walk-through tours and not habitation. The code also says a building permit may be allowed for model homes in a platted subdivision before the certificate of completion if the fire marshal indicates in writing that adequate fire protection improvements are constructed and operational.</p>

<p>The city's inspection page says all inspections are completed from 7 a.m. to 3 p.m., Monday through Friday. Inspections are scheduled by email to inspections@cityofnsb.com or through Citizens Self Service using the permit number. A request submitted before 4 p.m. on a work day is scheduled for the next work day. A request made after 4 p.m. or on a weekend is scheduled for the business day after. The city's process page says inspectors visit only when you call and schedule. It also says that if a contractor is hired, talk to the contractor about scheduling, and ask that an inspection be scheduled before walls are sealed up. If changes are needed, the inspector gives a list, and another inspection is scheduled before the work is covered.</p>

<p>Two more items apply. The city's inspection page says state law requires a Notice of Commencement to be recorded on any project costing more than 5,000 dollars, counting labor and materials. It must be recorded with the Clerk of the Court, and a copy must be posted on the job site before the first inspection. The permit number must appear on it, or the city will not accept it. The second item is cranes. The city page says the FAA requires a permit for any crane work within a 3-mile radius of any airport. It says that if you will use a crane, call the New Smyrna Beach Municipal Airport at 386-410-2680 before permitting.</p>

<p>Section 52-6 says the obligation to pay impact fees runs with the land. Section 304.00 G says permits and certificates of zoning authorize only the use, arrangement and construction set forth in the approved plans and applications, and that use, arrangement or construction at variance is a violation. Section 304.00 J sets the punishment for a person who violates the land development regulations at a fine not exceeding 300 dollars or imprisonment not exceeding 60 days, or both, and each day is a separate offense. The Building and Inspections office phone is 386-410-2860, and permit status is tracked in the Citizen Self Service portal at permits.cityofnsb.com.</p>

<p>Section 1104.00 B adds that all construction shall comply with the standard construction details for utilities adopted by the Utilities Commission, City of New Smyrna Beach. Section 404.01 sets the potable water concurrency standard at 240 gallons per day per equivalent residential unit, with capacity determined by the utilities commission using accepted engineering principles.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-new-smyrna-beach-beachside-mainland-costs-and-what-to-know">Living in New Smyrna Beach: Beachside, Mainland, Costs and What to Know</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-new-smyrna-beach-utilities-trash-permits">Moving to New Smyrna Beach: Utilities, Trash, Permits</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-property-tax-bill-line-by-line-2026">New Smyrna Beach Property Tax Bill, Line by Line (2026)</a>.</p>

<p>Bottom line. A new house in the City of New Smyrna Beach needs a building permit and a certificate of occupancy, and the city code says impact fees are paid at building permit issuance and, if not paid by then, are collected before that certificate or by another authorized method, unless exempt. The code also says no one may live in the house before that certificate is issued. Four printed fees add up to 3,930.61 dollars for a single-family house (a computed total, not printed in the code), base amounts printed in the code text. See the <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">homes for sale in New Smyrna Beach</a>.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Where is a building permit for a new house submitted in New Smyrna Beach?</strong></summary>
<p>Inside the City of New Smyrna Beach, permits are submitted through the city's Energov portal at permits.cityofnsb.com, and the Building and Inspections Division reviews and approves the construction plans. The city's page says that since July 1, 2022, Volusia County has performed all permitting, application review, code enforcement and public hearings for properties in unincorporated Volusia County. The page marks those areas orange on a map and lists the county building number as 386-626-6591.</p>
</details>

<details>
<summary><strong>How much are the city's impact fees on a new single-family house?</strong></summary>
<p>The code text lists four residential fees. The road fee is 1,752 dollars per single-family detached dwelling. The fire protection and emergency services fee is 460 dollars per dwelling unit. The parks and recreational facilities fee is 1,350 dollars per dwelling unit. The law enforcement fee is 368.61 dollars per dwelling unit. Adding those four base amounts (computed, not printed in the code) gives 3,930.61 dollars. The code adjusts each fee every October 1 by a Consumer Price Index formula, and the city posts an updated rate schedule each year.</p>
</details>

<details>
<summary><strong>When are the impact fees due?</strong></summary>
<p>Section 52-6 of the code says an applicant pays the appropriate impact fees at the issuance of a building permit. If a fee is not paid at or before the permit, the code says it is collected before the certificate of occupancy is issued or by another authorized method, unless exempt. The code adds that payment is in addition to all other fees due for the permit or the certificate. Florida's Impact Fee Act, section 163.31801, says that for impact fees adopted or increased after July 1, 2026, collection may not be required earlier than the issuance of the building permit.</p>
</details>

<details>
<summary><strong>What does a certificate of occupancy do?</strong></summary>
<p>The city's land development regulations say no building shall be occupied and no home shall be lived in until the building official issues a certificate of occupancy. The code says no certificate is issued until the required improvements that serve the building are completely constructed, operational and approved by city officials. For homes in a subdivision, the code says no certificate is issued until all proposed subdivision amenities are completed. A temporary certificate is allowed for model homes for walk-through tours and not for habitation.</p>
</details>

<details>
<summary><strong>Can an impact fee be reduced, refunded or reviewed?</strong></summary>
<p>The code provides these routes, among others. An applicant can file an alternative impact fee study with an administrative review fee of 1,500 dollars before the permit is issued. A credit may be granted for donated land or equipment or construction of capital facilities, subject to city manager approval. An applicant can ask the city commission for a review hearing within 30 days of written notice, with an administrative review fee of 500 dollars. A refund is available if the fee was paid at or before permit issuance, the permit expires before completion and the applicant applies within 90 days of expiration. Under section 52-16, a fee not spent or committed by the end of the fiscal year after the eighth anniversary is returned to the then-current owner, who must petition within 90 days after the end of the calendar quarter following that anniversary.</p>
</details>

<details>
<summary><strong>What other charges come due before a new house can be occupied?</strong></summary>
<p>A sewer connection charge set by the utilities commission must be paid before the building or sewer connection plumbing permit is issued, when public sewerage service is available. A stormwater drainage utility fee is collected for a parcel that seeks a certificate of occupancy, with a prorated amount paid in advance before the certificate issues. Fees collected through the building department are due before the certificate of occupancy.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 19:55:00 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/new-smyrna-beach-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[New Smyrna Beach Septic vs Sewer: What Buyers Check]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/new-smyrna-beach-septic-vs-sewer-what-buyers-check]]>
        </link>
        <description>
            <![CDATA[<p><a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach</a> has a septic rule in its city code. Section 82-156 says it is unlawful to construct or maintain a septic tank except as the same article provides. The Silver Sands project in the southern portion of the city will convert approximately 554 residential septic systems to sewer. The utility's project page, read in October 2026, supplies the Silver Sands facts, its variance statements and its January 1, 2030 date.</p>

<p>New Smyrna Beach Utilities lists 200 Canal Street, PO Box 100, the phone number 386-427-1361, and hours of Monday through Friday, 8:00 a.m. to 5:00 p.m.</p>

<h2>What the city code says about septic and sewer</h2>

<p>The private sewage disposal article is Article V. Under section 82-156, it is unlawful to construct or maintain a privy vault, septic tank, cesspool or other facility for the disposal of sewage, except as the article provides. Section 82-157 says where a public sanitary sewer is not available under the article, the building sewer is connected to a private sewage disposal system, and the owner first gets a written permit signed by the inspector.</p>

<p>Section 82-158 says a private sewage disposal permit does not take effect until the city's consulting engineers and the state division of health approve the plans and specifications. The installation must then be completed to the inspector's satisfaction. The inspector may inspect at any stage. The applicant tells the inspector when the work is ready for final inspection and before any underground portion is covered. The inspection takes place within 48 hours after the inspector receives the notice. Under section 82-161, when a building permit is needed and a septic tank goes in with the building, the building inspector must be shown a septic tank permit issued under the article.</p>

<p>Section 82-160 says the owner operates and maintains the private sewage disposal facilities in a sanitary manner at all times, at no expense to the city. Section 82-162 covers cleaning and repair. Anyone who cleans or repairs septic tanks inside the city limits needs an occupational license and also a permit from the building inspector. The application gives the exact address and location of the tank and the date. The inspector examines the tank before the permit issues, and the permit issues only if the inspector finds the tank needs cleaning or repair. After the work, the permit holder reports completion and the inspector makes an additional inspection.</p>

<p>Section 82-159 is titled switchover to public sewer. It says that when a public sewer becomes available to a property served by a private sewage disposal system, a direct connection shall be made to the public sewer. Any septic tanks, cesspools and other private facilities shall be abandoned. A second section, 82-114, puts the duty on the owner of any structure used for human occupancy or for commercial or industrial use. The owner obtains a city sewer connection plumbing permit and connects at the owner's expense when the utilities commission determines the system is available to the property. The owner makes the connection within one year after the date of official notice to connect from the utilities commission.</p>

<p>Under section 82-115, if the owner fails to connect and pay the fee in full within one year after the date of official notice, the utilities commission may bring a court action or pursue any other legal remedy. The same section says that when the utilities commission determines sewer service is available to the property, a connection charge set by the commission is paid before a building or sewer connection plumbing permit issues. Section 82-117 subjects a future connection that is not contemplated under the city's sewer construction program and requires extension of the public sewer to the property to a tapping fee set by the utilities commission, paid in addition to inspection fees when the sewer connection permit application is made.</p>

<p>The code defines a public sewer as a sanitary facility in which all owners of abutting properties have equal rights and which the city controls. It defines the building sewer as the extension from the building drain to the public sewer or other approved place of disposal. Section 82-120 requires a separate and independent building sewer for every building, with a rear-building exception.</p>

<p>Section 82-164 covers what happens to the tank once it is out of use. When use of a septic tank stops after a sewer connection, or after condemnation or demolition of a building, the tank shall be abandoned and any further use is prohibited. One exception applies. The utilities commission may approve the tank as an integral part of the sanitary sewer. The code says the tank need not be destroyed or filled unless the state department of environmental regulation, the county health department or the city declares it a health hazard. In that case the tank is pumped out, the bottom is suitably opened or ruptured, and the tank is filled with clean sand or other suitable material.</p>

<p>Water has its own rules in the same chapter. Section 82-41 requires a connection to the city water supply within 90 days after the system becomes available. Section 82-43 prohibits private well water inside dwellings or buildings in the city where the city water supply is available. Section 82-44 requires a city permit to drill, sink, operate or maintain any well within the city limits. The permit has no charge, and wells are installed, maintained and operated under the state division of health regulations.</p>

<h2>What Florida law adds</h2>

<p>Section 381.0065 of the Florida Statutes defines "available" for a sewerage system. The system must be capable of being connected to the plumbing of the residence, must not be under a Department of Environmental Protection moratorium, and must have adequate permitted capacity. For a single-family residence with an estimated flow of 1,000 gallons a day or less, the statute also requires a gravity sewer line, or a low pressure or vacuum line in areas approved for those, must exist in a public easement or right-of-way that abuts the property line.</p>

<p>Under section 381.00655, the owner of a properly functioning septic system must connect to an available public or investor-owned sewerage system within 365 days after written notification from the system's owner that it is available for connection. The sewerage system must notify the septic owner no less than one year before it becomes available. That notice says the owner must connect within one year of actual availability. The owner may prepay the amortized value of the connection charges in equal monthly installments over a period not to exceed two years from the date of the initial notification.</p>

<p>A system that needs repair has a 90-day clock. Under the same statute, the owner of a system that needs repair or modification to function in a sanitary manner must connect to an available sewerage system within 90 days after written notification from the Department. The statute allows a hardship extension of not more than 90 days, and only one extension. The statute also lets a sewerage system, with Department approval, waive the mandatory connection if it determines the connection is not required in the public interest due to public health considerations.</p>

<p>Section 381.0065 also says the following. If the siting, location, installation and repair information stays the same, a construction or repair permit for a septic system may be transferred to another person. The transferee files an amended application with proof of ownership within 60 days after the transfer of ownership, and no fee is associated with processing it. A building may not be occupied until the Department approves the final installation of a septic system. A municipality may not approve a change in occupancy or tenancy of a building that uses a septic system until the Department has reviewed the use of the system with the proposed change and approved it. Anyone who contracts to construct, modify, alter, repair, service, abandon or maintain any portion of a septic system must be registered under part III of chapter 489. An owner who does the work personally on his or her own owner-occupied single-family residence is exempt from registration but remains subject to all permitting requirements. Department rules on septic systems cover, among other things, water table elevation during the wettest season.</p>

<p>The statute also defines a bedroom as a room that can be used for sleeping and has at least 70 square feet of conditioned space in a site-built home. It must be along an exterior wall, have a closet and a door or an entrance where a door could be installed, and have an emergency escape and rescue opening to the outside under the Florida Building Code. A room used to reach another room, except a bathroom or closet, is not a bedroom. The statute says an existing-system inspection or evaluation, or a modification, replacement or upgrade, is not required for a remodeling addition to a single-family home if a bedroom is not added. The addition may not cover any part of the existing system or encroach on a required setback or the unobstructed area. The local health department reviews a floor plan and site plan, and the review must be completed within seven business days. If the review is not completed within seven business days, the project is approved for purposes of that paragraph.</p>

<p>Section 468.8311 defines home inspection services as a limited visual examination of readily accessible installed systems and components of a home. The list names the structure, electrical system, HVAC system, roof covering, plumbing system, interior components, exterior components and site conditions that affect the structure.</p>

<h2>The Indian River Lagoon rules and the Silver Sands project</h2>

<p>Section 373.469 of the Florida Statutes sets out the Indian River Lagoon Protection Program. The program consists of the Banana River Lagoon plan, the Central Indian River Lagoon plan, the North Indian River Lagoon plan and the Mosquito Lagoon Reasonable Assurance Plan, as appropriate. The Department of Environmental Protection page says the Mosquito Lagoon plan was adopted by secretarial order in September 2019. It lists the City of New Smyrna Beach among its sponsors, along with Edgewater, Oak Hill, the Florida Department of Transportation and Volusia County. The page says the plan aims to restore water quality in the Mosquito Lagoon within 15 years. The statute's findings name onsite sewage systems among the causes of excess nutrients in the lagoon, along with land use changes, aging infrastructure, stormwater runoff, agriculture and residential fertilizer.</p>

<p>The statute sets rules for septic systems inside those plan areas. Beginning January 1, 2024, unless previously permitted, a new septic system is prohibited where a public or investor-owned sewerage system is available as defined in section 381.0065. Where central sewer is not available, only an enhanced nutrient-reducing system, or another system that achieves at least 65 percent nitrogen reduction, is authorized. The statute defines an enhanced nutrient-reducing system as one the Department approves as capable of at least a 50 percent total nitrogen reduction before wastewater reaches the drainfield, or at least 65 percent combined from the tank or tanks and drainfield. Section 403.067 also prohibits new septic systems within a basin management action plan area, a reasonable assurance plan or a pollution reduction plan where connection to a sewerage system is available. On lots of one acre or less within such a plan where sewer is not available, it requires installation of enhanced nutrient-reducing systems or other systems achieving at least 65 percent nitrogen reduction.</p>

<p>By July 1, 2030, any commercial property or any residential property of 10 acres or less with an existing septic system in those plan areas must connect to central sewer if it is available, or upgrade to an enhanced nutrient-reducing system or other system that achieves at least 65 percent nitrogen reduction. For all applications submitted before July 1, 2030 to repair, modify or replace a conventional system on such a property, the permitting agency shall notify the owner of this requirement.</p>

<p>The New Smyrna Beach Utilities project page says House Bill 1379 requires homeowners in a Reasonable Assurance Plan area to install a nitrogen-reducing system or connect to central sewer by January 1, 2030. Section 373.469 says July 1, 2030.</p>

<p>Now the project itself. Silver Sands is in the southern portion of New Smyrna Beach, between the Atlantic coast and the intercoastal waterway. The utility says the septic to sewer project will convert approximately 554 residential septic systems to centralized sewer. Wastewater will be treated at the utility's treatment facility through a lift station and a gravity collection system. The new sewer will be built within the right-of-way, and the utility says a portion of the system will need to be constructed on each property to connect the home. The utility says Silver Sands is located within a Reasonable Assurance Plan area.</p>

<p>The utility will replace the water mains in the area while the gravity sewer is installed. It says the existing water mains are asbestos cement pipes estimated to be nearing the end of their useful life, and that the utility is funding the water main replacement portion. The utility says it was awarded 7.5 million dollars in grant funding in December 2023 and an additional 11.4 million dollars in early 2025 for construction costs and private connection costs. It gives the total awarded as 18.9 million dollars and says it will continue to review various funding options to cover project expenses in excess of the awarded amounts.</p>

<p>On June 26, 2024 the utility entered a contract with an engineering consultant for preliminary engineering, detailed design and construction. A preliminary schedule has been developed for the multi-year project, which the page says is expected to be completed prior to, or by, July 1, 2030.</p>

<p>The utility's page lists four things to consider for an owner who needs a new septic system before the project is done. They are state regulations, variances, the timeframe of replacement, and the cost to replace versus the cost to connect. On variances, the page says the utility is able to grant a variance to an owner of a performance-based septic system permitted through the Department, as long as the owner makes sure the system functions properly and meets all the conditions of its operating permit. Section 381.00655 says a local government or water and sewer district operating a centralized system may grant such a variance, and nothing in that paragraph requires it to issue one. The utility says variance applications will be made available as the project progresses, and that the choice between connecting and installing a performance-based system with a variance is entirely up to the property owner.</p>

<p>The utility also lists the rules it names as drivers of the project. They are the Clean Waterways Act of 2020, the Standards for Onsite Sewage Systems of 2021, House Bill 1379 of 2023, section 381.00655(2)(c) of the Florida Statutes, local ordinances, and a federal case, number 6:22-cv-02048-CEM-LHP. The page says the purpose of the project is to comply with all state regulations related to septic systems. The utility lists a project contact, a communications manager, at 386-424-3003.</p>

<h2>The bottom line</h2>

<p>For <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach</a>, section 381.0065 of the Florida Statutes treats sewer as available when the system can be connected to the home, is not under a Department of Environmental Protection moratorium and has adequate permitted capacity. For a single-family home with an estimated flow of 1,000 gallons a day or less, a gravity sewer line, or a low pressure or vacuum line in approved areas, must also exist in a public easement or right-of-way that abuts the property line. Where a public sewer is available, section 82-159 of the city code calls for a direct connection and for the septic tank to be abandoned, and section 381.00655 sets 365 days from written notice. Where public sewer is not available, section 82-157 provides for a private sewage disposal system with a written permit signed by the inspector.</p>

<p>Under section 373.469, inside the plan areas, beginning January 1, 2024 and unless previously permitted, a new septic system is prohibited where a sewerage system is available. By July 1, 2030, a commercial property, or a residential property of 10 acres or less, with an existing septic system in those plan areas must connect to central sewer if available or upgrade to an enhanced nutrient-reducing system or another system that achieves at least 65 percent nitrogen reduction. Section 373.469 gives July 1, 2030 for existing systems in the plan areas. Separately, the utility's project page gives January 1, 2030 for homeowners in a Reasonable Assurance Plan area to install a nitrogen-reducing system or connect to central sewer. For a house on septic, section 82-160 makes the owner responsible for operating and maintaining the system in a sanitary manner at no expense to the city, and section 381.0065 lets a septic permit transfer to another person if the siting, location, installation and repair information stays the same and that person files an amended application with proof of ownership within 60 days after the transfer.</p>

<p>See also:</p>
<ul>
<li><a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-new-smyrna-beach-beachside-mainland-costs-and-what-to-know">Living in New Smyrna Beach: Beachside, Mainland, Costs and What to Know</a></li>
<li><a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-new-smyrna-beach-utilities-trash-permits">Moving to New Smyrna Beach: Utilities, Trash, Permits</a></li>
<li><a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-flood-zones-flood-insurance-guide">New Smyrna Beach Flood Zones & Flood Insurance Guide</a></li>
<li><a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-property-tax-bill-line-by-line-2026">New Smyrna Beach Property Tax Bill, Line by Line (2026)</a></li>
</ul>

<p>The questions below restate the sections above.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What does "sewer available" mean under Florida law?</strong></summary>
<p>Florida law defines it in section 381.0065. The sewerage system must be capable of being connected to the home, must not be under a Department of Environmental Protection moratorium, and must have adequate permitted capacity. For a single-family home with an estimated flow of 1,000 gallons a day or less, a gravity sewer line, or a low pressure or vacuum line in approved areas, must be in a public easement or right-of-way that abuts the property line.</p>
</details>
<details>
<summary><strong>How long does an owner have to connect once sewer is available?</strong></summary>
<p>The city code, in section 82-114, says the owner connects within one year after the date of official notice from the utilities commission. Florida law, in section 381.00655, says the owner of a properly functioning septic system must connect within 365 days after written notification that the system is available. The sewerage system must give notice at least one year before it becomes available. The statute lets the owner prepay the amortized connection charges in equal monthly installments over up to two years from the initial notification.</p>
</details>
<details>
<summary><strong>What happens to the septic tank after a connection?</strong></summary>
<p>Section 82-159 of the city code says a direct connection shall be made to the public sewer and the septic tanks, cesspools and other private facilities shall be abandoned. Section 82-164 says the tank need not be destroyed or filled unless the state department of environmental regulation, the county health department or the city declares it a health hazard. In that case the tank is pumped out, the bottom is opened or ruptured, and the tank is filled with clean sand or other suitable material. The utilities commission may approve a tank as an integral part of the sanitary sewer.</p>
</details>
<details>
<summary><strong>What is the Silver Sands project?</strong></summary>
<p>It is a New Smyrna Beach Utilities project in the southern part of the city, between the Atlantic coast and the intercoastal waterway. The utility says it will convert approximately 554 residential septic systems to centralized sewer through a lift station and gravity collection system. The utility says it is expected to be completed prior to, or by, July 1, 2030.</p>
</details>
<details>
<summary><strong>Does a state lagoon rule limit new septic systems inside its plan areas?</strong></summary>
<p>Section 373.469 of the Florida Statutes sets out the Indian River Lagoon Protection Program, which consists of the Mosquito Lagoon Reasonable Assurance Plan and three other plans, as appropriate. Beginning January 1, 2024, unless previously permitted, a new septic system is prohibited in those plan areas where a sewerage system is available. Where it is not available, only an enhanced nutrient-reducing system, or another system with at least 65 percent nitrogen reduction, is authorized. The Mosquito Lagoon Reasonable Assurance Plan lists the City of New Smyrna Beach among its sponsors.</p>
</details>
<details>
<summary><strong>Must an existing septic system be upgraded by 2030?</strong></summary>
<p>Section 373.469 says that by July 1, 2030 any commercial property or any residential property of 10 acres or less with an existing septic system in those plan areas must connect to central sewer if available or upgrade to an enhanced nutrient-reducing system. The utility's project page gives January 1, 2030 for homeowners in a Reasonable Assurance Plan area to install a nitrogen-reducing system or connect to central sewer. Before July 1, 2030, an application to repair, modify or replace a conventional system brings a notice of the requirement.</p>
</details>
<details>
<summary><strong>How does Florida law define home inspection services?</strong></summary>
<p>Section 468.8311 defines home inspection services as a limited visual examination of the readily accessible installed systems and components of a home: the structure, electrical system, HVAC system, roof covering, plumbing system, interior components, exterior components and site conditions that affect the structure, for the purpose of a written professional opinion of the condition of the home.</p>
</details>
<details>
<summary><strong>Does a remodeling addition need a septic inspection if no bedroom is added?</strong></summary>
<p>Florida law says an existing-system inspection or an upgrade is not required for a remodeling addition to a single-family home if a bedroom is not added, and the addition may not cover any part of the system or encroach on a required setback. The statute defines a bedroom, including 70 square feet of conditioned space for a site-built home, a location along an exterior wall, a closet and a door or place for one, and an emergency escape opening. The local health department reviews a floor plan and site plan, and the review must be completed within seven business days. If the review is not completed within seven business days, the project is approved for purposes of that paragraph.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Tue, 17 Nov 2026 19:54:35 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/17/new-smyrna-beach-septic-vs-sewer-what-buyers-check]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Port Orange Condo Milestone Inspections and SIRS Guide]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/08/port-orange-condo-milestone-inspections-and-sirs-guide]]>
        </link>
        <description>
            <![CDATA[<p>If you are buying a condo in Port Orange, the first two questions are simple: how many stories does the building have, and has its association completed the state milestone inspection and the structural integrity reserve study? Florida requires both only for condominium buildings of three habitable stories or more. A one-story or two-story condo building is outside both rules. For a taller building, the answers to those two questions tell you whether the association has already done the work the law asks for or still has a deadline ahead of it.</p>

<p>This guide explains what the two rules require, what the City of Port Orange handles, and which documents to ask for before you sign. It sticks to what the Florida Statutes and the city actually say. For the rest of the town, start with our <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/port-orange-florida-a-buyer-s-guide-to-neighborhoods-and-costs">Port Orange buyer's guide to neighborhoods and costs</a>, or browse <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange homes for sale</a>.</p>

<h2>Two Rules, Two Different Jobs</h2>

<p>Florida passed two separate requirements for older condominium buildings. They are not the same thing.</p>

<p>The milestone inspection, set by Florida Statute 553.899, is about the building's physical condition. A licensed architect or engineer looks at the structure and reports whether it shows substantial structural deterioration.</p>

<p>The structural integrity reserve study, usually shortened to SIRS and set by Florida Statute 718.112(2)(g), is about money. It estimates how long major parts of the building will last, what replacing or maintaining them will cost, and how much the association should set aside each year to pay for it.</p>

<p>One tells you what shape the building is in. The other tells you whether the association is saving enough to keep it that way. A careful buyer reads both.</p>

<h2>Which Port Orange Buildings the Rules Cover</h2>

<p>The milestone inspection applies to a building that is three habitable stories or more in height and is a residential condominium under chapter 718 of the Florida Statutes, or a residential cooperative under chapter 719. The reserve study requirement applies to each building that is three habitable stories or higher.</p>

<p>The milestone statute also spells out who is left out. It does not apply to a single-family, two-family, three-family or four-family dwelling with three or fewer habitable stories above ground. So if you are looking at a duplex, a villa or a low-rise townhome community, check how the property is set up before you assume either rule applies. Our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/townhomes-and-villas-in-port-orange-who-owns-what">townhomes and villas in Port Orange and who owns what</a> walks through the difference between a condominium and other kinds of shared ownership.</p>

<p>The practical step: before you write an offer on a unit in a building three stories or taller, ask the listing agent or the association two questions in writing. Has the building had its milestone inspection, and has the association completed its reserve study? The answers shape everything that follows.</p>

<h2>The Milestone Inspection: The Schedule</h2>

<p>Under Florida Statute 553.899, the first milestone inspection is due by December 31 of the year the building reaches 30 years of age, counted from the date its certificate of occupancy was issued. After that, another one is due every 10 years.</p>

<p>The statute set earlier deadlines for buildings that were already old when the law took effect. A building that reached 30 years of age before July 1, 2022 had to have its first inspection before December 31, 2024. A building that reached 30 on or after July 1, 2022 and before December 31, 2024 had to have it before December 31, 2025.</p>

<p>There is one local twist that matters on the coast. The statute lets the local enforcement agency decide that local circumstances, with proximity to salt water named as an example, call for the first inspection at 25 years of age instead of 30. Whether that earlier clock applies to a particular Port Orange building is a question for the city's Building Division, not something to assume. Ask in writing, give the building's address, and keep the answer in your file.</p>

<h2>The Milestone Inspection: How It Works, Step by Step</h2>

<p>The process starts with a notice. Under the statute, once the local enforcement agency determines that a building needs a milestone inspection, it must send written notice to the association by certified mail, return receipt requested. The association then has 14 days to tell unit owners that the notice arrived.</p>

<p>Phase one comes next. It must be completed within 180 days after the owner receives that written notice. Phase one is a visual examination of the habitable and nonhabitable areas of the building, including its major structural components, by a licensed architect or engineer authorized to practice in Florida. If the inspector finds no signs of substantial structural deterioration, phase two is not required.</p>

<p>Phase two is only required if phase one finds substantial structural deterioration. It may involve destructive or nondestructive testing. If phase two is needed, the architect or engineer must submit a phase two progress report, with a timeline for finishing the inspection, within 180 days after the phase one report.</p>

<p>The statute is careful about what counts as a real problem. Surface imperfections such as cracks, distortion, sagging, deflections, misalignment, signs of leakage or peeling of finishes are not substantial structural deterioration on their own, unless the engineer or architect decides they are a sign of it. So a phase one report can list maintenance items and still not trigger phase two. Read the report's conclusion, not just its list of findings.</p>

<p>The inspection also has limits worth knowing. Its stated purpose is not to determine whether the building complies with the Florida Building Code or the firesafety code. It is a structural check, not a full code review.</p>

<h2>What the Inspection Report Must Contain</h2>

<p>When a phase one or phase two inspection is finished, the architect or engineer must deliver a sealed copy of the report, along with a separate summary of the material findings and recommendations, to the association and to the local building official. Among other things, the report must state whether unsafe or dangerous conditions were observed.</p>

<p>Unit owners get the summary too. Within 45 days after receiving the report, the association must send each unit owner a copy of the inspector-prepared summary, post a copy in a conspicuous place on the condominium property, and publish the full report and summary on the association's website if it is required to have one.</p>

<p>If phase two finds substantial structural deterioration, the law expects action. The statute requires repairs for that deterioration to be commenced within 365 days after the local enforcement agency receives the phase two report.</p>

<p>Two more details help you read the paperwork. The condominium association pays for the milestone inspection for the parts of the building it must maintain under its governing documents. And an architect or engineer who bids on the inspection must disclose in writing any intent to bid on repair work the inspection may recommend, so ask whether the firm that inspected the building is also the firm doing the repairs.</p>

<h2>The Reserve Study: What It Covers</h2>

<p>Under Florida Statute 718.112(2)(g), a residential condominium association must have a structural integrity reserve study completed at least every 10 years for each building three habitable stories or higher. At a minimum, the study covers the roof, the structure, fireproofing and fire protection systems, plumbing, electrical systems, waterproofing and exterior painting, and windows and exterior doors.</p>

<p>It also covers any other item whose deferred maintenance expense or replacement cost exceeds $25,000, or the inflation-adjusted amount set by the state division, whichever is greater, when failing to maintain or replace that item would harm the items on the main list.</p>

<p>The study is based on a visual inspection of the condominium property. It must be performed or verified by a licensed engineer, a licensed architect, or a person certified as a reserve specialist or professional reserve analyst by the Community Associations Institute or the Association of Professional Reserve Analysts.</p>

<h2>The Reserve Study: How to Read It</h2>

<p>For each item it covers, the study must state the estimated remaining useful life and the estimated replacement cost or deferred maintenance expense. That annual amount is the number to compare against the association's actual budget.</p>

<p>One rule deserves a close look. The study may recommend that replacement reserves are not needed for an item with an estimated remaining useful life greater than 25 years, although it can still recommend a deferred maintenance amount for that item. That is a legitimate option under the law, and it is also why the line items matter more than the total. Find each major component, read its remaining life, and see whether money is being set aside for it.</p>

<p>Two signatures and two notices follow the study. An officer or director of the association must sign an affidavit acknowledging receipt of the completed study. And within 45 days after receiving it, the association must give each unit owner either a copy of the study or a notice that it is available for inspection and copying on written request.</p>

<h2>The Reserve Study: The Deadlines</h2>

<p>The statute set a firm calendar for existing buildings. </p>

<p>There is a carve-out for buildings due for a milestone inspection. An association that must finish a milestone inspection on or before December 31, 2026 may complete the reserve study at the same time as the inspection. But the statute adds a hard stop: in no event may the study be completed after December 31, 2026.</p>

<p>The two rules also connect in two other ways. A milestone inspection performed within the past 5 years that meets the statute's requirements may be used in place of the visual inspection part of the reserve study. And after completing a milestone inspection, an association may delay a required reserve study for no more than the 2 consecutive budget years that follow, so it can put its money toward the repairs the inspection recommended. If an association tells you its study is delayed, ask which milestone inspection it is relying on and when that inspection was completed.</p>

<h2>What the City of Port Orange Handles</h2>

<p> According to the city, its Building Division receives building permit applications for structures ranging from commercial buildings to residential homes and fences, and it reviews construction plans for compliance with the Florida Building Code and local regulations.</p>

<p>For a condo buyer, that office is where to confirm what the city has on file for a building: the certificate of occupancy date, whether a milestone inspection notice was sent, and whether a phase one or phase two report was filed. It is also reasonable to ask which permits, if any, have been opened for repairs to the building.</p>

<p>The city lists these contacts:</p>

<ul>
<li>Building Permit, Inspection and Business Tax line: 386-506-5602</li>
<li>Building Official Al Tischler: 386-506-5627</li>
<li>Community Development Department, 1000 City Center Circle, Port Orange, FL 32129, lobby hours Monday-Friday 8:00am - 4:00pm</li>
</ul>

<p>If you are buying near the water, flood risk is a separate question from structural safety. Our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-flood-zones-and-flood-insurance-for-buyers">Port Orange flood zones and flood insurance</a> covers how to check an address.</p>

<h2>The Documents a Resale Buyer Is Entitled To</h2>

<p>When you buy a condo from an owner rather than a developer, Florida Statute 718.503(2) gives you a right to a set of documents, at the seller's expense, once you are under contract. They include:</p>

<ul>
<li>The declaration of condominium</li>
<li>The articles of incorporation of the association</li>
<li>The bylaws and rules of the association</li>
<li>The annual financial statement and annual budget</li>
<li>The inspector-prepared summary of the milestone inspection report, if the building has one</li>
<li>The association's most recent structural integrity reserve study, or a statement that it has not completed one</li>
<li>The Frequently Asked Questions and Answers document</li>
</ul>

<p>The timing on a resale is 7 days, not 15. A resale contract must state either that the buyer received these documents more than 7 days, excluding Saturdays, Sundays and legal holidays, before signing, or that the buyer may cancel by written notice within 7 days, excluding Saturdays, Sundays and legal holidays, after receiving them. The 15-day cancellation period in the same statute applies to purchases from a developer, not to resales. Mark the 7-day window on your calendar the day the documents arrive, and read the milestone summary and the reserve study first.</p>

<h2>A Short Checklist Before You Sign</h2>

<ul>
<li>Confirm the building's height in habitable stories, and whether the unit is part of a condominium.</li>
<li>Ask for the certificate of occupancy date, and work out when the building turns 30, or 25 if the city applies the earlier clock.</li>
<li>Ask whether the association received a milestone inspection notice, and whether phase one, and if needed phase two, are done.</li>
<li>Read the inspector-prepared summary, especially whether unsafe or dangerous conditions were observed.</li>
<li>If phase two found substantial structural deterioration, ask for the repair schedule and whether repairs have commenced.</li>
<li>Get the reserve study, read the remaining useful life and recommended annual reserve for each major item, and compare it with the budget.</li>
<li>Confirm with the Port Orange Building Division what it has on file for the address.</li>
<li>Track your 7-day review window from the day the resale documents arrive.</li>
</ul>

<p>If you are comparing buildings in more than one city, the state rules are the same, so confirm each building's records with that city. Our <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/daytona-beach-condo-milestone-inspections-and-sirs-guide">Daytona Beach condo milestone inspection and SIRS guide</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-condo-milestone-inspections-and-sirs-guide">Palm Coast condo milestone and SIRS guide</a> cover those cities. This guide explains what the law says. It is not legal advice, so for a question about a specific contract or building, talk with a Florida real estate attorney and confirm the building's records with the city.</p>

<h2>Frequently Asked Questions</h2>

<h3>Does a Port Orange condo need a milestone inspection and a SIRS?</h3>
<p>Only if the building is a residential condominium three habitable stories or more in height. For those buildings, Florida Statute 553.899 requires a milestone inspection by December 31 of the year the building turns 30, then every 10 years, and Florida Statute 718.112(2)(g) requires a reserve study at least every 10 years. Ask the Building Division whether the earlier 25-year clock applies to the building's address.</p>

<h3>What is the difference between a milestone inspection and a SIRS?</h3>
<p>The milestone inspection is a structural check by a licensed architect or engineer. The structural integrity reserve study estimates the remaining life and replacement cost of major building parts and recommends how much the association should save each year.</p>

<h3>How long does a condo association have to finish phase one?</h3>
<p>Phase one must be completed within 180 days after the owner receives the local enforcement agency's written notice. The association must tell unit owners about that notice within 14 days of receiving it.</p>

<h3>When is phase two required?</h3>
<p>Only when phase one finds substantial structural deterioration. Cracks, sagging, signs of leakage and peeling finishes do not count on their own unless the inspector decides they are a sign of deeper structural trouble.</p>

<h3>What was the last date to complete a reserve study?</h3>
<p>An owner-controlled association that existed on or before July 1, 2022 had to finish by December 31, 2025. One that must finish a milestone inspection by December 31, 2026 may do both together, but in no event may the study be completed after December 31, 2026.</p>

<h3>How long do I have to cancel a condo resale contract in Florida?</h3>
<p>On a resale, the contract gives you either an acknowledgment that you received the documents more than 7 days before signing, or a right to cancel by written notice within 7 days after receiving them, excluding Saturdays, Sundays and legal holidays. The 15-day period applies to purchases from a developer.</p>

<h3>Who do I call at the City of Port Orange about a building's records?</h3>
<p>The city lists its Building Permit, Inspection and Business Tax line at 386-506-5602. The Community Development Department is at 1000 City Center Circle, Port Orange, FL 32129.</p>
</content>
</invoke>

]]>
        </description>
        <pubDate>
            <![CDATA[Sun, 08 Nov 2026 16:59:18 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/11/08/port-orange-condo-milestone-inspections-and-sirs-guide]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[DeLand New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/deland-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>A new house inside DeLand city limits needs a city building permit, and the city says the Certificate of Occupancy will not be issued until all fees are paid in full. The county's own FAQ says impact fee payments are due before a Certificate of Occupancy is issued. The permit for a new home in <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a> comes from the city when the project is inside city limits.</p>

<p>This guide stays inside the City of DeLand. Everything here comes from the city's own building pages, its fee schedules, the county's impact fee office and the Florida Statutes, all read on October 28, 2026. The figures below carry the dates printed on the city's own sheets. The 2026 Impact Fees sheet is marked Effective 12/29/2025.</p>

<h2>Who Permits a New House in DeLand and What the City Asks For</h2>

<p>The city's Building Division processes all building permits for projects within the city limits of DeLand. If the project is in unincorporated Volusia County, the permit must come from the Building Department of Volusia County. For city versus county, the city page says to go to the Property Appraiser's website.</p>

<p>Florida law requires the permit. Section 553.79 of the Florida Statutes requires a permit before constructing any building in Florida, from the appropriate enforcing agency, on payment of the reasonable fees that agency adopts. The same section says that when a permit is denied or revoked for noncompliance, the agency must identify the specific plan or project features that do not comply. It must also name the code chapters and sections the finding is based on, and give that to the applicant.</p>

<p>DeLand sorts its permits by type. New single family homes are filed under the permit type New Building. The city describes it as construction for a brand new building considered a main structure on the property, including new single family attached and detached dwellings and multifamily structures. Other types cover accessory structures, additions, renovations, demolition, electric, mechanical, plumbing, reroofing, signs and solar.</p>

<p>The code in force is stated on the city's permit pages. The 8th Edition (2023) Florida Building Codes and the 2020 National Electric Code are effective for all permits applied for on or after December 31, 2023. The date is tied to when the application was made.</p>

<p>The city publishes a checklist for a single family residence, townhouse, addition or duplex. The administrative items are specific. An Owner/Builder Disclosure form is signed and notarized in the office if it applies. An updated workers' compensation exemption or certificate is uploaded with the application. A Notice of Commencement is recorded for any improvement with a contract price greater than five thousand dollars, and the checklist says it must be submitted before the first inspection is scheduled.</p>

<p>The plans items follow. The checklist asks for construction plans including truss layouts or conventional framing details, signed and sealed by a licensed professional where the code requires it. It asks for truss packages and layouts with the engineer's seal and for energy calculation forms. It asks for dimensioned site plans that show the setback requirements, a Product Approval Specification sheet, and the septic location with Health Department approval if septic applies. The checklist adds that other plans may be required and gives a building email address and phone numbers for scope questions.</p>

<p>A second city document, the plan checklist for the Florida Building Code one and two family dwellings, goes further into detail. It calls itself a guide only. It says plans with insufficient information will be rejected. It lists two sets of plans sealed by an engineer or architect. It lists two signed and sealed surveys, including the crown of road, the finished floor, the driveway location and the location and dbh of each tree on the parcel. The elevations section has blanks labeled Flood BFE and FFE. If plans are submitted electronically, the document says to submit only one of each item.</p>

<p>The city also sets a rule for the as-built survey. A notice on the Building Permits page is addressed to contractors, engineers and surveyors. It says that for proper lot grading and drainage, the as-built survey must show at least three additional spot elevations along the lot line on each side, at regular intervals, beyond the spot elevations on the approved plot plan. The page says the spot elevations should let the reviewer see whether there are humps or dips that may impede proper stormwater runoff.</p>

<p>Permits are processed by the date received. Permits are reviewed and processed according to the date received. The Plans Examiner addresses any deficiencies and contacts the applicant. The application stays on hold until every request from the plans examiner is satisfied. The city asks that a valid email address or phone number be on the application. After all approvals, the Building Division contacts the applicant to give the cost of the permit.</p>

<p>The city says that in accordance with section 553.79, the status of all building permit applications may be obtained through its Accela Citizen Portal. The city also runs a Development Activity Map. It shows planning applications, building permits, fire permits, code enforcement cases and business applications processed by the city. The page says the map is updated daily and offers alerts for an area of the city.</p>

<p>The city's Permit Exemption page explains the exemption. Under Florida House Bill 803, effective July 1, 2026, owners of single-family homes and their contractors may do qualifying work valued at less than seven thousand five hundred dollars without a building permit. Electrical, plumbing, mechanical, gas and structural work does not qualify regardless of value. Neither does any work on property located partially or entirely within a Flood Hazard Area. A project cannot be split into smaller pieces to stay under the threshold, and the exemption applies to a complete single-family residential project. The city requires a written exemption request. Its legal notice says the city has no legal duty to the owner or contractor for work done under the exemptions.</p>

<p>The city also explains why it wants permits pulled. The Building Permits page says permits are necessary to satisfy insurance requirements and to protect health, safety and welfare. It says work done without the proper permits could result in complications when selling a home, including preventing the sale until the work is compliant with current city and building codes. It adds the risk of fines.</p>

<p>An applicant may request private provider plan review and inspections. The city's private provider page says registration became available October 1, 2025 and became required January 1, 2026. It says an applicant may request private provider plan review and private provider inspections, and city inspectors will not conduct inspections when plan review is conducted by a private provider. Early Start Permits are not permitted under a private provider. No work may begin until a building permit is issued, and no inspection report may pre-date the permit issuance date. A Notice to Building Official is required with every new permit. The page tells applicants to review the permit invoice for discounts.</p>

<h2>What a New Build Costs the City and the County in Fees</h2>

<p>Three separate sets of fees apply. The city charges building permit fees. The city charges its own impact fees and water and sewer development fees. Volusia County charges its own impact fees.</p>

<p>Start with the permit itself. The city charges a non-refundable submittal fee when the application goes in. The residential fee is one hundred dollars and the commercial fee is two hundred dollars. The city says new construction valuation is based on the current rate of the ICC Building Valuation Data Table or the actual value, whichever is greater. Permit fees are paid in full at pickup, and the city accepts cash, check, money order, Visa or Mastercard. The fees page adds that a 3% convenience fee is added to online transactions through the Citizen Portal when a credit card is used, shown as a separate charge before the transaction is completed.</p>

<p>The city's building fees change on October 9, 2026, in response to Florida HB 803. Permit applications without a complete submittal package that have not been accepted for review by September 30, 2026 are processed under the new fees. Applications in review by September 30, 2026 have the current fees applied. The city links the new schedule under the heading Building Fees Effective October 9th 2026.</p>

<p>That schedule sets a residential permit fee for single-family homes, townhouses and duplexes at one dollar and ten cents per square foot. The square footage is the area under roof, and the schedule says that includes porches, garages, carports, interior alterations, additions and detached accessory structures. A zoning review fee may apply. Mechanical, electrical and plumbing are one hundred fifty dollars each. Each required inspection is one hundred dollars.</p>

<p>Plan review has its own line. Residential plan review is ten cents per square foot with a minimum of one hundred dollars. A plan revision review is thirty dollars per page. A reinspection for the first and second inspection is one hundred dollars, and for the third and any later inspection of the same item it is three hundred dollars. An access drive permit is fifty dollars per driveway. The schedule also reduces calculated fees by 25 percent for plan review and for inspection when a private provider is used. A change to a private provider after the permit is issued carries a flat fee of one thousand two hundred dollars.</p>

<p>Next come the city's impact fees. The city's 2026 Impact Fees sheet lists, for a single family dwelling, Fire and EMS at one thousand forty-one dollars, Police at five hundred forty dollars, Government at eight hundred seventy-six dollars and Parks and Recreation at two thousand four hundred eight dollars. The sheet is marked Effective 12/29/2025. The sheet also defines the category. Single family generally includes single family detached housing, town houses, duplexes, residential buildings with fewer than five dwelling units and mobile home units. Multi-family means residential buildings with five or more dwelling units.</p>

<p>The same sheet lists water at three hundred eighteen dollars and seventy-five cents per fixture unit and sewer at three hundred sixty-six dollars per fixture unit. City Ordinance 2026-22 amends section 30-20 of the DeLand Code of Ordinances, which covers development fees, and its effective date section says it takes effect October 1, 2026. Under the ordinance text, one equivalent residential unit is equivalent to 20 fixture units, and all residential units are charged a connection fee equal to one ERU. The ordinance copy marks its changes with underline and strikethrough. The new rates it prints are the same per-unit figures as the impact fee sheet.</p>

<p>When are the city fees due? The city's fees page says building inspection fees and city impact fees, meaning water, sewer, police, fire, government buildings, and parks and recreation, are collected when the permit is issued. The ordinance text for section 30-20 gives a different trigger. It says the development fee for new construction shall be due and payable upon application for water or sewer service, and that the fee is charged separately for water and for sewer. These are two statements from two city documents.</p>

<p>Volusia County's fees are separate from all of that. The county has five growth-related impact fees: Transportation for roads, Education for schools, Parks and Recreation, EMS and Fire Rescue. The county says they pay for new or expanded county roads and facilities needed to serve new residential and non-residential development. The county FAQ says an impact fee is assessed and due from anyone who builds a new residence or commercial building or changes the use of an existing building.</p>

<p>The city says new construction, including additions, must submit a county impact fee application with a copy of the floor plan to the Volusia County Permit Center so the county can calculate the transportation impact fees. The county FAQ describes the route for a project inside city limits. The application goes in through the Connect Live portal, by email to impactfees@volusia.gov or in person at the DeLand office, and the bottom of the application must be signed by city staff before it is uploaded. The county impact fee office is at 123 W. Indiana Ave. in DeLand and its number is 386-736-2700.</p>

<p>Two pages describe the timing. The city's page says Volusia County impact fees can be deferred until the completion of the project. The county FAQ says impact fee payments are due before the issuance of a Certificate of Occupancy. The county does not accept partial payments, but it lets a payer pay each use separately and in its entirety. Its example is paying the road impact fees now and the school impact fees later.</p>

<p>State law sets guardrails for impact fees. The Florida Impact Fee Act is section 163.31801. For fees adopted or increased after July 1, 2026, it requires that the calculation rest on a demonstrated-need study that is plan-based. It limits administrative charges for collecting the fee to actual costs. It requires 90 days notice before the effective date of a new or increased fee. It says collection may not be required to occur earlier than the date the building permit is issued. It also says funds must be earmarked for capital facilities to benefit new users.</p>

<p>The Act also limits how fast a fee can rise. An increase of not more than 25 percent must be implemented in two equal annual increments. An increase over 25 percent and up to 50 percent must be implemented in four equal installments. An increase may not exceed 50 percent, and a fee may not be increased more than once every four years. The statute provides a separate path for extraordinary circumstances. It also says a local government that requires any improvement or contribution must credit that contribution against the impact fee dollar for dollar at fair market value, for the same category of public facilities.</p>

<h2>Inspections, the Certificate of Occupancy and Related Deadlines</h2>

<p>The city has an automated inspection line and an online permit scheduling system, and it lists SelecTXT as another way to schedule an inspection by text. The phone system is open 24 hours a day to schedule and cancel inspections, get results and pay inspection fees. It asks for the permit number and the inspection codes. The caller should not hang up until the system issues a confirmation number. The permit inspection phone number is 386-626-7035. The city also accepts digitally sealed plans for review through ePermitHub.</p>

<p>The city has no stand-alone page for the certificate of occupancy that this guide could find. A note headed Certificates of Occupancy states that a final survey shall be submitted prior to the CO for new single-family homes and commercial buildings, effective May 13, 2025. The same note lists extra documents for commercial buildings, including a county receipt showing impact fees paid in full.</p>

<p>The city states that the Certificate of Occupancy will not be issued until all fees are paid in full. The county states that impact fee payments are due before the issuance of a Certificate of Occupancy. The city's Building Permits page says a final survey shall be submitted prior to the CO for new single-family homes, effective May 13, 2025.</p>

<p>Section 553.791 sets a clock inside its private provider section. Subsection 16 says that within 10 business days, or within 2 business days if the permit relates to a single-family or two-family dwelling, after the building official receives a request for a certificate of occupancy and the applicant presents a certificate of compliance and approval of all other required government approvals, including payment of all outstanding fees, the building official shall issue the certificate or give notice of incomplete forms or documents. If no notice is given in that time, the request is automatically granted and deemed issued as of the next business day. The written certificate must then be provided within 10 days. The statute defines the request as a properly completed and executed application. The city has not published a DeLand-specific turnaround that this guide could find.</p>

<p>Under section 95.11, the time for an action founded on the design, planning or construction of an improvement to real property runs from the date the authority issues a temporary certificate of occupancy, a certificate of occupancy or a certificate of completion, or the date of abandonment, whichever is earliest. For a latent defect, the time runs from discovery. In any event the action must be commenced within seven years after that date.</p>

<p>The tax calendar has its own date. Section 192.042 says real property is assessed on January 1 of each year, and that improvements or portions not substantially completed on January 1 shall have no value placed on them. It defines substantially completed to mean the improvement, or a self-sufficient unit within it, can be used for its purpose.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-taxes-utilities-and-the-city-vs-county-line">DeLand Taxes, Utilities and the City vs County Line</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption: How to File and What It Saves You</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-deland-utilities-trash-permits-month-1">Moving to DeLand: Utilities, Trash, Permits, Month 1</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deland-fl-neighborhoods-costs-and-what-to-know">Living in DeLand, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>Bottom Line</h2>

<p>A new house in <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a> runs through the city and the county. The city's Building Division permits it. The city collects its own fees. Under the Volusia County FAQ, the county impact fee payments are due before a Certificate of Occupancy is issued, and the city says it will not issue the certificate of occupancy until all fees are paid in full. The city also lists a final survey ahead of the certificate for a new single-family home.</p>

<p>The Building Permits page lists the permit status in the Accela Citizen Portal, and the city's pages describe two timings for city fees: when the permit is issued, and upon application for water or sewer service. The county impact fee application goes through the Connect Live portal, by email to impactfees@volusia.gov, or in person at the DeLand office. The final survey is listed in the city's note on Certificates of Occupancy. On the state side, section 95.11 runs the limit for construction claims from the earliest of a temporary certificate of occupancy, a certificate of occupancy, a certificate of completion or abandonment, and no later than seven years after that date.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Who issues the building permit for a new house in DeLand?</strong></summary>
<p>The City of DeLand Building Division processes all building permits for projects within the city limits. If the project is in unincorporated Volusia County, the permit must come from the Building Department of Volusia County. The city's page says to use the Property Appraiser's website to see whether a property is in the city or the county. New houses are filed under the permit type called New Building, which the city describes as construction for a brand new main structure, including new single family attached and detached dwellings. The status of any application can be read in the city's Accela Citizen Portal.</p>
</details>
<details>
<summary><strong>What does the city ask for with a new single-family permit application?</strong></summary>
<p>The city's single family residence checklist lists a recorded Notice of Commencement for any improvement with a contract price greater than five thousand dollars, an updated workers' compensation exemption or certificate, construction plans sealed where code requires it, truss packages with the engineer's seal, energy calculation forms, dimensioned site plans showing setbacks, a Product Approval Specification sheet, and the septic location with Health Department approval if it applies. The checklist adds that other plans may be required. The city's plan checklist also lists signed and sealed surveys.</p>
</details>
<details>
<summary><strong>What fees does the City of DeLand collect on a new house?</strong></summary>
<p>The city charges a non-refundable submittal fee of one hundred dollars for a residential permit. Building fee changes take effect October 9, 2026, and the fee schedule effective that date sets the residential permit fee at one dollar and ten cents per square foot under roof, with inspections at one hundred dollars each. The city's impact fees for water, sewer, police, fire, government buildings, and parks and recreation are listed on a separate 2026 Impact Fees sheet. The city's fees page says building inspection fees and city impact fees are collected when the permit is issued.</p>
</details>
<details>
<summary><strong>What are Volusia County impact fees and who collects them?</strong></summary>
<p>Volusia County has five growth-related impact fees: Transportation, Education, Parks and Recreation, EMS and Fire Rescue. The county says an impact fee is assessed and due from anyone who builds a new residence. For a project inside city limits, the application goes in through the county's Connect Live portal, by email to impactfees@volusia.gov or in person at the DeLand office, and city staff must sign the bottom of the application first. The county does not accept partial payments, but each use can be paid separately and in its entirety.</p>
</details>
<details>
<summary><strong>When must the impact fees be paid before the certificate of occupancy?</strong></summary>
<p>The county FAQ says impact fee payments are due before the issuance of a Certificate of Occupancy. The city's Building Permits page says county impact fees can be deferred until the completion of the project and that the Certificate of Occupancy will not be issued until all fees are paid in full. The city page also says a final survey must be submitted before the CO for a new single-family home, effective May 13, 2025.</p>
</details>
<details>
<summary><strong>Does Florida law set a deadline for issuing a certificate of occupancy?</strong></summary>
<p>Section 553.791 sets a deadline inside its private provider section. It says the building official has no more than 10 business days, or 2 business days if the permit relates to a single-family or two-family dwelling, after receiving a request and the applicant's certificate of compliance and other required government approvals, including payment of all outstanding fees. If no notice of incomplete forms is given in that time, the request is automatically granted and deemed issued as of the next business day. The city has not published a DeLand-specific turnaround that this guide could find.</p>
</details>
<details>
<summary><strong>What date does Florida law use to start the time limit for a construction claim?</strong></summary>
<p>Under section 95.11 of the Florida Statutes, the time for an action founded on the design, planning or construction of an improvement to real property runs from the date the authority issues a temporary certificate of occupancy, a certificate of occupancy or a certificate of completion, or the date of abandonment, whichever is earliest. For a latent defect, the time runs from discovery. In any event the action must be commenced within 7 years after that date.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 15:13:23 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/deland-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[DeLand Short-Term Rental Rules for Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/deland-short-term-rental-rules-for-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Our search of <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a>'s Code of Ordinances on October 28, 2026 found no section that defines or regulates a short-term rental by name. This guide lists what DeLand's code, Florida statutes and Volusia County's tax page say about renting a house to guests. Several sources bear on it, as listed below: the city's definitions of lodging, its zoning use tables, its business tax receipt, Florida's licensing and tax statutes, Volusia County's tax page and the Florida statutes on association rules.</p>

<p>This guide stays with what those sources say. It does not say that a nightly rental is allowed in a DeLand neighborhood, and it does not say that one is banned. The sources below cover what is written and what we did not find. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deland-fl-neighborhoods-costs-and-what-to-know">Living in DeLand, FL: Neighborhoods, Costs and What to Know</a>.</p>

<h2>What DeLand's code says about lodging</h2>

<p>Start with what we searched and what came back. A search of the DeLand Code of Ordinances for "short-term rental" returned two hits. One was Section 33-37, the Medical Services Overlay District, where the match was the phrase "long-term care services." The other was Section 33-12, the definitions section of the Land Development Regulations, where the match was the phrase "on a short term basis" inside the definition of a temporary communication tower. A search for "vacation rental" returned one hit, also Section 33-12, and the text of that section does not contain the phrase "vacation rental."</p>

<p>The Code of Ordinances page also carries a list headed "Adopted Ordinances Not Yet Codified." On October 28, 2026 that list held ten ordinances. They are 2026-22 (development and connection fees), 2026-21 (water, sewer and reclaimed water rates), 2026-19 (construction in rights-of-way), 2026-20 (building codes reinspection fee), 2026-10 (utility service area reference), 2026-08 (micromobility devices), 2026-05 (building code time limitation), 2026-04 (oil and grease), 2026-02 (plats) and 2026-01 (police lobby recording). None of those titles concerns rentals or lodging.</p>

<p>The code defines the following terms: hotel, motel, bed and breakfast homestay and bed and breakfast inn. Section 33-12 defines a hotel as "a building, group of buildings, or other structure kept, used, maintained or advertised under the same management as a place where sleeping accommodations for more than 16 persons or more than eight rooms are supplied for pay to transient guests." The same section defines a motel, tourist court or motor lodge as "a group of attached or detached buildings with individual sleeping units, with automobile storage or parking space provided in connection therewith, designed for use by automobile transients."</p>

<p>Two more definitions follow. The first is the bed and breakfast homestay. The code calls it a bed and breakfast facility which is an accessory use to a single-family dwelling unit. No more than six rooms in the principal residential structure are set aside for guest clients. Breakfast is available on site solely to guest clients at no extra charge. The length of stay of guest clients ranges from one to 30 days. The owner or operator of the principal structure resides on site. The definition adds that a homestay does not include uses such as motels, hotels, community residential facilities, boarding or lodging houses.</p>

<p>The second is the bed and breakfast inn. The code calls it a dwelling unit that is 50 years of age or older. Up to 12 rooms in the principal residential structure are set aside for guest clients. Breakfast is available on site solely to guest clients at no extra charge. The length of stay ranges from one day to 90 days. The owner or operator of the principal structure resides on site. The inn definition also does not include such uses as motels, hotels, community residential facilities, boarding or lodging houses.</p>

<p>The homestay definition states a limit of six rooms and one to 30 days. The inn definition states a limit of up to 12 rooms and one day to 90 days. Both say the owner or operator of the principal structure resides on site. The hotel definition is stated in terms of more than 16 persons or more than eight rooms under the same management. The motel definition is stated in terms of individual sleeping units with parking, designed for use by automobile transients.</p>

<p>Section 33-27.03 states the purpose of the bed and breakfast rules. It says permitting homestays as accessory uses in residential areas, inns as accessory uses in residential areas and inns in commercial areas "is to preserve historic structures and avert commercial development pressures."</p>

<h2>Where DeLand's zoning lists lodging uses</h2>

<p>Section 33-16.01 says "The purpose of this article is to describe the specific permitted uses allowed in the various zoning districts created herein." The use tables are in Section 33-17. We did not find a sentence in Section 33-16 or 33-17 that states what happens to a use the tables do not list.</p>

<p>Section 33-27.03 gives the district lists in words. Homestays that are an accessory use to a single-family residence may be located in R-R, R-R1, R-1AA, R-1A, R-1B, R-1, R-2, P-1 and PD, provided the use is consistent with the Comprehensive Plan and the requirements of the section are met. Inns that are an accessory use to a residential use may be located in R-8, R-12, R-16 and PD. Inns may also be located in BR, C-1, C-2, C-2A and PD.</p>

<p>The use table in Section 33-17 is not identical. In the residential table, "Bed and breakfast homestay, accessory" is marked P in R-R, R-R1, R-1AA, R-1A, R-1B, R-1, R-1C and R-2. It has no mark in R-8 through E-1. "Bed and breakfast inn, accessory" is marked P in R-8, R-12 and R-16. The table shows R-1C and omits P-1 and PD, which the written section lists.</p>

<p>In the commercial table, which covers the P-1, BR, C-1, C-2, C-2A, C-2AC, C-3, C-4 and M-1 districts, "Bed and breakfast inn" is marked P in BR, C-1, C-2 and C-2A. It is marked "C 19" in P-1. "Hotels or motels and associated accessory uses including restaurant and conference facilities" are marked P in BR, C-2 and C-2A. They are marked "C 5" in C-1 and "C 6" in M-1. There is no mark for them in P-1, C-2AC, C-3 or C-4. We did not read the legend for the "C" or the footnotes, so we do not state what they require.</p>

<p>The individual residential district sections list the homestay as "accessory use only (See also section 33-27.03.)" The table and the text differ.</p>

<h2>The homestay standards, the business tax receipt and the license</h2>

<p>Section 33-27.03 adds standards a homestay must meet, in addition to the definition. All homestays and inns "shall be reviewed and approved as outlined in section 33-132 of the Land Development Regulations," which is a development permit. The standards for a homestay are listed one by one.</p>

<p>No more than six guestrooms are allowed. The use of the structure is subordinate to its residential purposes and shall not change its character. No stove, oven or range is permitted in bedrooms. No living quarters or guestrooms may be located in an accessory building, and that item is subject to the Special Exception process. The entire perimeter is landscaped with at least a Class A landscape buffer, except for any portion of the lot adjacent to commercial zoning. Food service is restricted to guests. A Class B buffer shall screen parking areas unless they are located in the rear of the building. Parking and traffic may not be in greater volumes than normally expected in a residential neighborhood.</p>

<p>Three items carry a Special Exception tag. The first is the accessory-building item above: no living quarters or guestrooms in an accessory building. The second is that homestays are restricted to properties which have at least one side abutting a nonresidential zoning district. The third is that guestrooms are in structures 50 years of age or older. Each of the three is tagged as subject to the Special Exception process.</p>

<p>Inns that are not accessory uses are subject to the relevant residential development and design requirements for the zoning district. No accessory bed and breakfast inn may have more than 12 guestrooms.</p>

<p>Now the city's business paperwork. The city's page on business tax receipts says all businesses located within the City of DeLand are required to obtain a Business Tax Receipt, formerly known as an Occupational License, which must be renewed annually. Renewals are sent by email in July of each year. An email in April asks for an annual declaration of changes such as the number of employees, seats or stations. The homestay standards add that a homestay is subject to all applicable city business tax receipts and all applicable state and local business taxes. The city's contact for questions is 386-626-7007 or building@deland.org.</p>

<p>The state license is the third piece. Section 509.241 of the Florida Statutes says each public lodging establishment shall obtain a license from the state's division. A public lodging license may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree.</p>

<p>The statutes define the label. Under Section 509.242, a vacation rental is any unit or group of units in a condominium or cooperative, or any individually or collectively owned single-family, two-family, three-family or four-family house or dwelling unit, that is also a transient public lodging establishment but is not a timeshare project. Under Section 509.013, transient occupancy means occupancy that is temporary. The term includes the occupancy of a dwelling unit at a hotel, motel, vacation rental, bed and breakfast inn or timeshare project, unless a written rental or lease agreement expressly states that the dwelling unit is the sole residence of the guest.</p>

<p>The state's Division of Hotels and Restaurants keeps an easily searchable online database of licensed vacation rentals. The division says it gives the address of every vacation rental condo or dwelling currently licensed and that it refreshes daily.</p>

<h2>State law, taxes and association rules</h2>

<p>Section 509.032(7)(b) provides that a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. The next sentence says this paragraph does not apply to any local law, ordinance or regulation adopted on or before June 1, 2011.</p>

<p>Section 509.032(7)(a) separately says that the regulation of public lodging establishments, including sanitation standards and inspections, is preempted to the state. It also says this does not preempt the authority of a local government or local enforcement district to conduct inspections of public lodging and public food service establishments for compliance with the Florida Building Code and the Florida Fire Prevention Code.</p>

<p>Two taxes may apply to renting living quarters. The first is the state tax. Section 212.03(1)(a) says every person is exercising a taxable privilege who engages in the business of renting, leasing, letting or granting a license to use living quarters in connection with any hotel, apartment house, roominghouse, tourist or trailer camp, mobile home park, recreational vehicle park, condominium or timeshare resort. Section 212.03(1)(c) exempts the rental of facilities intended primarily as a principal or permanent place of residence, and it says the rental of such facilities that primarily serve transient guests is not exempt by that subsection. We do not quote a rate here.</p>

<p>The second is Volusia County's Tourist and Convention Development Tax, which applies to rentals of 6 months or less. The county describes it as a local option transient rental tax collected by Volusia County. Everyone who rents, leases or lets any living quarters for a term of 6 months or less is exercising a taxable privilege. If you rent a bed, room, apartment, house, condo, hotel, motel, recreational vehicle or watercraft for 6 months or less, you are responsible for collecting and remitting this tax. You register online, by email at treasury@volusia.org or by phone at (386) 943-7085.</p>

<p>The county adds its own caution. Its page says "Registration and payment of taxes does not guarantee compliance with other state and local laws. Please contact your city and county zoning departments to determine whether short-term rentals are permitted in your area, and if so, for what duration."</p>

<p>Association documents can restrict rentals as well. For a home in a homeowners association, Section 720.306 says which parcel owners a rental amendment applies to. A governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title after the effective date or who consents. A separate paragraph says an association may amend its governing documents to prohibit or regulate rental agreements for a term of less than 6 months. It may also prohibit the rental of a parcel more than three times in a calendar year. Those amendments apply to all parcel owners.</p>

<p>For a condominium, under Section 718.110(13), an amendment that prohibits unit owners from renting, alters the duration of the rental term or specifies or limits the number of times unit owners may rent during a specified period applies only to unit owners who consent and to unit owners who acquire title after the amendment's effective date.</p>

<p>Section 720.401 requires a disclosure summary before the contract for sale. A prospective parcel owner must be presented a disclosure summary before executing the contract for sale. If it was not provided before the contract, the purchaser may void the contract by written notice within 3 days after receipt of the disclosure summary or prior to closing, whichever occurs first. The right may not be waived and terminates at closing. The section does not apply to associations regulated under chapter 718, 719, 721 or 723.</p>

<p>See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-taxes-utilities-and-the-city-vs-county-line">DeLand Taxes, Utilities and the City vs County Line</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a>.</p>

<h2>Where each source can be reached</h2>

<p>The city's Business Tax Receipt page lists 386-626-7007 and building@deland.org for questions. The Volusia County Tourist and Convention Development Tax page lists treasury@volusia.org and (386) 943-7085, and says to register online. The state's Division of Hotels and Restaurants publishes its searchable database of licensed vacation rentals online. For the city's Code of Ordinances, the version we read is Supplement 15, with online content updated June 30, 2026 and codified through Ordinance 2025-17, adopted October 20, 2025.</p>

<p>Also see: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">Closing Costs in Florida: What Buyers and Sellers Pay in Volusia County</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-flood-zones-and-insurance-how-to-check-an-address">DeLand Flood Zones and Insurance: How to Check an Address</a>.</p>

<h2>The bottom line</h2>

<p>Our search of DeLand's code found no section that defines or regulates a short-term rental by name. The city's written code defines hotels, motels, bed and breakfast homestays and bed and breakfast inns. The homestay and the inn each have a district list and stated limits. Section 33-27.03 sets homestay and inn standards. Florida law says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals, and that paragraph does not apply to a local rule adopted on or before June 1, 2011. Florida requires public lodging to be licensed, Volusia County collects a tax on rentals of 6 months or less and association documents can restrict rentals.</p>

<p>Volusia County's tax page says to contact the city and county zoning departments with questions on whether short-term rentals are permitted. For homes in <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand</a>, it does not name those departments.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Does DeLand's code have a short-term rental section?</strong></summary>
<p>We searched DeLand's Code of Ordinances on October 28, 2026 and found no section that defines or regulates a short-term rental by name. The code does define hotels, motels, bed and breakfast homestays and bed and breakfast inns, with district lists for the homestay and the inn. We did not find a sentence on what happens to a use the zoning tables do not list.</p>
</details>
<details>
<summary><strong>What is a bed and breakfast homestay in DeLand?</strong></summary>
<p>The code defines it as a bed and breakfast facility that is an accessory use to a single-family dwelling unit. No more than six rooms are set aside for guests, breakfast is available on site solely to guest clients at no extra charge, stays range from one to 30 days and the owner or operator resides on site. Section 33-27.03 adds standards such as landscape buffers, no stove, oven or range in bedrooms and review under section 33-132.</p>
</details>
<details>
<summary><strong>Does a seller's vacation rental license transfer to the buyer?</strong></summary>
<p>Section 509.241 of the Florida Statutes says a public lodging license may not be transferred from one place or individual to another. Operating without a license is a misdemeanor of the second degree. The state's Division of Hotels and Restaurants has an online database of licensed vacation rentals that gives the address of each one and refreshes daily.</p>
</details>
<details>
<summary><strong>Can the city regulate how often I rent a vacation rental?</strong></summary>
<p>Section 509.032(7)(b) says a local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. It also says that paragraph does not apply to a local law, ordinance or regulation adopted on or before June 1, 2011.</p>
</details>
<details>
<summary><strong>What taxes apply to renting a DeLand house to guests?</strong></summary>
<p>Two taxes come up. Florida's Section 212.03 treats renting living quarters in connection with a hotel, apartment house, roominghouse, tourist or trailer camp, mobile home park, recreational vehicle park, condominium or timeshare resort as a taxable privilege. Section 212.03(1)(c) separately covers rentals intended primarily as a principal or permanent place of residence. This guide does not establish whether a single-family house falls in the list above. Volusia County collects a Tourist and Convention Development Tax on rentals of 6 months or less, and you register through the county. We do not quote rates. The county says registration and payment of taxes does not guarantee compliance with other state and local laws.</p>
</details>
<details>
<summary><strong>What does section 720.306 say about rental restrictions in an HOA?</strong></summary>
<p>Section 720.306(1)(h)1 says a governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title after the effective date or who consents. Section 720.306(1)(h)2 says an association may amend to prohibit or regulate rental agreements for a term of less than 6 months and may prohibit rental of a parcel more than three times in a calendar year, and such amendments apply to all parcel owners.</p>
</details>
<details>
<summary><strong>What if I am buying a condo and want to rent it for short stays?</strong></summary>
<p>Under Section 718.110(13), an amendment prohibiting unit owners from renting, altering the duration of the rental term, or specifying or limiting the number of times unit owners may rent applies only to unit owners who consent and unit owners who acquire title after the amendment's effective date.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 15:13:06 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/deland-short-term-rental-rules-for-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Daytona Beach New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/daytona-beach-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>The City of Daytona Beach schedule for December 1, 2025 to November 30, 2026 puts the city impact fee for a new single-family home between three thousand seven hundred ninety dollars and three thousand eight hundred eighty-four dollars, depending on the size of the home. The permit package, the county's fees and the certificate of occupancy each have their own rules. This guide goes through them for <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach real estate and homes</a>.</p>

<p>Everything below comes from the city's Permits & Licensing pages, the city's PDFs, the Volusia County impact fee page and the Florida Statutes. Several of the city documents carry their own dates, and those dates are stated where they matter. The amounts and dates below are the ones printed on the documents on the day they were read.</p>

<h2>What the City of Daytona Beach Asks For Before a New Home Permit</h2>

<p>The Permits & Licensing office is at 301 S. Ridgewood Ave., Room 127B, in Daytona Beach. The phone number is (386) 671-8178. Hours are Monday through Friday, 8 a.m. to 4 p.m. The city names a Chief Building Official on that page. It also says the city uses the web-based Intuitive Municipal Services platform, called iMS, for online permit and license services.</p>

<p>Under "Always Check Before Building," the city says to start with zoning to see if what you want to do is feasible and allowed. It adds that a survey should show current structures and should state what FEMA-based flood zone you are in.</p>

<p>The city then lists a minimum set of items to construct a single-family residence. A new home or an addition needs two signed and sealed surveys, and the surveyor of record must dimension the structure onto the survey. The city also requires two site plans and a tree permit form for a new structure or an addition. The city's fee schedule has a line for tree removal or clearance at twenty dollars per tree, up to six hundred dollars.</p>

<p>The plans carry the most detail. The city says new structures and additions need plans showing all elevation views, the footing or monolithic slab, the exterior walls and the interior wall layout. For the slab, the plans show the location, size, steel placement and type, and the strength of the concrete. For the walls, the plans show downrods, window and door locations, lintels, headers, smoke alarms, an ADA accessible bathroom, plumbing fixtures, attic or crawl space access and properly sized rooms.</p>

<p>The roof is handled in two pieces. The roof truss layout must be signed and sealed by the architect or engineer of record. The truss engineering is signed and sealed by the truss manufacturer's engineer. The plans also show typical wall sections and buck details.</p>

<p>Energy calculations are on the list too. The city says that form is usually provided by the mechanical (HVAC) contractor, and that Manual D or J calculations are also required. Window and door specifications must be provided at the jobsite if the form is filled out correctly and shows either the Florida Approval Number or the Miami-Dade NOA. If neither is available, two sets of installation details and manufacturer specifications must be submitted.</p>

<p>The city also publishes a Single Family Home Submittal Checklist. The Single Family Home Submittal Checklist is dated 06/26/2024 in its footer. It begins with the online permit application submittal and a recorded Notice of Commencement. It lists a utility application or a septic tank permit from Volusia County, if applicable. It lists a disclosure statement that applies only to an owner/builder applicant, and a permit authorization of the license holder, if applicable. It lists a recorded warranty deed if the deed differs from what the Property Appraiser's webpage shows. It also lists architectural approval for LPGA and Pelican Bay only.</p>

<p>The checklist describes the survey in detail. The signed and sealed survey shows all proposed improvements with setback measurements for the principal structure, the driveway, the A/C pad and any accessory structures, measured from all property lines. It shows a proposed finish floor elevation, with a minimum of 12 inches above the crown of the road and 1 foot above base flood elevation. It shows elevations at the crown of the road, at all corners including one between each corner, and at mechanical equipment. It shows flow arrows for storm water runoff. It states the flood zone according to the most current FEMA map. A signed and sealed Elevation Certificate is added if the lot is in the 100 year flood zone or is non-FIRM.</p>

<p>The remaining checklist items are these. One copy of the tree permit form goes in with one copy of a landscape plan that shows whether trees are being removed. Construction plans must be designed by a Florida registered engineer to meet section R301 of the 2023 Florida Building Code, 8th Edition, Residential, and must be signed, sealed and verified by a third party. The package includes one set of truss engineering that is signed, sealed and dated, and one completed Product Approval Form, with one complete set of installation specifications on the jobsite. It includes energy forms that are signed and dated, plus one copy of the front page. If applicable, it includes a snapshot of the subdivision plot plan showing the lot and the lots next to it. The checklist closes: "Additional plans, documents, and information may be required."</p>

<p>The city says a Volusia County impact fee statement must be submitted when the permit application package is brought in, and that the statement indicates whether or not the fees have been paid. The city page also has an affordable housing note. If you are requesting expedited processing, notify Permits & Licensing or Planning staff when you submit and state the statutory basis. Staff give higher priority to applications that qualify under the Live Local Act.</p>

<h2>Impact Fees and the Other Charges on the City Schedule</h2>

<p>The city impact fee schedule for single-family homes has five parts. They are Fire/EMS, General Government, Parks, Police and Roads. The schedule is headed December 1, 2025 to November 30, 2026, even though the file name on the city's site says 2024-2025. The schedule sorts amounts by conditioned square feet, and four of the five parts do not change from one size band to the next.</p>

<p>Those four parts are the same in every band. Fire/EMS is four hundred forty-four dollars and sixty-seven cents. General Government is seven hundred twenty dollars. Parks is one thousand eight hundred twenty-nine dollars. Police is four hundred eighty-two dollars and thirty-three cents. Only Roads moves. It is three hundred fourteen dollars for a home under 1,000 square feet, three hundred fifty-nine dollars for 1,000 to 1,999 square feet, three hundred eighty dollars for 2,000 to 2,999, three hundred ninety-eight dollars for 3,000 to 3,999 and four hundred eight dollars for 4,000 or more.</p>

<p>The totals follow from that. A home under 1,000 square feet totals three thousand seven hundred ninety dollars. A home from 1,000 to 1,999 square feet totals three thousand eight hundred thirty-five dollars. The 2,000 to 2,999 band totals three thousand eight hundred fifty-six dollars and the 3,000 to 3,999 band totals three thousand eight hundred seventy-four dollars. A home of 4,000 square feet or more totals three thousand eight hundred eighty-four dollars. The same schedule lists a multi-family unit at two thousand seven hundred six dollars and eighty-six cents and a mobile home at two thousand seven hundred eighty-eight dollars and sixty-seven cents.</p>

<p>The city also has an Impact Fee Application. The form states that a city building permit application must be submitted before this review. The form asks for the city permit application date and number, the address and the 12-digit tax parcel ID number from the County Property Appraiser. It asks for the intended use, with choices that include single-family, duplex, accessory dwelling unit, townhome or condo, mobile home and apartment. It asks for the number of dwelling units, the number of stories and the square feet, and it says the square feet are measured on conditioned and living space. The form lists the Permits & Licensing office at 301 S. Ridgewood Avenue, Room 127, phone (386) 671-8264.</p>

<p>The city documents fetched for this guide do not say when the city impact fee must be paid, so this guide does not give a deadline for it. The fee schedule says sanitary sewer tap and capital facilities fees are in addition to the plumbing fees, and that water tap and capital facilities fees are in addition to those and are prescribed by the City Commission from time to time. The schedule gives no tap fee amounts.</p>

<p>The county has its own set. Volusia County lists five growth-related impact fees: Transportation (roads), Education (schools), Parks and Recreation, Emergency Medical Services and Fire Rescue. The county says they pay for the cost of new or expanded county roads and facilities needed to serve new residential and non-residential development. The county lists impactfees@volusia.gov as its contact. The city's checklist prints impactfees@Volusia.org. The county page does not state when its fees are due. The city's checklist does. It says Volusia County impact fees are due prior to the certificate of occupancy being issued.</p>

<p>The city fee schedule for 2025-2026 lists the permit-side charges as well. A residential one- or two-family new construction plumbing permit is one hundred seventeen dollars and fifteen cents. The mechanical line for residential one- and two-family new and existing construction is ninety-seven dollars and sixty-five cents. The electrical line for residential one- and two-family new construction is one hundred fifty-six dollars and twenty cents. The application fee is thirty-three dollars and eighty cents. The schedule adds a technology surcharge of 10 percent of the permit fee, and it lists a re-inspection fee of fifty-six dollars and thirty-five cents.</p>

<p>Power has its own lines. The schedule lists Pre-Power 90 days at one hundred ninety-five dollars and twenty-five cents and a Pre-Power 90 day extension at ninety-seven dollars and sixty-five cents. The city's inspection list also has a Pre-Power inspection code, 480.</p>

<p>The buyer's side of a new-home contract has its own statute. Under section 501.1375, an offer or contract between a building contractor or developer and a buyer of a one- or two-family residential dwelling unit must notify the buyer that any deposit, up to 10 percent of the purchase price, will be placed in escrow unless the buyer waives that in writing. The escrow holder can be a savings and loan association, a bank, a trust company, an attorney who is a member of The Florida Bar, a licensed Florida real estate broker or a title insurance company. The contract must carry the conspicuous legend the statute requires. The statute defines "default" as the buyer's failure to close after the certificate of occupancy is issued, or the buyer's failure to comply with other obligations in the contract. See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a>.</p>

<h2>Inspections, the Certificate of Occupancy and the Clocks That Run Through the Build</h2>

<p>Section 553.79 makes it unlawful to construct, erect, alter, modify, repair or demolish any building without first obtaining a permit from the appropriate enforcing agency, on payment of the reasonable fees that the agency adopts. The same section sets how long a single-family permit lasts. A building permit for a single-family dwelling expires 1 year after it is issued or on the effective date of the next edition of the Florida Building Code, whichever is later. The statute does not stop a local government from extending a permit past that date. It also lets a local government send a written notice of expiration at least 30 days before the permit expires.</p>

<p>The city's fee schedule has two lines that deal with permit timing. One is a permit renewal for a permit extension before the expiration date, at thirty-three dollars and eighty cents. The other is the expired permit fee, at forty-five dollars and ten cents per inspection, to reinstate an expired permit in order to final the permit. Those are the city's own lines, and the city also publishes a Request for Extension form.</p>

<p>The city's inspection list gives each inspection a three-digit code. For a new home the building codes include 107 Footing, 111 Slab, 135 Framing and 195 Final Building. The plumbing codes include 231 Sewer Connection and 295 Final Plumbing. The mechanical list includes 395 Final Mechanical, and the electrical list includes 480 Pre-Power and 495 Final Electric. A group marked "By Others" includes 610 Final Zoning, 620 Final Landscaping and 630 Final Engineering. The list is marked Revised 3/05/08, so the codes may be out of date, and the city can confirm the current codes.</p>

<p>The same list explains how to schedule. It says to call 386.671.8140 and press option 3, or to use the city's online ePermits permit search. It says inspections can be requested up to 9 p.m. for the following business day, and up to 3 days in advance. The fee schedule adds that after-hours inspections are scheduled upon availability of inspectors, with a two hour minimum on weekdays and a four hour minimum on weekends and holidays.</p>

<p>Some projects use a private provider. The city has a Private Provider Audit page that cites section 553.791(1)(b). It says the city may audit private providers up to four times a year. It says an audit may be performed during construction and that construction work may continue without delay while the audit is completed. Findings are uploaded to the record as an Audit Report. Corrections and inspections are the responsibility of the private provider and the permit holder. Under the statute, a fee owner or contractor who uses a private provider notifies the local building official in writing at permit application, or by 2 p.m. local time, 2 business days before the first scheduled inspection.</p>

<p>The certificate of occupancy has a statutory clock. Under section 553.791, the local building official has no more than 10 business days to issue a certificate of occupancy or certificate of completion, or no more than 2 business days when the permit relates to a one- or two-family dwelling. The clock runs from receipt of the request and the applicant's presentation of a certificate of compliance and approval of all other government approvals required by law, including payment of all outstanding fees. The official either issues the certificate or gives notice of incomplete forms. If no notice comes in time, the request is automatically granted and deemed issued as of the next business day. The written certificate is due within 10 days after that. Under section 553.791, the clock runs from receipt of the request, once the applicant presents a certificate of compliance and approval of all other government approvals, including payment of all outstanding fees. The city's checklist separately says Volusia County impact fees are due before the certificate of occupancy is issued.</p>

<p>The city's fee schedule also lists a Temporary Certificate of Occupancy at two hundred ninety-two dollars and ninety cents and a 90 day extension of it at one hundred seventeen dollars and fifteen cents.</p>

<p>The city has a separate Utility Service Application for water and sewer. It asks whether the property is inside the city limits, whether it has access to a paved street and whether it is residential or commercial. It asks whether the work is new construction or an existing facility, and whether a current building permit has been issued, with the permit number. It asks the size of water required and the type of water service: domestic, irrigation or fireline. The city's checklist separately lists a utility application or a septic tank permit from Volusia County, if applicable.</p>

<p>Several other city forms are listed on the Submittal Forms page, including the Notice of Commencement, the Product Approval form, the Request for Partial Inspection, the Land Survey Affidavit, the Roof Inspection Affidavit, the Stormwater Management Plan and the Workman Comp Affidavit. A Blower Door form is also listed. It is headed as an envelope leakage test report for residential compliance with the 2023 Florida Building Code, Energy Conservation, 8th Edition. The city pages fetched for this guide do not say when the form is required.</p>

<p>Two property tax statutes are covered here. Under section 192.042, which covers improvements not substantially completed on January 1, real property is assessed on January 1, and improvements or portions not substantially completed on January 1 have no value placed on them. The statute says "substantially completed" means the improvement, or some self-sufficient unit within it, can be used for the purpose for which it was constructed. Separately, section 196.011 sets a March 1 filing deadline: a person who holds legal title on January 1 and is entitled to an exemption must file an application with the county property appraiser on or before March 1. This guide does not say that deadline applies to unfinished homes. See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption: How to File and What It Saves You</a>.</p>

<p>The last clock is in the statute of limitations. Under section 95.11(3)(b), an action founded on the design, planning or construction of an improvement to real property runs from the date the authority issues a temporary certificate of occupancy, a certificate of occupancy or a certificate of completion, or from abandonment of construction, whichever is earliest. Latent defect runs from discovery, but in any event the action must be commenced within 7 years after that date. The statute adds that correcting or repairing completed work, whether under warranty or otherwise, does not extend the period. A model home runs from the first recorded deed. When a project has several buildings, each building is its own improvement.</p>

<h2>The Bottom Line</h2>

<p>A new home in Daytona Beach has two sets of impact fees, the city's and Volusia County's, and the city's checklist says the county's are due before the certificate of occupancy is issued. The city's schedule for December 1, 2025 to November 30, 2026 puts its own single-family total between three thousand seven hundred ninety dollars and three thousand eight hundred eighty-four dollars. The permit package has a long list, from two signed and sealed surveys to engineered plans and truss engineering. The city documents read for this guide do not state when the city impact fee is due. See also <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach real estate and homes</a>.</p>

<p>Short answers drawn from the city documents and the statutes above.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Where do I apply for a new home permit in Daytona Beach?</strong></summary>
<p>The City of Daytona Beach Permits & Licensing office is at 301 S. Ridgewood Ave., Room 127B, phone (386) 671-8178, open Monday through Friday, 8 a.m. to 4 p.m. The city says it uses the web-based Intuitive Municipal Services platform, called iMS, for online permit and license services. Its Single Family Home Submittal Checklist begins with completing the permit application submittal online. The checklist is dated 06/26/2024 in its footer.</p>
</details>
<details>
<summary><strong>What survey does the city require for a new single-family home?</strong></summary>
<p>The city's Permits & Licensing page says a new home or an addition needs two signed and sealed surveys, and the surveyor of record must dimension the structure onto the survey. The city's checklist says the survey shows setbacks for the principal structure, driveway, A/C pad and accessory structures from all property lines. It also shows a proposed finish floor elevation of at least 12 inches above the crown of the road and 1 foot above base flood elevation, elevations at the crown of the road, all corners and mechanical equipment, storm water flow arrows and the flood zone from the most current FEMA map.</p>
</details>
<details>
<summary><strong>How much is the City of Daytona Beach impact fee for a new single-family home?</strong></summary>
<p>The city's schedule for December 1, 2025 to November 30, 2026 lists five parts: Fire/EMS, General Government, Parks, Police and Roads. Only Roads changes with the size of the home. The total is three thousand seven hundred ninety dollars for a home under 1,000 square feet and three thousand eight hundred eighty-four dollars for 4,000 square feet or more. The city's documents fetched for this guide do not say when the city fee is due.</p>
</details>
<details>
<summary><strong>When are Volusia County impact fees due on a new Daytona Beach home?</strong></summary>
<p>The city's Single Family Home Submittal Checklist says Volusia County impact fees are due prior to the certificate of occupancy being issued. The county lists five impact fees: Transportation, Education, Parks and Recreation, Emergency Medical Services and Fire Rescue. The city also says a Volusia County impact fee statement must be submitted with the permit application package and that it indicates whether or not the fees have been paid. The county lists impactfees@volusia.gov as its contact.</p>
</details>
<details>
<summary><strong>How long does the city have to issue a certificate of occupancy?</strong></summary>
<p>Under section 553.791, the local building official has no more than 10 business days, or no more than 2 business days for a one- or two-family dwelling, after receiving the request and the certificate of compliance, with all fees paid. If no notice of incomplete forms comes in that time, the request is automatically granted and deemed issued as of the next business day.</p>
</details>
<details>
<summary><strong>Does the city have a temporary certificate of occupancy?</strong></summary>
<p>The city's 2025-2026 fee schedule lists a Temporary Certificate of Occupancy at two hundred ninety-two dollars and ninety cents and a 90 day extension at one hundred seventeen dollars and fifteen cents. Under section 95.11(3)(b), the time for a construction claim runs from the earliest of a temporary certificate, a certificate of occupancy, a certificate of completion or abandonment of construction, and a latent defect runs from discovery, but in any event the action must be commenced within 7 years after that date.</p>
</details>
<details>
<summary><strong>What does Florida law say about improvements not substantially completed on January 1?</strong></summary>
<p>Section 192.042 says real property is assessed on January 1 and that improvements or portions not substantially completed on January 1 have no value placed on them. The statute says an improvement is substantially completed when it, or some self-sufficient unit within it, can be used for the purpose for which it was constructed. Separately, section 196.011 sets March 1 as the deadline to file an exemption application with the county property appraiser for a person who held legal title on January 1 and is entitled to an exemption. This guide does not say it applies to unfinished homes.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 15:12:46 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/daytona-beach-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Port Orange Septic vs Sewer: What Buyers Check]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/port-orange-septic-vs-sewer-what-buyers-check]]>
        </link>
        <description>
            <![CDATA[<p>In Port Orange, the city code makes sewer connection mandatory for each lot or parcel where service is available within the city limits, except unimproved and unused property, and connection is not mandatory for an existing improved property when the nearest sewer line is more than 100 feet from the property. That rule comes from Section 74-63 of the City of Port Orange Code of Ordinances. For <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange</a>, this guide cites Section 74-63 of the city code and Section 381.0065 of the Florida Statutes. It restates what the city code and state law say, as we read them in October 2026. We did not read the city resolution that sets sewer rates and availability charge amounts, or Florida Statute 468.8311.</p>

<p>We found no published count of septic systems in Port Orange. We did not source a list of streets without sewer. Dollar amounts for a septic repair, a sewer hookup or the sewer availability charge were not sourced, so none appears here. The city sets sewer charges by resolution and posts a utility rate study.</p>

<h2>What the Port Orange code says about sewer and septic</h2>

<p>The city's Public Utilities Department operates and maintains the municipal utility system, which includes drinking water, sanitary sewer and reclaimed water. Its service area also includes the Town of Ponce Inlet, Wilbur-by-the-Sea, and portions of Daytona Beach Shores and unincorporated Volusia County. The department's page lists 386-506-5720 for establishing or canceling service and 386-506-5766 for reporting a sewer spill.</p>

<p>Section 74-63 is the connection rule. Connection to the city's sewer collection facilities by a property owner, where service is available within the city limits, is mandatory for each lot or parcel of land except unimproved and unused property. Connections to existing improved properties are not mandatory when the nearest sewer line is more than 100 feet from the closest point of the property.</p>

<p>The same section adds three more points. If an existing improved property is proposed to connect to sewer, all existing and proposed future buildings and all other wastewater generators on the property are required to connect at that time as well. No person is required to cross the private property of another to connect unless there is an appropriate easement or right-of-way. And at the time connection is mandatory, the owner becomes liable for all applicable development fees, connection charges and other fees, charges and deposits set by ordinance or resolution of the city council.</p>

<p>Section 74-64 covers an extension. If the city's sewer collection facilities are expanded or extended to an area where service was previously unavailable, the owner of property in that area must connect, as provided in Section 74-63, within one year of the date the service becomes available. The owner also pays all applicable development fees, connection charges and other fees, charges and deposits. The city's water rule, Section 74-31, sets the water connection tests. Water connection is mandatory where available, it is not mandatory for an existing improved property when the nearest water line is more than 100 feet away, and an expansion starts a one-year clock.</p>

<p>Section 74-73 requires approval by the county health department for septic tanks built in the city. Section 74-69 says every residence and building in which humans reside, are employed or congregated must have a sanitary method of disposing of human excrement, and it names two: either a sanitary water closet that is connected with the city sewer, or an approved type of septic tank or related systems. Section 74-73 is titled "Septic tanks to be county-approved." It says no septic tank other than those approved by the county health department shall be constructed within the corporate limits of the city. Section 74-72 makes it unlawful for an owner or lessee to permit the disposal of human excrement on any property except in a sanitary water closet where sewerage lines are available.</p>

<p>Section 74-70 covers building and remodeling. No person shall build or remodel any structure used for human habitation or occupancy within the city which is within 100 feet of a city sanitary sewer line unless it is provided with water-carried sewerage facilities that are designed and constructed to connect to the city's sewer collection system.</p>

<p>There is a written exemption process in Section 74-66. In unique and extraordinary circumstances an owner may be exempted from connecting. The owner files a written request with the city manager stating the basis. Requests other than for a single-family dwelling must come with a statement from a professional engineer. Every request must clearly show three things. First, there is no practical means of connecting the property without extraordinary engineering and construction costs. Second, the cost of connecting is cost prohibitive to an owner who has a practical alternative means of disposing of the wastewater. Third, the long-term costs to the city of maintaining facilities or servicing the property if connected will likely exceed the revenues from the owner.</p>

<p>The code then lists what does not count. A simple booster pump on an owner's sewer line, or a lift station to serve a single-family dwelling or a multifamily project, or similar requirements, do not constitute exemptions. The city engineer reviews, and the city manager submits a recommendation to city council. An exemption is at the absolute discretion of the city council, and it may be reviewed and rescinded at any time. No exemption may be requested or granted based solely on the economic hardship imposed by the mandatory connection requirement.</p>

<h2>Charges, permits and who owns which pipe</h2>

<p>The code spells out money questions in general terms. Section 74-77 says there is no sewer connection charge for a connection made at the same time as construction of sewer mains when the work is developer installed. If a service connection is required after the main is built, or the city pays for a service connection with a line extension, the city may provide materials or labor to bring the service main to the property line, and a minimum charge per sewer connection applies. The actual charge may be greater than the minimum if the city's actual cost is greater.</p>

<p>Section 74-78 sets the monthly charges. All monthly charges for sewer service are set by resolution of the city council. A monthly minimum charge, called an availability charge, is assessed for sewer that is available but not yet connected. The code adds that the minimum monthly sewer charge is not suspended during vacation periods or during periods when a property is vacated. Water measured through potable irrigation meters is excluded from the computation of the monthly sewer charge, and sewer rates are not applied to water measured through irrigation meters.</p>

<p>Section 74-67 covers a request for service beyond the present collection system. The person requesting the service pays all costs of the extension before construction, including the costs of any pumping stations required. Extensions need plans and specifications prepared by a registered engineer and approved by the city manager or designee. The city also publishes a development fee schedule for water and sewer next to its fire, transportation, parks and police impact fees. The city's page says those fees ensure that new development helps support the services and infrastructure it will need.</p>

<p>The code requires permits for work on the city's system. Section 74-76 makes it unlawful to tap, cut or use any line or part of the city's sewage collection facilities without a written permit from the city and payment of all rates and charges. Section 74-81 says no person other than an authorized city employee may enter any public sewer or make connections to it without a written permit from the city. Section 74-71 covers old plumbing. When an owner or plumber plans to connect old plumbing to the city sewer main, they must notify the city plumbing inspector, who inspects the old plumbing and tells them what alterations are necessary. Anyone who connects without the plumbing inspector's approval is subject to the penalties for violation of the article.</p>

<p>Section 74-74 assigns the house sewer. The property owner is responsible for maintaining and keeping clean the sewer pipe leading from the plumbing system to the city sewer system. That pipe ends at a cleanout normally located near the edge of the utility easement or right of way. Where there is no cleanout, the city sewer system begins at the edge of the utility easement or right-of-way. The city's own FAQ addresses repairs. The city says to contact a local plumbing company for repairs to a damaged lateral that is more than 15 feet from the edge of the paved street or damaged between the house and the clean-out. In other instances the city says to call its Wastewater Collection Division at 386-506-5795.</p>

<h2>State rules for septic systems</h2>

<p>Section 381.0065 of the Florida Statutes (2025) defines when a sewerage system is "available" for purposes of that section. A sewerage system is "available" when it is capable of being connected to the plumbing of a residence, is not under a Department of Environmental Protection moratorium, and has adequate permitted capacity. For a single-family residence with an estimated flow of 1,000 gallons per day or less, there is one more test. A gravity sewer line, or a low pressure or vacuum collection line in areas approved for it, must exist in a public easement or right-of-way that abuts the property line. The statute defines "Department" in that section as the Department of Environmental Protection. The Port Orange code in Section 74-73 still refers to the county health department. We note both wordings and leave it at that.</p>

<p>Section 381.00655 sets the state connection clocks. The owner of a properly functioning septic system, excluding an approved graywater system, must connect to an available publicly owned sewerage system within 365 days after written notification from the sewerage system owner that it is available. At least one year before the system becomes available, the sewerage system must notify affected owners of the anticipated availability and tell them they will be required to connect within one year of actual availability. The owner may prepay the amortized value of required connection charges in equal monthly installments over a period not to exceed two years from the date of the initial notice.</p>

<p>A 90-day clock applies to a system that needs repair or modification to function in a sanitary manner. The owner of a system that needs repair or modification to function in a sanitary manner must connect to an available sewerage system within 90 days after written notification from the Department of Environmental Protection. In hardship cases the department may approve an extension of not more than 90 days, and it may approve only one. The statute also lets a publicly owned sewerage system, with the department's approval, waive mandatory connection if it decides connection is not required in the public interest due to public health considerations.</p>

<p>Several state rules attach to the septic system itself. If the siting, location and installation conditions or repair information remain the same, a construction or repair permit for a system may be transferred to another person. The new owner files, within 60 days after the transfer of ownership, an amended application with corrected information and proof of ownership. The statute says a fee is not associated with processing that information. A person may not contract to construct, modify, alter, repair, service, abandon or maintain any portion of a system without being registered under part III of chapter 489. An owner who personally performs construction, maintenance or repairs on a system serving his or her own owner-occupied single-family residence is exempt from the registration requirement but remains subject to all permitting requirements.</p>

<p>The statute also speaks to occupancy. A building may not be occupied, and no municipality or agency may authorize occupancy, until the department approves final installation of the system. A municipality or political subdivision may not approve a change in occupancy or tenancy of a building that uses a septic system until the department has reviewed the use of the system with the proposed change, approved it and amended the operating permit.</p>

<p>Bedrooms matter in the statute. A bedroom is a room that can be used for sleeping and that, for site-built dwellings, has a minimum of 70 square feet of conditioned space, is located along an exterior wall, has a closet and a door or an entrance where a door could reasonably be installed, and has an emergency means of escape and rescue opening to the outside under the Florida Building Code. The statute says an existing-system inspection, or a modification, replacement or upgrade of a system, is not required for a remodeling addition or modification to a single-family home if a bedroom is not added. The addition may not cover any part of the existing system or encroach on a required setback or the unobstructed area. The local health department reviews a floor plan and site plan from the remodeler. If it has not finished within seven business days after receiving the plans, the project is approved for the purposes of that paragraph.</p>

<p>One more state rule gets mentioned in Volusia County, so we checked it. Volusia County's Environmental Management page says that effective June 27, 2025, the Department of Environmental Protection implemented a Final Order for Basin Management Action Plans, with septic policies in the Volusia Blue, DeLeon and Gemini Springs areas. Inside those boundaries, a new conventional septic system on a lot of one acre or less is prohibited where central sewer is available. The state's Volusia Blue Spring plan covers portions of DeBary, DeLand, Deltona and Lake Helen, all of Orange City, and a portion of unincorporated Volusia County. The order's text does not contain the words "Port Orange." The Volusia County page says no prohibitions currently exist for conventional systems on lots greater than one acre within the plan boundaries.</p>

<p>The Port Orange Public Utilities Department lists 386-506-5770 for drinking water questions and 386-506-5785 for reclaimed water questions. The city FAQ lists 386-506-5795 for the Wastewater Collection Division, Monday through Friday, 7 a.m. to 3 p.m., and says to call 386-756-5380 or 386-506-5785 at other times. The city FAQ also says grease, oils, glass, plastics, antifreeze, pesticides and other listed items should not be disposed of in the sanitary sewer system.</p>

<p>Section 381.00655 also addresses connection fees. The local governing body may provide that a connection fee charged by an investor-owned sewerage system may be paid without interest in monthly installments, not to exceed five years from availability, if it determines the owner has demonstrated financial hardship.</p>

<h2>Bottom line</h2>

<p>The Port Orange code requires connection to city sewer where it is available, with a 100-foot limit for existing improved properties, a one-year clock when lines are extended and an exemption only in unique and extraordinary circumstances that city council can rescind at any time. The state adds its own definition of "available," a 365-day clock and a 90-day clock for a system that needs repair or modification to function in a sanitary manner. Section 74-69 names an approved type of septic tank as one sanitary method. For <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange</a>, the city publishes its code and utility pages, the county publishes its BMAP septic page, and the state publishes the statutes we cited.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/port-orange-florida-a-buyer-s-guide-to-neighborhoods-and-costs">Port Orange, Florida: A Buyer's Guide to Neighborhoods and Costs</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-impact-fees-what-a-new-build-buyer-pays">Port Orange Impact Fees: What a New-Build Buyer Pays</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-utilities-and-reclaimed-water-for-new-owners">Port Orange Utilities and Reclaimed Water for New Owners</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-port-orange-utilities-trash-and-permits">Moving to Port Orange: Utilities, Trash and Permits</a>.</p>

<p>Here are answers to eight questions drawn from the city code, the statutes, and the city, county and state pages we read.</p>
<h2>Frequently Asked Questions</h2>
  <details>
    <summary><strong>Does Port Orange require a property to connect to city sewer?</strong></summary>
    <p>Section 74-63 of the city code says connection is mandatory for each lot or parcel where service is available within the city limits, except unimproved and unused property. It sets one limit for existing improved property. Connection is not mandatory for an existing improved property when the nearest sewer line is more than 100 feet from the closest point of the property.</p>
  </details>
  <details>
    <summary><strong>What does available sewer mean under Florida law?</strong></summary>
    <p>Section 381.0065 says a sewerage system is available when it can be connected to the residence's plumbing, is not under a Department of Environmental Protection moratorium and has adequate permitted capacity. For a single-family residence with a flow of 1,000 gallons per day or less, a gravity line, or an approved low pressure or vacuum line, must exist in a public easement or right-of-way that abuts the property line.</p>
  </details>
  <details>
    <summary><strong>How long does an owner have to connect once sewer is available?</strong></summary>
    <p>The Port Orange code in Section 74-64 says owners must connect within one year of the date service becomes available when the city extends its sewer to an area that did not have it. State law in Section 381.00655 gives the owner of a properly functioning septic system 365 days after written notice that sewer is available. It also requires the sewer provider to give at least one year of advance notice of anticipated availability. A system that needs repair or modification to function in a sanitary manner has a 90-day clock after written notice from the Department of Environmental Protection.</p>
  </details>
  <details>
    <summary><strong>Can a Port Orange owner get an exemption from connecting?</strong></summary>
    <p>Section 74-66 allows an exemption only in unique and extraordinary circumstances. The owner files a written request with the city manager and must show no practical means of connecting without extraordinary costs, a cost that is prohibitive for an owner with a practical alternative, and long-term city costs that would likely exceed revenues. City council decides at its absolute discretion and may rescind the exemption. An exemption cannot rest solely on economic hardship.</p>
  </details>
  <details>
    <summary><strong>What does the city charge for sewer that is available but not connected?</strong></summary>
    <p>Section 74-78 says a monthly minimum charge, called an availability charge, is assessed for sewer that is available but not yet connected. The code says it is not suspended during vacation periods or when a property is vacated. The council sets the amounts by resolution, and this guide does not quote one because we did not find a current figure on the pages we read.</p>
  </details>
  <details>
    <summary><strong>Who is responsible for the pipe between the house and the city sewer?</strong></summary>
    <p>Section 74-74 makes the property owner responsible for maintaining and keeping clean the sewer pipe from the plumbing system to the city sewer system. That pipe ends at a cleanout normally located near the edge of the utility easement or right of way. For repairs to a damaged lateral more than 15 feet from the edge of the paved street or damaged between the house and the clean-out, the city says to contact a local plumbing company. In other instances the city says to call Wastewater Collection at 386-506-5795.</p>
  </details>
  <details>
    <summary><strong>Does a septic permit transfer to a new owner in Florida?</strong></summary>
    <p>Under Section 381.0065, a construction or repair permit may be transferred if the siting, location and installation conditions or repair information remain the same. The new owner files an amended application with corrected information and proof of ownership within 60 days after the transfer of ownership. The statute says a fee is not associated with processing that information.</p>
  </details>
  <details>
    <summary><strong>Is Port Orange inside the Volusia Blue Spring septic plan?</strong></summary>
    <p>The state order that adopts the Volusia Blue Spring plan lists portions of DeBary, DeLand, Deltona and Lake Helen, all of Orange City and a portion of unincorporated Volusia County. The order's text does not contain the words "Port Orange." The text we read does not settle the question beyond that.</p>
  </details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 15:12:12 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/port-orange-septic-vs-sewer-what-buyers-check]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for Flagler Beach Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-flagler-beach-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>The City's Flood Hazard page says <a href="http://www.adamscameron.com/flagler-beach-florida-real-estate-and-homes.html">Flagler Beach</a> is not a barrier island. The page says the city was originally part of the mainland. The same page says that Flagler Beach is now vulnerable to flooding on two fronts, the Atlantic Ocean and the Intracoastal Waterway.</p>

<p>This guide draws on the City of Flagler Beach website, the Flagler County emergency management page, state pages from the Florida Division of Emergency Management and the Florida Statutes. It covers evacuation zones, alerts, hurricane history as the City reports it, flood and wind protection, permits, insurance paperwork and three Florida statutes. It includes a section on what could not be confirmed. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/buying-a-home-in-flagler-beach-what-to-know-about-florida-s-small-beach-town">Buying a Home in Flagler Beach: What to Know About Florida's Small Beach Town</a>.</p>

<h2>Evacuation zones, alerts and who to call</h2>

<p>Flagler County publishes a page called Hurricane Evacuation Planning Zones. The county says its map identifies whether an address is within a zone that may be evacuated for a hurricane. The county also says that if evacuation orders are issued, a different map will be available that identifies the neighborhoods being evacuated. The City of Flagler Beach lists the county's evacuation zone map first on its Important Maps page. This guide does not state a zone for any Flagler Beach street, because the county map is interactive and could not be read for this article.</p>

<p>The State of Florida runs a second tool called Know Your Zone. The state says to know whether you live in an evacuation zone, a low-lying flood prone area, a mobile home or an unsafe structure. It describes the colored zones on its map as flood zones. The state says Zone A is typically the most vulnerable and the most likely to evacuate first. It says Zone E is most likely to evacuate last. It also says that not all evacuation zones are always ordered.</p>

<p>The state's page states that the greatest threat to life from a hurricane is storm surge flooding. It tells anyone in an ordered evacuation zone, a low-lying flood area or a mobile home to follow all evacuation orders. It says that if you are not in an ordered zone, a low-lying flood prone area, a mobile home or an unsafe structure, it may be safer to stay in your home. If no order is issued for your area and your house is not in an evacuation zone, the state says you may consider sheltering in place. It adds that you should know your home's ability to withstand strong winds and heavy rain.</p>

<p>The City says it participates with Flagler County Emergency Management in disaster preparedness. It says a Disaster Preparedness Guide is available at County and City government buildings. According to the City, the guide has an evacuation map, a detachable card with important emergency numbers and information on how to plan before, during and after an emergency.</p>

<p>Alerts come through ALERTFlagler. The City describes it as an emergency communications network chosen by Flagler County. People who enroll can receive emails or phone calls, depending on the options they choose, about warnings in targeted geographic areas. The City describes signing up as easy and quick. The City's Emergency Alert page lists a Code Red icon, which is for being notified by the local emergency response team, and an ALERTFlagler sign-up link on the Everbridge member site.</p>

<p>The City's Emergency Alert page says emergency ordinances, declarations and orders that the City adopts are posted in two places. They are posted in the News section of the City home page and on the Emergency Alert page itself.</p>

<p>The City lists phone numbers for the agencies that serve it. In an emergency, call 911. The Flagler County Emergency Operations Center is in Building 3 behind the Government Services Building at 1769 E. Moody Boulevard in Bunnell. The county's administration phone is 386-313-4200 and the 24-hour Sheriff's Center is 386-313-4911. The county's emergency management page also lists the email address eoc@flaglercounty.gov. For the City, the Flagler Beach Police Department is at 240 S. Flagler Avenue and its non-emergency number is 386-517-2020. The Fire Department is at 320 S. Flagler Avenue, 386-517-2010. Public Works is at 105 S. 2nd Street, 386-517-2000. The City says its police, fire and public works departments stand at the ready to assist before, during and after emergency events like hurricanes, floods and other disasters.</p>

<p>The City also names the broadcast channels to use in a declared emergency. On television it lists channel 2 (NBC Orlando, WESH), channel 6 (CBS Orlando, WKMG), channel 9 (ABC Orlando, WFTV) and channel 35 (FOX Orlando, WOFL). On radio it lists AM 1150 WNDB, AM 1550 WNZF, FM 92.7 Beach, FM 93.1 WKRO, FM 98.7 KIX Country and FM 103.3 WVYB.</p>

<p>The City's Flood Warning page points to two tracking tools. One is the National Weather Service site, where you can enter a city or zip code for local conditions, a seven-day forecast and a link to the Hazardous Weather Outlook. The other is the St. Johns River Water Management District, which has rain and stream gauges. The City names the nearest two. One measures rainfall at Mosquito Control near I-95 and Palm Coast Parkway. The other measures water level at Bulow State Park. The City says the data is uploaded every two hours, and that daily totals are not available to the public until the following day.</p>

<p>The City's Flood Hazard page says hurricanes generally approach Flagler Beach either from the Caribbean Sea up the Atlantic coast or across the Florida peninsula from the Gulf of Mexico. It also reports numbers from a private, non-governmental site, hurricanecity.com, whose records date to 1871. As the City reports that site, the longest gap between storms in Flagler Beach was 18 years, from 1982 to 2001. The ratio of tropical storms to hurricanes is 69 to 31. The city gets brushed or hit, on average, every 2.73 years. These numbers come from hurricanecity.com, a private, non-governmental site, as the City's page reports it.</p>

<p>The state's page gives the hurricane season as June 1 through November 30. It encourages Floridians to have at least seven days of supplies, including food, water, medicine and batteries. The state's page notes that Hurricanes Helene and Milton made landfall in Florida in 2024, within two weeks of each other.</p>

<p>On shelters, the state says Florida has two types, general population shelters and special needs shelters. It says not every person with a disability is eligible for a special needs shelter. The state also says that the best place to shelter for every Floridian is outside the evacuation area, in a safe and secure structure, with family and friends. It recommends that an emergency plan list area and regional shelters with directions, and that you choose several destinations in different directions. For a general population shelter, the state says to bring your own supplies, such as bed linens or blankets. This guide does not say which shelters serve Flagler Beach, because that could not be confirmed.</p>

<h2>Flood and wind protection on the house itself</h2>

<p>The City's Wind Mitigation page defines mitigation as any activity taken to reduce the risk and vulnerability of people and infrastructure to damage and injury. It gives examples for a building. These are wood or metal shutters and impact resistant glazing for windows, beams added to house and garage doors, hurricane clips and straps for roof structures, and tie downs that anchor mobile homes. The City points to a 20-page wind mitigation booklet on the Florida Disaster website.</p>

<p>The City's Property Protection Measures page sorts flood protection into three types, which it calls Emergency, Dry and Wet. Emergency floodproofing is non-permanent. The City names sandbags, earth-fill retaining walls and stop log barriers. The page says these are intended for use when a flood warning has been issued. It also says materials need to be acquired, stored and maintained, and that labor and equipment for installation need to be set up in advance.</p>

<p>Dry floodproofing is designed to keep water from entering a building that is below the Base Flood Elevation. The City says this generally means elevating the building on piers, piles or posts. A building can also be raised on solid foundation walls, which the City says is recommended for areas of low to moderate water depth and velocity. The page states that solid foundation walls are not allowed in the V Zone, also known as the Coastal High Hazard Zone, where wave heights equal or exceed three feet. It also names two other options. One is to relocate the structure to a place above the Base Flood Elevation. The other is to demolish it and rebuild to modern code.</p>

<p>Wet floodproofing works the other way. The City says it lets water enter the building so that the water levels inside and outside equalize. That greatly reduces hydrostatic pressure, including buoyancy. The City says this is done with openings in the foundation, generally one square inch for each square foot of interior space. The City states that wet floodproofing does not protect contents. It says it is practical only for enclosures below raised buildings.</p>

<p>The same page names a FEMA manual, the Homeowner's Guide to Retrofitting, Six Ways to Protect Your Home from Flooding, from 2009, numbered FEMA P-312. A copy is at City Hall for loan.</p>

<p>The City states that construction in the City, regardless of flood zone, requires a Flagler Beach building permit. The City Commission passed new floodplain requirements, Ordinance 2015-03, on February 26, 2015. The City says it was written in conjunction with the Florida Building Code. The City lists the Building Permit Department at 116 South 3rd Street, phone 386-517-2005. To report illegal floodplain development, the City lists its Code Enforcement Officer at 386-517-2000, extension 249. That page also carries a public notice titled SWIFT Grant (Home Elevation). This guide did not read the notice, so it says nothing more about it.</p>

<p>The City's Building Plan Reviews and Inspections page says a building permit is required for all projects to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure. Permits are also required for electrical, gas, mechanical or plumbing systems regulated by technical codes. The City lists exceptions for cosmetic work, such as carpeting, wood flooring, tile, cabinet replacement and residential painting. Required inspections are listed on every permit. You can schedule an inspection by calling 386-517-2000, pressing 3 for the Building Department and then 6 for Inspections. You can also use the Online Inspection Portal. The City says inspections scheduled before 4:30 p.m. may be performed the following business day. The Chief Building Official is in the office from 7:00 a.m. to 8:00 a.m. each business day.</p>

<p>The Florida Statutes add two rules that apply to roofs and openings. Section 553.844 says that for site-built single-family residential structures, a roof replacement must incorporate secondary water barriers and the strengthening or correcting of roof-decking attachments and fasteners. For a building in the wind-borne debris region with an insured value of three hundred thousand dollars or more, a roof replacement must also incorporate roof-to-wall connection techniques. The statute says just valuation applies if the building is uninsured. The statute states that roof-to-wall connections are not required unless evaluation and installation at gable ends or all corners can be completed for 15 percent of the cost of roof replacement.</p>

<p>The same section covers opening protection. Permit-required work applied for on or after July 1, 2008, with an estimated cost of fifty thousand dollars or more, must include opening protections as required for new construction in the wind-borne debris region. That applies where the insured value is seven hundred fifty thousand dollars or more, or the just valuation is that much if the building is uninsured. The statute excludes roof covering replacement or repair work associated with preventing degradation of the residence. It also says that if a roof built, repaired or replaced under the 2007 Florida Building Code or a later edition is 25 percent or more repaired, replaced or recovered, only the repaired, replaced or recovered portion must be brought to the code.</p>

<h2>Flood insurance, disclosure and paperwork on a purchase</h2>

<p>The City's Flood Insurance page says most homeowners' insurance policies do not cover flood. The state's flood insurance page says the same and tells readers to check their policy. The City says coverage generally does not take effect until 30 days after purchase. The state says many policies take upwards of 30 days to take effect.</p>

<p>The City's page says flood insurance is mandatory for a home with a federally backed mortgage in the Special Flood Hazard Area, which it lists as zones A, AE, V and VE. It says flood insurance is available to anyone. It reports that nearly 25 percent of National Flood Insurance Program claims are for policies outside the mapped high-risk areas, and it says that statistic was updated in 2013. The City lists the factors that go into a premium. They are the amount of coverage, the deductible, the age of the building, its occupancy, the design of its foundation, its elevation and its flood zone. The state adds that private providers may have higher limits or broader coverage than National Flood Insurance Program policies. Related: <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/flagler-beach-flood-zones-and-flood-insurance-for-buyers">Flagler Beach Flood Zones and Flood Insurance for Buyers</a>.</p>

<p>The City states that it was accepted into the National Flood Insurance Program on May 15, 1985 and became a member of the Community Rating System on October 1, 1995. The page says Flagler Beach achieved a Class 6 rating on May 1, 2012. It says that equates to a 20 percent discount on policies in the Special Flood Hazard Area and a 10 percent discount on policies outside it. The page says each CRS class improvement reduces premiums by 5 percent. The rating date on that page is 2012.</p>

<p>The state's flood insurance page makes two points about federal help. It says that without a Presidential Disaster Declaration you will not receive federal assistance. If your area is declared, the page says the average payout from FEMA's Individuals and Households Program is only about five thousand one hundred dollars in Florida. It says National Flood Insurance Program claim payments average around twenty-nine thousand dollars. Those are the state's figures as printed on its page.</p>

<p>The City's FIRMs and Floodplains page says where flood maps can be viewed and how to request a Floodplain Determination for an address or parcel. The City says flood maps are available for public view at City Hall, at the Engineering Department off 2nd Street or the Building Department counter off 3rd Street, and at the City Library on South 7th Street. It says a Certified Floodplain Manager on staff can supply a Floodplain Determination for a specific address or parcel number. You request the form from the Engineering Department at 386-517-2400, extension 248. The page says FEMA's Map Service Center can produce a site-specific FIRMette, and it lists Flagler Beach's community number as 120087. That page shows maps dated July 17, 2006 and mentions new maps projected for 2016, so the page itself is dated. This guide does not state which map is current.</p>

<p>The same page explains the Elevation Certificate. It certifies the elevation of a building and its utilities relative to the adjacent grade. Its main purpose is to determine the proper flood insurance rate for a property. It must be prepared, signed and sealed by a land surveyor, engineer or architect authorized by law. The City says a new certificate is not required each time a property is sold. Unless the building footprint has changed, a certificate from a previous owner is transferable. The City says it is required to keep copies of Elevation Certificates for all new and substantially improved buildings, and you can call the City to ask whether a Finished Construction certificate is available for an address. The City says it cannot recommend a company to prepare one.</p>

<p>Florida law adds a flood disclosure. Section 689.302 of the Florida Statutes requires a seller to complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods. It also says the buyer is encouraged to discuss separate flood insurance with the buyer's insurance agent. The seller then marks three items. The first is knowledge of any flooding that has damaged the property during the seller's ownership. The second is whether a flood claim was filed with an insurance provider, including the National Flood Insurance Program. The third is whether the seller received assistance for flood damage, including from the Federal Emergency Management Agency. For this disclosure, the statute defines flooding as the overflow of inland or tidal waters, the unusual and rapid accumulation of runoff or surface waters from an established water source such as a river, stream or drainage ditch, or sustained periods of standing water resulting from rainfall.</p>

<p>Section 627.711 covers wind discounts. It requires an insurer to notify an applicant or policyholder of a personal lines residential property policy, at issuance and at each renewal, of the availability and range of each premium discount, credit, other rate differential or reduction in deductibles for properties with fixtures or construction techniques shown to reduce windstorm loss. The statute also sets out a uniform mitigation verification inspection form that all insurers use when policyholders submit it for wind discounts. An insurer must accept the form when it is signed by a licensed home inspector who has completed at least three hours of approved hurricane mitigation training and passed a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer or a licensed professional architect. An insurer must also accept the form from any other individual or entity the insurer recognizes as qualified. The person who signs must inspect the structures personally, with limited exceptions for direct employees of engineers and contractors. The statute bars an inspector from offering or delivering compensation to an insurance agency, agent or employee for a referral. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a>.</p>

<h2>Safety rules the City publishes and what this guide could not confirm</h2>

<p>The City's Flood Safety page gives a short list of rules. It says to have water, non-perishable food and medicines to last a week. It says to keep spare lanterns, flashlights and batteries on hand and to keep vehicle gas tanks full. For homes with gas utilities, the City says not to use gas until the gas company says it is safe. It says to be alert for gas leaks, and not to smoke or use candles, lanterns or open flames unless the gas has been turned off and the area aired out.</p>

<p>On electricity, the City says that if flood water soaked your electrical appliances, you should turn off your electricity until they dry out thoroughly. It says some appliances, such as television sets, can keep an electrical charge and shock you even after they are turned off. It says not to use wet appliances or motors unless they have been taken apart, cleaned and dried.</p>

<p>The City's page says CO exhaust kills. It says to use a generator or other gasoline-powered machine outdoors, and the same for camping stoves. It calls charcoal fumes especially deadly and says to use charcoal only outdoors. The state's generator page adds that generators produce deadly, invisible carbon monoxide. It says to operate a generator outdoors, far from windows, doors and vents, and never in a garage or basement. The state says to keep the generator dry with a canopy or cover while keeping airflow, and to turn it off and let it cool for at least 20 minutes before refueling. It says to use heavy-duty outdoor-rated extension cords in good condition, to ground the generator and not to overload it. It also says to install battery-operated carbon monoxide detectors.</p>

<p>On the road, the City says not to go near downed power poles or wires. It says the road bed under flood waters may be damaged, and it states in capital letters never to drive around a barricade to cross a flooded street. The City says it takes only two feet of water to carry away a vehicle, including pickups and SUVs. If a vehicle stalls, the City says to get out and go to higher ground. It says six inches of flowing water can knock an adult off his feet, and that anyone who must walk through flood waters should tap ahead with a long stick or pole. It also lists things to watch for on foot. They are electrical wires, broken bottles, nails, slippery stairs and small animals, especially snakes.</p>

<p>Several things could not be confirmed for this guide. It states no evacuation zone for any Flagler Beach street, and it does not say which bridges or shelters serve the city. It did not read the City's Land Development Regulations or flood ordinance text, so it gives no freeboard figure and no lowest-floor rule. It did not read Ordinance 2015-03. It states no current flood map date, no current Community Rating System class and no current National Flood Insurance Program limits, because the City pages carry dates from 2006, 2012 and 2014. It gives no insurance premium or discount figure beyond what the City's page states about the rating system.</p>

<p><strong>Bottom line.</strong> The City says <a href="http://www.adamscameron.com/flagler-beach-florida-real-estate-and-homes.html">Flagler Beach</a> is exposed to flooding from both the Atlantic Ocean and the Intracoastal Waterway. Most homeowners' policies do not cover flood. A flood policy generally takes 30 days to take effect. The City can be called to ask whether a Finished Construction Elevation Certificate is available for an address.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Where do I find out whether a Flagler Beach address is in a hurricane evacuation zone?</strong></summary>
<p>Flagler County publishes a Hurricane Evacuation Planning Zones map that identifies whether an address is within a zone that may be evacuated for a hurricane. The State of Florida runs a second tool called Know Your Zone, which lets you find whether an address is in one of the colored evacuation zones. The state says Zone A is typically the most vulnerable and the most likely to evacuate first, and that not all zones are always ordered. If orders are issued, the county says a different map will identify the neighborhoods being evacuated.</p>
</details>
<details>
<summary><strong>How do I get emergency alerts for Flagler Beach?</strong></summary>
<p>The City describes ALERTFlagler as an emergency communications network chosen by Flagler County. People who enroll can receive emails or phone calls, depending on the options they choose, about warnings in targeted geographic areas. The City's Emergency Alert page lists a Code Red icon, which is for being notified by the local emergency response team, and an ALERTFlagler sign-up link on the Everbridge member site. The City also lists television and radio stations to tune to during a declared emergency.</p>
</details>
<details>
<summary><strong>Does homeowners insurance cover flood damage in Flagler Beach?</strong></summary>
<p>The City and the state both say most homeowners' insurance policies do not cover flood. Section 689.302 of the Florida Statutes also puts that statement on the seller's flood disclosure form, which a seller must give a purchaser at or before the time the sales contract is executed. The City says a flood policy generally does not take effect until 30 days after purchase. The state says many policies take upwards of 30 days. The City adds that flood insurance is available to anyone, and is mandatory with a federally backed mortgage in zones A, AE, V and VE.</p>
</details>
<details>
<summary><strong>Does a new Elevation Certificate have to be made every time a Flagler Beach home sells?</strong></summary>
<p>The City says a new Elevation Certificate is not required each time a property is sold. It says that unless the building footprint has changed, a certificate from a previous owner is transferable. The City is required to keep copies of certificates for all new and substantially improved buildings, and you can call the City to ask whether a Finished Construction certificate is available for an address. The City says an Elevation Certificate must be prepared, signed and sealed by a land surveyor, engineer or architect authorized by law, and that the City cannot recommend a company.</p>
</details>
<details>
<summary><strong>Does a Flagler Beach construction project need a building permit?</strong></summary>
<p>The City states that construction in the City, regardless of flood zone, requires a Flagler Beach building permit. Its Building Plan Reviews and Inspections page says a permit is required to construct, enlarge, alter, repair, move or demolish a building or structure, and for electrical, gas, mechanical and plumbing systems. It lists exceptions for cosmetic work such as carpeting, wood flooring, tile, cabinet replacement and residential painting. The City lists the Building Permit Department at 116 South 3rd Street, phone 386-517-2005.</p>
</details>
<details>
<summary><strong>What does Florida law say about wind discounts on home insurance?</strong></summary>
<p>Section 627.711 of the Florida Statutes requires an insurer to notify a policyholder, at issuance and at each renewal, of the availability and range of each premium discount, credit or reduction in deductibles for fixtures or construction techniques shown to reduce windstorm loss. The statute sets a uniform mitigation verification inspection form that insurers use for wind discounts. An insurer must accept the form when it is signed by a licensed home inspector with the required training, a certified building code inspector, a licensed contractor, a licensed engineer or a licensed architect. The person signing must inspect the structures personally, with limited exceptions.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 15:00:19 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-flagler-beach-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for Ponce Inlet Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-ponce-inlet-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Volusia County sorts hurricane evacuations into three levels, written A, BC and DE. The county says local officials may order one of the three levels depending on the track and strength of a threatening hurricane. The levels correspond to the flooding that is likely to occur during a hurricane.</p>

<p>This guide draws on <a href="http://www.adamscameron.com/ponce-inlet-florida-real-estate-and-homes.html">Ponce Inlet</a>'s own pages, Volusia County pages, state pages and the Florida Statutes. It covers evacuation levels, the Town's alert system, public shelters, the Town's permit rules, the Town's post-disaster buildback program, and three Florida statutes that the sources cover, one of which (s. 689.302) requires a flood disclosure at or before the time a sales contract is executed. It also lists what could not be confirmed. See <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-ponce-inlet-fl-homes-costs-and-what-to-know">Living in Ponce Inlet, FL: Homes, Costs and What to Know</a>.</p>

<h2>Evacuation levels, alerts and shelters</h2>

<p>The county's evacuation plan page calls storm surge the most deadly of hurricane hazards. It describes storm surge as salt water flooding that rushes over coastal and river areas and destroys homes and businesses. The same page states that surge can reach seven feet above sea level in a category 1 hurricane and as much as 28 feet above sea level in a category 5 hurricane. The evacuation levels are tied to that flooding.</p>

<p>The State of Florida's Know Your Zone page uses colored zones A to F. The state says Zone A is typically the most vulnerable and the most likely to evacuate first. It also says not all evacuation zones are always ordered. The state describes the colored zones on its map as flood zones, and it asks you to find whether your address is in one of the colored zones. This guide does not state a level for any Ponce Inlet street, because the county and state maps were not read for this article.</p>

<p>The county's plan says that if you live in a mobile home or recreational vehicle, you must evacuate for all evacuation levels regardless of where you are. It says these structures are extremely vulnerable to hurricane winds. Mobile homes have flat sides and are lightweight, so the construction does not allow proper transfer of wind load into the foundation and ground. The county asks owners to maintain tie-down straps and anchors and to check the straps for rust or corrosion.</p>

<p>The county's page states that failure to obey an evacuation order is a violation of Florida law. The state's page adds a second point for people who are not ordered out. If an order is not issued for your area and your house is not in an evacuation zone, the state says you may consider sheltering in place. It says that if you are in an ordered evacuation zone, a low-lying flood-prone area or a mobile home, you should follow all evacuation orders. It also says the homeowner is responsible for knowing whether the home is strong enough, and that homes built after 2002 generally include features that make them more resilient to hurricanes.</p>

<p>The county gives a short list for people who leave. Know where you are going, whether that is family, friends, a hotel or motel, or a public shelter. Take a map showing two routes to reach your destination. Notify family, friends and caregivers of your location. Secure your home and property, take your emergency supplies, and do not delay. The same page lists steps for people who stay. Check your disaster supply kit, stay in your designated safe room, and stay away from windows and glass doors. Turn off the electricity at the main fuse or breaker box if flooding threatens. Run a generator outside the house and connect appliances directly to the generator. The county states that back-feeding generators have killed power company line workers.</p>

<p>The county also describes how bridges behave. When an evacuation is ordered, the east-bound lanes of the bridges close to traffic. The west-bound lanes remain open until sustained winds exceed 39 miles per hour. At that point all lanes are closed. This guide does not name any bridge.</p>

<p>The Town runs its own alert system. Alert Ponce Inlet is the Town's official emergency notification system, powered by Everbridge. The Town says it will no longer be using Code Red as of September 30, 2026. The system sends hurricane and severe weather alerts, evacuation notices, boil water advisories, police and public safety emergencies and other critical emergency notifications. A registrant can choose text messages, email, landline calls or mobile calls, and picks a primary contact method. If the alert is not acknowledged, the system keeps contacting the registrant through the other selected methods until the message is acknowledged.</p>

<p>Registration follows the Town's steps. Click the registration link on the Town's page, select Set Up New Account, and enter an email address or phone number. Verify it, and check spam or junk for the code if it does not arrive. Complete the form and enter a location name, such as Home. Select notification preferences and submit. The Town says to contact the Office Manager at the Fire Department at 386-322-6720 for help. The county's flood brochure, which the Town links, also asks residents to sign up for AlertVolusia and lists other ways flood notices arrive, including NOAA weather radio, reverse 911 and door-to-door knocks from first responders.</p>

<p>Shelters work on demand. The county says Volusia County has many public shelter locations that open according to each disaster, that not all shelters open at once, and that shelters open based on demand. To stay informed it points to the county emergency preparedness app, www.volusia.org/PIN and Emergency Management on Facebook and Twitter. The Citizens Information Hotline is 866-345-0345, and the county says it is only activated during an emergency. Evacuees may need to stay at a shelter for 24 to 72 hours. General population shelters do not provide cots, and the county recommends a beach chair and sleeping pad.</p>

<p>The county's special needs shelter program has its own rules. The county runs a Special Needs Shelter program, and people who need the service should register with Volusia County Emergency Management. The county says hospitals are not shelters. Special Needs Shelters are not for people who need 24-hour dedicated care, a hospital bed, a ventilator, other complex care, or isolation patients.</p>

<p>The Town's flood page says flooding can happen anywhere and points to FEMA's Map Service Center to find a property's zone. The Town directs questions about historical flooding, localized drainage issues, repetitive loss areas and topographic issues to the Planning & Development Department, Building Division, at 386-236-2185, and says the Chief Building Official and Certified Flood Plain Manager is also available for site visits. The county adds that every property in Volusia County is in a FEMA flood zone, that the county has no authority to assign zones, and that 25 percent of flood claims come from outside high-risk flood zones. See <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/ponce-inlet-flood-zones-and-flood-insurance-guide">Ponce Inlet Flood Zones and Flood Insurance Guide</a>.</p>

<h2>Permits, repairs and rebuilding in Ponce Inlet</h2>

<p>The Town has adopted the Florida Building Code and the State Model Floodplain Management Code. Its permit handout lists work that requires a permit, and the list includes re-roofs, exterior door and window replacement, screen enclosures, generators, storm shutters, docks and seawalls, fences and walls, and pools. The Town calls the list not all-inclusive. The Town's handout states that insurance companies provide favorable rates for towns that provide plan review and building inspections for all construction-related activity that follows nationally recognized building codes.</p>

<p>Over-the-counter permits have a location limit. The Town says they can be used only for mechanical, electrical and plumbing work that does not require plan review, in the same exact location, and for properties not in a special flood hazard area. The Town states that this excludes most properties in Town located west of S. Peninsula Drive. Complete applications that qualify usually take about 15 to 20 minutes to enter, process and print.</p>

<p>Emergency repairs have their own track. The Town says emergency repairs can be performed immediately, and its examples are loss of electrical power, loss of air-conditioning and heat, and roof leaks caused by acts of nature. The owner or contractor proceeds at once. They must contact the Building Permit Department the next business day. They must apply for a building permit within one business day after the repair. The repair must comply with the applicable codes, and the inspections must be performed and passed.</p>

<p>Some small jobs may not need a permit. The Town's list of work that may not require a permit includes roof repairs of less than 100 square feet total area, replacement of window and pool enclosure screening, fascia and soffit up to 30 linear feet, gutters and downspouts, and minor repair of small areas of siding up to 100 square feet. The Town states that replacing the entire outside condenser unit or interior air handler requires a permit. It says to check with the Building and Permitting Division at 386-236-2181 or 386-236-2182, Monday to Friday, 8:00 AM to 4:00 PM. Inspection requests go to the hotline at 386-236-2188 or online and must be received by 4:00 PM the day prior.</p>

<p>Effective July 1, 2026, CS/CS/HB 803 creates two permit exemptions for single-family residential properties. The first covers work valued at less than seven thousand five hundred dollars. It does not cover electrical, plumbing, mechanical, gas or structural work. It does not cover any work on a property located partially or entirely within a flood hazard area as defined by the Florida Building Code. A project may not be split into smaller projects to stay under the threshold. The request is made in writing with the owner's notarized signature and a copy of the written contract or other documentation of the nature and value of the work.</p>

<p>The second exemption concerns temporary hurricane and flood protection walls or barriers. The Town says it applies only to properties that are not in a Special Flood Hazard Area. Five conditions must all be met. The wall or barrier is non-load-bearing and non-habitable. It is on the residential property of a single-family dwelling, two-family dwelling or townhouse. It is built to mitigate or prevent storm surge or floodwaters from entering a structure or property. A contractor licensed under Part I of Chapter 489, Florida Statutes, installs it. It complies with local zoning, drainage, easement and setback requirements. If any condition is not met, a permit is required. Requests can be made in person at 4300 S Atlantic Avenue, by email, or through the electronic portal, and the Town's number for questions is 386-236-2182. The Town's page states that the Town has no legal duty to the owner, contractor, or their successors or assigns for any work performed under this exemption.</p>

<p>Ponce Inlet also runs a Residential Post-Disaster Buildback Program. The Town's frequently asked questions document says the registration lets lawfully permitted, non-conforming residential structures damaged by a terrorist act, accidental fire or natural disaster be reconstructed. It states that the program guarantees the right to rebuild the home the same way it was built. Registration is optional. The documents are marked "Revised 2017." Town Planning and Development is at 386-236-2181.</p>

<p>The Town lists who may want to consider registering. The list includes a residence or condominium building taller than 35 feet and a residence built or permitted before May 1, 2005, the date the Town's Floor Area Ratio and special height setback requirements took effect. It also includes a multi-story residence built close to the front and side setbacks, a large house on a small lot, and a waterfront property, where setback measurement may have changed over the years. Only the owner registers, not a renter. A condominium association may submit one application for the whole building. Someone can apply for an owner who is out of town with notarized authorization.</p>

<p>The program covers the principal residential structure and attached structures such as decks, carports and screen pool enclosures. It does not cover detached accessory structures such as docks, sheds, above-ground pools or detached garages and carports. The Town charges no fee. The applicant records the issued certificate with the Volusia County Clerk of Court. The recording fees are set by the Clerk. The certificate takes effect once it is recorded and a copy is given to the Town. The Town says review should take no longer than 45 days and that staff notify the applicant within five business days if more information is needed.</p>

<p>The submission checklist asks for the latest deed, an affidavit of authorization if the applicant is not the owner, and a property survey. For multi-story structures it asks for floor plans and photographs of all four sides. For properties in a flood zone it asks for the most recent elevation certificate. For homes below base flood elevation, the Town's document states that federal law requires damaged homes to be rebuilt above the floodplain, and that the buildback provisions only guarantee the same footprint, setbacks and floor area. A building already above the 35-foot limit may be rebuilt above 35 feet, measured from the new finished grade above base flood elevation, without losing habitable space. A building not above 35 feet cannot exceed the limit after being raised.</p>

<p>The county lists what to pack for a shelter stay. Items include special dietary food, snacks, water, bedding, ear plugs, extra clothing, medications and medical supplies, toiletries, a flashlight and batteries, and something to pass the time. For people with only minutes to pack, the county lists prescription medications, eyeglasses and dentures, a flashlight, batteries, a radio, a first aid kit, bottled water, a change of clothes, a sleeping bag or bedroll and pillow for each household member, and car keys and keys to the place you may be going.</p>

<p>The county's flood page gives a zone table. Zone AE and A are high risk with a 1 percent annual chance of flooding and base flood elevations established. Zone VE is high risk coastal, with a 1 percent annual chance plus coastal wave action. Zone AH and AO are moderate to high risk, with shallow water, ponding or drainage channels. Shaded Zone X is moderate risk with a 0.2 percent annual chance. Unshaded Zone X is low risk, described as minimal flood risk but not zero. Zone D is unknown. The county adds that flood risk also depends on elevation versus Base Flood Elevation, proximity to water, drainage and ground saturation.</p>

<p>The Town's flood page says that in a special flood hazard area, substantial improvements must meet current Florida Building Code standards and the local floodplain ordinance. It defines them as repairs equal to or greater than 50 percent of the home's market value, not including the value of the property. The page says to get a permit before work and use a licensed contractor, and that an Elevation Certificate will be required and may be on file at your local government office.</p>

<p>The Town also has pages for the period after a storm. Its Hurricane Milton Recovery page lists tree trimming, hiring a contractor, solicitors and getting an owner/builder permit. The Town has separate pages titled FEMA Assistance Hurricane Milton and Small Business Administration Loans. On tree work, the Town's flyer says removing a tree entirely requires a permit, and that no permit fee is charged if the trees are already dead or have caused or are likely to cause damage to buildings or structures. Trimming branches does not require a permit if it is not excessive to the point of killing the tree. A contractor must remove the limbs from the property. Roadside trimmings cannot be greater than three feet in length or weigh more than 40 pounds, and they cannot block the sidewalk or street. For a large debris pile, the flyer says to contact Waste Pro at 386-788-8890.</p>

<p>The Town's contractor flyer advises caution about door-to-door solicitors offering to expedite permits or requesting large upfront payments. Its tips are to hire licensed contractors and verify licenses, get written estimates and check references, ensure contractors have insurance, use a detailed written contract, get guarantees in writing, have work inspected, and make final payments only after satisfactory completion. Unlicensed activity is reported at 386-236-2181. The Town's solicitor flyer says all door-to-door solicitors must have a solicitation permit and background check and carry the original permit. Their hours are between 9:00 a.m. and 6:00 p.m., Monday through Saturday, with no soliciting on Sunday. The Police Department non-emergency line is 386-248-1777.</p>

<p>The Town's owner/builder flyer says owners acting as their own contractor must provide direct on-site supervision. If you pull an owner/builder permit for an unlicensed contractor, you must deduct F.I.C.A. and withholding tax and provide workers' compensation. Without workers' compensation insurance, the flyer says you could be held liable for injuries on your property and not be covered under your homeowners insurance policy.</p>

<p>The Town's Resilient Ponce Inlet page says Town Council adopted a Stormwater Utility on July 16, 2026, and that the Final Adaptation Plan was adopted June 19, 2026. The highest-priority capital projects identified April 9, 2026 are the Stormwater Backflow Prevention Program, the Septic-to-Sewer Conversion Project, South Atlantic Avenue Swale Regrading and Expansion, Store More Water Where We Can, Beach Street Conveyance Upgrades, and Bay Harbour Drive to Beach Street Conveyance Upgrades. The Town will now pursue funding opportunities, including grants. The Watershed Master Plan, approved by FDEP in December 2024, evaluates four types of flooding, stormwater, tidal, storm surge and compound, under current conditions and future projections for 2040, 2070 and 2100.</p>

<h2>State law on roofs, wind discounts and flood disclosure</h2>

<p>Section 553.844 of the Florida Statutes sets roof rules for site-built single-family structures, and the current statutes display it. Subsection (3)(a) says a roof replacement must incorporate secondary water barriers and the strengthening or correcting of roof-decking attachments and fasteners. Subsection (3)(b) applies in the wind-borne debris region. It says that where the insured value is three hundred thousand dollars or more, or the just valuation for taxation if the building is uninsured, a roof replacement must incorporate roof-to-wall connection techniques. Subsection (2)(b)3 says the cost of the roof-to-wall retrofit is intended not to exceed about 15 percent of the reroofing cost. It also says roof-to-wall connections are not required unless the evaluation and installation can be completed for 15 percent of the cost of the roof replacement.</p>

<p>Subsection (3)(c) says that permit-required work applied for on or after July 1, 2008 with an estimated cost of fifty thousand dollars or more must include opening protections as required for new construction in the wind-borne debris region, where the insured value or just valuation is seven hundred fifty thousand dollars or more. Roof covering replacement or repair is excluded from that rule. Subsection (5) says that if a roofing system or roof section was built, repaired or replaced under the 2007 Florida Building Code or a later edition, and 25 percent or more of it is being repaired, replaced or recovered, only the repaired, replaced or recovered portion must be constructed under the code in effect.</p>

<p>Section 627.711 covers wind discounts. Subsection (1) says an insurer shall clearly notify the applicant or policyholder of any personal lines residential property insurance policy, at issuance and at each renewal, of the availability and range of each premium discount, credit, other rate differential or reduction in deductibles for fixtures or construction techniques demonstrated to reduce windstorm loss. Subsection (2)(a) says the uniform mitigation verification inspection form is used by all insurers when submitted by policyholders for wind discounts. An insurer shall accept the form when it is signed by a licensed home inspector who has at least three hours of approved hurricane mitigation training and has passed a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer, a licensed professional architect, or any other individual or entity the insurer recognizes. Subsection (3) says the person signing must inspect the structures personally, not through employees or other persons.</p>

<p>Section 689.302 covers flood disclosure. A seller must complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for damage resulting from floods, and that the buyer is encouraged to discuss separate flood insurance with the buyer's insurance agent. The seller checks three items. The first is knowledge of any flooding that damaged the property during the seller's ownership. The second is whether a flood claim was filed with an insurance provider, including the National Flood Insurance Program. The third is whether the seller received assistance for flood damage, including from the Federal Emergency Management Agency. The statute defines flooding as the overflow of inland or tidal waters, the unusual and rapid accumulation of runoff or surface waters from any established water source such as a river, stream or drainage ditch, or sustained periods of standing water resulting from rainfall.</p>

<p>The county's flood brochure, which the Town links, makes a point about timing. Most flood insurance policies take 30 days to become effective, and some flood insurance policies are transferable when buying and selling a home. The county adds that flood damage is not covered by standard homeowners or renters insurance. The Town lists boathouses, docks and seawalls among permit-required work. See <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/ponce-inlet-waterfront-homes-docks-seawalls-flood-rules">Ponce Inlet Waterfront Homes: Docks, Seawalls, Flood Rules</a>.</p>

<p>Some questions could not be answered from the sources read for this guide. The evacuation level of any Ponce Inlet address, the bridges that serve the Town, the text of the Town's flood ordinance, and which properties sit seaward of the Coastal Construction Control Line were not confirmed.</p>

<p>The bottom line is short. This guide did not read the state or county evacuation maps. Alert Ponce Inlet is the Town's official emergency notification system. FEMA's Map Service Center shows a property's flood zone, and the Building Division at 386-236-2185 takes questions on historical flooding and drainage. The Town lists roofs, windows and storm shutters among permit work. Section 689.302 requires the seller's flood disclosure at or before the time the sales contract is executed. See <a href="http://www.adamscameron.com/ponce-inlet-florida-real-estate-and-homes.html">Ponce Inlet</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>What are the hurricane evacuation levels in Volusia County?</strong></summary>
<p>Volusia County says local officials may order one of three evacuation levels, written A, BC and DE, depending on the track and strength of a threatening hurricane. The county says the levels correspond to the flooding that is likely to occur during a hurricane. The State of Florida's Know Your Zone page uses zones A to F and says Zone A is typically the most vulnerable and the most likely to evacuate first. The state also says not all evacuation zones are always ordered.</p>
</details>
<details>
<summary><strong>How do I get emergency alerts for a Ponce Inlet address?</strong></summary>
<p>Register for Alert Ponce Inlet, the Town's official emergency notification system, powered by Everbridge. The Town says it will no longer be using Code Red as of September 30, 2026. You choose text messages, email, landline calls or mobile calls, and you pick a primary contact method. If an alert is not acknowledged, the system keeps trying your other selected methods until it is acknowledged. For help signing up, the Town lists the Fire Department Office Manager at 386-322-6720.</p>
</details>
<details>
<summary><strong>Can I make emergency repairs right away after a storm?</strong></summary>
<p>The Town says emergency repairs can be performed immediately. Its examples are loss of electrical power, loss of air-conditioning and heat, and roof leaks caused by acts of nature. The owner or contractor must contact the Building Permit Department the next business day and must apply for a building permit within one business day after the repair. The repair must comply with the applicable codes, and the inspections must be performed and passed. The Building and Permitting Division is at 386-236-2181 or 386-236-2182.</p>
</details>
<details>
<summary><strong>What is the Ponce Inlet Residential Post-Disaster Buildback Program?</strong></summary>
<p>It is an optional registration. The Town's frequently asked questions document says it lets lawfully permitted, non-conforming residential structures damaged by a terrorist act, accidental fire or natural disaster be reconstructed, and that it guarantees the right to rebuild the home the same way it was built. The Town charges no fee. The applicant records the issued certificate with the Volusia County Clerk of Court. The Town's documents are marked Revised 2017. Planning and Development is at 386-236-2181.</p>
</details>
<details>
<summary><strong>What does the buildback document say about homes below base flood elevation?</strong></summary>
<p>The Town's document states that federal law requires damaged homes to be rebuilt above the floodplain, and that the buildback provisions only guarantee the same footprint, setbacks and floor area. A building already above the 35-foot limit may be rebuilt above 35 feet, measured from the new finished grade above base flood elevation, without losing habitable space. A building that is not above 35 feet cannot exceed the limit after being raised.</p>
</details>
<details>
<summary><strong>What does the Florida flood disclosure ask a seller?</strong></summary>
<p>Section 689.302 of the Florida Statutes requires the seller to complete and provide a flood disclosure at or before the time the sales contract is executed. The seller checks whether the seller has knowledge of any flooding that damaged the property during the seller's ownership, whether a flood claim was filed with an insurance provider, including the National Flood Insurance Program, and whether the seller received assistance for flood damage, including from the Federal Emergency Management Agency. The form also states that homeowners' insurance policies do not include coverage for damage resulting from floods.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 15:00:03 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-ponce-inlet-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Palm Coast New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/palm-coast-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>A new home in Palm Coast gets a permit review that the city says usually takes 5 business days, and it ends with a certificate of occupancy that the city's new builder Q&A says is issued automatically overnight once the listed items are complete. This guide lays out what the City of Palm Coast itself says about permits, fees and the certificate of occupancy for a single-family house in <a href="http://www.adamscameron.com/palm-coast-florida-real-estate-and-homes.html">Palm Coast</a>.</p>

<p>This is a local guide. It stays inside the City of Palm Coast in Flagler County. It names no builders and quotes no home prices. It gives one fee figure, forty dollars for a re-inspection or a revision, from the city's new builder Q&A, stamped 9/2020 (called the Q&A below), and no impact fee or water and sewer amounts. The city's fee documents are dated, and the ones we found have changed since they were written. The article names the fees the city lists and says when each falls due. The city's own pages are the source for the process, and Florida Statutes are the source for the state rules at the end. Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/is-palm-coast-a-good-place-to-live-an-honest-look-for-buyers">Is Palm Coast a Good Place to Live? An Honest Look for Buyers</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a>.</p>

<h2>How a Palm Coast permit works before the first shovel</h2>

<p>The city's Building Services contact can be reached at 386-986-3780 or at Buildingdivision@palmcoastgov.com. The city's permit portal page lists the City of Palm Coast at 160 Lake Avenue, Palm Coast, FL 32164, with office hours Monday through Friday, 8 a.m. to 5 p.m.</p>

<p>The city's Building page cites Florida Building Code section 105.1. As the city puts it, that section requires anyone who undertakes construction, enlargement, alteration, repair, moving, demolition or change of occupancy of a building to first obtain the necessary permits from the building official. The same section covers installing, altering or replacing an electrical, gas, mechanical or plumbing system. Section 553.79(1)(a) of the Florida Statutes makes it unlawful to construct, erect, alter, modify, repair or demolish any building in the state without first obtaining a permit from the appropriate enforcing agency, upon payment of the reasonable fees that agency adopts.</p>

<p>Palm Coast runs its permits through an online portal. The city's Single Family Residence entry says the permit must be submitted through the city's online permitting process. The portal page lists what a user can do there. A registered user can submit permit applications, view plan reviews and comments, submit corrections and revisions, pay fees, print documents, the job card and the permit, schedule inspections and view the results. The portal also takes the notice of commencement, roofing affidavits and termite certificates. The portal also lets users view permits by address.</p>

<p>The city's page says the progress of a project can be followed on the website.</p>

<p>Who can apply? The city's page says that to make application for a permit you must be registered in the city's database. The city offers a contractor registration form, and it says its contractor database can be searched to see whether a contractor is registered. Once registered, a contractor can create an account for the online permitting system.</p>

<p>On the question of which approvals are needed before applying, the Q&A says: "There are no prior approvals needed." The submittal itself brings in other departments. The Q&A lists Building, Electrical, Mechanical, Plumbing, Fire, Planning and Zoning, Utility, Engineering and Stormwater, and Environmental, among others. All agencies review the submittal at the same time and electronically.</p>

<p>The Q&A describes what comes out of that review. The locates for the water and sewer hook-up are identified on the survey. The water and sewer capacity and impact fees are determined. A swale and culvert diagram is designed. The Q&A adds that if the information needed to design the swale and culvert is not on file, the swale design is provided later through the online portal. The city's Single Family Residence entry gives a time for that. If a swale plan is required, it will be provided within 2 months following issuance of the building permit and will be available online.</p>

<p>The city's page says the processing time for the permit is usually 5 business days. If additional information is required, the applicant receives an email with the details. The city says revisions may be submitted once all outstanding reviews are completed. It does not accept submittals during an open review cycle. Communication runs by automated email, and the city's page says to verify the city has your correct email address on file.</p>

<p>One permit covers the trades. The Q&A says sub-contractors do not need separate permits. Mechanical, electrical, plumbing and roofing sub-contractors are identified on the one permit, and the fees and inspections are all inclusive on that permit.</p>

<h2>What goes into the application for a single-family house</h2>

<p>The city's Single Family Residence entry lists what is required to apply.</p>

<p>The first group is the plans. The list names the permit application generated through the portal and signed and sealed construction drawings. It names an engineered truss or roof framing plan signed and sealed by the home's design engineer. The city says roof framing may be a deferred submittal, with a request on letterhead. Plans submitted electronically must be sealed with a digital signature, and the city says it will not accept photocopies of a signed and sealed document.</p>

<p>The second group is the product and energy paperwork. The list calls for a product approval specification sheet, electrical load calculations, a color and material sheet, and energy calculations. The front page of the energy calculations, with the preparer's signature and Florida seal, is uploaded as a separate document. A roofing worksheet and a paver driveway detail sheet are also on the list.</p>

<p>The third group is the lot. The list asks for a geotechnical investigation report, and the city says that report is not required for new private subdivisions. It asks for proof of ownership, either a recorded deed or a property appraiser printout. A construction lien law affidavit signed by the property owner is on the list, and the city says it is not required if the contractor is the property owner. There is an application for water and sewer. If the property is within an A zone, an elevation certificate is on the list.</p>

<p>The fourth group is the site documents. The city names a locate survey or site plan, and says a separate site plan is submitted for the utility review. That separate plan is required for scattered lots. The list also names a site plan, a survey, and a grading and drainage plan prepared by a Florida licensed professional engineer. The plan is prepared by an engineer, not a surveyor. A BMP pre-construction form, a landscape plan and a topographic survey complete the group. On a saltwater canal lot, the city adds that a grade elevation profile drawing is required.</p>

<p>The notice of commencement is the last item. The city's page says it is required for any improvement greater than five thousand dollars. It is filled out and recorded with the Flagler County Clerk's office in Bunnell. The city says it is not required at permit issuance but is required prior to any inspections. The city's checklist asks for a certified copy of the notice of commencement.</p>

<p>The landscape plan has numbers in it. The city's page says residential homes provide a foundation planting of 16 shrubs on interior lots, with eight in front of the home and four on each side. For trees, the city's page says one tree is required for every 2500 square feet, with calculations rounded to the nearest whole number. Existing trees must be within the property lines to get credit. Palms may be substituted for canopy trees, but the city says they may make up no more than 50 percent of the tree requirement. The city refers readers to its Technical Manual for landscaping requirements.</p>

<p>Two site conditions get their own handling. The first is the PEP tank. The Q&A describes a PEP tank as a pre-treatment effluent pumping system. It accounts for half of the wastewater collection system, with the other half being gravity sewer. The Q&A says it is similar to a septic tank, but instead of an on-site drain field the gray water is pumped into the wastewater collection system. The city installs the PEP tank, and the city owns and operates it. The Q&A lists the sections of Palm Coast with PEP tanks as 23, 26, 28, 29, 30, 31, 33, 34, 35, 37, 59, 60, 63, 64 and 65, and it points to a city PEP tank map. The Q&A says the City of Palm Coast supplies water and sewer. The Q&A says that only in very rare cases would a piece of property require a septic system.</p>

<p>The city's Single Family Residence entry says that if the lot requires a PEP tank, the electrical panel must be located on the side of the home where the PEP tank is indicated. A revision is not required if the proposed panel is on the opposite side. The city says that can be a change made in the field without paperwork approval. The Q&A says the tank can be requested when the home is at the finished framing stage, through the permitting system. The tank site must be clear of construction debris such as dumpsters, porta-lets and temporary power poles. Trees cannot be located within the tank site, and a clean-out must be installed on the sewer stub-out by the house as a reference point.</p>

<p>The second condition is gopher tortoises. The Q&A says that if a site has been identified as a possible location for gopher tortoises, a field inspection is conducted during the permit review. If no gopher tortoise or burrows are found, the inspection is approved and the permit may be issued. If tortoises or burrows are found, the Q&A says it is the contractor's responsibility to hire a private authorized gopher tortoise agent to start permitting and relocation.</p>

<p>The Q&A also sets a rule on timing for clearing. It says you cannot begin to clear or remove any trees until the building permit for the home has been issued. Erosion control measures are required to be in place.</p>

<p>The Q&A says the city uses a swale system. Swales are the broad, shallow channels along roads, driveways and parking lots, designed to keep water off the road, and the Q&A calls them a key part of the stormwater drainage system. The city's Technical Manual gives the design standards for a lot. The Q&A says the permit is made ready prior to the swale design so that construction can begin, and the swale sheet is uploaded for download before that part of the construction.</p>

<h2>Impact fees and the other fees, and when each one is due</h2>

<p>The Q&A says no fees are due at the time of permit submittal. All fees are collected at the time of permit issuance.</p>

<p>Impact fees have their own rule. The Q&A says the transportation, fire and parks impact fees may be waived until issuance of the certificate of occupancy. When they are paid at permit issuance, the Q&A says a 3 percent discount is given. It also says the applicant needs to tell the city if they choose not to pay at permit issuance.</p>

<p>Which impact fees exist? The city's Summary of Application and Impact Fees, which carries the line "Updated November 17, 2022," lists six under its Type 1 heading. They are the park system impact fee, the fire and rescue system impact fee, the educational facilities impact fee, the Flagler County library impact fee, the transportation impact fee, and the Flagler County law enforcement and emergency medical service impact fee. The summary lists the park and fire fees per dwelling unit. It lists the educational facilities fee by housing type, with single family and duplex, multi-family and mobile home each shown separately. The summary says the library fee and the law enforcement and emergency medical service fee are collected on behalf of Flagler County.</p>

<p>A Contractors Newsflash dated September 12, 2024 says the Fire and Parks impact fees increase for permits applied for on or after October 1, 2024. A Contractors Newsflash dated September 12, 2024 says the fire and parks impact fees increase for new residential and commercial construction, effective for permits applied for on or after October 1, 2024. This guide does not repeat any fee amount from the 2022 summary. Building Services can be reached at 386-986-3780.</p>

<p>Building permit fees are a separate group. The Q&A says each permit is assessed an administrative fee, a plan review fee and inspection fees. Additional fees may include zoning, stormwater and engineering fees, and state surcharges. The city has a fee calculator that gives an estimate. The Q&A says the calculator excludes impact fees and water and sewer fees.</p>

<p>A second Contractors Newsflash, dated July 23, 2025, says that effective October 1, 2025, building permitting fees will remove the current reduction adjustment from the base fee of 10 percent. The city says the fee schedule was adopted by City Council in 2021 and that the budget and fee schedule are monitored regularly.</p>

<p>Re-inspections and revisions are each charged forty dollars. The city's page and the Q&A, stamped 9/2020, both say re-inspections and revisions are each charged forty dollars. The page says the re-inspection fees do not have to be paid during construction. The Q&A says the re-inspection and revision fees are due prior to the issuance of the certificate of occupancy.</p>

<p>Water and sewer connection is its own schedule. The city's page says water and sewer fees will be collected at the time of permit issuance, and the application for water and sewer is part of the required documents. The Q&A says the Customer Service Department determines the connection fees for the particular lot during the review. It says an amount can be requested before permitting through an online request. The contact the Q&A gives for water and sewer capacity fees is Customer Service at 386-986-2360.</p>

<p>The 2022 summary describes what a single-family connection schedule includes. It lists a contribution in aid of construction for water and for sewer, main extension fees, and installation fees. The installation fees include the water tap, meter installation, sewer connection inspection, meter deposit and turn on fee. Optional irrigation meter fees are listed separately. The summary's note says the schedule is for single-family platted lots where water and sewer mains have been installed and service is available. It says that for unplatted lots, reserve parcels or undeveloped property, additional fees or main extensions will be required.</p>

<p>The Q&A says the utility application has a box to check for a second meter for irrigation. The fees are determined during the review. The water meter itself is requested through the permitting system once the permit is issued. The Q&A lists the requirements: the permit issued, the lot cleared, vegetation cleared in a 5 foot diameter around both front survey pins, and obstructions removed. If a secondary irrigation meter has been requested, the Q&A says the domestic and irrigation meter are installed at the same time.</p>

<h2>Inspections, surveys and the certificate of occupancy</h2>

<p>The city's page says the permit remains active for six months from the date of issuance, and then for six months from each passing inspection. If the permit expires without the required inspections, the page says a new permit will be required.</p>

<p>The Q&A explains how inspections are requested. They can be scheduled around the clock through the online portal or through the automated phone line at 386-986-4747. Inspections requested by 7:00 a.m. are done the same day. Anything requested after 7:00 a.m. is done the following day. When an inspector is assigned, the Q&A says an automatic email gives the inspector's name and phone number, and the inspector can provide a two hour time frame.</p>

<p>Several inspections are named in the Q&A. An early power inspection is automatically added to the list. A temporary power pole inspection is optional. When the electric inspection is completed, an automatic email is sent to Florida Power and Light. A cross connection inspection is required for new residential construction. The Q&A says it is meant to ensure that a cross connection to the potable water supply is not present, and it lists reuse and reclaimed water, wells and irrigation lines as examples.</p>

<p>The city's page says a formboard survey must be submitted prior to any vertical construction. The Q&A says the foundation survey is reviewed by Zoning and Engineering. They look at the finished floor elevation, which is compared with the proposed elevation and the minimum requirements. They look at the setbacks from the closest point of the structure to the front, rear and side yard property lines. Once the survey is approved, the Q&A says the inspection area for the foundation survey is released and further inspections can be requested.</p>

<p>The final survey comes at the other end. The city's page says a final survey is required prior to all final inspections. The Q&A says that when it is submitted, staff schedule a final survey inspection and Engineering and Stormwater review it. When it is approved, a field survey inspection is scheduled and the inspector visits the site to verify the grade matches the survey and meets the minimum requirements. The city's page also lists a final lot grading and drainage certification. It is submitted at completion of the home and after installation of all required landscaping, on a city form. It is prepared and signed and sealed by the Florida licensed professional engineer who prepared the lot grading and drainage plan.</p>

<p>Now the certificate of occupancy itself. The city's page lists what is required before it is issued. A termite certificate is required. A Blower Door Test form is required. The page says that prior to the certificate of occupancy, all fees must be paid, and a termite certificate, blower door test and duct leakage report must be submitted.</p>

<p>The Q&A gives the longer list and the timing. It says the certificate of occupancy is issued automatically when these items have been completed: all inspections approved, an approved blower door test submitted, the final termite certificate submitted, all outstanding fees paid, the final elevation certificate submitted and approved if it applies, and any special circumstances specific to the permit resolved. The Q&A says the certificate will be issued automatically overnight when all of that has been met. It adds that you may email or call to request it earlier and the city will issue it manually.</p>

<h2>What Florida law says about builders, deposits, assessment and claims</h2>

<p>Florida law sets the limitation period from the earliest of a temporary certificate of occupancy, a certificate of occupancy, a certificate of completion, or abandonment of construction (for a latent defect, from discovery). Section 95.11(3)(b) of the Florida Statutes covers an action founded on the design, planning or construction of an improvement to real property. The time runs from the date the authority having jurisdiction issues a temporary certificate of occupancy, a certificate of occupancy or a certificate of completion, or the date of abandonment of construction if not completed, whichever date is earliest. For a latent defect, the time runs from discovery. In any event, the action must be commenced within 7 years after that date.</p>

<p>The statute adds two more points. If the construction is performed under a duly issued building permit and a certificate of occupancy has been issued, the correction of defects to completed work or repair of completed work, whether performed under warranty or otherwise, does not extend the time. If the home is used as a model home, the time begins on the recorded deed first transferring title to another party.</p>

<p>Section 558.004 sets a notice step before a lawsuit. Section 558.004(1)(a) says the claimant shall, at least 60 days before filing any action, serve written notice of claim on the contractor, subcontractor, supplier or design professional, as applicable. For an action involving an association representing more than 20 parcels, the statute says at least 120 days.</p>

<p>Section 553.835(4) limits one kind of claim. It says there is no cause of action based on the doctrine of implied warranty of fitness and merchantability or habitability for damages to offsite improvements. The section does not alter or limit other causes of action based on contract, tort or statute. Its list of offsite improvements includes a street, road, driveway, sidewalk, drainage, utilities, or any other improvement or structure located on or under the lot that does not immediately and directly support the fitness, merchantability or habitability of the home itself.</p>

<p>Deposits have a rule too. Section 501.1375(2) says that in a contract between a building contractor or developer and a prospective buyer of a one-family or two-family residential dwelling unit, the buyer must be notified that any deposit, up to 10 percent of the purchase price, shall be deposited in an escrow account unless the buyer waives that in writing. The contract must carry a conspicuous legend saying so. The statute excludes a person who sells or constructs fewer than 10 units per year statewide. It defines default as the buyer's failure to close after issuance of the certificate of occupancy, or the buyer's failure to comply with other obligations under the purchase contract.</p>

<p>The same section lets a builder use escrowed money for construction. Subsection (4) says that after notification to the buyer, the builder acquires a surety bond payable to the buyer in the amount of the escrow deposit, if one is readily available. After that, the escrowed funds are released to the builder for construction purposes only. Subsection (5) says a master surety bond is an alternative.</p>

<p>Section 192.042(1) says real property is assessed on January 1 of each year. It says improvements or portions not substantially completed on January 1 shall have no value placed on them. The statute defines substantially completed as meaning that the improvement, or some self-sufficient unit within it, can be used for the purpose for which it was constructed.</p>

<p>The Q&A also says the city uses the latest edition of the Florida Building Code and, as of its 9/2020 stamp, has no local amendments.</p>

<h2>Bottom line</h2>

<p>The city's page says the permit review usually takes 5 business days. The Q&A says no fees are due at permit submittal and all fees are collected at permit issuance, and that the transportation, fire and parks impact fees may be waived until issuance of the certificate of occupancy, with a 3 percent discount when paid at permit issuance. The Q&A says the certificate of occupancy is issued automatically overnight once the listed items are complete. Building Services can be reached at 386-986-3780. This guide covers a single-family house in <a href="http://www.adamscameron.com/palm-coast-florida-real-estate-and-homes.html">Palm Coast</a>.</p>

<p>The questions below restate what the city's pages and the statutes say.</p>
<h2>Frequently Asked Questions</h2>
  <details>
    <summary><strong>How long does the City of Palm Coast take to review a new single-family permit?</strong></summary>
    <p>The city's Single Family Residence entry says the processing time for the permit is usually 5 business days. If additional information is required, the applicant receives an email with the details. The city says revisions may be submitted once all outstanding reviews are completed, and it does not accept submittals during an open review cycle. Communication runs by automated email, so the city's page says to verify the city has your correct email address on file.</p>
  </details>
  <details>
    <summary><strong>When are impact fees due on a new Palm Coast home?</strong></summary>
    <p>The city's new builder Q&A, stamped 9/2020, says no fees are due at permit submittal and all fees are collected at permit issuance. It says the transportation, fire and parks impact fees may be waived until issuance of the certificate of occupancy, and that a 3 percent discount is given when they are paid at permit issuance. The applicant must tell the city if they choose not to pay at permit issuance. A Contractors Newsflash dated September 12, 2024 says the fire and parks fees increase for permits applied for on or after October 1, 2024.</p>
  </details>
  <details>
    <summary><strong>What has to happen before Palm Coast issues the certificate of occupancy?</strong></summary>
    <p>The city's Q&A lists these items: all inspections approved, an approved blower door test submitted, the final termite certificate submitted, all outstanding fees paid, the final elevation certificate submitted and approved if it applies, and any special circumstances for the permit resolved. The city's Building page also lists a duct leakage report. The Q&A says the certificate is issued automatically overnight when the criteria are met, and that you may email or call to request it earlier and the city will issue it manually.</p>
  </details>
  <details>
    <summary><strong>Which Palm Coast sections have PEP tanks?</strong></summary>
    <p>The city's Q&A describes a PEP tank as a pre-treatment effluent pumping system. It is similar to a septic tank, but instead of an on-site drain field the gray water is pumped into the wastewater collection system. The city installs it, and the city owns and operates it. The Q&A lists the sections of Palm Coast with PEP tanks as 23, 26, 28, 29, 30, 31, 33, 34, 35, 37, 59, 60, 63, 64 and 65. If the lot requires one, the city's page says the electrical panel must be on the side of the home where the tank is indicated.</p>
  </details>
  <details>
    <summary><strong>How long does a Palm Coast building permit stay active?</strong></summary>
    <p>The city's Single Family Residence entry says the permit remains active for six months from the date of issuance, and then for six months from each passing inspection. If the permit expires without the required inspections, the city's page says a new permit will be required.</p>
  </details>
  <details>
    <summary><strong>Does a Florida builder have to put my deposit in escrow?</strong></summary>
    <p>Section 501.1375(2) of the Florida Statutes says that in a contract between a building contractor or developer and a prospective buyer of a one-family or two-family residential dwelling unit, the buyer must be notified that any deposit, up to 10 percent of the purchase price, shall be deposited in an escrow account unless the buyer waives that in writing. The contract must carry a conspicuous legend. The statute excludes a person who sells or constructs fewer than 10 units per year statewide.</p>
  </details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:59:46 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/palm-coast-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Moving to Palm Coast: Utilities, Trash and Permits for Month One]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/moving-to-palm-coast-utilities-trash-and-permits-for-month-one]]>
        </link>
        <description>
            <![CDATA[<p>Palm Coast takes new utility service through an online application, and the city says you must be signed in to an account before you can apply. The City Hall main line is 386-986-2360, Monday to Friday, 8 a.m. to 5 p.m. This guide covers who sets up your water and trash in <a href="http://www.adamscameron.com/palm-coast-florida-real-estate-and-homes.html">Palm Coast</a>, which days the trucks run, what the water shortage order says about sprinklers and which projects need a permit.</p>

<p>Everything below was read on October 28, 2026 from the City of Palm Coast's own web pages. It states only a few fees, taken from the city's service fee sheet. It leaves out utility rates because the Utility Rates page could not be found when it was read, and it leaves out deposit amounts because no page read for this guide stated one. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/is-palm-coast-a-good-place-to-live-an-honest-look-for-buyers">Is Palm Coast a Good Place to Live? An Honest Look for Buyers</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-property-tax-bill-line-by-line">Palm Coast Property Tax Bill, Line by Line</a>.</p>

<h2>Setting up city water, sewer and trash</h2>

<p>Palm Coast Utilities provides drinking water, wastewater treatment and reclaimed water for the community. The city's Customer Service page describes new utility service as setting up water, sewer and trash, and it says you can also cancel service or transfer service. The same page carries a card for a utility payoff request, which it ties to people ready to build a new home. The city says all of those requests will be returned within 2 business days.</p>

<p>The application itself lives on the city's New Service Application page. That page says you can request new service, turn off service, or apply for a 72 hour inspection. It also states "You must be signed in to apply for new service" and offers two buttons, one to create an account and one to sign in. The city adds that the same account can be used to create and monitor cases and to view utility information.</p>

<p>The city's fee sheet lists a transfer fee of twenty-five dollars and describes it as a fee applied for new accounts, account changes or transfers, to cover administrative costs. It lists a lien search fee of thirty dollars and describes it as the administrative fee to ensure all city fees are reported correctly. It also lists a late fee equal to 1.5 percent of the bill or ten dollars, whichever is greater. The sheet also lists other charges, including a premise visit fee and a meter testing charge.</p>

<p>Deposits follow a rule the city states in two places. Deposits are held on file for 23 months. If you have no late fees within the last two years, you may request your deposit returned or applied to your utility bill. If you move out of the property, the deposit is applied automatically to your final bill, and if a credit is showing, a check is mailed to you. To make the request, you complete a case through the city's Palm Coast Connect site at palmcoast.gov/connect. The pages read for this guide do not state what a deposit costs.</p>

<p>The city offers a one-time leak credit and says your consumption needs to be four times higher to be eligible. It also offers a one-time pool credit.</p>

<p>Paying the bill has several routes, and the cost of each is posted. AutoPay needs an account with a zero balance, begins with your next billing cycle, and needs your full account number and registration through the secure customer portal. A checking account draft has no processing fee. A credit card draft carries a processing fee of one dollar and ninety-five cents per month when the payment is drafted. You can also pay by phone at 386-986-2360, which the city says is available 24/7 through an automated system, using a bank account, credit card or debit card. Or you can pay through your bank's bill pay service, giving your full account number and the mailing address, City Hall, 160 Lake Avenue, Palm Coast, FL 32164. A one-time payment needs only the full account number.</p>

<p>The city's fee structure effective June 1, 2025 lists the rest. Online utility payments by credit card, debit card or digital wallet cost one dollar and ninety-five cents per transaction. Online payments from a checking account through ACH or eCheck cost forty-three cents per transaction. An in-person credit or debit payment at Customer Service carries a fee of 3.5 percent with a minimum of two dollars and fifty cents. The city lists no service fees for cash, personal or company checks, money orders, or bill pay started through your bank. It says the card fees are charged by third-party payment processors and passed through at cost.</p>

<p>The city's Customer Service page says that only residents within the City of Palm Coast limits receive trash services. The same page links to Utility Service Rates Inside City Limits and Utility Service Rates Outside City Limits.</p>

<h2>Trash, recycling and yard waste: the weekly pattern</h2>

<p>The City of Palm Coast contracts with FCC Environmental for garbage collection, recycling, yard waste, bulk trash and white goods removal. The city says items for collection must be placed in the collection area, within five feet of the driveway.</p>

<p>The garbage page has a street lookup for the collection schedule. On the city's Garbage Collection page, you enter your street name without the house number. The page says to try it without the suffix if needed, for example "Eric" instead of "Eric Trail". The page also links a 2026 holiday schedule and a link labeled "My garbage didn't get picked up?".</p>

<p>Residents have two service collection dates each week. Service day one collects normal household waste. Service day two collects normal waste and bulk items less than three cubic yards. The city says trash receptacles are purchased by the resident. A container should be between 10 and 35 gallons and should not exceed 60 pounds at the time of removal. Up to four receptacles may be set out on your service day, and bagged items must be placed in cans.</p>

<p>Timing is set by Palm Coast Code Chapter 41, as the city's garbage page describes it. Waste containers may be placed out no earlier than 6:00 PM on the day before a scheduled collection day. They must be removed no later than 6:00 AM on the day after the containers are emptied. Except when placed for collection, containers must be screened from the right-of-way. The same page states that no littering or debris disposal is allowed on private or public property.</p>

<p>Recycling is single-stream and collected weekly. The city says cans and bottles should be rinsed out thoroughly to prevent contamination, and that only recyclable items may go in the recycle bin. FCC takes all the recycling it collects to GEL Recycling. The city also cautions that an item listed as recyclable is not always accepted and that certain steps may be required for certain items. A new resident can ask for an initial bin through a New Resident Recycling Bin Request on the city's garbage page.</p>

<p>Yard waste has its own rhythm. It is collected curbside each Wednesday. It must be tied in a bundle, neatly stacked, or placed in a can or bag. No piece may exceed five feet in length or six inches in diameter, and no can or bag may exceed fifty pounds. The total accumulation should not exceed two cubic yards. If the amount is over the limits, you receive a tag and pay the hauler directly to have it picked up. The city also says that under city ordinance, waste generated by a contractor, including a lawn service or tree trimmer, must be removed by the contractor at their own expense.</p>

<p>Bulk trash can include furniture, mattresses, televisions, dishwashers, stoves, washers and dryers. It is picked up weekly on your second trash day, and the city asks you to keep it to three cubic yards. White goods such as refrigerators and hot water heaters go curbside too. Refrigerator and freezer doors must be removed. The city says to allow one to five days for pickup and to call Customer Service for arrangements, and the garbage page also links Schedule White Goods Pick-Up.</p>

<p>On hazardous waste, the city's garbage page says the Flagler County Recycling and Household Hazardous Waste drop-off site has closed. Flagler County is telling residents to safely store any hazardous materials until an amnesty day. The first amnesty day is anticipated to occur in January 2027.</p>

<h2>Water: sprinklers, the tap and the meter</h2>

<p>In a notice dated Friday, May 15, 2026, the City of Palm Coast reported that the St. Johns River Water Management District had issued a Phase III Extreme Water Shortage Order affecting Flagler County. Under that order, landscape irrigation is limited to one day per week by address, for all water users including private well users. Odd-numbered addresses water on Saturday. Even-numbered addresses water on Sunday. Non-residential properties water on Tuesday. Irrigation is prohibited between 8 a.m. and 6 p.m.</p>

<p>The notice lists exceptions and extras. Residents with a retail reclaimed meter are not impacted. The District also limited what the city calls aesthetic water uses, such as pressure washing and washing vehicles, boats and mobile equipment. The city said additional restrictions could be implemented if conditions worsen. The city's Customer Service page, read on October 28, still carried a banner saying the District had implemented Phase III restrictions limiting landscape irrigation to one day per week across Flagler County. The District's site could not be read for this guide.</p>

<p>The city also publishes plain facts about the water itself. Its FAQ says the city uses two treatment processes. Water Treatment Plant 1 is a conventional lime softening facility, fed by shallow aquifer wells that average 60 to 90 feet in depth. Water Plants 2 and 3 are nanofiltration plants, which the city describes as membrane softening. The average hardness is about 100 milligrams per liter, which the city says is about 6 grains per gallon. The city does not add fluoride, and the fluoride naturally present averages about 0.061 milligrams per liter. For disinfection, the city says it uses monochloramine and not chlorine.</p>

<p>The city's FAQ says chlorine and chloramines are toxic to fish, and it includes turtles, reptiles and amphibians in that warning. The disinfectant must be removed before adding water to fishbowls and aquariums. The FAQ says to check that a neutralizing product lists both chloramines and chlorine.</p>

<p>The city says a precautionary boil water notice, delivered as a green tag on your door, follows a loss of pressure from a main break or another issue. Analysis of water samples usually takes around 24 to 48 hours. When the water is safe, the city notifies customers with a rescind notice. If the advisory continues beyond 48 hours, a new door tag is issued. The city's utility page offers boil water notices.</p>

<p>According to the city's FAQ, the property owner or resident is responsible for all on-site water lines beginning at the discharge side, the point of delivery, of the domestic and irrigation backflow preventer when one is present, or of the domestic and irrigation meter. A water softener or whole-house filter inside the home is the customer's responsibility as well. The FAQ says a home treatment unit that is not maintained properly can allow bacteria to grow in the unit.</p>

<p>To report a concern or create a case, the city points you to Palm Coast Connect. Useful numbers from the city's quick contact list are Customer Service at 386-986-2360, Animal Control at 386-986-2520, Building Services at 386-986-3780 and Code Compliance at 386-986-3764. Also see <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-flood-zones-what-to-check-before-an-offer">Palm Coast Flood Zones: What to Check Before an Offer</a>.</p>

<h2>Permits for projects on the property</h2>

<p>Florida Building Code 105.1, as the city's Building Services page quotes it, says anyone undertaking construction, enlargement, alteration, repair, moving, demolition or change of occupancy of a building or structure must first obtain the necessary permits from the building official. The same section covers installing, altering, repairing, removing, converting or replacing any electrical, gas, mechanical or plumbing system. The city says this includes additions, alterations, re-roofs and even some repairs. Building Services is at 386-986-3780 and Buildingdivision@palmcoastgov.com.</p>

<p>The city's permit pages describe an online permitting portal, used for inspections. Roof permits can be submitted through the portal or in person. Inspections can be scheduled through the portal or by calling the automated inspection system at 386-986-4747. The plan reviewers can be reached at 386-986-3782. Documents printed from the portal must be at the site when the inspector arrives. A permit remains active for six months from the date of issuance, and if it expires without the required inspections, a new permit is required.</p>

<p>On fences, the city says a permit is no longer required to install a fence on residential property, but the property owner must acknowledge the City Land Development Code before proceeding. That route is only for residential zoned properties for one- and two-family dwellings and townhouses. A fence that does not meet the regulations, including height limits, is not eligible and needs a building permit. The route does not apply to walls, and a permit is required for a wall. The owner must complete the online acknowledgement, and the contractor may not do it on the owner's behalf. The city's Zoning Division answers at 386-986-3751. If a property is governed by a homeowners association or has its own architectural regulations, the city says getting that approval is your responsibility, and those rules may be more stringent than the city's code.</p>

<p>Several common projects have their own timing on the city's pages. A water heater permit is issued within 24 hours of application, and the city says a plumbing permit does not include water heaters. A window or door permit is only for replacement where the size does not change and nothing structural is altered, and it is usually ready within 24 hours. Doors and windows must have the Florida Product Approval sticker affixed, and the city says not to remove it before the inspection. A roof permit is usually ready the same or next day, a separate permit is required for new skylights, and the city says a homeowner may not self-certify the roofing affidavit. Same-day roof inspections may be requested up to 6:59 a.m.</p>

<p>For a water heater, the city lists proof of property ownership, which can be a recorded deed or a property appraiser printout, plus a construction lien law affidavit for jobs greater than five thousand dollars. It also lists a notice of commencement, required for any improvement greater than five thousand dollars. The city says the notice is recorded with the Flagler County Clerk's office in Bunnell. It is not required at the time the permit is issued, but it is required before any inspections.</p>

<p>Outdoor projects carry their own lines. The city says a permit is required for all decks in Palm Coast, regardless of area, height above the ground and whether the deck is attached or detached. A deck permit review is usually completed within five business days. Residential accessory structures, which the city lists as pergolas, gazebos, decks and detached patio covers, also require a permit, and the city's design wind speed is 120 miles per hour. A shed greater than 120 square feet has its own permit type, and the city refers shed owners of 120 square feet or less to a separate category. A driveway permit is usually ready in two to five days. If the project requires moving the water meter pit, the city says to contact the Utility Department before applying, and a plumber is required to connect from the private side to the public system, in addition to the relocation cost.</p>

<p>Concrete and pools add a survey step. A non-structural patio or slab permit is usually ready within one day, and a final topographic survey is required for concrete or flat work greater than 300 square feet. A swimming pool permit is usually ready within five days, and a final survey including drainage is required before the final inspection, which the city compares to the approved drainage pattern. The city says no permit is needed for a portable spa and a permit is required for a non-portable spa. It defines a swimming pool as a structure in a residential area intended for swimming or recreational bathing that contains water over 24 inches deep, including hot tubs and non-portable spas.</p>

<p>On the contractor side, the city's pages say applicants for a mechanical permit must be registered in the city's contractor database, and hurricane shutter contractors must be registered too. Residential electrical permits are usually ready in one to three days and plumbing permits in one to two days. A generator permit review is usually completed within five business days. The city's Homeowners Permitting heading reads "Pulling Owner/Builder Permits is Risky Business". It says that if you do not intend to do the work yourself and have been asked by someone without a contractor's license to pull the permit, you are at risk of harm both by penalty and injury. Garage doors must also be approved by the State of Florida through its Product Approval Process, and the approval number should be affixed on the door.</p>

<p>Lot work follows the same pattern. A seawall permit is usually ready in three to five days. On a vacant lot, only a portion of the lot can be cleared, and a pre-clearing inspection is required first. A lot clearing permit is usually ready within one week. Building Services can be reached at 386-986-3780 or Buildingdivision@palmcoastgov.com.</p>

<h2>The bottom line</h2>

<p>The city's New Service Application page says you must be signed in to apply. The city's fee sheet lists a transfer fee of twenty-five dollars. The pages read for this guide do not state a deposit amount. The city's main number is 386-986-2360. The garbage page has a street lookup for the collection schedule, yard waste is collected on Wednesday, and Flagler County is telling residents to store hazardous materials until the amnesty day anticipated in January 2027. The city's May 15, 2026 notice limits landscape irrigation to one day per week, odd-numbered addresses on Saturday and even-numbered addresses on Sunday. Building Services at 386-986-3780 answers building questions. For a driveway that needs the water meter pit moved, the city says to email a proposed site plan to customer-service@palmcoastgov.com, and technical driveway questions go to the Construction Management and Engineering Division at 386-986-3794. For residential one- and two-family dwellings and townhouses, a fence that meets the rules uses the owner's online acknowledgement instead of a permit. A fence that breaks the height or other rules, and any wall, needs a building permit. See also <a href="http://www.adamscameron.com/palm-coast-florida-real-estate-and-homes.html">Palm Coast</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>How do I start water, sewer and trash service in Palm Coast?</strong></summary>
<p>The city's New Service Application page lets you request new service, turn off service or apply for a 72 hour inspection. It states that you must be signed in to apply, and it offers buttons to create an account or sign in. The Customer Service page describes the service as water, sewer and trash, and it says you can also cancel or transfer service. The City Hall main line is 386-986-2360, Monday to Friday, 8 a.m. to 5 p.m. The city's fee sheet lists a transfer fee of twenty-five dollars for new accounts, account changes or transfers.</p>
</details>
<details>
<summary><strong>What is the weekly trash schedule in Palm Coast?</strong></summary>
<p>Residents have two service collection dates each week. Service day one collects normal household waste. Service day two collects normal waste and bulk items less than three cubic yards. Recycling is single-stream and collected weekly. Yard waste is collected curbside each Wednesday. To find your days, use the city's Garbage Collection page and enter your street name without the house number. The city says to try it without the suffix if needed, for example Eric instead of Eric Trail. FCC Environmental is the city's contracted hauler.</p>
</details>
<details>
<summary><strong>When can I put my trash cans out in Palm Coast?</strong></summary>
<p>The city's garbage page describes Palm Coast Code Chapter 41 this way: waste containers may be placed out no earlier than 6:00 PM on the day before a scheduled collection day. They must be removed no later than 6:00 AM on the day after the containers are emptied. Except when placed for collection, containers must be screened from the right-of-way. The city also says up to four receptacles may be set out on your service day, and each container should be between 10 and 35 gallons.</p>
</details>
<details>
<summary><strong>What are the sprinkler rules in Palm Coast right now?</strong></summary>
<p>In a notice dated May 15, 2026, the city reported a Phase III Extreme Water Shortage Order from the St. Johns River Water Management District affecting Flagler County. Landscape irrigation is limited to one day per week. Odd-numbered addresses water on Saturday, even-numbered addresses on Sunday and non-residential properties on Tuesday. Irrigation is prohibited between 8 a.m. and 6 p.m. Residents with a retail reclaimed meter are not impacted. The city said additional restrictions could be implemented if conditions worsen, and its Customer Service page still showed the Phase III banner when this guide was written.</p>
</details>
<details>
<summary><strong>Do I need a permit for a fence in Palm Coast?</strong></summary>
<p>The city says a permit is no longer required to install a fence on residential property, but the property owner must acknowledge the City Land Development Code before proceeding. The route applies to residential zoned properties for one- and two-family dwellings and townhouses. A fence that does not meet the regulations, including height limits, needs a building permit, and a permit is required for a wall. The owner must complete the online process, and the contractor may not do it for the owner. The Zoning Division answers at 386-986-3751. A homeowners association may have stricter rules.</p>
</details>
<details>
<summary><strong>How long do Palm Coast permits take?</strong></summary>
<p>The city's pages give a typical time for each permit type. A water heater permit is issued within 24 hours. A window or door permit is usually ready within 24 hours. Roof permits are usually ready the same or next day. Residential electrical permits usually take one to three days and pool permits usually take five days. Deck permits are usually reviewed within five business days. A permit remains active for six months from issuance. Building Services answers at 386-986-3780, and inspections are scheduled through the portal or at 386-986-4747.</p>
</details>
<details>
<summary><strong>What happens to household hazardous waste in Palm Coast?</strong></summary>
<p>The city's garbage page says the Flagler County Recycling and Household Hazardous Waste drop-off site has closed. Flagler County is telling residents to safely store any hazardous materials until an amnesty day. The first amnesty day is anticipated to occur in January 2027.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:59:30 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/moving-to-palm-coast-utilities-trash-and-permits-for-month-one]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Deltona New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/deltona-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>New construction in Deltona runs through the city's Building Services Division, and the Volusia County impact fee receipt has to be in hand before the certificate of occupancy. The city publishes a Residential New Construction Checklist. This guide walks through what the city and county pages say about which office holds which piece of paper. See also: <a href="http://www.adamscameron.com/deltona-florida-real-estate-and-homes.html">Deltona</a>.</p>

<p>Everything here comes from the City of Deltona's pages, Volusia County's impact fee pages and the Florida Statutes, read on October 28, 2026. The statutes cited are as the city's pages cite them or as read from the state statute text. It names no builders, no neighborhoods and no sale prices.</p>

<p>See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a></p>

<h2>Who permits and inspects a new home in Deltona</h2>

<p>The Building Services Division is at 2345 Providence Boulevard, Deltona, FL 32725. The division page lists the phone numbers 386-878-8650 and 386-878-8660. Its contact box lists hours of Monday through Friday, with in-person service from 8:00 AM to 4:30 PM and phone support from 7:00 AM to 5:00 PM. The introduction on the same page gives 7:00 AM to 5:00 PM for Monday through Friday. The page lists two sets of hours.</p>

<p>The division describes its job this way. It helps residents, contractors and businesses safely build, improve and maintain properties. It provides permitting, plan review and inspections so that projects meet the Florida Building Code, the National Electrical Code and local regulations. Its listed services are building plan review, permit processing, construction inspections and code compliance support.</p>

<p>Section 553.79 of the Florida Statutes says it is unlawful for any person, firm, corporation or governmental entity to construct, erect, alter, modify, repair or demolish any building in the state without first obtaining a permit from the appropriate enforcing agency. The statute allows that agency to charge reasonable fees that it adopts. Deltona's FAQ states the rule for the city. The city's FAQ says a permit is required when the owner or authorized agent intends to construct, enlarge, alter, repair, move, demolish or change occupancy of a building or structure, or to install or change electrical, gas, mechanical or plumbing systems regulated by the Florida Building Code and/or the National Electrical Code. The city says doing work without a permit can lead to fines, failed inspections or having to redo the work.</p>

<p>Permits are handled in an online self-service portal. The division page says you can apply for permits, check application status, upload documents and pay fees and invoices there. It says the portal is available around the clock for permits submitted after July 16, 2019. For visits in person, the division offers a virtual waiting line during business hours. You can join up to 30 minutes before you arrive, and you are notified when it is your turn.</p>

<p>Who can apply for a permit? The city's FAQ names two groups. One is a licensed contractor or the contractor's authorized permit runner. The other is the owner of a non-rented property that will not be for sale or rent for a full year after final inspections, which the city calls an owner-builder and ties to Florida Statute 489.103. The FAQ adds that if you do the work yourself, you are fully responsible for meeting code requirements. The permitting forms page also lists an Owner Builder Disclosure form and a form called Change of Sub-contractor.</p>

<p>The city's FAQ says the current code is the 2023 Florida Building Code, 8th Edition. The state's building commission site says the effective date of that edition is December 31, 2023. The same site lists materials related to a 2026 update. The city's residential checklist names the 2023 8th Edition, the 2020 National Electrical Code and FPC 8th Edition.</p>

<p>Inspections follow their own routine. You schedule them with the city's automated system at 386-575-6900. You need the permit number, the confirmation number and the three-digit inspection IVR number. The city FAQ says most inspections are scheduled for the next business day. On the day of an inspection you can log into the portal, search by permit number or address, and see your assigned inspector and that person's contact information.</p>

<p>The permit card must be posted and visible from the street. The approved plans must be on site. The work must be ready to inspect. The FAQ says that if the inspector cannot see your permit or access the work, it will fail. Inspections are required at different stages of a project, before covering work such as framing or wiring, and at final completion.</p>

<p>Permits also run on a clock. The city says expiration dates are traditionally set 180 days after permit issuance, and that the clock resets on the day of each passed inspection. If a permit expires, you may need to reapply or pay additional fees. On timing, the FAQ says small jobs take a few days and larger projects take several weeks or more because plan review is required.</p>

<h2>What the city's new home checklist asks for at each stage</h2>

<p>Deltona publishes a document called the Residential New Construction Checklist. The permitting forms page lists it as Single Family Residential. The copy read for this guide is marked Revised 1/2024. The checklist says incomplete or emailed applications will not be accepted. It lists permitting@deltonafl.gov and 386-878-8660 as the contact.</p>

<p>The checklist lists items at application, before issuance of the permit and before a certificate of occupancy.</p>

<p>At application, the checklist asks for a signed building permit application that lists subcontractors for each trade. It asks for a non-refundable submittal fee and a plan review fee. It asks for one set of signed and sealed plans, designed by a Florida registered architect or engineer. Separately, the checklist, revised 1/2024, names the 2023 Florida Building Code 8th Edition, the 2020 National Electrical Code and FPC 8th Edition. If trusses are used, it asks for sealed truss engineering and layout. It asks for energy calculations that include Manual J, Manual D and Manual S.</p>

<p>The site documents come next. The checklist asks for a survey of existing conditions, signed and sealed by a Florida licensed surveyor and mapper. It asks for a plot plan of the proposed development. The plot plan must meet the city's Residential Lot Grading and Driveway Design Guidelines. A Wetland Alteration Permit is required when development is within or adjacent to a wetland area. A Tree Removal Permit Application is listed too, or a Certificate of Compliance if no protected trees of 6 inches DBH or larger will be removed within the required zoning yard setbacks.</p>

<p>The remaining application items are product approvals and utilities. The checklist asks for Florida product approvals for windows, mullions, sliding glass doors, the garage door and entry doors. It asks for a septic permit with a soil analysis sheet and a survey showing the septic location, or proof of sanitary sewer. It also asks for a City Right of Way Use Permit for the driveway.</p>

<p>One line on the checklist names roads. If the job site is on a county-maintained road, a Volusia County Use Permit is required. The checklist lists these county roads: Doyle Road, also called CR 4162 and Debary Avenue, Providence Boulevard, Howland Boulevard, Enterprise-Osteen Road, Graves Avenue, Enterprise Road, also called CR 4156, Lake Helen Osteen Road, Lake Shore Drive and Saxon Boulevard.</p>

<p>Before the permit is issued, the checklist adds more. If the lot is in a flood zone, an Elevation Certificate is required with the construction drawings. A copy of the recorded Notice of Commencement is required. The checklist also asks for proof of potable water in the form of the paid water receipt from the water utility company, the Volusia County Impact Fee Application, the permitting fees and the city impact fees. The checklist says the impact fee application "needs to be reviewed and signed by staff here prior to taking to Volusia County".</p>

<p>The checklist also asks for proof of a contract with Waste Pro for solid waste disposal. It states that the City of Deltona has an exclusive contract with Waste Pro for all solid waste disposal and that roll-off dumpsters must be obtained through that company. It lists 386-574-0723 as the contact. On the utility side, the city's water and wastewater utility says the deposit depends on the meter size and the type of service available at the location. The utility's page links a deposit and fee schedule for residential accounts.</p>

<p>The Notice of Commencement deserves its own paragraph. The city's FAQ describes it as a legal document filed with the county for larger projects. It identifies the owner, contractor and lender. The FAQ says Florida Statute 713.13 requires it, that it must be posted at the job site, and that it is effective for one year from the date of recording unless another date is specified. The city's lien law page reproduces section 713.135. That text says the permit card must carry a warning that failing to record a Notice of Commencement may result in paying twice for improvements to the property. It says the notice must be recorded and posted on the site of the improvement before the first inspection. The applicant must file a copy with the issuing authority before the first inspection if the direct contract is greater than five thousand dollars. Without that copy, the authority or a private provider may not perform or approve later inspections. The same paragraph does not require recording before the permit is issued.</p>

<h2>Impact fees, assessments and the certificate of occupancy</h2>

<p>Deltona's own impact fees are set under Chapter 94 of its Code of Ordinances, according to the city's Impact Fees page. That page lists five fees: Fire/Rescue, Park, Complete Streets, Law Enforcement and Municipal. They are charged per 1,000 square feet and vary by land use. Single family, multi-family, retail, office, hotel or motel, institutional and industrial uses each have a row. The page says the schedule does not apply to accessory uses.</p>

<p>Two schedules are posted on that page. One is labeled effective October 1, 2026, and the other effective October 1, 2027. The history line at the bottom of the page ends with Resolution No. 2026-53, dated 9-9-26. In the single family row, all five figures on the 2027 schedule are higher than the matching figures on the 2026 schedule. This guide does not print the amounts.</p>

<p>The city also posts a second page under Building Services, called Impact and Special Assessment Fees. It lists a shorter set of impact fees, including fire and law enforcement fees per square foot, a park fee and a transportation fee. Its figures do not match the Impact Fees page, and it shows no effective date. The article takes no impact fee amounts from it. The same page lists two annual assessments. The Solid Waste Assessment is two hundred sixty dollars annually and the Stormwater assessment is one hundred ninety dollars annually.</p>

<p>Those two assessments are collected through the property tax bill for the fiscal period of October to September. The city page explains the first year this way. When a house is first built, the city charges for the months of service from the date of the certificate of occupancy to the first full billing through the property tax roll. A table on that page gives the amount by the month the certificate of occupancy was issued for residential units, with an amount for each month. A certificate issued in October carries the full annual amount of each, 260.00 for Solid Waste and 190.00 for Stormwater in the table. A certificate issued in September carries 21.66 for Solid Waste and 15.83 for Stormwater. The checklist lists Solid Waste Assessment Fees among the items due before a certificate of occupancy.</p>

<p>Volusia County adds a second set. The county page lists five growth-related impact fees: Transportation for roads, Education for schools, Parks and Recreation, Emergency Medical Services and Fire Rescue. It says they pay for new or expanded county roads and facilities. The city's Impact Fees page states that additional impact fees from Volusia County may apply, and it links to the county's schedule and the county school board's fee schedule.</p>

<p>The county's FAQ, updated January 16, 2026, covers the mechanics for a project inside city limits. An application can go in on the county's Connect Live portal, by email to impactfees@volusia.gov or in person at the DeLand office at 123 W. Indiana Avenue, Room 200. A completed application is uploaded to Connect Live. The county says the bottom of the application must be signed by city staff before it is uploaded. The city checklist says the same thing, that city staff review and sign the form first.</p>

<p>Who pays? The county says an impact fee is assessed and due from anyone who builds a new residence or commercial building or changes the use of an existing building. When is it due? The county says payments are due before the issuance of a certificate of occupancy. You can pay online through Connect Live if you are a registered user and are listed as the applicant on the permit. You can also pay at the Treasury and Billing office in the Historic Courthouse, 125 W. New York Avenue, Room 120, DeLand. The county does not accept partial payments, but it lets you pay each use separately in its entirety. The county's phone number for impact fees is 386-736-5924.</p>

<p>The Building Services Division page also covers requests for certificates of completion. A property owner listed on the permit visits in person with a valid ID. Anyone who is not an owner submits a public records request through the City Clerk. The pages read for this guide do not state a number of days the city takes to issue a certificate.</p>

<p>The checklist's third stage is the list of what must be done before a certificate of occupancy. All required inspections must pass. A Blower Door Test Form must be completed before the final building inspection. The septic final, or the sewer equivalent, must be obtained, and the checklist points to the Volusia County Health Department in DeLand at 386-822-6250 for the result. A final Elevation Certificate is required if the lot is in a flood zone. A final as-built survey showing drainage is required, with a minimum of three elevation shots on each side. Re-inspection fees, the county impact fee receipt, a Sidewalk Fund Fee if the sidewalk is not installed and the Solid Waste Assessment Fees complete the list.</p>

<p>Section 553.791 sets a timetable for the local building official to issue a certificate of occupancy or give notice of incomplete forms. Under it, the local building official has no more than two business days for a single-family or two-family home to issue the certificate or give notice of incomplete forms. That clock starts after the request, the certificate of compliance and approval of all other government approvals required by law, including payment of all outstanding fees. If the official gives no notice in time, the request is automatically granted and deemed issued as of the next business day, and the written certificate is due within 10 days. The Deltona pages read for this guide do not mention a private provider option.</p>

<p>Section 192.042 says real property is assessed on January 1 and that improvements not substantially completed on that date have no value placed on them. It defines substantially completed as the improvement, or some self-sufficient unit within it, being usable for its purpose. Section 95.11(3)(b) sets four years for an action founded on the design, planning or construction of an improvement, running from the earliest of a temporary certificate of occupancy, a certificate of occupancy, a certificate of completion or abandonment of construction. For a latent defect, time runs from when the defect was or should have been discovered. In any event the action must start within 7 years of that earliest date.</p>

<p>Chapter 558 adds a notice step. Section 558.004 says a claimant must serve written notice of claim at least 60 days before filing an action over a construction defect, and at least 120 days for an association representing more than 20 parcels. It also says that notice does not toll any statute of repose period under chapter 95. Section 553.835 says there is no implied warranty cause of action for damages to offsite improvements, and it leaves contract, tort and statutory claims in place.</p>

<p>Deposits have their own statute. Section 501.1375 says a builder or developer of one-family or two-family homes must tell the buyer that any deposit, up to 10 percent of the purchase price, will be held in escrow unless the buyer waives that in writing. The contract must carry a conspicuous legend. The statute defines default as the buyer's failure to close after issuance of the certificate of occupancy, or failure to comply with other buyer obligations. It applies to a builder or developer who sells or constructs 10 or more units a year statewide.</p>

<p>See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-flood-zones-flood-insurance-check-an-address">Deltona Flood Zones and Flood Insurance: Check an Address</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deltona-septic-vs-sewer-what-buyers-must-check">Deltona Septic vs Sewer: What Buyers Must Check</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/your-deltona-property-tax-bill-line-by-line-2026">Your Deltona Property Tax Bill Line by Line (2026)</a>.</p>

<h2>The bottom line</h2>

<p>A new home in Deltona is permitted by the city, charged impact fees by the city and the county, and closed out with a certificate of occupancy. The city's Residential New Construction Checklist lists what is due at application, before the permit and before the certificate. The county says its impact fees are due before the certificate. The city posts two impact fee pages whose figures do not match. Section 95.11(3)(b) runs from the earliest of a temporary certificate of occupancy, a certificate of occupancy, a certificate of completion or abandonment. See also: <a href="http://www.adamscameron.com/deltona-florida-real-estate-and-homes.html">Deltona</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deltona-fl-neighborhoods-costs-and-what-to-know">Living in Deltona, FL: Neighborhoods, Costs and What to Know</a>.</p>

<p>The questions below pull out the details from the city and county pages.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Which office issues building permits for a new house in Deltona?</strong></summary>
<p>The City of Deltona Building Services Division at 2345 Providence Boulevard issues them. The division describes its work as permitting, plan review and inspections under the Florida Building Code, the National Electrical Code and local regulations. You can apply, check status, upload documents and pay fees in the online self-service portal. Phone numbers listed on the division page are 386-878-8650 and 386-878-8660, and the contact box lists weekday hours.</p>
</details>
<details>
<summary><strong>What does the city's new home checklist ask for before a permit is issued?</strong></summary>
<p>The Residential New Construction Checklist, marked Revised 1/2024, lists items due before issuance. They include an Elevation Certificate if the lot is in a flood zone, a copy of the recorded Notice of Commencement, proof of potable water by the paid water receipt, the Volusia County Impact Fee Application signed by city staff, permitting fees, city impact fees and proof of a Waste Pro contract for solid waste disposal.</p>
</details>
<details>
<summary><strong>When are Volusia County impact fees due on a Deltona new build?</strong></summary>
<p>The county's FAQ says impact fee payments are due before the issuance of a certificate of occupancy. The county does not accept partial payments, but a payment can be made for each use separately in its entirety. Online payment requires a registered Connect Live account and being listed as the applicant on the permit. The county phone number for impact fees is 386-736-5924.</p>
</details>
<details>
<summary><strong>Which Deltona impact fee schedule applies to my permit?</strong></summary>
<p>The city posts two pages with different figures. The Impact Fees page lists Fire/Rescue, Park, Complete Streets, Law Enforcement and Municipal fees per 1,000 square feet, with one schedule effective October 1, 2026 and another effective October 1, 2027. The Impact and Special Assessment Fees page lists a shorter set and shows no effective date.</p>
</details>
<details>
<summary><strong>What are the stormwater and solid waste assessments on a new Deltona house?</strong></summary>
<p>The city's Impact and Special Assessment Fees page lists a Solid Waste Assessment of two hundred sixty dollars annually and a Stormwater assessment of one hundred ninety dollars annually. They are collected through the property tax bill for the fiscal period of October to September. For a new house, the city charges the months from the certificate of occupancy date to the first full billing, using a month-by-month table on that page.</p>
</details>
<details>
<summary><strong>Does the Notice of Commencement have to be recorded before the first inspection?</strong></summary>
<p>The city's lien law page reproduces section 713.135, which says the notice must be recorded and posted on the site before the first inspection. The applicant must file a copy with the issuing authority before the first inspection if the direct contract is greater than five thousand dollars. Without the copy, the authority or a private provider may not perform or approve later inspections. The same paragraph does not require recording before the permit is issued.</p>
</details>
<details>
<summary><strong>Who can request a certificate of completion from the Deltona Building Services Division?</strong></summary>
<p>The division page says property owners listed on the permit can visit in person with a valid ID. Anyone who is not an owner submits a public records request through the City Clerk. The pages read for this guide do not state how many days the city takes to issue a certificate. Section 553.791 sets a timetable for the local building official to issue a certificate of occupancy or give notice of incomplete forms.</p>
</details>
<details>
<summary><strong>How long do I have to bring a claim over a construction defect in a new Deltona home?</strong></summary>
<p>Section 95.11(3)(b) sets four years, running from the earliest of a temporary certificate of occupancy, a certificate of occupancy, a certificate of completion or abandonment of construction. For a latent defect, time runs from when it was or should have been discovered, and in any event the action must start within 7 years of the earliest date. Section 558.004 requires written notice of claim at least 60 days before filing.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:59:13 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/deltona-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Edgewater New Construction: Permits, Impact Fees and the Certificate of Occupancy]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/edgewater-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </link>
        <description>
            <![CDATA[<p>A new house inside the City of Edgewater needs a city building permit before work starts, and the Volusia County impact fees for it are due before the certificate of occupancy is issued. This guide covers the city's own forms, its Land Development Code and the county and state rules that sit around them, for a lot inside the city limits of <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater</a> in Volusia County.</p>

<p>It names no builders and ranks nothing. The impact fee ordinance the city has posted for the 2027 fiscal year is a redline draft, so this guide gives no amounts. The city's Land Development Code was read as a posted PDF. The city and county pages and the Florida Statutes on the Legislature's site were read on October 28, 2026. The Florida Building Code section on certificates of occupancy could not be read, and the R322.2.1 citation below comes from the city's flood page.</p>

<h2>The city permit: who issues it and what the application asks for</h2>

<p>Start with the office. The Building Division of the City of Edgewater does plan reviews, gives building code interpretations, issues building permits and performs inspections during all phases of construction, including single-family residences. It also issues Certificates of Occupancy once the project is complete. The city's page says all of its inspectors are licensed in accordance with state law.</p>

<p>Florida law sets the baseline. Section 553.79(1)(a) of the Florida Statutes makes it unlawful to construct, erect, alter, modify, repair or demolish any building in the state without first obtaining a permit from the appropriate enforcing agency, on payment of the reasonable fees that agency has adopted. The same paragraph lets the agency revoke a permit if it determines the work violates or does not conform to the Florida Building Code.</p>

<p>The city enforces the 8th Edition (2023) Florida Building Codes and the 2020 edition of the National Electric Code. The Building Division accepts every permit application type by email at BuildingDept@Cityofedgewater.org. Plans sent that way must be signed and sealed digitally. A person with a permit number can log in at any hour, any day, to pay permit fees, schedule an inspection, reschedule or cancel one and obtain inspection results. The phone line is 386-427-3279, option 2, and it asks for the permit number and the inspection code. A live representative is available Monday through Friday from 8:00 a.m. to 4:30 p.m., excluding legal holidays.</p>

<p>Contractor licensing runs through Volusia County. The city uses the county's Contractor Licensing Program, called Volusia County Connect Live. A contractor who is registered and up to date there does not register separately with Edgewater. A contractor who is not registered there submits a copy of the state license, workers compensation coverage and liability coverage with every permit application.</p>

<p>The city's New Construction Permit form shows what a file for a new house contains. The classes of work include Single-Family, Single-Family Reconstruction, Single-Family Remodel, Townhouse, Duplex and Triplex, along with mobile home, commercial and warehouse classes. The form asks whether the applicant is the owner or a contractor. It asks whether a Notice of Commencement is required. It also asks whether the applicant plans to use private provider inspections or plan review.</p>

<p>The form then asks for the project address and parcel ID, a description of the work and the job cost. It asks for the model of house, the number of bedrooms and bathrooms, which side the garage is on and the total square feet of the proposed structure. It asks for the name and license number of the mechanical, electrical, plumbing and roofing subcontractors.</p>

<p>Two more lines concern the ground. The form asks for the proposed finished floor elevation. It also asks for the fill material and the fill volume in cubic yards, whether fill or dirt has been brought to the property and whether the applicant has received a site Violation Notice.</p>

<p>The site plan has its own list. The form says it shall show the location of proposed fill by length, width and height, any existing or proposed drainage improvements such as a pond, pipe or swale, existing structures with dimensions and property line setbacks, streets and roadways, easements, bodies of water, trees within the fill area, arrows showing the direction of drainage flow, a north arrow, the flood zone delineation line and the wetland delineation line. On easements the form says do not encroach into drainage easements with new fill.</p>

<p>The form also carries a Notice of Deed Restrictions. The applicant acknowledges that the property might be subject to deed restrictions and, as owner or authorized agent, is responsible for determining, before adding fill, whether the fill violates them. It carries a Historic Tree Affidavit and a Home Owner Affidavit, both described below.</p>

<h2>Lot rules, trees, fill and stormwater</h2>

<p>Table V-1 of the Land Development Code, as posted with the 2024-O-34 stamp, sets the site dimensions by district. For R-3 Single Family Residential the table lists a minimum lot of 8,625 square feet, a width of 75 feet and a depth of 115 feet. The front yard is 30 feet, the rear yard 20 feet and the side yard 10 feet. Maximum height is 26 feet, maximum building coverage is 30 percent, maximum impervious coverage is 60 percent and the minimum floor area is 1,000 square feet.</p>

<p>The city's Build Responsibly page says any development in a floodplain, including fill dirt, new construction and remodeling, requires a permit. New residential construction in a special flood hazard area must sit above FEMA's base flood elevation. The Florida Building Code requires the building to be raised an additional 1 foot above that elevation, under section R322.2.1.</p>

<p>Trees come next. The Historic Tree Affidavit on the permit form defines historic trees as specimen trees reaching 36 inches in diameter at breast height, measured 4.5 feet from the ground, with the exception of the Laurel Oak. A historic tree comes out only on approval of a Tree Removal Permit granted by City Council or under section 163.045 of the Florida Statutes. Single-family and duplex lots shall have a minimum of one tree per 1,500 square feet of lot area. If there is a tree of 36 inches or larger, the city requires a tree survey with the building permit. Section 21-55.07(h) of the code says no existing or replacement trees shall be removed after a Certificate of Occupancy is issued.</p>

<p>The stormwater section gives worked numbers. The city's Right of Way, Stormwater and Fill Application says the first one-half inch of runoff from the entire site must be maintained on lots under 10,890 square feet, which is one-quarter acre. One inch of runoff must be retained on lots over that size. Retention areas must be maintainable, no more than six inches deep, with side slopes of 6:1 or flatter, and they must be sodded. The form gives a worked example. A 10,000 square foot lot multiplied by 0.0415 gives 415 cubic feet, which is 830 square feet of retention area at a depth of six inches. A 21,780 square foot lot multiplied by 0.083 gives 1808 cubic feet, rounded up, which is 3,616 square feet.</p>

<p>Other stormwater lines on the same form are short. Rain gutter downspouts must discharge to a retention area. Driveways and sidewalks must slope to a retention area. All disturbed areas must be sodded. Properties in areas with a designated storm water system, which the form names as the Florida Shores areas, must grade toward the City right-of-way where possible. No storm water shall run off to adjacent property owners, and erosion control measures are required during and after construction.</p>

<p>Driveways have their own inspection steps. A driveway in the public right-of-way must not block drainage. On an unpaved road it must extend approximately 15 feet beyond the property line. On a paved road it must meet the street. An inspection is required before the pour. A paver driveway in the right-of-way needs a release or hold harmless agreement, and recording fees are extra. Elevation grade stakes must be set by the Stormwater Department before grading, and the number on the form is 386-424-2400, extension 4007. The same number is for the final inspection, which the form says to request at least one working day in advance. The form notes a re-inspection fee of forty dollars, payable before rescheduling, and tells applicants to call 811 before digging.</p>

<h2>Notice of commencement, owner-builders and utilities</h2>

<p>The city form says that for direct contracts of five thousand dollars or greater, a current certified copy of the recorded Notice of Commencement must be submitted to the city. Section 713.02(5) of the Florida Statutes, as it reads on the Legislature's site today, says an improvement with a direct contract price of twenty-five hundred dollars or less is exempt from the other provisions of that part of the chapter, except section 713.05. The two figures are not the same.</p>

<p>The statute explains what the notice does. Section 713.13 says an owner or the owner's authorized agent, before actually commencing to improve real property, shall record a notice of commencement in the clerk's office and post either a certified copy or a notarized statement that it has been filed for recording. The notice is effective when it is filed in the clerk's office. The owner must sign it, and no one else may sign in the owner's place. If the improvement is not commenced within 90 days after recording, the notice is void. The statutory form expires one year after recording unless a different date is written in.</p>

<p>The statutory form also carries a warning. It says payments made by the owner after the notice expires are improper payments. It says a notice of commencement must be recorded and posted on the site of the improvement before the first inspection.</p>

<p>The Home Owner Affidavit on the city form says an owner may build or improve a one-family or two-family residence or a farm outbuilding for the owner's own use or occupancy. It may not be built or substantially improved for sale or lease. If a building the owner built is sold or leased within one year after construction is complete, the law presumes it was built for sale or lease, which violates the exemption. The owner must provide direct, onsite supervision.</p>

<p>Utilities are a separate application. Section 21-51.02(b) of the Land Development Code says all new development shall connect to the City's water and sewer system. Temporary package plants may be permitted if City-owned water and sewer improvements are planned. Under paragraph (c), all new development shall connect to the reclaimed water system if it is available, and drylines may be required for future reclaimed service. Paragraph (j) says all utility lines in new residential developments shall be installed underground.</p>

<p>The city's Water and Wastewater Service Application asks whether the applicant is an owner or a contractor and whether the request is for a new service or a change. It asks for the construction type, with single-family residential as one choice. It asks which services are requested, from water, wastewater, reclaimed water or irrigation only. It asks for the parcel ID, the subdivision, the building square feet and the fixture count. Meter size runs from three-quarter inch up to 8 inch. Reclaimed water alone, for a parcel that already has water and sewer, goes through Utility Customer Service at City Hall, 104 N Riverside Drive.</p>

<p>The Table V-1 footnotes add two setback notes. The yard columns carry "50 feet upland from mean high water line" and "25 feet upland from wetlands vegetation". Abandoned or non-developed streets in Florida Shores require a ten foot side corner setback. For R-2 the table lists a minimum lot of 10,000 square feet, 80 feet wide and 125 feet deep, with setbacks of 30, 20 and 10 feet, a height of 26 feet, 30 percent building coverage, 60 percent impervious coverage and a minimum floor area of 1,200 square feet. For R-1 it lists 12,000 square feet, 100 feet wide and 120 feet deep, with a front yard of 40 feet, a rear yard of 30 feet, a side yard of 10 feet, the same 26 foot height, 30 and 60 percent coverage and a minimum floor area of 1,300 square feet.</p>

<h2>Impact fees: what the city lists and what the county collects</h2>

<p>Impact fees in Edgewater involve both the city and Volusia County. Start with the city. Section 21-51.02(f) of the Land Development Code says all development shall pay the adopted City and County impact and development fees. The city's FY2027 impact fee ordinance is posted as ordinance 2026-O-17, and the posted copy is a redline. Struck-through and underlined numbers run together, the signature date is blank and so is the effective date. Because the posted copy is a redline draft, this guide gives no amounts.</p>

<p>The posted draft still contains the following provisions. It says the Florida Impact Fee Act, section 163.31801 of the Florida Statutes, imposes requirements on how impact fees are adopted, collected and used. It says the city's water and sewer capital charges are assessed as connection fees, and that under section 163.31801(12) the Act does not apply to water and sewer connection fees. Table 21-888 sets single-family detached at 1.0 equivalent residential unit per dwelling unit, and the capital charges are stated per gallon of capacity or per ERU. The stormwater impact fee is set per equivalent dwelling unit for residential establishments.</p>

<p>A separate section covers other city services. It says development that intends to create or intensify usage pays for the impact on City services. It lists five: Fire Rescue and Emergency Medical Support, Law Enforcement, General Government Buildings, Parks and Recreation, and Multi-Modal Transportation. Table 21-999, headed City of Edgewater Impact Fee Schedule, has one line for single-family and multi-family dwellings, counted per dwelling unit, with a column for each of those five services.</p>

<p>The draft also says the following. After the water and sewer capital charges are paid, the city may review actual consumption within 24 months after service starts. If consumption reflects a greater demand than the capacity paid for, the draft lets the city increase the total capital charges collected. Consumers outside city limits pay a 25 percent surcharge until July 1, 2029. A section on Individual Impact Assessment lets a feepayer who believes the impact is less than the fee ask for an assessment.</p>

<p>Now the county. Volusia County's impact fee page says the program finances new roads, schools, parks, fire services and emergency medical services necessitated by new development. The county has five growth-related impact fees: Transportation, Education, Parks and Recreation, Emergency Medical Services and Fire Rescue. The page was updated January 16, 2026. In the county's FAQ, an impact fee is assessed and due from anyone who builds a new residence or commercial building or changes the use of an existing building.</p>

<p>The county's timing line is short. The FAQ says impact fee payments are due before the issuance of a Certificate of Occupancy. For a project inside city limits, an application goes through the Connect Live portal, by email to impactfees@volusia.gov or in person at the county office in DeLand. The completed application must be uploaded, and the bottom of the application must be signed by city staff before it is uploaded. Payment can be made online through Connect Live, but the payer must be a registered user and must be listed as the applicant on the permit. It can also be made at the Volusia County Treasury and Billing office in the Historic Courthouse at 125 W. New York Ave., Room 120 in DeLand, or by check payable to County of Volusia.</p>

<p>The county FAQ says impact fee payments are due before the issuance of a Certificate of Occupancy. Separately, for impact fees adopted or increased after July 1, 2026, section 163.31801(4)(e) says collection may not be required earlier than the date the building permit is issued for the property. A local government must give at least 90 days notice before a new or increased impact fee takes effect, and new or increased fees may not apply to permit applications already submitted before the effective date, unless the result reduces the total cost to the applicant.</p>

<h2>The certificate of occupancy and what follows it</h2>

<p>The Building Division issues the Certificate of Occupancy once the project is complete. Two items in the Land Development Code are tied to it by name. Section 21-54.02(f) says all new development must sod all disturbed areas of the lot before the Certificate of Occupancy is issued, in accordance with all applicable regulatory agency requirements. Section 21-55.07(h) bars removal of existing or replacement trees after the certificate is issued. The county's impact fee payments are due before it, as shown above.</p>

<p>The permit form's upload fields are Product Approval Application, Survey, Truss Layout, Truss Engineering, Energy Calcs and Building Plans, plus miscellaneous building items. Survey, Truss Layout, Truss Engineering, Energy Calcs and Building Plans are marked required, and files must be pdf or zip.</p>

<p>Property tax has a state rule tied to completion. Section 192.042(1) of the Florida Statutes says real property is assessed on January 1 of each year, and improvements or portions not substantially completed on January 1 have no value placed on them. The statute defines substantially completed to mean that the improvement, or some self-sufficient unit within it, can be used for the purpose for which it was constructed.</p>

<p>At the county, partial payments are not accepted. A payment can be made for each use separately in its entirety, for example road impact fees now and school impact fees later. The county's impact fee office is at impactfees@volusia.gov, (386) 736-5924, 123 W. Indiana Ave., Room 200, DeLand.</p>

<p>Section 163.31801 has more limits. Under (4)(c), administrative charges for collecting impact fees are limited to actual costs. Under (5)(a), a local government that requires an improvement or contribution must credit it dollar-for-dollar at fair market value against the impact fee for that category of facility. Under (6)(b), an increase of not more than 25 percent of the current rate is implemented in two equal annual increments. Under (6)(d), an increase may not exceed 50 percent of the current rate. Under (6)(e), a fee may not be increased more than once every 4 years. Under (10), impact fee credits are assignable and transferable within the same impact fee zone or district or an adjoining one in the same jurisdiction.</p>

<p>A building permit may be closed by the enforcing agency six years after it was issued, even without a final inspection, if no apparent safety hazards exist, under section 553.79(16)(c) of the Florida Statutes. A property owner may close a permit by keeping the original contractor, by hiring a different appropriately licensed contractor or by acting as an owner-builder. Under section 553.79(17)(a), an agency may not deny a permit to, issue a notice of violation to or fine an arms-length purchaser for value solely because a permit applied for by a previous owner was not closed. The agency keeps its rights against the owner and contractor listed on the permit.</p>

<p>The Florida Building Code's own wording on certificates of occupancy was not available to read on the day this guide was checked, so this guide does not describe the inspection list behind the certificate. The city says its Building Division issues the certificate and that inspectors work through all phases of construction. The county says its impact fees are due before the certificate.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-flood-zones-and-flood-insurance-check-an-address">Edgewater Flood Zones and Flood Insurance: Check an Address</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-canal-and-river-lots-permits-utilities-flood">Edgewater Canal and River Lots: Permits, Utilities, Flood</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-edgewater-fl-utilities-trash-and-permits">Moving to Edgewater, FL: Utilities, Trash and Permits</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-property-tax-bill-2026-lines-explained">Edgewater Property Tax Bill: 2026 Lines Explained</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County: Builder Contracts, Inspections and Costs</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-edgewater-fl-neighborhoods-costs-and-what-to-know">Living in Edgewater, FL: Neighborhoods, Costs and What to Know</a>.</p>

<p><strong>Bottom line.</strong> The city Building Division issues the permit, inspects the work and issues the Certificate of Occupancy. Volusia County's impact fees are due before that certificate. The city's own impact fee schedule for the 2027 fiscal year was only available as a redline draft, so this guide gives no amounts. See <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater</a>.</p>

<h2>Frequently Asked Questions</h2>

<details>
  <summary><strong>What does the City of Edgewater Building Division do on a new house?</strong></summary>
  <p>According to the city's Building and Permitting page, the Building Division does plan reviews, gives building code interpretations, issues building permits and performs inspections during all phases of construction, including single-family residences. It issues Certificates of Occupancy once the project is complete. The city says its inspectors are licensed in accordance with state law and that it enforces the 8th Edition (2023) Florida Building Codes and the 2020 National Electric Code. Permit applications can be emailed to BuildingDept@Cityofedgewater.org, and plans sent that way must be signed and sealed digitally.</p>
</details>

<details>
  <summary><strong>When are Volusia County impact fees due on a new house in Edgewater?</strong></summary>
  <p>The county's FAQ says impact fee payments are due before the issuance of a Certificate of Occupancy. The county has five growth-related impact fees: Transportation, Education, Parks and Recreation, Emergency Medical Services and Fire Rescue. For a project inside city limits, the application must be signed by city staff before it is uploaded to the county's Connect Live portal. The county does not accept partial payments, but it does allow a payment for each use separately in its entirety. The county's impact fee office is at (386) 736-5924, 123 W. Indiana Ave., Room 200, DeLand.</p>
</details>

<details>
  <summary><strong>Does the city of Edgewater charge its own impact fees?</strong></summary>
  <p>The city's Land Development Code says all development shall pay the adopted City and County impact and development fees. The city's posted FY2027 ordinance lists impact on Fire Rescue and Emergency Medical Support, Law Enforcement, General Government Buildings, Parks and Recreation, and Multi-Modal Transportation, and it sets a stormwater impact fee per equivalent dwelling unit. The posted copy is a redline draft with an unsigned date, so this guide gives no amounts.</p>
</details>

<details>
  <summary><strong>What do the city and the state say about a notice of commencement?</strong></summary>
  <p>Section 713.13 of the Florida Statutes says an owner or the owner's authorized agent, before commencing to improve real property, shall record a notice of commencement in the clerk's office and post a certified copy or a notarized statement. The owner must sign it. It is void if work does not begin within 90 days after recording. The city's permit form asks for a recorded copy on direct contracts of five thousand dollars or greater, while section 713.02(5) refers to twenty-five hundred dollars or less.</p>
</details>

<details>
  <summary><strong>What do the city and county tie to the certificate of occupancy?</strong></summary>
  <p>Two Land Development Code items name the certificate. Section 21-54.02(f) requires all disturbed areas of the lot to be sodded before the Certificate of Occupancy is issued. Section 21-55.07(h) bars removal of existing or replacement trees after it is issued. The county says its impact fee payments are due before it. The pages read give no processing time.</p>
</details>

<details>
  <summary><strong>Can an owner build their own house in Edgewater?</strong></summary>
  <p>The city's Home Owner Affidavit says an owner may build or improve a one-family or two-family residence or a farm outbuilding for the owner's own use or occupancy. It may not be built or substantially improved for sale or lease. If the building is sold or leased within one year after construction is complete, the law presumes it was built for sale or lease, which violates the exemption. The owner must provide direct, onsite supervision.</p>
</details>

<details>
  <summary><strong>How much does a new house in a flood zone have to sit above base flood elevation in Edgewater?</strong></summary>
  <p>The city's Build Responsibly page says new residential construction in a special flood hazard area must sit above FEMA's base flood elevation. The Florida Building Code requires an additional 1 foot above that elevation under section R322.2.1. The permit form also asks for the proposed finished floor elevation and for a site plan showing the flood zone delineation line.</p>
</details>

<details>
  <summary><strong>Is a house that is not finished on January 1 taxed?</strong></summary>
  <p>Section 192.042(1) of the Florida Statutes says real property is assessed on January 1 of each year, and improvements or portions not substantially completed on January 1 have no value placed on them. The statute defines substantially completed to mean the improvement, or some self-sufficient unit within it, can be used for the purpose for which it was constructed.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:58:52 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/edgewater-new-construction-permits-impact-fees-and-the-certificate-of-occupancy]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for Daytona Beach Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-daytona-beach-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Daytona Beach publishes its own hurricane guide, and the city says the Atlantic hurricane season has begun. If you are looking at <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach</a>, this guide covers the evacuation rules the city publishes, the flood zone letter the city provides at no charge and the storm-repair permit rules the city sets out.</p>

<p>This guide covers rules published by the City of Daytona Beach, with county and state sources marked where they are used. It draws on the city's emergency, flood protection and permitting pages, Volusia County Emergency Management, the state's Know Your Zone page, Florida Statutes and the state's four-point inspection guide.</p>

<h2>Evacuation questions, bridges and shelters</h2>

<p>The city's evacuation page says to evacuate if you live in a storm surge zone, a low-lying or flood-prone area, a mobile home or recreational vehicle, or if you require a respirator or other electric-dependent medical equipment. It says not to if you live in a sound structure and none of those categories apply. The page links the Volusia County hurricane evacuation zones PDF map and Volusia County's website.</p>

<p>Storm surge is the most deadly of hurricane hazards, according to the city page. The city says surge can reach seven feet above sea level in a category 1 hurricane and as much as 28 feet above sea level in a category 5 hurricane.</p>

<p>The levels themselves are described in different ways. The city page says officials may order one of five evacuation levels, matching the five hurricane categories. The Volusia County page says officials may order one of three levels, written A, BC or DE. The state's Know Your Zone page uses zones A through F. It says Zone A is generally the most vulnerable and is evacuated first, and Zone F is generally evacuated last. The state also says not all zones are always ordered.</p>

<p>Some structures are covered by a blanket rule. The city and the county both say that a mobile home, manufactured home or recreational vehicle must evacuate for all evacuation levels regardless of where it sits. The county explains that these structures have flat sides and are lightweight, and that this type of construction does not allow the wind load to transfer through the supports into the foundation. Both say tie-down straps and anchors should be maintained and checked for rust or corrosion. The city and county pages say failure to obey an evacuation order is a violation of Florida law.</p>

<p>Condominium owners get their own line. The city says residents of condominiums should follow the evacuation instructions given to people in single-family homes. It adds that even if a condominium is not damaged severely, you may be without power for days.</p>

<p>The city and county list these steps for leaving. Know where you are going, whether that is family, friends, a hotel or motel, or a public shelter. Take a map showing two routes to reach the destination. Notify family, friends and caregivers where you will be. Secure your home, take your emergency supplies and do not delay. The state's Know Your Zone page adds that the safest and easiest option may be to stay with friends or family who live outside the evacuation zone.</p>

<p>The bridge rule comes from the county. When an evacuation is ordered, the east-bound lanes of bridges close to traffic. The west-bound lanes stay open until sustained winds exceed 39 miles per hour, and then all lanes close.</p>

<p>Staying home has its own instructions. The county and city say to stay in your designated safe room. They say to stay away from windows and glass doors. If flooding threatens, they say to turn off the electricity at the main fuse or breaker box. Generators belong outside the house, and appliances should connect directly to the generator. The city and county say not to connect to the fuse box or incoming power line, because back-feeding has killed power company line workers.</p>

<p>The state says that if you are not in an ordered evacuation zone, a low-lying flood-prone area, a mobile home or an unsafe structure, it may be safer to stay in your home. It also says the homeowner is responsible for knowing whether the home is strong enough to withstand a hurricane. The state notes that homes built after 2002 generally include features that make them more resilient to hurricanes. It names one precaution as the most important: protect the areas where wind can enter.</p>

<p>Volusia County has many public shelter locations that can be opened according to each disaster, and not all open at once. They open based on demand. The county says evacuees may need to stay 24 to 72 hours and that general population shelters do not provide cots, and a beach chair and sleeping pad are recommended. Hospitals are not shelters. The county's People and Pet shelter, where people and pets share a location, is at the Fairgrounds only. The Citizens Information Hotline is 866-345-0345 and is activated only during an emergency. Directions to open shelters are in the county Emergency Management app. The school board and Votran provide free rides to general public shelters from regular Votran bus stops, and the Votran number for Daytona Beach is 386-322-5100.</p>

<h2>Flood: surge, rain and the area the city calls the bowl</h2>

<p>The city describes Daytona Beach as a coastal community subject to flooding from the Atlantic and Halifax Rivers by storm surge. The city says surge combined with tides can push stormwater upstream into low-lying areas that would normally drain to the Halifax River. Volusia County adds a countywide fact. Based on the Multi-Jurisdictional Local Mitigation Strategy, out of thirteen individual hazards, flooding is the most frequent and costly natural hazard in the Volusia County area.</p>

<p>The city also records a flood event in May 2009. In that unnamed event, the city says, 790 structures flooded. The Nova Canal overtopped its banks and backed up through the drainage system outfalls. The city identifies the Florida Department of Transportation's Nova Canal, on the east side of Nova Road, as the major cause of flood damage in the topographically low area generally bounded by Nova Road, Orange Avenue, U.S. 1 and Beville Road. The city's own name for that area is "the bowl."</p>

<p>The city makes these flood insurance statements. Homeowner's insurance policies do not cover damage from rising water. Flood insurance has a 30-day waiting period before it takes effect. The city's National Flood Insurance Program notice says FEMA has launched an online service that lets owners receive quotes and buy NFIP policies directly online, without an agent. The city lists floodsmart.gov and the NFIP number, (877) 336-2627, for help finding a provider.</p>

<p>The city says to call the Utilities Engineering Division at (386) 671-8807 about a letter certifying the flood zone. A letter from the city certifying the zone assigned to a property is available on request. A copy of an elevation certificate is also available for structures built within a Special Flood Hazard Area after 1986, if one exists. The city says there is no charge for these services for property owners, that in most cases only the street address is needed, and that it tries to return calls within 24 to 48 hours. The city also offers an interactive flood zone map. For a flooding problem inside the city, the city lists Utilities Dispatch at 386-671-8815.</p>

<p>The map letters carry specific meanings, according to the city's FEMA zone table. An AE zone shows base flood elevations. Zone VE is the coastal area subject to a velocity hazard from wave action, where base flood elevations are provided. A shaded Zone X, or Zone B, is an area of moderate flood hazard between the limits of the 100-year and 500-year floods. An unshaded Zone X, or Zone C, is an area of minimal flood hazard above the 500-year level. Volusia County labels inland high-risk zones A or AE and coastal high-risk zones with additional storm surge risk VE. The county lists its current flood risk products as effective February 19, 2014, September 29, 2017 and August 7, 2018. The city's Flood Protection page says the Daytona Beach maps were last updated in 2017.</p>

<p>The city says the maps show areas expected to be covered with water when 11 inches of rain falls in one day, an event with a 1 percent chance of happening in any given year. The county says a 100-year flood is the flood elevation that has a 1 percent chance of being equaled or exceeded each year, and that it is not the flood that will occur once every 100 years. The county also says its own map is not survey accurate and recommends independent verification. For FEMA's own lookup, the county points to msc.fema.gov/portal/search.</p>

<p>The city's flood safety page gives two figures. It says six inches of swiftly moving water can sweep you off your feet, and that most cars can be swept away by less than two feet of moving water. It lists an emergency kit with at least three days of food and water, a flashlight, batteries, cash and first aid supplies. It also says to photograph damage for insurance purposes.</p>

<h2>Roofs, permits and Florida statutes</h2>

<p>Start with what Florida Statutes say. Section 553.844 sets roof replacement requirements for site-built single-family homes. A roof replacement must incorporate a secondary water barrier and roof-decking attachment and fastener techniques. For a building in the wind-borne debris region with an insured value of 300,000 dollars or more, or a just valuation of 300,000 dollars or more if it is uninsured, a roof replacement must also incorporate roof-to-wall connection techniques. The legislature states its intent that the cost of those connection retrofits not exceed approximately 15 percent of the cost of reroofing. The statute also says that if a roof was built, repaired or replaced under the 2007 Florida Building Code or a later edition, and 25 percent or more of it is repaired, replaced or recovered, only that portion has to meet the code in effect.</p>

<p>The state's four-point inspection guide covers the insurance side. It says a four-point inspection is commonly required by Florida insurers when issuing or renewing a policy, and that it covers the roof, electrical, plumbing and HVAC systems. It also says an insurance company may require documentation confirming at least five years of remaining useful life for roofs older than 15 years if they are shingle, or 20 years if they are tile or metal. Section 627.711 adds a rule about wind discounts. Insurers must notify the applicant or policyholder, at issuance and at each renewal, of the available wind premium discounts, credits and deductible reductions. The uniform mitigation verification inspection form must be accepted when it is signed by a licensed home inspector with at least three hours of hurricane mitigation training, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer or a licensed architect. The person signing must inspect the structure personally.</p>

<p>The sale itself has a flood step in Florida law. Section 689.302 requires the seller to complete and give the purchaser a flood disclosure at or before the time the sales contract is executed. The form states that homeowners' insurance policies do not include coverage for flood damage. The seller then states whether they have knowledge of flooding that damaged the property during their ownership, whether they filed a flood damage claim with an insurance provider including the National Flood Insurance Program, and whether they received assistance for flood damage, including from FEMA. The statute defines flooding to include the overflow of inland or tidal waters, the rapid accumulation of runoff or surface waters from an established water source, and sustained standing water from rainfall.</p>

<p>The city's Post-Storm Recovery Permitting Guide explains what happens after a storm. After a declared state of emergency, the city says it will activate a post-storm permitting center at 301 S. Ridgewood Avenue or an alternate location. It says it will keep at least 40 hours per week of public-facing permitting services as soon as conditions allow, and it will use expedited review and inspection for storm-related repairs. The guide lists the repairs that require a permit: roof replacements or substantial roof repairs, structural repairs, electrical service restoration or replacement, HVAC equipment replacement, window and door replacement, fence replacement, water heater replacement, screen enclosure repairs or rebuilds, and drywall removal or replacement. It lists repairs that do not require a permit: tarping of roofs, debris removal, minor cosmetic repairs such as paint or carpet, and tree removal for storm-related dead or damaged trees.</p>

<p>The guide also lists how to apply. Applications go online at DaytonaBeach.ims16.com or in person at the Building Department, 301 S. Ridgewood Avenue, Daytona Beach, FL 32114. The required documents are a permit application, an Owner Builder Affidavit if you qualify as an owner builder, and plans, specifications, a site plan or other application documents. The expedited categories are roofs, electrical service reconnects, water damage-related HVAC replacements, and window and door replacements. The guide says expedited review is completed in one to three business days for essential repairs, and inspections are scheduled within 24 to 48 hours of the request, weather permitting. It adds that a permit fee deferment is possible if the City Commission activates it. The Permits and Licensing Department number is (386) 671-8178.</p>

<p>Flood rules attach to repairs as well. In a Special Flood Hazard Area, a building that is substantially damaged or improved must meet the FEMA Base Flood Elevation plus one foot of freeboard, as required by the Florida Building Code, along with the latest Florida Building Code and local amendments. The city says compliance with these rules provides a discount on flood insurance rates for all property owners within the city. Volusia County states a related threshold. Improvements or repairs equal to or greater than 50 percent of a home's market value must meet current Florida Building Code standards and comply with the local floodplain ordinance. The county says an Elevation Certificate may be on file with Building and Code Administration, at 386-626-6591.</p>

<p>The city is waiving permit and inspection fees for commercial and residential projects through January 31, 2027. The city lists new construction, interior renovations, roof replacements, electrical and fire suppression upgrades, fences, doors, windows, driveways and air conditioning units as eligible. It says this is the sixth time since 2020 that it has waived fees. Applications are available online, and the city also lists 386-671-8140 for Permits and Licensing.</p>

<p>A state program covers beach construction. The Florida Department of Environmental Protection runs the Coastal Construction Control Line program, which regulates structures and activities that can cause beach erosion, destabilize dunes, damage upland properties or interfere with public access. Adopting a line establishes an area of jurisdiction with special siting and design criteria. The department says those criteria may be more stringent than elsewhere because of the greater forces expected in the seaward beach zone during a storm. The department offers help locating the line at 850-245-8570. Which Daytona Beach properties fall under it is not stated on the pages cited here.</p>

<p>Preparation includes signing up for alerts. The city says to register at www.codb.us/alerts and states that you will only receive emergency notifications if you are signed up. The city's alert categories include boil water notices, Amber and Silver alerts, evacuations and road closures. The city posts storm information on Facebook, Instagram, Twitter and Nextdoor, and it recommends monitoring local television and radio. Its Emergency Operations Center sits within the Police Department headquarters, and Fire Department and Police Department personnel manage it. The city's Hurricane Preparedness Guide is a booklet with notification information, safety tips, evacuation zone information and a removable supply checklist with important phone numbers. It is available at www.DaytonaBeach.gov/StormGuide.</p>

<p>The city also repeats the National Weather Service definitions. A Hurricane Watch is issued when a tropical cyclone with winds of 74 miles per hour or higher poses a possible threat, generally within 48 hours. A Hurricane Warning is issued when sustained winds of 74 miles per hour or higher are expected in 36 hours or less. Either one may come with storm surge, coastal flooding or river flooding. A watch does not mean hurricane conditions will occur. A warning can stay in effect when dangerously high water continues even though winds may be less than hurricane force.</p>

<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/daytona-beach-condo-milestone-inspections-and-sirs-guide">Daytona Beach Condo Milestone Inspections and SIRS Guide</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/daytona-beach-flood-zones-how-to-check-any-address">Daytona Beach Flood Zones: How to Check Any Address</a> | <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/daytona-beach-neighborhoods-beachside-mainland-golf-and-55-communities">Daytona Beach Neighborhoods: Beachside, Mainland, Golf and 55+ Communities</a>.</p>

<h2>Bottom line</h2>

<p>The main points in this guide come from the city, county, state and statute pages listed in this guide's sources. The county evacuation zone map is linked from the city's evacuation page. The level for a given street was not verified for this guide. The city's Utilities Engineering Division can provide a letter certifying the flood zone, at no charge to property owners. The city's Post-Storm Recovery Permitting Guide lists how to apply online at DaytonaBeach.ims16.com or in person at the Building Department. The seller's flood disclosure under section 689.302 states what the seller knows about flooding, claims and assistance.</p>

<p>For property in <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach</a>, the city says homeowner's insurance policies do not cover damage from rising water. Flood insurance takes 30 days to start, according to the city.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>How do I find the hurricane evacuation level for a Daytona Beach address?</strong></summary>
<p>The Volusia County hurricane evacuation zone map, which the city links from its evacuation page, is the place to confirm the level. The county page says officials may order one of three levels, written A, BC or DE. The city page says five levels, and the state's Know Your Zone page uses zones A through F. The published descriptions differ. The state also says not all zones are always ordered.</p>
</details>
<details>
<summary><strong>Does Daytona Beach certify the flood zone for a property?</strong></summary>
<p>Yes. The city says to call the Utilities Engineering Division at (386) 671-8807 about a letter certifying the flood zone. A letter from the city certifying the flood zone is available on request, and so is a copy of an elevation certificate for structures built within a Special Flood Hazard Area after 1986, if one is available. The city says there is no charge for these services for property owners, that usually only the street address is needed, and that it tries to return calls within 24 to 48 hours.</p>
</details>
<details>
<summary><strong>Does homeowners insurance cover flood damage in Daytona Beach?</strong></summary>
<p>The city says homeowner's insurance policies do not cover damage from rising water, and most standard homeowners policies do not cover flood. Florida's seller flood disclosure under section 689.302 also states that homeowners' insurance policies do not include coverage for flood damage. The city says flood insurance has a 30-day waiting period before it takes effect. FEMA has launched an online service for owners to get quotes and buy National Flood Insurance Program policies without an agent, and the city lists floodsmart.gov and the NFIP number, (877) 336-2627, for help finding a provider.</p>
</details>
<details>
<summary><strong>What does the Florida flood disclosure ask a seller?</strong></summary>
<p>Section 689.302 of the Florida Statutes requires the seller to complete and give the purchaser a flood disclosure at or before the time the sales contract is executed. The seller states whether they have knowledge of flooding that damaged the property during their ownership, whether they filed a flood damage claim with an insurance provider, including the National Flood Insurance Program, and whether they received assistance for flood damage, including from FEMA. The statute defines flooding to include the overflow of inland or tidal waters, the rapid accumulation of runoff or surface waters from an established water source, and sustained standing water from rainfall.</p>
</details>
<details>
<summary><strong>Which storm repairs need a permit in Daytona Beach?</strong></summary>
<p>The city's Post-Storm Recovery Permitting Guide lists roof replacements or substantial roof repairs, structural repairs, electrical service restoration or replacement, HVAC equipment replacement, window and door replacement, fence replacement, water heater replacement, screen enclosure repairs or rebuilds, and drywall removal or replacement. It says tarping of roofs, debris removal, minor cosmetic repairs and tree removal for storm-related dead or damaged trees do not need a permit. Permits and Licensing can be reached at (386) 671-8178.</p>
</details>
<details>
<summary><strong>What is the rule about bridges when a hurricane evacuation is ordered?</strong></summary>
<p>Volusia County says that when an evacuation is ordered, the east-bound lanes of bridges close to traffic. The west-bound lanes stay open until sustained winds exceed 39 miles per hour, and then all lanes close. The city and county pages say failure to obey an evacuation order is a violation of Florida law.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:58:36 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-daytona-beach-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for New Smyrna Beach Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-new-smyrna-beach-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>The State of Florida and the Florida Statutes set roof and opening requirements, and Volusia County and the City of New Smyrna Beach publish evacuation and flood guidance for the City of <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach</a>. Local officials may order one of three evacuation levels, written A, BC and DE, depending on the track and strength of a hurricane. The state designates evacuation zones from A to F. The city lists flood maps, and Section 553.844 of the Florida Statutes sets roof requirements.</p>

<p>This guide restates what those official sources say. It covers evacuation and the bridges, what the city reports about its own flooding after hurricanes, what the building code and state law say about roofs and openings, and the shelter and alert systems the county runs. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-flood-zones-flood-insurance-guide">New Smyrna Beach Flood Zones & Flood Insurance Guide</a>.</p>

<h2>Evacuation levels, zones and the bridges</h2>

<p>Volusia County Emergency Management publishes an evacuation plan page. The county page says to evacuate if you live in the hurricane evacuation zone. It says to evacuate if you live in a low-lying, flood prone area, including homes along river basins. It also says to evacuate if you live in a mobile home, substandard housing, a recreational vehicle or a campsite. The county page states that failure to obey an evacuation order is a violation of Florida law.</p>

<p>The county page says that mobile homes have flat sides and are lightweight, which does not allow the proper transfer of wind load through the supports into the foundation and ground. It says that if you live in a mobile home or recreational vehicle you must evacuate for all evacuation levels regardless of where you are. The page asks owners to seek shelter elsewhere when a major storm threatens, to regularly maintain tie-down straps and anchors, to check straps for rust or corrosion, and to protect windows and doors.</p>

<p>The city's own frequently asked questions page gives its own list. It says you should evacuate if you live in a storm surge zone, live in a low-lying or flood prone area, or live in a mobile home or recreational vehicle. It adds one more group. You should evacuate if you require a respirator or other electric-dependent medical equipment.</p>

<p>Depending on the track and strength of a hurricane, local officials may order level A, BC or DE. The county calls these Hurricane Evacuation Categories and says they correspond to the flooding that is likely to occur. The state's Know Your Zone page designates evacuation zones A to F. It says that generally Zone A is the most vulnerable and most likely to be evacuated first and Zone F last. The state also says that not all evacuation zones are always ordered.</p>

<p>The county page states that storm surge is the most deadly of hurricane hazards. It describes surge as salt water flooding that rushes over coastal and river areas near where the eye of the hurricane strikes, destroying homes and businesses. It states that storm surge can reach seven feet above sea level in a category 1 hurricane and as much as 28 feet in a category 5 hurricane. The state's page says the greatest threat to life from a hurricane is storm surge flooding.</p>

<p>The state's page also says that if you are in an ordered evacuation zone, a low-lying flood prone area or a mobile home, you should follow all evacuation orders. It says that if you are not in an ordered evacuation zone, low-lying flood prone area, mobile home or unsafe structure, it may be safer to stay in your home. It says it is the responsibility of the homeowner to know if the home is strong enough, and that generally homes built after 2002 include features that make them more resilient. It says staying with friends or family outside the evacuation zone or in a stronger house may be the safest and easiest option.</p>

<p>The city's Flood Protection page links to maps titled Hurricane Evacuation Zones with Traffic Evacuation Zones Map, Storm Surge Zones Map and Storm Tide Zones Map. The same page lists Volusia County Flood Basics. It says the Flood Insurance Rate Map may be viewed at FEMA's Flood Map Service Center, at the city Engineering Department at 214 Sams Ave., phone 386-410-2812, and at the New Smyrna Beach Regional Library. It says lenders use the map to determine whether flood insurance is required. Maps are updated as changes occur.</p>

<p>The county page lists what to do when evacuating. It says to know where you are going, whether family, friends, a hotel or motel, or a public shelter, to take a map showing two routes, to notify family, friends and caregivers of your location, to secure your home and property, to take emergency supplies and not to delay. For residents who are not required to evacuate, the page says to take precautions to protect home and property, check the disaster supply kit, stay in the designated safe room, and stay away from windows and glass doors. It says to turn off electricity at the main fuse or breaker box if flooding threatens, and to run a generator outside the house and connect appliances directly to the generator, not to the fuse box or incoming power line. It states that back-feeding generators have killed power company line workers.</p>

<p>The county says that when an evacuation is ordered, the east-bound lanes of bridges close to traffic. The west-bound lanes remain open until sustained winds exceed 39 miles per hour, at which point all lanes close. The city posted a notice on September 26, 2024 about the high-rise coastal bridges. It says Volusia County closes them when the county emergency management director determines it is necessary, in coordination with the Volusia Sheriff's Office. The notice lists three conditions. One is the arrival of winds sustained at 39 mph. Another is visible damage to the bridge or flooding of the approaches. The third is to conduct damage assessments. The notice gives the Citizens Information Center number as 866-345-0345.</p>

<p>The city's Additional Services page says that Fire and Rescue personnel assist residents and business owners with information and tips on how to prepare and plan for a hurricane or other disaster.</p>

<h2>What the city reports about flooding after its own hurricanes</h2>

<p>The city's Stormwater Management page describes what the storms it names did, Hurricane Ian in 2022 and the 2022 and 2024 hurricanes. The city states that in September 2022 it experienced widespread flooding after Hurricane Ian produced approximately 20 inches of rainfall that coincided with very high storm surge in Turnbull Bay.</p>

<p>The city hired Jones Edmunds for an Exposure Analysis within a Vulnerability Assessment fully funded by the Florida Department of Environmental Protection. The city's page says Jones Edmunds did not find deficiencies in the city's stormwater code and standards or how they are applied that are leading to increases in flooding due to development, and found them more protective than most Florida communities. The 27-page report recommended updating the Stormwater Master Plan, demonstrative criteria for large developments, evaluating improvement of the Community Rating System Class, drainage easement mapping and acquisition, and ditch maintenance.</p>

<p>The page says the report notes that many developed parcels were built before modern stormwater regulations and are in FEMA Special Flood Hazard Areas at or below 100-year flood stages, which Hurricane Ian significantly exceeded. It says a substantial investment will be required to significantly reduce 100-year flood stages in most parts of the city, some of which will likely have no feasible solution for removing properties from a Special Flood Hazard Area. In those cases, the page says, raising the finished floor elevation of the structures will likely be the only solution to eliminate 100-year flood risks. The page also says a temporary building moratorium was in place while the study was underway.</p>

<p>The city lists projects. In Corbin Park, the page lists a Volusia County retrofit with new conveyance pipe, inlet and outlet structures and backflow preventers, a six million dollar Transform386 grant, and construction to begin in early 2026. The page says the subdivision was developed without modern design standards and that established finished floor elevations do not meet guidelines.</p>

<p>For the Historic Westside, the city lists upsizing pipes, inlets, backflow prevention, regrading swales and curbing. The reason it gives is substantial flooding resulting from hurricanes in 2022 and 2024. The page names a one million dollar state appropriation. For North Atlantic Avenue from Lakewood Street to Inlet Street, the city lists an exfiltration system, inlets, curbing, a 10-inch water main and electrical system hardening, with a projected completion of July 2, 2026 on the city's page. The current status is not verified. The page gives the reason as heavy rain events causing flooding, particularly along the west side of the street.</p>

<p>The city's page also lists several dates. On January 6, 2025 the Planning and Zoning Board approved new stormwater regulations. They update minimum design criteria for ponds, ditches and swales in new developments, reduce the total discharge allowed, and increase storage by setting minimum vertical distances between peak water levels and the tops of retention systems. They add standards for roadway drainage and residential infill lots and mandate a review of stormwater requirements every two years. On December 3, 2024 the city held a public forum on flooding after Hurricane Milton, with questions and comments sent to flooding@cityofnsb.com. The page says the Citywide Stormwater Master Plan Phase 1 study was complete on March 25, 2026, and that on July 14, 2026 Volusia County launched an interactive dashboard of flood control projects, watershed analyses and maintenance activities.</p>

<h2>Roofs, openings, permits and the building code</h2>

<p>The City of New Smyrna Beach states on its Building and Inspections page that, as of January 1, 2024, the state and the city enforce the 8th Edition 2023 Florida Building Code and the 2020 National Electric Code. Permit applications on or after that date must comply. The office is at 214 Sams Ave., open 7 a.m. to 4 p.m. Monday to Friday, and the phone number on the page is 386-410-2860. All permits are submitted through Energov Citizen Self Service, where the homeowner and any subcontractors are added to the permit.</p>

<p>The same page says that since July 1, 2022, Volusia County performs all permitting, application review, code enforcement and public hearings for properties in unincorporated Volusia County under the Interlocal Service Boundary Agreement. The page tells residents in the orange area of its map to contact Volusia County. It lists 386-736-5925 for code enforcement and 386-736-5942 for subdivisions. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-new-smyrna-beach-utilities-trash-permits">Moving to New Smyrna Beach: Utilities, Trash, Permits</a>.</p>

<p>Section 553.844 of the Florida Statutes, in the version posted by the Florida Legislature, says that for site-built single-family residences a roof replacement must incorporate secondary water barrier techniques and the strengthening or correcting of roof-decking attachments and fasteners. For a building in the wind-borne debris region with an insured value of 300,000 dollars or more, a roof replacement must also incorporate roof-to-wall connection techniques. If the building is uninsured or no insured value is presented, the statute uses a just valuation of 300,000 dollars or more. The statute says roof-to-wall connections are not required unless evaluation and installation can be completed for 15 percent of the cost of roof replacement.</p>

<p>The statute has an exception for roofs built to newer codes. If an existing roofing system or roof section was built, repaired or replaced in compliance with the 2007 Florida Building Code or any later edition, and 25 percent or more of it is being repaired, replaced or recovered, only the repaired, replaced or recovered portion must be constructed to the code in effect. The statute says a local government may not adopt an administrative or technical amendment to that exception.</p>

<p>The statute also has a rule for openings. Permits applied for on or after July 1, 2008 for work with an estimated cost of 50,000 dollars or more, not including roof covering replacement or repair, must include opening protections as required for new construction, for a building in the wind-borne debris region with an insured or just value of 750,000 dollars or more.</p>

<p>The state's Know Your Zone page says the most important precaution is to protect the areas where wind can enter. The city's Development Services frequently asked questions document says that homes built in the last 10 years, or with an addition, driveway, fence or pool in that time, most likely have a survey and permit record with the Building Department. It says the city may hold a survey or elevation certificate, and that Engineering may hold elevation certificates for flood-zone properties, filed by year of construction back to the early 1990s.</p>

<p>The same document says New Smyrna Beach special flood hazard zones are A, AE and VE. It says many older, established neighborhoods lack stormwater capacity, so each owner must retain a portion of runoff on the property, most commonly a shallow grassed depression that soaks back within 24 to 48 hours of rain. It says these are required by code and that filling them in may flood an adjacent property or the street.</p>

<p>Section 627.711 of the Florida Statutes says that at issuance and at each renewal, the insurer must notify the applicant or policyholder of the availability and range of premium discounts, credits or deductible reductions for fixtures or construction techniques that reduce windstorm loss. Insurers must accept a uniform mitigation verification form signed by an authorized inspector. The list is a licensed home inspector with at least 3 hours of approved hurricane mitigation training, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer or architect, or another person the insurer recognizes.</p>

<p>The statute says the signer must personally inspect the structures, except that licensed contractors and engineers may authorize a direct employee. It says signing a form that falsely says the inspector personally inspected is misconduct.</p>

<p>The city's Substantial Improvement and Damage packet, from the Building Department at 214 Sams Ave., phone 386-410-2800, says that if a home or business is below the 100-year flood elevation, determined by the Elevation Certificate, the city's flood damage prevention regulations may affect repair, remodel, renovation or add-on. It says substantial damage and substantial improvement both mean a cost equal to or greater than 50 percent of the structure's market value, before the damage or before the start of construction.</p>

<p>The packet says that if the lowest finished floor is below the 100-year flood elevation, the building must be raised to or above that level. It says electrical and mechanical equipment, bath and toilet rooms, laundry rooms, water heaters and finished areas must be at or above it. Only unfinished space for parking, building access and limited incidental storage is allowed below it.</p>

<h2>Shelters, alerts, flood coverage timing and the bottom line</h2>

<p>A city notice posted July 29, 2024 says the new Volusia County Emergency Management app keeps real-time situational updates, weather conditions, sandbag distribution points, shelter locations and evacuation alerts. It says the previous app no longer receives updates and tells residents to search for Volusia Emergency Management. The county emergency management director is quoted as saying the app puts critical information directly in the hands of our residents. The county's shelter page says residents can use the county app, volusia.org/PIN, social media, or the toll-free Citizens Information Hotline, 866-345-0345, which is only activated during an emergency.</p>

<p>The county shelter page says many public shelters can open according to each emergency, but not all open at once and they open based on demand. It says evacuees may stay 24 to 72 hours and that general population shelters do not provide cots, so a beach chair and sleeping pad are recommended. It says Votran provides free rides to public shelters from regular bus stops, that every Votran bus stop is an evacuation assembly point during a declared evacuation, and that the Votran New Smyrna Beach number is 386-424-6810. Shelter directions for opened shelters are in the county app.</p>

<p>The county shelter page says special needs shelters assist evacuees who are elderly, physically, mentally or sensory disabled, or require oxygen, and that residents should register with Volusia County Emergency Management in advance. It says hospitals are not shelters and that special needs shelters are pet friendly. On returning home, the page says re-entry to evacuated areas is authorized based on public safety, security and operational needs of search and rescue teams, and that the policy is set as soon as possible with as few restrictions as possible and announced through the news media.</p>

<p>The Volusia County floods page says most standard homeowner's policies do not cover flooding from rising water. It says most flood insurance policies have a 30-day waiting period before they become effective. It says some flood insurance policies are transferable when buying and selling a home, and that a condominium master policy does not usually cover the inside of the unit or contents. It lists Building and Code Administration at 386-626-6591 as an office that may have an elevation certificate.</p>

<p><strong>Bottom line.</strong> The county says local officials may order evacuation level A, BC or DE, and the state designates zones A to F. The city lists evacuation zone, storm surge and storm tide maps on its Flood Protection page. The city reports that many developed parcels were built before modern stormwater regulations, and it lists projects in Corbin Park, the Historic Westside and North Atlantic Avenue. Section 553.844 sets roof requirements, and the city's packet defines substantial damage and substantial improvement as a cost equal to or greater than 50 percent of the structure's market value. These are the published rules and guidance of Volusia County, the City of <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach</a>, the State of Florida and the Florida Statutes.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Who can order an evacuation?</strong></summary>
<p>Local officials may order one of three evacuation levels, A, BC or DE, depending on the track and strength of a hurricane. The county calls these Hurricane Evacuation Categories and says they correspond to the flooding that is likely to occur. The county page states that failure to obey an evacuation order is a violation of Florida law.</p>
</details>

<details>
<summary><strong>When do the bridges close during a hurricane?</strong></summary>
<p>The county evacuation page says that when an evacuation is ordered, bridges' east-bound lanes close to traffic. West-bound lanes remain open until sustained winds exceed 39 miles per hour, at which point all lanes close. Separately, a city notice posted September 26, 2024 covers the high-rise coastal bridges. It says Volusia County closes them when the county emergency management director determines it is necessary, in coordination with the Volusia Sheriff's Office. The notice lists winds sustained at 39 mph, visible damage to the bridge or flooding of the approaches, and damage assessments.</p>
</details>

<details>
<summary><strong>Who performs permitting for properties in unincorporated Volusia County?</strong></summary>
<p>The City of New Smyrna Beach Building and Inspections page says that since July 1, 2022, Volusia County performs all permitting, application review, code enforcement and public hearings for properties in unincorporated Volusia County. The page tells residents in the orange area of its map to contact Volusia County.</p>
</details>

<details>
<summary><strong>What does Florida law require when a roof is replaced?</strong></summary>
<p>Section 553.844 of the Florida Statutes says that for site-built single-family residences, a roof replacement must incorporate secondary water barrier techniques and the strengthening or correcting of roof-decking attachments and fasteners. For a building in the wind-borne debris region with an insured value of 300,000 dollars or more, it must also incorporate roof-to-wall connection techniques. The statute says roof-to-wall connections are not required unless evaluation and installation can be completed for 15 percent of the cost of roof replacement. There is an exception. If an existing roofing system or roof section was built, repaired or replaced in compliance with the 2007 Florida Building Code or any later edition, and 25 percent or more of it is being repaired, replaced or recovered, only the repaired, replaced or recovered portion must be constructed to the code in effect.</p>
</details>

<details>
<summary><strong>What does the city packet say about repairs or improvements to a home below the 100-year flood elevation?</strong></summary>
<p>The city's Substantial Improvement and Damage packet says that if a home or business is below the 100-year flood elevation, the city's flood damage prevention regulations may affect repair, remodel, renovation or add-on. Substantial damage and substantial improvement both mean a cost equal to or greater than 50 percent of the structure's market value. If the lowest finished floor is below the 100-year flood elevation, the building must be raised to or above that level. The city's Building Department phone number on the packet is 386-410-2800.</p>
</details>

<details>
<summary><strong>How do shelters work in Volusia County?</strong></summary>
<p>The county shelter page says many public shelters can open according to each emergency, but not all shelters open at once and they open based on demand. Evacuees may stay 24 to 72 hours, and general population shelters do not provide cots. The page says special needs shelters assist evacuees who are elderly, physically, mentally or sensory disabled, or require oxygen, and that residents should register with Volusia County Emergency Management in advance. It says hospitals are not shelters. The county's toll-free Citizens Information Hotline is 866-345-0345 and is only activated during an emergency.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:58:19 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-new-smyrna-beach-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[New Smyrna Beach Waterfront: Docks, Seawalls and Canal Lot Permits]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/new-smyrna-beach-waterfront-docks-seawalls-and-canal-lot-permits]]>
        </link>
        <description>
            <![CDATA[<p>A New Smyrna Beach dock on a non-oceanfront lot is limited to two boat slips per parcel, and a single-family dock structure is capped at 1,000 square feet of footprint, not counting a walkway, gangway or access pier five feet wide or less. Those two numbers come from the city's Land Development Regulations. Docks and seawalls each have their own rules in the code of <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach</a>.</p>

<p>This guide reads the city's Code of Ordinances on Municode, Florida Statute 403.813 and Volusia County's manatee permitting page. All three were read on October 28, 2026. The online code is Supplement 50, codified through Ordinance 28-26, which was enacted May 26, 2026. Municode itself says the posted code may not reflect the most current legislation adopted.</p>

<h2>What the city code lets a waterfront lot build</h2>

<p>The dock rules sit in section 803.04 of the Land Development Regulations. The section covers boat docks, terminal platforms, boat slips, covered boat slips or boathouses, mooring poles, boat ramps and docking facilities for non-commercial watercraft. It permits them on a non-oceanfront waterfront lot in any residential zoning district, except the multifamily districts. They must be an accessory use to a single-family or two-family use, and they must follow Volusia County's Manatee Protection Plan. The code calls these standard facilities.</p>

<p>Start with the slip count. No more than two boat slips are allowed per parcel, whether covered or not covered. A single boat slip is limited to no more than 360 square feet. A double boat slip may not exceed 600 square feet. The code defines a standard facility as a private structure accessory to a single-family or two-family residential property where boats are moored or launched, including boat slips, boathouses, mooring poles and terminal platforms. The maximum number of slips, mooring poles and boat ramps is a combination of any two.</p>

<p>A boat ramp counts against that limit. The code says that in lieu of a second boat slip, a parcel can have one boat ramp not exceeding 13 feet in width. Two lots can also join. Any two non-oceanfront waterfront lots in a single-family and two-family residential district may build a shared facility in the adjacent waterway that accommodates up to four boats. The code states that a shared facility would eliminate the right of either property to construct a separate dock or slip facility. The shared facility is either boat docking, a terminal platform and a boat lift with a boathouse or mooring poles, for a maximum of four boats per two lots, or no more than four uncovered boat slips, or a minimum of two single or double covered slips or boathouses. The same 360 and 600 square foot limits apply to the covered slips. Two boat ramps of no more than 13 feet in width are allowed, with no more than one per property, and each ramp is in lieu of one boat slip.</p>

<p>The code also has a provision for common areas. A non-oceanfront waterfront common area within a platted subdivision, a multi-family development or a commercial marina may build boat docks, boat lifts, terminal platforms, boathouses, mooring poles, access piers and access walkways. It may also build covered boat slips or boathouses, none of which exceed 300 square feet, and one boat ramp not exceeding 13 feet in width. The city commission approves the number and location of the dock facilities at a hearing open to the public. For a subdivision, the code adds that the common area has direct water frontage, the docks are owned and maintained by individual homeowners, and the docks are not rented or used by non-residents of the subdivision. The land used to reach the docks is owned and maintained by the homeowners association and stays common area. Setbacks for those docks are the same as for other single-family docks in the city. These facilities may be subject to the city slip pool, which the code sets at 1,480 slips in total. Of those, 1,204 are north of the North Causeway and 276 are south of the South Causeway. An unlimited number are between the North and South Causeways.</p>

<p>Now the size and position limits. The maximum height of a structure is 15 feet above the mean high waterline. For a second-story deck, the height is measured from the second floor and not from the required handrails. The maximum footprint of a single-family dock structure cannot exceed 1,000 square feet, not counting a walkway, gangway or access pier five feet in width or less. Terminal platforms may be covered by a roof so long as the area under the roof does not exceed the maximum square footage for covered boat slips. A second-story deck is allowed if it does not exceed that same maximum. The 600 square feet maximum must be shared between a covered slip or boathouse and a covered platform.</p>

<p>The side setback is ten feet. No standard structure may be closer than ten feet from the side lot lines, or from the Florida Department of Environmental Protection interpreted extensions of the side lot lines waterward from the property water frontage line. The list of structures includes mooring poles, boathouses, boat docks, terminal platforms, access piers and walkways, boat lifts and other boat storage and docking facilities. The prohibition also applies to the storage, anchorage or mooring of any boat. One exception is stated in the code. A structure may sit closer if it is permitted or required to be there by a valid court order equitably prorating a basin among upland owners.</p>

<p>How far a dock may reach into the water is a separate limit. The code says no boats or structures, including mooring poles, may be erected in the waterway beyond a set distance. The distance is measured from the mean high water line or the seawall at the point of the lot line to the mean high waterline or seawall at the nearest opposite shore. The limit is reached where the length of the structure is more than 25 percent of the width of the waterway when there are platted, buildable lots on the opposite shore. It is 30 percent when there are no platted or buildable lots on the opposite shore. The code exempts construction along, and in, the Intracoastal Waterway, Indian River, Callalisa Creek and Indian River Lagoon from those two percentages.</p>

<p>A second-story deck has its own guardrail list. The guardrail must comply with the Florida Building Code. The rails between the floor and the top railing are stainless steel cables. Posts are no closer than four feet apart. The bottom cable is no more than two inches above the floor. The top of the rail is at least 36 inches in height as measured from the deck of the second floor. Stairs accessing the second floor must comply with the Florida Building Code.</p>

<p>One more line in the code is about living aboard. No boat or vessel may be used or maintained as a dwelling unit unless it is sound, seaworthy and equipped with sanitary facilities. Those facilities are either connected to a public sewer system or a self-contained waste treatment system.</p>

<h2>What gets filed, and who signs off</h2>

<p>A dock in New Smyrna Beach has more than one permit behind it. Section 803.04 says no structure in a natural or man-made waterway may be erected without the required permits, certifications or exceptions from the Department of Environmental Protection, the Volusia County Manatee Protection Plan and the Army Corps of Engineers. Before work starts, applicants must submit a copy of the DEP or Army Corps of Engineers permit or self-certification and Volusia County Manatee Protection Plan approval. The code adds that copies of all permits, exemptions or approvals required from county, state and federal agencies go to the city manager or designee, and are attached to the building permit application.</p>

<p>If a county, state or federal agency requires a shorter dock projection than the city regulations permit, the agency's requirement applies.</p>

<p>The city also wants a drawn plan. Before a building permit is issued for the A and B facilities in section 803.04, a plan drawn to a scale no smaller than 1 inch equals 30 feet must be submitted to and approved by the city manager or designee. The code lists twelve items for the plan. They are a survey by a Florida registered land surveyor showing the mean high waterline or mean high elevation, depth soundings at three-foot vertical intervals from the property water frontage line to the opposite shore, the legal description, the lot boundary lines, the bulkhead location if there is one, the height above the mean high waterline, the facility dimensions, the percentage of the total waterway width, the distance from all side property lines or their waterward extensions, the type of facility as floating or non-floating, the construction material, and the boat mooring or docking positions. The percentage of waterway width is not required for a dock along the Intracoastal Waterway, Indian River, Callalisa Creek or Indian River Lagoon.</p>

<p>Volusia County has its own step. Its Environmental Management page says single family residences are permitted one structure with one or two boat slips. Inside a city, the building permit comes from the city before construction. The applicant must also submit to Volusia County Environmental Management a Manatee Mitigation Fee Checklist and a site plan of the dock with slips or moorings. The page adds the mitigation fee payment, if the structure is not exempt. In unincorporated Volusia, both a building permit and a Letter of Compliance are needed before work may commence.</p>

<p>The state has an exemption list. Florida Statute 403.813(1) says a permit is not required under chapters 403 and 373 for the listed projects, and a local government may not require a person claiming the exception to provide further department verification. The same subsection says it does not relieve an applicant from requirements to obtain permission to use or occupy state-owned lands. It also does not relieve an applicant from complying with applicable local pollution control programs or other requirements of county and municipal governments.</p>

<p>Under paragraph (1)(b), the exempt private dock has 500 square feet or less of over-water surface area in an area designated Outstanding Florida Waters, or 1,000 square feet or less in an area that is not so designated. It is built on pilings or is a floating dock constructed so as not to involve filling or dredging other than that necessary to install the pilings. It may not substantially impede the flow of water or create a navigational hazard. It is used for recreational, noncommercial activities associated with the mooring or storage of boats and boat paraphernalia. It is the sole dock built under the exemption as measured along the shoreline for a distance of 65 feet, unless the parcel or platted lot is less than 65 feet along the shoreline, in which case one exempt dock may be allowed per parcel or lot. Paragraph (1)(i) separately lists private docks of 1,000 square feet or less of over-water surface area and seawalls in artificially created waterways, when the construction will not violate water quality standards, impede navigation or affect flood control.</p>

<p>If an applicant wants a variance from section 803.04, the request goes to the Planning and Zoning Board at a public hearing. Adjacent property owners must be notified by certified mail by the applicant. The application goes to the Planning and Engineering Department with a letter of request. The code lists the criteria. They include special circumstances peculiar to the property or the waterway that make boat mooring or waterway access difficult, and strict application of the rules depriving the owner of reasonable rights enjoyed by other nearby owners. The circumstances may not result from the actions of the present or past owner, and the code says the test is not satisfied if an owner created the hardship to any degree. A variance also may not cause substantial detriment to public welfare, safety, navigation or convenience, and may not be a special privilege.</p>

<h2>Seawalls, the property line and what an old dock can keep doing</h2>

<p>The code defines a seawall as a retainer wall or structure designed to prevent the erosion of land by water action or acts of nature. It defines a bulkhead line as an imaginary line established in, or along, the Atlantic Ocean, a river, watercourse or other body of water, in order to fix and establish the maximum distance from the shoreline within which filling may be permitted. Chapter 90 of the code, titled Waterways, has a section that sets bulkhead lines on the Atlantic Ocean and a second section that sets bulkhead lines not located on the Atlantic Ocean.</p>

<p>The seawall changes where the setback starts. For bulkheaded and seawalled lots that are not on the oceanfront, the code says setbacks or property lines are measured from the bulkhead or seawall. That holds regardless of whether the fee simple property line extends into the water or is upland from the bulkhead or seawall. The dock rules use the seawall as a reference point too. The reach limit described above is measured from the mean high water line or the seawall.</p>

<p>On the oceanfront the code works from a different line. For bulkheaded and seawalled oceanfront lots, setbacks are at the City Coastal Construction Setback Line if fee simple ownership extends east of that line. If ownership does not extend east of it, the setback is as required in the upland zoning district from the property line. The Coastal Construction Setback Line is the same location as the Florida Department of Environmental Protection's Coastal Construction Control Line, as amended. On the land between that line and the Atlantic Ocean, the code prohibits principal buildings, including porches, balconies and roof overhangs, and accessory structures including pools, decks, patios, garages, sheds and gazebos. The prohibition does not apply where an exemption applies or where a Coastal Construction Setback Line variance is obtained from the planning and zoning board (section 703.02 D).</p>

<p>Seawalls are permitted seaward of the setback line under conditions. A seawall needs a building permit and any other required approvals, and it must meet two conditions. The first is that it will fill an existing gap of less than 200 feet between existing seawalls, or that it is an emergency event required to protect public health and safety. The second is a height limit. The seawall may not exceed the greater of the highest point of the existing grade within 25 feet of the proposed location, or the average height of the two nearest seawalls.</p>

<p>The state treats seawall work through 403.813 as well. Paragraph (1)(e) exempts the restoration of seawalls at their previous locations or upland of, or within 18 inches waterward of, their previous locations. The statute says this may not affect the permitting requirements of chapter 161, and that department rules shall clearly indicate that the exception does not exempt a project from chapter 161. Paragraph (1)(o) covers private seawalls built between and adjoining at both ends existing seawalls, following a continuous and uniform construction line with them, of not more than 150 feet in length, that do not violate water quality standards, impede navigation or affect flood control. In estuaries and lagoons, the construction of vertical seawalls is limited to the circumstances and purposes stated in section 373.414(5)(b)1. through 4. Paragraph (1)(i) says its seawall exemption does not apply to vertical seawalls in estuaries or lagoons unless the construction is within an existing manmade canal where the shoreline is currently occupied in whole or part by vertical seawalls.</p>

<p>For an older dock, the city code has a rule. Existing structures permitted before the enactment of the ordinance can exist as legal non-conforming accessory structures. If over 50 percent of the value of the structure is removed or damaged, all new or replacement structures must meet the current regulations. The state statute has a repair paragraph. Paragraph (1)(d) exempts the replacement or repair of existing docks and piers, except that fill material may not be used. The replacement or repaired dock or pier must be within 5 feet of the same location and no larger than the existing dock or pier. No additional aquatic resources may be adversely and permanently impacted. The paragraph does not preclude different construction materials or minor deviations to allow upgrades to current structural and design standards.</p>

<p>Ordinance 38-25, adopted July 22, 2025, amends Chapter 58 to add Section 58-4, use of city docks and boat ramps, which sets time limits for mooring at city-owned docks. At the time of the supplement the ordinance was listed as adopted but not yet codified.</p>

<p>Flood maps are a separate layer. The city's May 2022 flood FAQ says the special flood hazard zones in New Smyrna Beach are A, AE and VE. The city's Engineering Department, at 214 Sams Ave., 386-410-2812, helps with flood maps and flood history.</p>
<p>Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-new-smyrna-beach-beachside-mainland-costs-and-what-to-know">Living in New Smyrna Beach: Beachside, Mainland, Costs and What to Know</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-flood-zones-flood-insurance-guide">New Smyrna Beach Flood Zones & Flood Insurance Guide</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a>.</p>

<p>The bottom line is this. On a non-oceanfront waterfront lot, the city code allows two slips, a 1,000 square foot footprint for a single-family dock structure, a 15 foot height, a ten foot side setback and a reach limit of 25 or 30 percent of the waterway outside the four named waters, and the permits from the DEP or Army Corps, the Manatee Protection Plan and the city all have to be in hand. A dock built before the ordinance can stay as a legal non-conforming structure, and if more than 50 percent of its value is removed or damaged, the replacement meets today's code. Before a building permit for the A and B facilities, the city requires a surveyed plan showing the items listed above. These dock rules apply to non-oceanfront waterfront lots in residential districts other than multifamily in <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach</a>. Seawall setbacks differ on oceanfront lots, as described above.</p>

<p>The rules above come from several offices, so the questions below sort out the pieces one at a time.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>How many boat slips can a New Smyrna Beach waterfront lot have?</strong></summary>
<p>The city code allows no more than two boat slips per parcel on a non-oceanfront waterfront lot in a residential district other than the multifamily districts, whether the slips are covered or not. A single slip is limited to 360 square feet and a double slip to 600 square feet. In lieu of a second slip, a parcel can have one boat ramp not exceeding 13 feet in width. Two non-oceanfront waterfront lots in a single-family or two-family district can build a shared facility in the adjacent waterway for up to four boats. The code says this would eliminate the right of either property to build a separate dock or slip facility.</p>
</details>

<details>
<summary><strong>How large can a single-family dock be in New Smyrna Beach?</strong></summary>
<p>Section 803.04 says the maximum footprint of a single-family dock structure cannot exceed 1,000 square feet, not including a walkway, gangway or access pier five feet in width or less. The maximum height is 15 feet above the mean high waterline. Covered single slips are limited to 360 square feet and covered double slips to 600 square feet. The city's 1,000 square foot cap is the footprint of the dock structure. State law has a separate exemption from state permits that is measured as over-water surface area, 1,000 square feet or less outside Outstanding Florida Waters and 500 square feet or less inside them, and it has its own conditions, including that it is the sole exempt dock along 65 feet of shoreline. County and municipal requirements remain in place.</p>
</details>

<details>
<summary><strong>How close to the neighbor's property line can a dock sit?</strong></summary>
<p>The code says no standard structure may be closer than ten feet from the side lot lines, or from the Florida Department of Environmental Protection interpreted extensions of the side lot lines waterward from the property water frontage line. That covers docks, boathouses, mooring poles, terminal platforms, access piers and walkways, boat lifts and other boat storage and docking facilities. It also applies to the storage, anchorage or mooring of any boat. The one exception in the code is a structure permitted or required to be there by a valid court order equitably prorating a basin among upland owners.</p>
</details>

<details>
<summary><strong>Which permits does a New Smyrna Beach dock need?</strong></summary>
<p>The code says no structure in a natural or man-made waterway may be erected without the required permits, certifications or exceptions from the Department of Environmental Protection, the Volusia County Manatee Protection Plan and the Army Corps of Engineers. Applicants submit a copy of the DEP or Army Corps permit or self-certification and Manatee Protection Plan approval before construction starts. Copies of all permits, exemptions or approvals go to the city manager or designee and are attached to the building permit application. Inside a city, Volusia County Environmental Management also receives a checklist and a dock site plan.</p>
</details>

<details>
<summary><strong>What happens to an older dock if it is damaged?</strong></summary>
<p>The code says existing structures permitted before the enactment of the ordinance can exist as legal non-conforming accessory structures. If over 50 percent of the value of the structure is removed or damaged, all new or replacement structures must meet the current regulations. Florida Statute 403.813(1)(d) separately exempts the replacement or repair of existing docks and piers from state permits when no fill is used, the structure is within 5 feet of the same location and no larger than the existing one, and no additional aquatic resources are adversely and permanently impacted.</p>
</details>

<details>
<summary><strong>Where does the setback start on a seawalled lot?</strong></summary>
<p>On a bulkheaded or seawalled lot that is not on the oceanfront, the code says setbacks or property lines are measured from the bulkhead or seawall. That is stated regardless of whether the fee simple property line extends into the water or is upland from the bulkhead or seawall. On a bulkheaded or seawalled oceanfront lot, the setback is at the City Coastal Construction Setback Line if fee simple ownership extends east of that line. If ownership does not extend east of it, the setback is as required in the upland zoning district from the property line.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:58:03 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/new-smyrna-beach-waterfront-docks-seawalls-and-canal-lot-permits]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Hurricane Readiness for Port Orange Home Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-port-orange-home-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Volusia County says local officials may order one of three evacuation levels, written A, BC and DE, depending on the track and strength of a storm. Each level corresponds to the flooding likely to occur during a hurricane. <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange</a></p>

<p>Related: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers: 4-Point, Wind Mitigation and Citizens Explained</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-flood-zones-and-flood-insurance-for-buyers">Port Orange Flood Zones and Flood Insurance for Buyers</a>.</p>

<h2>Evacuation levels, storm surge and shelters</h2>

<p>Volusia County's evacuation plan page says that, depending on the track and strength of a threatening hurricane, local officials may order one of three evacuation levels, A, BC or DE. The page calls these Hurricane Evacuation Categories. It says they correspond to the flooding that is likely to occur during a hurricane. The page links an interactive Evacuation Zone Map.</p>

<p>The State of Florida's Know Your Zone page says evacuation zones are designated A to F. The state says Zone A is generally the most vulnerable and the most likely to be evacuated first. It also says that not all evacuation zones are always ordered. The county uses evacuation levels A, BC and DE. The state uses evacuation zones A to F.</p>

<p>The county names three groups who should evacuate. The first is anyone who lives in the hurricane evacuation zone. The second is anyone in a low-lying, flood prone area, and the page includes homes along river basins in that group. The third is anyone who lives in a mobile home, substandard housing, a recreational vehicle or a campsite.</p>

<p>The county calls storm surge the most deadly of hurricane hazards. It describes surge as salt water flooding that rushes over coastal and river areas. The county says surge can reach seven feet above sea level in a category 1 hurricane and as much as 28 feet above sea level in a category 5 hurricane. The state page says the greatest threat to life from a hurricane is storm surge flooding.</p>

<p>If you are not in an ordered evacuation zone, a low-lying flood prone area, a mobile home or an unsafe structure, the state says it may be safer to stay in your home. It adds that the homeowner is responsible for knowing whether the home is strong enough to withstand a hurricane. It says generally that homes built after 2002 include features that make them more resilient. It also says to always heed the advice and orders of local officials.</p>

<p>The county states that failure to obey an evacuation order is a violation of Florida law. The county also gives a bridge rule. When an evacuation is ordered, the east-bound lanes of bridges close to traffic. The west-bound lanes remain open until sustained winds exceed 39 miles per hour. At that point all lanes close.</p>

<p>Mobile homes have a separate rule. The county says that residents of a mobile home or recreational vehicle must evacuate for all evacuation levels regardless of where they are. It gives the reason in construction terms. Mobile homes have flat sides and are lightweight, and that construction does not allow the proper transfer of the wind load through the supports into the foundation and ground. The county tells owners to maintain tie-down straps and anchors and to check the straps for rust or corrosion. The city's disaster guide says to inspect tie downs annually.</p>

<p>The county lists what to do if you evacuate. Know where you are going, whether that is family, friends, a hotel or motel, or a public shelter. Take a map showing two routes to the destination. Notify family and friends of your location. Secure your home and property. Take emergency supplies. Do not delay. The state adds that your safest and easiest option may be to stay with friends or family who live outside the evacuation zone or in a stronger house. The city's disaster guide says to make sure your destination is not within a zone that has been ordered to evacuate, and that a hotel or motel needs to be checked for availability and reserved well in advance.</p>

<p>The county says not all shelters open at once and that they open based on demand. To stay informed it names the county emergency preparedness app, the web address volusia.org/PIN, and Emergency Management on social media. The toll-free Citizens Information Hotline is 866-345-0345, and the county says it is only activated during an emergency. Evacuees may need to stay at a shelter for 24 to 72 hours. General population shelters do not provide cots. The county recommends a comfortable beach chair and a sleeping pad.</p>

<p>The county says special needs shelters are for people who register with Volusia County Emergency Management, and its floodplain page gives 386-258-4088 for special needs preregistration. The county states that hospitals are not shelters. It states that special needs shelters are not for people who need 24-hour dedicated care, a hospital bed, a ventilator, other complex care, or isolation patients. People with special needs should be accompanied by a caregiver if that assistance is normally needed.</p>

<p>Alerts are the last piece. The Port Orange home page lists a quick link named Alert Port Orange - Emergency Notification System. The county's floodplain page tells residents to sign up for AlertVolusia Emergency Notification Alerts. Volusia County Emergency Management lists 386-254-1500, and Port Orange Fire & Rescue lists 386-506-5900. Hurricane season runs June 1 to November 30, according to the city.</p>

<h2>Flood zones, flood insurance and the 50 percent rule</h2>

<p>The county publishes the evacuation levels and the flood insurance rate map labels on separate pages. On the flood maps page the county says its maps label inland high-risk zones A or AE, and coastal high-risk zones that have additional risk from storm surge VE. The current flood insurance rate maps are effective February 19, 2014, September 29, 2017 and August 7, 2018. The county adds that its map information is not survey accurate, and it recommends independent verification of the data.</p>

<p>The city says that FEMA flood zones can change and that properties once outside a flood zone may now be in one. Port Orange offers an interactive map of current flood zones on its flood page. It also links the Volusia County Flood Risk Map and a complimentary flood zone determination request. The county points to the FEMA Map Service Center at msc.fema.gov for the same lookup. The Port Orange Building Permit Requirements page links both a Flood Zone Information page and a Flood Zone Map.</p>

<p>The city adds history questions to the zone question. For historical flooding, localized drainage issues, repetitive loss areas, natural conservation areas, wetlands, flood insurance, and rules for building in a floodplain, the city says to contact Community Development's Engineering Office at 386-506-5607. The city says site visits are made on request to review drainage and flooding concerns. The county gives 386-626-6591 for Building and Code Administration.</p>

<p>Most standard homeowners' policies do not cover flooding from rising water. All Port Orange homeowners can purchase flood insurance, and the county says all property owners in Volusia County can buy it for structures and contents. Most flood policies have a 30-day waiting period before they take effect, and the city says to purchase as early as possible. The county says some flood policies are transferable when a home is bought or sold. The county also says a condominium master policy does not usually cover the inside of the unit or its contents.</p>

<p>Section 689.302 of the Florida Statutes requires a seller to complete and provide a flood disclosure to a purchaser of residential real property at or before the time the sales contract is executed. The form opens with a statement that homeowners' insurance policies do not include coverage for damage resulting from floods. The seller then states three things. The first is whether the seller has or has no knowledge of any flooding that has damaged the property during the seller's ownership. The second is whether the seller has or has not filed a claim with an insurance provider for flood damage, including a claim with the National Flood Insurance Program. The third is whether the seller has or has not received assistance for flood damage, including assistance from the Federal Emergency Management Agency.</p>

<p>The statute defines flooding. It means a general or temporary condition of partial or complete inundation of the property caused by any of three things. The first is the overflow of inland or tidal waters. The second is the unusual and rapid accumulation of runoff or surface waters from any established water source, such as a river, stream or drainage ditch. The third is sustained periods of standing water resulting from rainfall.</p>

<p>Port Orange has a rule for work in the flood zones. The city says that if a building is in Flood Zones A or AE, all new construction, repairs, renovations, alterations and remodeling must comply with floodplain management rules in the Port Orange Land Development Code and the Florida Building Code. Before work on a building in Zone A or AE, the city says to contact it and obtain a Floodplain Development Permit or a Building Permit. It also says to use a licensed and insured contractor.</p>

<p>The county says that substantial improvements or repairs equal to or greater than 50% of a home's market value must meet current Florida Building Code standards and comply with the local floodplain ordinance. The city gives its own definitions. A Substantial Improvement is any combination of repair, reconstruction, rehabilitation, addition or improvement over five years that totals 50% or more of the building's value before the work starts. Substantial Damage is damage of any origin where the repair costs equal or exceed 50% of the pre-damage value. It also covers flood damage that occurs twice within 10 years, with repair costs averaging 25% of the building's value each time. The city says buildings that are substantially damaged or substantially improved must meet local floodplain management requirements, including elevation standards.</p>

<p>The county says an Elevation Certificate may be on file with Building and Code Administration. The county also says a few inches of water can cause tens of thousands of dollars in damage. The county's floodplain page says "Turn around, don't drown" and that more people drown in their cars than anywhere else. It says not to drive through flooded roads or around road barriers.</p>

<p>The city also tells residents what it does about flooding. It says it maintains 200 miles of canals and ditches and more than 100 ponds. It has adopted the Volusia County Multi-Jurisdictional Local Mitigation Strategy. The city says residents can report a problem with a pond, swale or canal near a property through SeeClickFix. It adds that some ponds and canals are managed by local homeowner associations, and that those associations may be the ones to address the issue. The Integrated Volusia County Floodplain Management Plan (2025) was developed by the East Central Florida Regional Planning Council and aligns with the Volusia County Local Mitigation Strategy.</p>

<h2>Roofs, openings and what the permit rules say after a storm</h2>

<p>Section 553.844 of the Florida Statutes sets requirements for site-built single-family homes. Under subsection (3)(a), a roof replacement must incorporate secondary water barriers and the strengthening or correcting of roof-decking attachments and fasteners. For a building in the wind-borne debris region with an insured value of 300,000 dollars or more, or a just valuation for tax purposes of 300,000 dollars or more if it is uninsured or no insured value is presented, a roof replacement must also incorporate roof-to-wall connection techniques. The statute says roof-to-wall connections shall not be required unless the evaluation and installation at gable ends or all corners can be completed for 15 percent of the cost of roof replacement.</p>

<p>Subsection (5) also says that if an existing roofing system or roof section was built, repaired or replaced in compliance with the 2007 Florida Building Code or any later edition, and 25 percent or more of it is being repaired, replaced or recovered, only the repaired, replaced or recovered portion must be constructed under the code in effect.</p>

<p>The Florida Department of Financial Services four-point inspection guide says an insurance company may require documentation confirming at least five years of remaining useful life for roofs older than 15 years if they are shingle, or 20 years if they are tile or metal. The state's Know Your Zone page says the most important precaution to reduce hurricane damage is to protect the areas where wind can enter, and to strengthen the exterior so wind and debris do not tear large openings in it.</p>

<p>The city's disaster guide sums up wind protection as three actions. Anchor your roof. Brace your entry and garage doors. Cover your windows. For the windows, the guide says to protect windows and glass doors with plywood or storm shutters. It says to brace double entry and garage doors at the top and bottom.</p>

<p>Section 627.711 says an insurer must notify a policyholder of any personal lines residential property policy, at the time of issuance and at each renewal, of the availability and range of each premium discount, credit, rate differential or deductible reduction for properties with fixtures or construction techniques demonstrated to reduce windstorm loss. The statute provides for a uniform mitigation verification inspection form that all insurers use when policyholders submit it for wind insurance discounts. An insurer shall accept as valid a form signed by a licensed home inspector who completed at least 3 hours of approved hurricane mitigation training and a proficiency exam, a certified building code inspector, a licensed general, building or residential contractor, a licensed professional engineer, or a licensed professional architect.</p>

<p>The statute adds a personal inspection requirement. A person authorized to sign the form must inspect the structures personally and attest to the personal inspection. Licensed engineers and contractors may authorize a direct employee who is not an independent contractor to conduct the inspection.</p>

<p>Port Orange processes building permits through the SmartGov portal. Its Building Permit Requirements page says to review the residential or commercial checklist before submitting, and that if the correct documents are not submitted the application is considered incomplete and will not be processed. The Building Department phone number is 386-506-5602. The City of Port Orange publishes a Hurricane and Tropical Storm Recovery Permitting Guide.</p>

<p>The guide says that following a declared state of emergency the city will activate a post-storm permitting center at 1000 City Center Circle or an alternate location. It says the city will maintain at least 40 hours per week of public-facing permitting services as soon as conditions allow, and will implement expedited review and inspection processes for storm-related repairs. The city lists repairs that require a permit. They are roof replacements or substantial roof repairs, structural repairs, electrical service restoration or replacement, HVAC equipment replacement, window or door replacement, fence replacement and water heater replacement. The city lists repairs that do not require a permit. They are tarping of roofs, debris removal, minor cosmetic repairs, fence panel attachment without posts, and tree removal for storm-related dead or damaged trees.</p>

<p>To apply after a storm, the guide says to use the SmartGov portal or go in person to the Building Department at 1000 City Center Circle. An Owner Builder Affidavit is required if the owner is the applicant. The expedited review categories are roofs, electrical service reconnects, water damage-related HVAC replacements, and window or door replacements. The guide says expedited review is completed in one to three business days for essential repairs. It says inspections are scheduled within 24 to 48 hours of request, weather permitting. It also says permit fee deferment applies if the City Council activates it by resolution.</p>

<p>The guide has a flood rule for rebuilding. For substantially damaged or substantially improved buildings, the elevation requirements reference the FEMA Base Flood Elevation and the local freeboard, along with the latest Florida Building Code and local amendments. The guide says Floodplain Development permits are required for repairs in the Special Flood Hazard area. It also says permits will not be required for the cleanup and removal of wet drywall, cabinets, carpeting and baseboards. The city says it reviews the guide annually by May 1 to comply with Florida CS/CS/SB 180.</p>

<p>The county links an interactive Evacuation Zone Map and the state has a Know Your Zone page. The city offers an interactive map of current flood zones and the county names the FEMA Map Service Center. The city's Engineering Office handles questions on historical flooding, drainage and repetitive loss areas. Section 689.302 requires a seller to provide a flood disclosure at or before the time the sales contract is executed. The city's Building Department handles permits, and the county and the city both state a 50 percent rule. Most flood policies have a 30-day waiting period.</p>

<p><a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange</a> <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-new-homes-permits-and-certificate-of-occupancy">Port Orange New Homes: Permits and Certificate of Occupancy</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/port-orange-florida-a-buyer-s-guide-to-neighborhoods-and-costs">Port Orange, Florida: A Buyer's Guide to Neighborhoods and Costs</a>.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>How do I find the hurricane evacuation level for a Port Orange address?</strong></summary>
<p>Volusia County's evacuation plan page links an interactive Evacuation Zone Map. The sources do not confirm what level any specific address falls in. Local officials may order one of three levels, A, BC or DE, and the State of Florida's Know Your Zone page uses zones A to F. Volusia County Emergency Management lists 386-254-1500. Port Orange Fire & Rescue lists 386-506-5900.</p>
</details>
<details>
<summary><strong>Who orders a hurricane evacuation in Port Orange?</strong></summary>
<p>Volusia County's evacuation plan says local officials may order one of three evacuation levels, A, BC or DE, depending on the track and strength of a threatening hurricane. The sources do not name the Port Orange body that issues the order. The county states that failure to obey an evacuation order is a violation of Florida law. The City of Port Orange says its Emergency Management supports each city department and keeps citywide emergency plans. The county's floodplain page names AlertVolusia, and the city's home page lists a link named Alert Port Orange.</p>
</details>
<details>
<summary><strong>How do I check the flood zone and flood history of a Port Orange home?</strong></summary>
<p>The city offers an interactive map of current flood zones and a complimentary flood zone determination request on its flood page. The county points to the FEMA Map Service Center. For historical flooding, localized drainage issues and repetitive loss areas, the city says to call Community Development's Engineering Office at 386-506-5607. For historical flooding, localized drainage, repetitive loss areas or topography, the county lists Building and Code Administration at 386-626-6591. The county also says its flood map information is not survey accurate and recommends independent verification.</p>
</details>
<details>
<summary><strong>What does the Florida flood disclosure ask a seller?</strong></summary>
<p>Section 689.302 of the Florida Statutes requires the seller to provide a flood disclosure at or before the time the sales contract is executed. It states that homeowners' insurance policies do not include coverage for damage resulting from floods. The seller then states whether the seller has or has no knowledge of flooding that damaged the property during ownership, whether the seller has or has not filed a flood damage claim, including with the National Flood Insurance Program, and whether the seller has or has not received flood damage assistance, including from FEMA.</p>
</details>
<details>
<summary><strong>What is the 50 percent rule for repairs and renovations in Port Orange?</strong></summary>
<p>The city defines Substantial Improvement as any combination of repair, reconstruction, rehabilitation, addition or improvement over five years that totals 50% or more of the building's value before the work starts. Substantial Damage is damage where repair costs equal or exceed 50% of the pre-damage value, or flood damage that occurs twice within 10 years with repair costs averaging 25% of the building's value each time. Such buildings must meet local floodplain management requirements, including elevation standards. The county states its own rule: improvements or repairs of 50% or more of market value must meet current Florida Building Code standards and the local floodplain ordinance. The city's Building Department phone is 386-506-5602.</p>
</details>
<details>
<summary><strong>What does Port Orange do about permits after a hurricane?</strong></summary>
<p>The city's Hurricane and Tropical Storm Recovery Permitting Guide says that after a declared state of emergency the city will activate a post-storm permitting center at 1000 City Center Circle or an alternate location. It says expedited review is completed in one to three business days for essential repairs, and inspections are scheduled within 24 to 48 hours of request, weather permitting. Roof replacements and window or door replacements require a permit. Tarping of roofs and debris removal do not.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:57:47 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/hurricane-readiness-for-port-orange-home-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Reverie at Palm Coast: A Buyer's Guide to the 55+ Community]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/reverie-at-palm-coast-a-buyer-s-guide-to-the-55-community]]>
        </link>
        <description>
            <![CDATA[<p>Reverie at Palm Coast is a community the builder markets as 55+, on the west side of U.S. 1. A 2023 news report, citing a 2020 development order, put its full plan at 421 single-family homes on 478 acres. If you are searching <a href="http://www.adamscameron.com/s/fl/palm-coast-city/reverie-at-palm-coast-subdivision">Reverie at Palm Coast subdivision page</a>, this guide sets out what the builder and the 2023 news report say about the community. Facts about the place come from the builder's own pages and from that news report. The rules come from the Florida Statutes text, read on October 28, 2026.</p>

<p>One limit first. I did not read Reverie's recorded declaration, its budget or its association documents. Those belong to the association and the developer, and the rest of this guide sets out what the statute says about them.</p>

<h2>Where Reverie sits and how it was planned</h2>

<p>The development is on the west side of U.S. 1, a mile north of Palm Coast Parkway. That is how FlaglerLive described the site on February 21, 2023. The builder, Dream Finders Homes, gives the community and sales office address as 3 Ellaville Drive, Palm Coast, FL 32137. The sales office hours the builder posts are Monday to Saturday from 10 a.m. to 5:30 p.m. and Sunday from noon to 5:30 p.m.</p>

<p>The name has a history. FlaglerLive says the development was previously called Spring Lake and has been renamed The Reverie at Palm Coast. The planning board issued a development order for Spring Lake at Palm Coast in June 2020. The article describes it as a two-phase development over 478 acres that will eventually total 421 single-family homes.</p>

<p>The first phase moved forward in February 2023. That month, the Palm Coast City Council approved the first phase of the final plat. The first phase consists of 272 single-family homes on 113 acres. The article states the density as 0.88 homes per acre. Those numbers come from an article dated February 21, 2023.</p>

<p>Reverie is part of a larger project. The article says Spring Lake is part of the Palm Coast Park development of regional impact. It describes that kind of project as a huge, planned development that a local government approves for development in phases, involving thousands of housing units. The city approved the Palm Coast Park project in 2004. It covers 4,600 acres and straddles U.S. 1 from just north of Hargrove Grade to Matanzas Woods Parkway. Spring Lake was the third large subdivision in Palm Coast Park and the first in its southwest portion.</p>

<p>The article gives several layout facts. The development has two access points to U.S. 1. Its western limit is the Florida East Coast Railway corridor. The vast acreage along the rail line is to remain in conservation. Infrastructure construction, meaning roads, intersections, ponds and a lift station, began after 2021.</p>

<p>The lot mix is spelled out too. At build-out the development will have 101 fifty-foot wide lots, 74 sixty-foot wide lots and 246 seventy-foot wide lots. Those add up to the 421 homes. The minimum lot size is 4,000 square feet. The minimum building setbacks are 5 feet to the sides, 20 feet to the front and 10 feet to the back. The builder's own homes page sorts its plans under three tabs: 50-foot, 60-foot and 70-foot homesites.</p>

<p>The article also says there will be an amenity center. The builder's pages call it The Lake House Amenity Center, overlooking a scenic lake. For the wider city, see <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/is-palm-coast-a-good-place-to-live-an-honest-look-for-buyers">Is Palm Coast a Good Place to Live? An Honest Look for Buyers</a>.</p>

<h2>What the builder says, and where its own pages differ</h2>

<p>Dream Finders titles its community page "New 55+ Active Adult Community in Palm Coast, Florida." The page header lists two to four bedrooms, two to three and a half baths, and 1,693 to 3,732 square feet. A second builder page describes Reverie as a 55+ community and calls it a gated enclave with a master-planned setting. That is the builder's description. It is not a recorded document.</p>

<p>The homes page shows how much care you need with marketing numbers. One paragraph says the community offers 15 uniquely designed home styles ranging from 1,700 to over 3,100 square feet. The plan list on that same page runs from 1,693 square feet to 3,732 square feet and shows 17 entries, three of them named Bonus. Both numbers sit on one page.</p>

<p>Here is the plan list as it appeared on October 28, 2026, with square footage. Alexander is 1,693. Casper is 1,836. Clark is 1,967. Charlotte is 2,029. Flagler is 2,172. Cooper is 2,186. Debary is 2,369. Casper Bonus is 2,433. Delmar is 2,468. Moore is 2,555. Needham is 2,588. Santa Rosa is 2,790. Jupiter is 2,860. Sheehan is 2,864. Ponce is 3,070. Cooper Bonus is 3,129. Sheehan Bonus is 3,732.</p>

<p>Bedroom counts on that list run from two, in the Alexander, to four, in the Sheehan and the Sheehan Bonus. The builder says the homes have two- and three-car garages.</p>

<p>The builder shows a starting price marked "From" for the smallest and the largest plans. On October 28, 2026, the smallest plan listed, the two-bedroom Alexander at 1,693 square feet, showed a starting price of three hundred twenty-nine thousand nine hundred ninety dollars. The largest plan listed, the four-bedroom Sheehan Bonus at 3,732 square feet, showed five hundred seven thousand nine hundred ninety dollars. Those are the builder's starting prices for those two plans on that date.</p>

<p>One plan gets a full description. The Flagler is a 2,172 square foot courtyard home with two bedrooms, two baths, a flex room and a two-car garage. The builder says it is built around a private open-air courtyard.</p>

<p>On amenities, the builder's highlight list names a 4,000 square foot lakeside clubhouse, indoor and outdoor social spaces, tournament-class pickleball courts, a fitness center, a resort-style pool and spa, a catering kitchen, additional sports courts including bocce ball, a food truck pavilion and a dog park. The amenities page says there are six tournament-class pickleball courts. It also mentions scenic walking and biking trails and a dedicated lifestyle team that curates a calendar of events. The community page lists events such as new resident happy hours, Wine Down Wednesdays, Book Nook swaps, tribute band concerts, boat tours and golf cart parades.</p>

<p>Read the tense on that amenities page. Some of its descriptions use the future tense. The fitness center entry uses the future tense, in the words "will provides" residents.</p>

<p>For Grand Haven in Palm Coast, see <a href="http://www.adamscameron.com/real-estate-info/2026/10/28/grand-haven-in-palm-coast-a-buyer-s-guide-to-the-cdd-the-master-association-and-the-rules">Grand Haven in Palm Coast: A Buyer's Guide to the CDD, the Master Association and the Rules</a>.</p>

<h2>The paperwork to read before you sign</h2>

<p>Start with Section 720.401 of the Florida Statutes, the 2026 text. A prospective parcel owner in a community must be presented a disclosure summary before executing the contract for sale. The statute supplies the form. It lists nine numbered points, and each one is a place to look for facts about Reverie.</p>

<p>Point one says you will be obligated to be a member of a homeowners' association. Point two says recorded restrictive covenants govern the use and occupancy of properties. Point three says you will be obligated to pay assessments to the association, that assessments may be subject to periodic change, and that special assessments may be imposed. Point four says you may be obligated to pay special assessments to the respective municipality, county or special district. Point five says that failing to pay assessments could result in a lien on your property.</p>

<p>Point six says there may be an obligation to pay rent or land use fees for recreational facilities. Point seven says the developer may have the right to amend the restrictive covenants without the approval of the association membership or the parcel owners. Point eight says the summary is only a summary, and that you should refer to the covenants and the association governing documents before purchasing. Point nine says those documents are either public record at the record office in the county where the property is located or can be obtained from the developer.</p>

<p>The statute says who supplies the summary. It must come from the developer, or from the parcel owner if the sale is by an owner who is not the developer. If it is not provided before the contract is signed, the buyer may void the contract by written notice within 3 days after receiving the disclosure summary or before closing, whichever happens first. That right cannot be waived, and it ends at closing. The same section says it does not apply to associations regulated under chapters 718, 719, 721 or 723.</p>

<p>I left the Reverie dues out of this guide because the only places I found a figure were third-party sites.</p>

<h2>Resale, the estoppel certificate and the lien</h2>

<p>If you are buying a resale home in Reverie, Section 720.30851 governs the estoppel certificate. The request comes from a parcel owner or the owner's designee, or a parcel mortgagee or its designee. The association must issue it within 10 business days after a written or electronic request. Each association must designate on its website a person or entity, with a street or email address, for these requests.</p>

<p>The certificate follows a statutory form. It states the regular periodic assessment and the date it is paid through. It lists the itemized money owed and any additional assessments scheduled to come due. It asks whether a capital contribution, resale, transfer or other fee is due. It asks whether there is an open rule violation. It asks whether the rules require board approval for the transfer of the parcel and, if so, whether the board has approved it. It asks whether a right of first refusal exists. It also lists the other associations the parcel belongs to and the contact information for insurance the association maintains.</p>

<p>The statute sets the timing and the fees. A certificate delivered by hand or electronically has a 30-day effective period. A certificate sent by regular mail has a 35-day effective period. The fee may not exceed two hundred fifty dollars if no delinquent amounts are owed on the date of issuance. An expedited certificate delivered within 3 business days may carry an additional fee of one hundred dollars. If a delinquent amount is owed, an additional fee may not exceed one hundred fifty dollars. If the association misses the 10 business days, it may not charge a fee. The statute also says the fees are adjusted every 5 years by the Consumer Price Index, and the Department of Business and Professional Regulation publishes the adjusted amounts.</p>

<p>One protection is worth knowing. The association waives the right to collect any money owed in excess of the amounts stated in the certificate from a person who relies on it in good faith.</p>

<p>Now the lien. Section 720.3085 says that, when the governing documents authorize it, the association has a lien on each parcel to secure payment of assessments. The lien is effective from, and relates back to, the date the original declaration of the community was recorded. As to first mortgages of record, it is effective from the recording of a claim of lien. A claim of lien must state the description of the parcel, the name of the record owner, the name and address of the association, the amount due and the due date. It secures unpaid assessments, interest, late charges, and reasonable costs and attorney fees.</p>

<h2>The 55+ label, the district question and the tax bill</h2>

<p>The builder markets Reverie as 55+. Section 760.29(4) says what housing for older persons must meet when it is intended and operated for occupancy by persons 55 or older. At least 80 percent of the occupied units must be occupied by at least one person 55 or older. The community must publish and adhere to policies and procedures that demonstrate that intent. It must comply with the federal HUD rules for verification of occupancy, which provide for verification by reliable surveys and affidavits. Governing documents that can be amended at a future date must be amended and properly recorded within one year after that date to reflect those requirements, if the community intends to continue as housing for older persons.</p>

<p>That is the legal test. The builder's label is not the test. This guide does not say who lives there, and it did not read the community's recorded rules.</p>

<p>On special districts, the Palm Coast Park Community Development District exists. Its own website says it is an independent local unit of special-purpose government under Chapter 190 of the Florida Statutes, established by Rule 42AAA-1 of the Florida Land and Water Adjudicatory Commission, effective September 13, 2005, with a five-member Board of Supervisors. I did not find a record that places Reverie inside that district or rules it out. The 2023 article says Reverie is part of the Palm Coast Park development of regional impact. Point four of the disclosure summary says you may be obligated to pay special assessments to a special district.</p>

<p>The tax side has one fixed rule. For a homesteaded property, the annual increase in assessment may not exceed the lower of 3 percent of the prior year's assessed value or the percentage change in the Consumer Price Index for the preceding calendar year. The Florida Department of Revenue lists the 2026 change at 2.7 percent. The limit starts the year after the property receives the homestead exemption. It limits the assessed value. For how a Palm Coast bill is built, see <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-property-tax-bill-line-by-line">Palm Coast Property Tax Bill, Line by Line</a>.</p>

<p>Flood zone and insurance are address questions. I did not look up a flood zone for any Reverie lot. FEMA publishes flood maps through the FEMA Flood Map Service Center. See <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-flood-zones-what-to-check-before-an-offer">Palm Coast Flood Zones: What to Check Before an Offer</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers</a>.</p>

<h2>Bottom line</h2>

<p><a href="http://www.adamscameron.com/s/fl/palm-coast-city/reverie-at-palm-coast-subdivision">Reverie at Palm Coast</a> is a community the builder markets as 55+. A 2023 news report gives its plan as 421 homes on 478 acres, the builder lists plans from 1,693 to 3,732 square feet, and the city approved a first phase of 272 homes. Section 720.401 tells a buyer to refer to the covenants and the association governing documents, and the disclosure summary must be presented before the contract is executed. On a resale, the estoppel certificate under Section 720.30851 is requested by the parcel owner or the owner's designee, or a parcel mortgagee or its designee. Whether Reverie sits inside a community development district was not confirmed. The builder's page shows two different size ranges, 1,700 to over 3,100 square feet in one paragraph and 1,693 to 3,732 square feet in its plan list.</p>

<p>These are the questions to settle before an offer. Some are answered above and some remain open.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Is Reverie at Palm Coast a 55+ community?</strong></summary>
<p>The builder markets it that way. Dream Finders titles its page a new 55+ active adult community in Palm Coast, Florida. Florida law has its own test for housing for older persons. At least 80 percent of occupied units must have one resident 55 or older, the community must publish and follow policies showing that intent, and HUD rules provide for verification by reliable surveys and affidavits. Under the statute, a community must publish policies showing its 55+ intent, so ask for those and for the recorded declaration.</p>
</details>
<details>
<summary><strong>How many homes are planned at Reverie at Palm Coast?</strong></summary>
<p>A February 2023 FlaglerLive report says the development will eventually total 421 single-family homes over 478 acres in two phases. It says the first phase final plat covers 272 homes on 113 acres. Those are figures from a 2023 article.</p>
</details>
<details>
<summary><strong>What does the disclosure summary cover and when must I get it?</strong></summary>
<p>Section 720.401 says a prospective parcel owner must be presented the summary before executing the contract. It covers mandatory association membership, recorded covenants, assessments and possible special assessments, possible special district assessments, liens, possible land use fees and the developer's right to amend covenants. If it was not provided before you signed, you may void the contract by written notice within 3 days after receiving it or before closing, whichever comes first. You cannot waive that right, and it ends at closing.</p>
</details>
<details>
<summary><strong>Who can request an estoppel certificate on a resale home?</strong></summary>
<p>Section 720.30851 says the request comes from the parcel owner or the owner's designee, or from a parcel mortgagee or its designee. The association must issue the certificate within 10 business days. It must state the assessment, any money owed, whether a transfer fee is due, whether board approval of the transfer is required and whether a right of first refusal exists. A certificate delivered by hand or electronically is effective for 30 days, and one sent by mail for 35 days.</p>
</details>
<details>
<summary><strong>Is Reverie at Palm Coast in a community development district?</strong></summary>
<p>I could not confirm it. The Palm Coast Park Community Development District exists, and Reverie is part of the Palm Coast Park development of regional impact according to a 2023 news report. Point four of the statutory disclosure summary says you may be obligated to pay special assessments to a special district.</p>
</details>
<details>
<summary><strong>What amenities does the builder list for Reverie at Palm Coast?</strong></summary>
<p>The builder lists a 4,000 square foot lakeside clubhouse, indoor and outdoor social spaces, tournament-class pickleball courts, a fitness center, a resort-style pool and spa, a catering kitchen, additional sports courts including bocce ball, a food truck pavilion and a dog park. Its amenities page says there are six pickleball courts. Some entries on that page use the future tense.</p>
</details>
<details>
<summary><strong>How much can my homestead assessment rise each year?</strong></summary>
<p>Under section 193.155, a homesteaded property's assessment may not rise by more than the lower of 3 percent of the prior year's assessed value or the change in the Consumer Price Index for the preceding calendar year. The Florida Department of Revenue lists the 2026 change at 2.7 percent. The limit starts the year after the property receives the homestead exemption. It limits assessed value.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:21:31 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/reverie-at-palm-coast-a-buyer-s-guide-to-the-55-community]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Colonial Colony South in Daytona Beach: A Buyer's Guide]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/colonial-colony-south-in-daytona-beach-a-buyer-s-guide]]>
        </link>
        <description>
            <![CDATA[<p>Colonial Colony South in Daytona Beach has 572 lots, and a buyer there purchases a home and leases the ground under it. The community's prospectus, last revised October 30, 2025, is the document that spells out what the lease includes, what it charges for and which rules apply.</p>

<p>This guide restates that prospectus, the community's own website and Chapter 723 of the Florida Statutes. The posted prospectus leaves its dollar amounts blank, so this guide gives no lot rent figures. Related page: <a href="http://www.adamscameron.com/s/fl/daytona-beach-city/colonial-colony-south-neighborhood">Colonial Colony South</a>.</p>

<h2>What Colonial Colony South is, and what the lease covers</h2>

<p>The community is at 1275 Beville Road, Daytona Beach, Florida 32119. Its website calls it a family-owned 55+ manufactured home community. The about page says the owner has two locations in Daytona Beach, Colonial Colony South and Colonial Colony North. This guide covers South only, and the prospectus it relies on is titled for Colonial Colony South Mobile Home Community.</p>

<p>The prospectus says the community has 572 lots, and that each lot is approximately 50 feet by 80 feet, or approximately 4,000 square feet. It says the original prospectus approval date was November 2, 1989. The last revision date is October 30, 2025.</p>

<p>The term to remember is land lease. A buyer owns the manufactured home and signs a lot lease with the community owner. The lease in the prospectus is Exhibit C, titled Lot Lease Agreement, and it says it is governed by Chapter 723 of the Florida Statutes, the Florida Mobile Home Act. Florida law requires a park with 26 or more lots to file a prospectus with the state division, and requires the park owner to deliver an approved prospectus before an enforceable rental agreement is made.</p>

<p>Spacing between homes is stated in the prospectus. It quotes the State Fire Marshal's adoption of the National Fire Protection Association code, with minimum separation of 10 feet side to side, 8 feet end to side and 6 feet end to end between manufactured homes. The same section lists City of Daytona Beach minimum spacing of 10 feet side to side, 8 feet end to side and 6 feet end to end, and 6 feet between a mobile home and any other structure. The prospectus adds that these requirements may not apply in whole or in part because of homes placed before the rules, vested rights or later court decisions. It tells a prospective tenant to get information from the appropriate permitting authority.</p>

<p>For carports and screened porches the prospectus quotes the fire code again. A carport, awning, ramada or open screened porch built entirely of materials that do not support combustion may sit next to a site line if it is not less than 3 feet from a building, cabana or enclosed porch on an adjacent site. One built with combustible materials may not be closer than 5 feet from the site line.</p>

<p>The 572 lots share a set of facilities. The prospectus lists two buildings, two swimming pools, one shuffleboard court area, one pickleball court area, an R.V. and boat storage area, one bocce ball court area and one horseshoe court area. It says 572 is the maximum number of lots that use them. The community's amenities page adds a fitness center, a car wash area, a grill area and a mailbox at each home site. The about page says the car wash area has city water and residents bring their own soap.</p>

<p>The two clubhouses are described in detail. The North Community Clubhouse is near the Beville Road entrance. It is one building of about 2,844 square feet used mainly for community offices, and it holds a fitness center room of about 30 feet by 30 feet. The South Community Clubhouse is on Colonial Drive between Mayflower Drive and Williamsburg Place. It is one building of about 7,400 square feet, with a main room of about 3,500 square feet and a stated capacity of 300 persons, plus a billiard room, a card and craft room and a kitchen area.</p>

<p>The pools need a closer read, because the two sources do not say the same thing. The prospectus describes one pool on the south side of the office building, about 40 feet by 20 feet, and says it is heated at the discretion of the management. It describes a second, free-form pool north of the activities building, 50 feet long, and says no heat is provided for it. The website's home page says "Resort-Style Swimming Pool, HEATED YEAR-ROUND." The about page says there are two pools and one of them is heated. The hours list names a north pool, and the pool descriptions place the heated pool south of the office building and the unheated pool north of the activities building.</p>

<p>Hours are in the prospectus. The office is generally open Monday, Tuesday, Thursday and Friday, 9:00 a.m. to 12:00 noon and 1:30 p.m. to 5:00 p.m. The website lists the office as closed Wednesdays and weekends. The fitness center is generally open 8:00 a.m. to 10:00 p.m. The prospectus lists the north pool as open 9:00 a.m. to 10:00 p.m. and the south pool as open 9:00 a.m. until dusk. The south social building is open 8:00 a.m. to 10:00 p.m. The courts are open 9:00 a.m. to 10:00 p.m. and are illuminated for evening play.</p>

<p>One more fact belongs here. The prospectus says all facilities are complete as of the filing date, and that the owner reserves the right to alter, remove, relocate or build facilities. It says no assurance is given that any facility will remain available for any specified period.</p>

<h2>What the rent covers, what it does not, and how it can change</h2>

<p>The prospectus uses a defined term, the lot rental amount. It consists of base rent, special use fees, government and utility charges, pass-through charges, assessments and other financial obligations. The base rent, late charge, returned check charge, guest fee, security deposit and special service amounts are blank in the copy posted on the community's website. This guide therefore gives no figure.</p>

<p>The website and the prospectus both list what the lease includes. The website's amenities page lists irrigation water for lawns, trash removal, lawn mowing, basic extended cable TV service, use of recreational facilities and community social events. The about page lists the same services and adds lawn pest control. The Lot Lease Agreement says street lighting, storm water drainage, basic television service, waste disposal, mailboxes and lawn maintenance are included in base rent. It says the lessee is separately responsible for cable television, telephone and electricity.</p>

<p>The prospectus gives more detail on water and sewer. It says the City of Daytona Beach provides water and bills the community in a lump sum. The charge is passed on to each home owner based on actual use, measured by submeters at each lot. It is additional rent within the total monthly lot rental amount, and it is invoiced separately from base rent. Sewage disposal is provided by the City of Daytona Beach and is passed on the same way, by submeter. The prospectus calls the city water in-home use only.</p>

<p>Water for lawns comes from a separate source. The prospectus says water for lawn irrigation and exterior use is from deep wells in the community. The community maintains the wells, pumps and water mains to and including the shut-off valve for each lot. Any distribution system beyond that valve is the home owner's responsibility. Rule 4.7 says city water supplied to each home is for use within the home, with the exception of a line to an exterior utility room washing machine.</p>

<p>The prospectus splits repair duties by location. The community is responsible for the water mains from the meter at the entrance to and including the shut-off valve for each home, a valve that sits above ground on the lot. Water lines from the valve to the home, and inside the home, belong to the home owner. For sewer, the community operates and maintains the lift stations and the central collection lines to the below-ground connection of each home's line. The in-ground connection and the lines to the home are the home owner's.</p>

<p>Other utilities are billed directly. Florida Power and Light provides electric power, bills residents directly and is not included in the lot rental amount. The community is responsible for service lines from the meter to the P-54 junction box, or through the panel under the meter if there is no P-54 box. The prospectus lists AT&T or another provider of the home owner's choice for telephone, and Public Gas Company of New Smyrna Beach for gas, both billed directly. Individual gas tanks need community management approval. Master antenna television is furnished through an underground cable system the community owns, and its cost is in base rent. Spectrum or another provider can supply additional cable service, which the resident contracts for and pays separately.</p>

<p>Trash is collected roadside by community personnel, and its cost is in base rent. Storm water drains by the grade of the roads and an open ditch system on the east, west and south sides of the community. It is eventually deposited in the Nova Road Canal, which the prospectus calls a major county storm water control canal.</p>

<p>The rent can change, and the prospectus says how. The owner must notify the mobile home owner of any increase in lot rental amount at least 90 days before the effective date. Except for government and utility charges, the lot rental amount will not increase more frequently than annually. The prospectus lists the factors that affect an increase as increased costs, prevailing market rent and prevailing economic conditions. It names water rates, sewer rates, electricity rates, waste disposal, maintenance costs, management costs, property taxes and major repairs or improvements among them.</p>

<p>The prospectus names a few more charges. A pass-through charge is the home owner's proportionate share of the direct costs and impact or hookup fees for a governmentally mandated capital improvement, divided equally among the affected developed lots. Annual assessments may be imposed in addition to base rent for a limited time, with notice delivered 90 days before they take effect. The prospectus says utility provider rates may change and the home owner's charges adjust automatically without an additional 90-day notice, even during the rental term. The owner may also reserve the right to charge separately for trash, or to end the service, on 90 days written notice.</p>

<p>Florida law backs the notice period. Section 723.037 says the park owner gives written notice to each affected mobile home owner at least 90 days before any increase in lot rental amount, reduction in services or utilities, or change in rules and regulations. The statute says the homeowner's right to the 90-day notice may not be waived. It also provides that the park owner and a homeowners' committee meet no later than 60 days before the change to discuss the reasons. At that meeting the park owner must disclose and explain all material factors and may not limit the discussion to generalities.</p>

<p>Section 723.031(4) says no rental agreement shall be offered for a term of less than 1 year, with one exception that lets a park start all agreements at the same time. The Lot Lease Agreement says the term is a stated number of months ending December 31. It is automatically extended for additional one-year periods unless the lessee gives written notice 30 days before the expiration. The lessor may raise the lot rental amount for an extended term by notice not less than 90 days before the end of the current term.</p>

<p>Section 723.031(3) says the homeowner has no financial obligation to the park owner as a condition of occupancy except the lot rental amount, and that user fees are agreed separately. The only user fee the prospectus lists is the storage area. The prospectus describes the storage area as a fenced facility in the southwest corner for R.V.s and boats, first come first served, under a user fee agreement.</p>

<h2>The rules that come with the lot</h2>

<p>The rules are Exhibit A to the prospectus, and the prospectus says the owner must give written notice at least 90 days before any change in them. Rules required to protect public health, safety and welfare may be enforced before the 90 days end. This section summarizes the rules that bear on a purchase. The full set is in the prospectus.</p>

<p>The age rules come first. Rule 1.2 says the primary resident in each home must be 55 or older. The rules say management may rent to a primary resident under 55 in its discretion, so long as occupied lots with at least one person 55 or older do not fall below 80 percent of occupied lots. The minimum age for admission is 35, with case-by-case exceptions. Management surveys each occupant's age every two years. Addendum A says the community is intended and operated for occupancy by persons 55 years of age and older and adheres to the Housing for Older Persons Act of 1995. It lists acceptable age verification documents, including a driver's license, birth certificate, passport and military identification.</p>

<p>Rule 1.1 says all mobile home occupants must apply for residency and be approved by community management before taking residency. Applicants are subject to a criminal background examination, a credit or previous landlord review and age verification. Occupancy of each home is limited to two persons per bedroom, with permission needed for more. Each guest is limited to a maximum visit of one month per year. Lots may be subleased only for periods of 30 days or more.</p>

<p>Rule 4.3 says awnings, carports, skirting and permanent steps are required on all homes. Homeowners must submit building plans for approval before starting any construction. All exterior improvements, such as carports, patios, screen rooms, sheds and spa or hot tubs, and all exterior painting, need written community approval before work starts. Licensed, qualified contractors perform the work, and the homeowner obtains any government permits. Room air conditioners need prior written approval. Fences and artificial borders for lots are not permitted. Residents may not place structures or personal items beyond their own lot.</p>

<p>The required improvements are listed in the prospectus. They include decorative underskirting, a carport awning wide enough to cover the driveway plus about one foot of overhang, a patio awning large enough to cover the patio plus about one foot of overhang, permanent steps where needed, and a decorative planter or shrubs large enough to obscure the hitch area. The home owner also installs the electric connections, the water line from the community shut-off valve to the home, and the sewage line from the home to the community's underground connection. The prospectus says all required improvements must meet community specifications, available from the office, and need prior written approval.</p>

<p>Rule 4.17 covers storage. Outdoor equipment is not allowed on the lot, and furniture meant for indoor use may not be stored outside. Rule 4.18 says a resident leaving for more than 30 days notifies the office and completes a vacation form naming who is responsible for the home and lot while the resident is away.</p>

<p>Pets need written approval first. Rule 6.1 says prior written approval from community management is required for any pet before it comes in. No more than two pets are allowed per household, and the pet must be an inside pet of small size, weighing under 25 pounds at maturity. Rule 6.5 lists dog breeds that are not permitted, including Doberman Pinschers, German Shepherds, Rottweilers, Pit Bulls and Chow Chows, and dogs must be inside except on a leash. Rule 6.14 treats assistance animals separately from pets and says an assistance animal is not a pet.</p>

<p>A few daily rules are easy to check. Quiet hours run from 10:00 p.m. to 7:00 a.m. Open fires may not be built. Alcohol may not be consumed in any common area unless within an area or function the community approves. Rule 7.3 says smoking, vaping and tobacco use are not permitted inside any community building and outdoors within the pool areas and other posted common areas. Residents may not park along the street right-of-way, and vehicles including golf carts may not be parked on the grass. Each lot is allowed two vehicles, and they must fit entirely within the paved driveway. Campers, trailers, motorhomes and boats may not be parked or stored overnight except in designated storage areas with approval. The speed limit throughout the community is 15 miles per hour.</p>

<p>For sellers and buyers, the rules on signs matter. Rule 4.14 limits each home to one For Sale sign, no larger than 18 inches by 24 inches. Open house signs may go in the yard of the sale home only on the day of the open house, and open houses may be held only during daylight hours.</p>

<h2>Buying a home here, step by step</h2>

<p>Rule 8.1 says homeowners have the right to sell their homes in the community, subject to the Rules, the rental agreement, the prospectus and Chapter 723. The purchaser must meet the residency requirements and be approved by the community before occupancy. Otherwise the purchaser must move the home out.</p>

<p>Florida law sets a floor under that approval. Section 723.059(1) says the purchaser of a mobile home in a park may become a tenant if the purchaser qualifies under the park rules, subject to the park owner's approval, but the approval may not be unreasonably withheld. The statute says the purchaser may cancel or rescind the contract for purchase if the purchaser's tenancy has not been approved by the park owner 5 days before the closing. Section 723.059(2) says properly promulgated rules may provide for screening of a prospective purchaser.</p>

<p>The seller has paperwork to complete. Under rule 8.2, the seller gives notice to the community owner with the proposed purchaser's name and address, and a copy of the final executed sales contract. The seller may redact financial information and Social Security numbers. The seller directs the purchaser to community management for the lot rental amount that will apply. Within seven days of transfer of title or a change in financing, the seller provides a true copy of the legal registration showing title in the purchaser's name and the lienholder.</p>

<p>Rule 8.3 allows an inspection. Before written approval of the purchaser, management may inspect the entire lot and the exterior of the home. The home must meet local code requirements, including electrical and plumbing. The inspection covers exterior maintenance, skirting, carports, awnings, attached structures, sheds, shrubs, trees and lawn care. Deficiencies must be repaired or assured in writing. Management may deny approval if the work is not done, but approval may not be unreasonably withheld.</p>

<p>The purchaser can step into the seller's lease. Section 723.059(3) says a purchaser who intends to become a resident has the right to assume the remainder of the term of any rental agreement in effect between the park owner and the seller, and may assume the seller's prospectus. The park owner may offer the purchaser any approved prospectus. Section 723.059(4) says the park owner may increase the rental amount when the assumed agreement expires, if the increase is disclosed to the purchaser before occupancy and imposed consistently with the purchaser's prospectus. The Colonial Colony South prospectus says tenants assuming the remaining term will be required to upgrade the home they are purchasing and install improvements on the same terms as the prospectus delivered to the initial recipient.</p>

<p>The Lot Lease Agreement (Exhibit C) says all new homes brought into the community shall be purchased from the owners of Colonial Colony South or from a dealer they select.</p>

<p>Moving a home out has its own rules. Rule 8.5 requires written notice at least 30 days before the moving date. Moves take place between 8:00 a.m. and 5:00 p.m. Transporters must be licensed, and must give management a security deposit and a certificate of liability insurance. Written permission from the community owner is required before any home moves in or out.</p>

<p>Storm damage has a stated process. Rule 8.9 says that if a home is destroyed by fire, windstorm, water or an act of God, the owner must remove the salvage from the lot within 30 days of the event or of the mailed notice, whichever is earlier, unless a longer period applies by ordinance or law. A home that is damaged but habitable must be repaired to its pre-storm condition. Rule 10.1 says the community owner is not liable for loss or damage from, among other things, fire, water, rain, hail, wind or flood, unless the community's active or willful misconduct caused it.</p>

<p>Section 723.011(2) says the park owner furnishes the prospectus with all exhibits to each prospective lessee before the lot rental agreement is signed or at occupancy, whichever comes first. Upon delivery of a prospectus, the lot rental agreement is voidable by the lessee for 15 days. Section 723.011(3) calls the prospectus a disclosure document intended to protect homeowners and prospective homeowners. The prospectus cover says the document contains important information about legal rights and financial obligations, tells the reader to read all of it and seek legal advice with any questions, and says oral representations should not be relied on.</p>

<p>On a separate point, section 723.061(1)(d) allows eviction for a change in use of the land, if the park owner gives the homeowners' association written notice of its right to purchase the park and gives affected owners and tenants at least 6 months' notice. The notice must say the owner may be entitled to compensation from the Florida Mobile Home Relocation Trust Fund. The prospectus zoning section says the zoning is TM, the permitted use is mobile home parks, the City of Daytona Beach is the zoning authority, and the community has no current plans to seek a change in the future use of the land.</p>

<p>See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/55-communities-in-volusia-county-how-age-restricted-neighborhoods-work">55+ Communities in Volusia County</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/lake-helen-villas-buyer-s-guide-land-lease-park-facts">Lake Helen Villas Buyer's Guide</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/daytona-beach-neighborhoods-beachside-mainland-golf-and-55-communities">Daytona Beach Neighborhoods</a>.</p>

<h2>Bottom line</h2>

<p>Colonial Colony South is a leased-lot community of 572 lots in Daytona Beach. You own the home and lease the lot. The prospectus, dated October 30, 2025, sets out the lease, the rules and the charges it describes, and its cover says it contains important information about legal rights and financial obligations and should be read in full. The posted copy leaves its dollar amounts blank. Chapter 723 gives a 90-day notice of rent and rule changes in section 723.037 and a 5-day approval date before closing in section 723.059(1). Related page: <a href="http://www.adamscameron.com/s/fl/daytona-beach-city/colonial-colony-south-neighborhood">Colonial Colony South</a>.</p>

<p>The sections above cover the lease, the rent, the rules and the sale. The questions below restate the key points.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Do you own the land if you buy a home in Colonial Colony South?</strong></summary>
<p>No. The prospectus describes a lot lease. You own the manufactured home, and you lease the lot from the community owner under a Lot Lease Agreement governed by Chapter 723 of the Florida Statutes. The lease term is a stated number of months ending December 31, and it extends automatically for additional one-year periods unless the lessee gives written notice 30 days before the expiration. The lessor may raise the lot rental amount for an extended term with notice not less than 90 days before the end of the current term.</p>
</details>
<details>
<summary><strong>How much notice does the community give before rent or rules change?</strong></summary>
<p>The prospectus says the owner must notify the mobile home owner of any increase in lot rental amount at least 90 days before it takes effect. It also says written notice at least 90 days before any change in rules and regulations. Section 723.037 of the Florida Statutes states the 90-day notice for increases, reductions in services or utilities and rule changes, and says the homeowner's right to it may not be waived. The prospectus says water and sewer charges adjust automatically when the utility provider changes its rates, without an additional 90-day notice.</p>
</details>
<details>
<summary><strong>What is included in the lot rent, and what do you pay separately?</strong></summary>
<p>The Lot Lease Agreement says street lighting, storm water drainage, basic television service, waste disposal, mailboxes and lawn maintenance are included in base rent. The website adds irrigation water for lawns and use of the recreational facilities. Electricity, telephone, gas and additional cable service are billed directly by the providers. Water and sewer for the home are charged as additional rent, based on submeter readings at the lot, and invoiced separately from base rent. The prospectus leaves its dollar amounts blank.</p>
</details>
<details>
<summary><strong>Can the community refuse a buyer, and what happens then?</strong></summary>
<p>Rule 8.1 says the purchaser must meet residency requirements and be approved by the community before occupancy, or must move the home out. Section 723.059(1) says approval may not be unreasonably withheld. It also says the purchaser may cancel or rescind the contract if the purchaser's tenancy has not been approved by the park owner 5 days before closing. Rule 1.1 says applicants are subject to a criminal background examination, a credit or previous landlord review and age verification.</p>
</details>
<details>
<summary><strong>Is Colonial Colony South a 55+ community, and how is that stated?</strong></summary>
<p>The community's website calls it a family-owned 55+ manufactured home community. Rule 1.2 of the prospectus says the primary resident in each home must be 55 or older, with management discretion for a primary resident under 55 so long as occupied lots with at least one person 55 or older do not fall below 80 percent. The minimum age for admission is 35, with case-by-case exceptions. Addendum A says the community adheres to the Housing for Older Persons Act of 1995 and lists the age verification documents it accepts. Management surveys each occupant's age every two years.</p>
</details>
<details>
<summary><strong>Do the pools and amenities on the website match the prospectus?</strong></summary>
<p>The prospectus lists two buildings and two swimming pools. The website lists two swimming pools, shuffleboard, bocce, pickleball and horseshoe areas. The website's home page says the swimming pool is heated year-round, and the about page says one of the two pools is heated. The prospectus says the pool south of the office building is heated at the discretion of the management and that no heat is provided for the second pool. The prospectus also says the owner reserves the right to alter or remove facilities.</p>
</details>
<details>
<summary><strong>What do the prospectus and statute say before you sign?</strong></summary>
<p>The prospectus cover says the document contains important information about legal rights and financial obligations, and tells readers to read all of it and seek legal advice with any questions. Section 723.011(2) says the park owner furnishes the prospectus with all exhibits before the lot rental agreement is signed or at occupancy, whichever is first, and that the lot rental agreement is voidable by the lessee for 15 days after delivery. The rules are in Exhibit A. Rule 8.3 lets management inspect the lot and the home exterior before approval.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:21:15 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/colonial-colony-south-in-daytona-beach-a-buyer-s-guide]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[The Falls at Ormond Beach: A Buyer's Guide to the Lot, the Rent and the Rules]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/the-falls-at-ormond-beach-a-buyer-s-guide-to-the-lot-the-rent-and-the-rules]]>
        </link>
        <description>
            <![CDATA[<p>The Falls at Ormond Beach has 599 home sites, and the residents own their houses while renting the ground under them. Florida law covers that arrangement in chapter 723 of the Florida Statutes. If you are searching <a href="http://www.adamscameron.com/s/fl/ormond-beach-city/the-falls-at-ormond-neighborhood">homes for sale in The Falls at Ormond Beach</a>, this guide restates what the community, the directories, the statutes and the local news report.</p>

<p>Every fact below comes from the community's own website, the MHVillage directory, state and federal law, Volusia County's emergency pages, or local news reports, all checked in October 2026. Where two sources disagree, the guide says so. It gives no lot rent figures and no home prices. Ask the community's office for current numbers in writing.</p>

<h2>What The Falls is, and what you are buying</h2>

<p>The address is 1 Falls Way Court, Ormond Beach, Florida 32174. The community's website says it sits within the city limits of Ormond Beach and calls it a 55+ manufactured home community with 599 manufactured homes. A Daytona Beach News-Journal report from December 2020 gave the size as 141 acres and placed the community between Hand Avenue and West Granada Boulevard. The park directory MHVillage lists the year built as 1984. It describes every home on its record as a multisection home with a peaked roof and lap siding, on paved streets with two off-street parking spaces.</p>

<p>Now the part that matters most. The Ormond Beach Observer reported on May 6, 2026 that The Falls is a privately owned manufactured housing community of about 600 homes where residents own the title to their homes but rent the land. Florida law covers that arrangement in chapter 723 of the Florida Statutes. Section 723.003 defines a homeowner in that chapter as a person who owns a mobile home and rents or leases a lot in a park for residential use. You buy the house and rent the lot. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/55-communities-in-volusia-county-how-age-restricted-neighborhoods-work">55+ communities in Volusia County</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/aberdeen-at-ormond-beach-homes-lot-rent-and-rules">Aberdeen at Ormond Beach</a>.</p>

<p>The amenity list on the community's website is long. It names a pool and hot tub, a large clubhouse, a library and media lounge, a billiards room, a micro-golf course, a fitness center, a dog park, pickleball courts and a tennis court. The activity list includes cards and games, weekly bingo, crafts, coffee hours and potluck dinners. The site also links to a lot map.</p>

<p>Here is one place where two sources disagree. The community's website calls the pool heated. MHVillage lists the pool type as unheated. The two cannot both be right today. Ask the office which one is true and get the answer in writing. The prospectus and the park rules are the documents to read.</p>

<p>The website says most of the homes sit around or near conservation areas, lakes and the clubhouse, and that the community is fully occupied, with several homes coming up for resale during the year. It names Newby Management in its footer. The prospectus must give the name and address of the person authorized to receive notices for the park owner.</p>

<p>One point deserves plain words. You buy the house, and the lot is rented. Section 723.031 says the homeowner has no financial obligation except the lot rental amount, with user fees separate and chosen. Florida law sets notice rules for how lot rent can change, and the next section covers them.</p>

<h2>Lot rent, notices and the paperwork that protects you</h2>

<p>Start with the prospectus. For a park with 26 or more lots, section 723.011 requires the park owner to file a prospectus with the state and to hand an approved copy to the homeowner before an enforceable rental agreement is signed. Under section 723.011, once the approved prospectus is delivered, the rental agreement is voidable by the lessee for 15 days. The contents are specific. They include the number of lots, the facilities, the services included in the rent, how rent is raised, which the statute puts at 90 days, the factors that can affect it, the park rules and how they can be changed, and the zoning of the land. The statute lists water rates, sewer rates, waste disposal, maintenance costs, management costs and property taxes among the factors a prospectus must disclose. It also requires the name and address of the person authorized to receive notices, a statement about zoning and a separate index of contents.</p>

<p>Next, the rental agreement itself. Under section 723.031, a lot rental agreement cannot run less than one year, and the homeowner has no financial obligation to the park owner as a condition of occupancy except the lot rental amount. User fees for optional services are separate and must be a choice. The lot rent cannot be increased during the term of the agreement except in a few situations. One is the manner of increase disclosed in an agreement longer than twelve months, which applies not more often than annually. Another is a pass-through charge. A third is a property tax, assessment or utility charge that the park owner may pass on, provided it was disclosed before the tenancy began, was passed on as a matter of custom, or was authorized by law.</p>

<p>Section 723.031 allows certain pass-through charges if the statute and the rental agreement allow them. The Observer's May 6 report described residents receiving 2026 notices about a property tax pass-on charge and an insurance assessment spread over six months. The report also quoted one resident who said her lot rent covers internet, cable, mowing and the community's amenities. That is one resident's account. The prospectus lists the services and facilities and the lot rent for them.</p>

<p>Then there is the increase process. Section 723.037 requires written notice at least 90 days before any increase in lot rent, any reduction in services or utilities, or any change in the park rules. The homeowner's right to that notice cannot be waived. A committee of up to five homeowners can then meet the park owner no later than 60 days before the change takes effect. At that meeting the park owner must explain the material factors behind the decision, not generalities. A majority of affected homeowners can petition the state to start mediation within 30 days after the last scheduled meeting. The park owner must also file a copy of each rent increase notice with the state each year by January 1. The history note on that section ends with chapter 2024-123. An attorney quoted by the Observer said House Bill 613 (2024) amended the mediation framework.</p>

<p>The process gives a right to written notice, a committee meeting and a petition for mediation. The Observer quoted attorney Erum Kistemaker saying state law does not cap lot rent increases, that it creates a mechanism to challenge them, and that she does not see a cap coming soon.</p>

<p>Section 723.004 expressly preempts to the state all regulation and control of mobile home lot rents and the landlord and tenant relationship covered by the chapter, and it prohibits every unit of local government from acting on those matters. At the May 5, 2026 city commission meeting, the Observer reported, City Manager Joyce Shanahan said, "We're really limited on what we can do." The Observer wrote that the city lacks authority because The Falls is privately owned and state law has jurisdiction under chapter 723. More than 20 residents spoke at that meeting, and the Observer's account records residents with very different views. The prospectus and the park rules are the documents to read.</p>

<p>Now the purchase of a specific home. Section 723.059 lets the buyer of a mobile home in a park become a tenant if the buyer meets the park's entry requirements, subject to the park owner's approval, which may not be unreasonably withheld. Properly adopted rules can include screening of a prospective buyer. If the tenancy has not been approved five days before closing, the buyer can cancel the purchase contract. The buyer also has the right to assume the rest of the seller's rental agreement term and may assume the seller's prospectus, and any later increase must be disclosed before occupancy.</p>

<p>Two more statutes explain how a park changes hands and how owners speak together. Under section 723.075, mobile home owners can form a homeowners association with the written consent of at least two thirds of the owners, and once it is formed and notice is served, it represents all owners in matters under the chapter. Under section 723.071, if a park owner offers the park for sale, the owners' association must be notified of the price and terms and has 45 days, unless otherwise agreed, to sign a contract. That rule is background for a buyer.</p>

<h2>The 55+ rule, taxes, storms and flood risk</h2>

<p>The community describes itself as age-restricted and 55+. The federal rule text is in 24 CFR 100.305 through 100.307. Under 24 CFR 100.305, at least 80 percent of occupied units must have at least one occupant who is 55 or older. Under 100.306, the community must publish and follow policies that show its intent to operate as 55+ housing, and the regulation lists written rules, advertising, lease provisions and actual practice among the evidence. Under 100.307, it must verify occupancy through reliable surveys and affidavits, and it must update that information at least every two years. Acceptable proof of age includes a driver's license, a birth certificate and a passport. Ask for the written age policy and the community's written rules before you make an offer.</p>

<p>Taxes come next, and here a mobile home on rented land differs from a house on its own lot. Section 193.075 of the Florida Statutes says a mobile home is taxed as real property if the owner of the home also owns the land it is permanently affixed to. A mobile home that is not taxed as real property must carry a current license plate under section 320.08(11), and the statute sets that annual fee by the length of the home. Whether a particular home is taxed as real property or carries a license plate is a fact to confirm for that home before you make an offer. Section 196.031 says the homestead exemption goes to a person with legal or beneficial title in equity to real property that is the permanent residence, so confirm whether any exemption applies to a specific home instead of assuming one. See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-property-taxes-explained-for-buyers">Volusia County property taxes for buyers</a>. Section 723.031 also lets a park owner pass on ad valorem taxes, non-ad valorem assessments and utility charges if disclosed before the tenancy, passed on by custom, or authorized by law.</p>

<p>Storms deserve a direct word. Volusia County's evacuation page says that if you live in a mobile home or recreational vehicle, you must evacuate for all evacuation levels regardless of where you are, and that failure to obey an evacuation order is a violation of Florida law. The county's own reason is that these structures are extremely vulnerable to hurricane winds. It also asks owners to maintain tie-down straps and anchors and to check the straps for rust. A separate county page words it more softly, saying residents of manufactured homes may be advised to evacuate regardless of zone. For more, see <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/hurricane-readiness-for-ormond-beach-home-buyers">hurricane readiness for Ormond Beach home buyers</a>. Related reading: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida home insurance for buyers</a>.</p>

<p>The website places most of the homes near conservation areas, lakes and the clubhouse. The official public source is the FEMA Flood Map Service Center, where you can search by address. The Volusia school locator is on the school district's website.</p>

<p>See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/living-in-ormond-beach-neighborhoods-costs-and-what-to-know">living in Ormond Beach</a>.</p>

<h2>Bottom line</h2>

<p>The Falls at Ormond Beach is a 55+ land-lease community of 599 manufactured homes where residents own their homes and rent the land. Lot rent can change on 90 days' written notice, and the Observer quoted an attorney saying state law does not cap increases. State law, not the city, governs lot rent. Read the prospectus and the current rules before you make an offer. Browse the current <a href="http://www.adamscameron.com/s/fl/ormond-beach-city/the-falls-at-ormond-neighborhood">The Falls at Ormond Beach homes for sale</a>.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Do I own the land under a home at The Falls at Ormond Beach?</strong></summary>
<p>No. The Observer reported on May 6, 2026 that residents own the title to their homes but rent the land. Florida law covers that arrangement in chapter 723. You buy the house, and you pay a lot rent to the park owner. The prospectus lists the lots, facilities, services and lot rent for them, how rent is raised and the park rules.</p>
</details>
<details>
<summary><strong>How much notice must the park owner give before raising lot rent?</strong></summary>
<p>At least 90 days, in writing. Section 723.037 of the Florida Statutes requires the 90 days for any lot rent increase, any reduction in services or utilities and any change in park rules, and it says the homeowner's right to that notice cannot be waived. A homeowner committee can then meet the park owner no later than 60 days before the change takes effect, and a majority of affected owners can petition the state for mediation.</p>
</details>
<details>
<summary><strong>Can the City of Ormond Beach cap lot rent at The Falls?</strong></summary>
<p>No. Section 723.004 of the Florida Statutes preempts to the state all regulation and control of mobile home lot rents and the landlord and tenant matters in chapter 723, and it prohibits local governments from acting on them. The Observer reported that City Manager Joyce Shanahan told the commission on May 5, 2026 that the city is limited in what it can do.</p>
</details>
<details>
<summary><strong>Can the park turn me down as a buyer?</strong></summary>
<p>The park owner must approve you as a tenant, but under section 723.059 that approval may not be unreasonably withheld. Properly adopted rules can include screening. If the park has not approved your tenancy five days before closing, you can cancel the purchase contract. A purchaser may also assume the remainder of the seller's rental agreement and prospectus.</p>
</details>
<details>
<summary><strong>How is The Falls a 55+ community, and who checks?</strong></summary>
<p>The community describes itself as age-restricted and 55+. Under the federal rule in 24 CFR 100.305, at least 80 percent of occupied units must have at least one occupant aged 55 or older. Under 100.307, the community must verify occupancy through surveys and affidavits and update them at least every two years. Ask for the written age policy and the community's written rules before you make an offer.</p>
</details>
<details>
<summary><strong>How do I check flood and storm risk on a specific home?</strong></summary>
<p>Search the exact address in the FEMA Flood Map Service Center, which is the official public source for flood hazard information. Then note the Volusia County evacuation information, including the instruction that residents of mobile homes must evacuate at all evacuation levels.</p>
</details>
<details>
<summary><strong>Is a home at The Falls taxed as real property or with a license plate?</strong></summary>
<p>It depends on the home and the land. Section 193.075 says a mobile home is taxed as real property if the owner also owns the land it is permanently affixed to. A mobile home not taxed as real property carries a license plate under section 320.08(11). Confirm the status of the specific home, and confirm whether any exemption applies instead of assuming one does.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:03:22 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/the-falls-at-ormond-beach-a-buyer-s-guide-to-the-lot-the-rent-and-the-rules]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[The Preserve at LPGA in Daytona Beach: A Buyer's Guide]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/the-preserve-at-lpga-in-daytona-beach-a-buyer-s-guide]]>
        </link>
        <description>
            <![CDATA[<p>The Preserve at LPGA is a Lennar-built subdivision in Daytona Beach. Two bodies apply to a buyer there: the Preserve's own homeowners association and the Indigo Community Development District. A third, the LPGA International master association, is linked to the Preserve only by one speaker's statement in district meeting minutes, and that link is unconfirmed. This guide lays out all three, using the Preserve's own website, the district's public meeting records, the city's own report and the Florida statutes, so you know what to ask for before you write an offer on one of the <a href="http://www.adamscameron.com/s/fl/daytona-beach-city/lennar-at-preserve-at-lpga-subdivision">Preserve at LPGA homes for sale</a>.</p>

<p>One note on how we wrote it. The builder's community pages redirected to its general Florida page, and the third-party listing sites disagree with each other on dues. So you will not find a monthly fee in this guide. A number we cannot trace to a primary document does not belong in front of someone about to sign a contract.</p>

<h2>Where the Preserve sits, and who runs what</h2>

<p>Start with the location. The Preserve's own association website says it is "located within the master planned community of LPGA International in Daytona Beach, Florida." The City of Daytona Beach is a separate source. The City Manager's Update dated February 19, 2025 describes the Preserve as "a Lennar Homes subdivision located just south of Daytona Stadium. Approved in 2019, The Preserve is about 85% built out." That is the status as of that update, not today, so ask for the current status of any section you are considering. The same update says much of the new home construction remains along the LPGA Boulevard corridor.</p>

<p>In its review of 2024 permits, the city said March had the most permits in one month, 181 approvals, and 78 of them were for homes in the Preserve. The dated records later in this guide, on roads and punch lists, are worth reading.</p>

<p>Now the three bodies, one at a time.</p>

<p>The first is the Preserve at LPGA Homeowners Association. It runs its own website, lists Solaris Management Inc. of Ormond Beach as its management company, and posts a board and membership meeting notice for October 27, 2026 at 6:00 p.m. at the Holiday Inn on Auto Mall Circle in Daytona Beach. The management company's own summary of duties lists accounting, collections, insurance administration, and "resale certificates" and "lending requests." The site also says a copy of the 2025 year-end financial report and the 2026 budget is available under its Resources tab or on written request to the management company. Ask for both. The management company's address is 1452 N US Hwy 1, Suite 102, Ormond Beach, and its listed hours are Monday to Friday, 9am to 5pm.</p>

<p>The second layer is the International Residential Owners Association, which the Preserve's website calls the master association of LPGA International. The master association publishes its bylaws, its master declaration of covenants and its Development Code, and the Preserve's site posts the same Development Code. The IROA site also lists the MARC application. We go through the Development Code in the next section.</p>

<p>At an Indigo district meeting on March 27, 2026, a speaker explained that much of the district's southwest quadrant was never committed to the master association. As each parcel was developed, a document was recorded to commit that neighborhood to the association. The same speaker said that for Lennar and the Preserve, a two-page supplemental document was recorded committing them to the master association's covenants and restrictions. That is one person's statement in meeting minutes, and we have not read the recorded document ourselves. So treat it as a pointer, not a finding. When you request documents, ask for the Preserve's own declaration and for whatever recorded paper ties the Preserve to the master association, and read how the two fit together.</p>

<p>The third layer is the Indigo Community Development District, a local special purpose government created under Chapter 190 of the Florida Statutes. Its own website says it was established on January 3, 1995 by rule of the Florida Land and Water Adjudicatory Commission, and that its fiscal year runs October 1 through September 30. The district explains that property owners inside it pay a non-ad valorem assessment, which appears on the annual property tax bill from the county tax collector. That assessment can have two parts. One covers operations and maintenance and can move up or down with each year's budget. The other repays bonds, and the district says those annual assessments are "generally fixed for the term of the bonds."</p>

<p>The district's budget papers show how specific the Preserve's share is. Its fiscal year 2025 budget package has a section titled "The Preserve at LPGA," which says the district will contract to maintain the Phase A and Phase B areas within the Preserve. Lines under it cover landscape maintenance, replacement plants and annuals, lake maintenance for Phase A starting in fiscal year 2025, fountain maintenance and irrigation repairs. The adopted budget for fiscal year 2027 also carries separate lines for the Preserve. So landscape, lake, fountain and irrigation work for the Preserve appears in the district's budget, and the district's assessment appears on your annual property tax bill. The district's own site says the current assessment levels can be found in the current budget.</p>

<p>The district counsel's description of those bonds is brief. At the March 27, 2026 meeting, counsel said, "The bonds are secured by special assessments, which are secured only by the lands which they encumber." The district's board authorized a bond secured by special assessments in 2024. District counsel said at the June 11, 2024 meeting that the Series 2024 bonds are secured by special assessments on "the 276 platted single-family units in Phase B1," and that all 276 lots are assessed in a similar way. The bond series is labeled Integrated LPGA Phase B1. We do not know from that record whether Phase B1 is the same set of lots as any section of the Preserve, and we are not going to guess. The practical step is simple. For the exact lot you are looking at, ask the district manager which assessment area it belongs to and what its annual assessment is. The district's own website says current assessment levels are in the current budget.</p>

<h2>The rules that go with the house</h2>

<p>The Development Code is posted on the Preserve's site as "IROA Dev Code 2.0 approved CE." It is version 2.0 of the Development Code of the International Residential Owners Association, and its introduction says it supports review by the Master Architectural Review Committee under the master declaration. The Preserve's site posts it. Some of its exhibits carry dates from 2007, and it points to neighborhood association documents for certain items, so a few rules may read differently for your exact section. Treat this list as a map of the kind of rules you will meet, then confirm each one against the Preserve's own documents.</p>

<p>Start with approvals. The code says no structure, grading, tree removal, landscaping or exterior color change may be made without the prior written approval of the committee. An applicant pays a fee and a deposit before review. Work has to be finished and pass a final inspection within 120 days of approval, and new homes get twelve months. The Preserve's site says the same thing in plainer words: fences, screen enclosures, paint colors, landscape additions and driveway changes all need association approval, through an architectural review application.</p>

<p>Exterior color works like this. A new color scheme needs approval from the committee and from the neighborhood association. Repainting in the same scheme does not need an application. Vinyl siding is prohibited on all structures in all neighborhoods, while stucco, stone, brick and wood are permitted.</p>

<p>Fences deserve a careful read. The code says only aluminum picket-style fencing will be considered, and only with MARC consent. Chain link, vinyl and wood fencing are not allowed anywhere on any lot. Fences of any kind are kept out of side and rear yards except as each neighborhood's own documents specify, and then only with approval. The code refers to each neighborhood's association documents for side and rear yard fences, so read that rule against the Preserve's declaration.</p>

<p>Pools and screen enclosures follow their own rules. The code bans above-ground pools. In-ground pools, hot tubs and spas need prior written approval. A screen enclosure needs written approval and may not be taller than twelve feet unless approved, may never rise above the roof line, and has to be bronze with charcoal screening. The code also calls for hedge-type landscaping around the perimeter.</p>

<p>A few smaller rules are worth a line each, because each of them changes how a house is used. Window and wall unit air conditioners are not permitted, and outdoor air conditioning units, pool equipment and trash containers have to be screened from the street. Every single-family home must have at least a two-car garage, and a garage may not be converted to living space unless an additional garage replaces it, and the committee approves. Driveways may be no wider than sixteen feet at the street curb, and painted or asphalt driveways are not permitted. Sheds and storage buildings need approval. Holiday lighting comes down within fourteen days after the holiday. Satellite dishes and antennae need approval and are governed by the federal rules. Solar devices cannot be prohibited under Florida law, but their location can be reasonably regulated.</p>

<p>Hurricane shutters have a timing rule you can plan around. Shutters visible from outside have to be a type approved in writing. Panel, accordion and roll-up shutters may be installed or closed up to 48 hours before an expected hurricane and must be opened or removed within 72 hours after the end of a watch or warning, unless the board decides otherwise. Ask the association how its rule applies to the kind of shutters you would install. See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers</a>.</p>

<p>The code also says a sign for selling, leasing or renting must be wood, metal or composite and painted white with lettering. Temporary holiday flags are allowed without approval.</p>

<p>Signs follow a rule too. One yard sign for selling, leasing or renting a home is allowed if it meets the association's sign standard, which the code describes as a placard no larger than eighteen inches by twenty-four inches. A United States flag no larger than four and a half feet by six feet, attached to the home, is allowed without approval.</p>

<p>The Development Code's own limits are worth repeating. It is version 2.0, its exhibits carry dates in 2007, and it refers to neighborhood-specific tables and neighborhood association documents for some items. The Preserve's site also posts a MARC application for 2025 and a pool key card application. The Preserve's own recorded declaration sits in the site's Governing Documents area behind a login, and we have not read it. The IROA bylaws and master covenants are posted publicly as scanned images, which we also have not read word for word.</p>

<p>Shared amenities have rules of their own. The Preserve's site says pool and cabana access cards are issued by the management office. Cards go only to the owner of the property, and a renter gets a card from the landlord. The pool key card application, a form printed in August 2022, adds that the owner of record is solely responsible for issuing cards to lessees and for any damage caused by the owner's family, guests or approved tenants, and it lists the pool, the cabana area with its bathrooms and a playground as the association's common amenities. It also lists pool hours of 8:00 in the morning to 8:00 in the evening and bars pets and wheeled devices from inside the fenced pool area. That is a dated form, so confirm the current hours and card fees with the management office before you count on them.</p>

<p>Florida law limits what an association can do with all of this, and it helps to know where the limits are. Under section 720.3035 of the Florida Statutes, an association or its architectural committee may review plans and enforce exterior standards only to the extent stated or reasonably inferred in its declaration or published guidelines, and it has to apply them reasonably and equitably. It may not limit the interior of a structure that is not visible from the parcel's frontage, an adjacent parcel, a common area or a community golf course. Under section 720.305, a fine is capped at one hundred dollars per violation unless the governing documents say otherwise, and a continuing violation is capped at one thousand dollars in total unless the documents say otherwise. The board must give at least 14 days of written notice of the right to a hearing, and a committee of at least three members who are not officers, directors or employees must approve the fine. A fine under one thousand dollars cannot become a lien on the property.</p>

<h2>The paperwork and money to check before you offer</h2>

<p>Ask for the documents first, so the contract you write reflects what you actually learned.</p>

<p>For a resale, ask for the estoppel certificate first. Section 720.30851 says the association must issue it within 10 business days after a written or electronic request from the owner, the owner's designee, or a mortgagee. Every association has to name, on its website, a person or entity with an address for receiving those requests. The statute's form asks whether a capital contribution, resale or transfer fee is due, whether any rule violation is open, whether the board must approve a transfer, and whether anyone holds a right of first refusal. It also asks for a list of every other association the parcel belongs to. An estoppel is good for 30 days when it is delivered by hand or email, and 35 days when it goes by regular mail. If the association misses the 10 business days, it cannot charge a fee for it.</p>

<p>The second document is the disclosure summary. Under section 720.401, a prospective buyer must be given a disclosure summary before signing the contract. It states that you will be required to be a member of a homeowners' association, that you will pay assessments and any special assessments, and that you may owe special assessments to the municipality, county or a special district. If you were not given it before you signed, you can void the contract within 3 days after you receive it or before closing, whichever comes first. That right ends at closing. On a resale, the owner supplies the summary. On a new purchase from the developer, the developer does.</p>

<p>That brings up the difference between a first sale and a resale on the district disclosure. Section 190.048 requires a warning, that the district "may impose and levy taxes or assessments," in each contract for the initial sale of a lot or residential unit in a district. The statute's text is written for initial sales. The district's current budget and your tax bill are where the assessment appears. See also <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County</a>.</p>

<p>Liability for old debts follows the property. Under section 720.3085, a new owner is jointly and severally liable with the previous owner for all assessments that came due up to the transfer of title. Ask the title or closing agent how any unpaid assessments will be handled at closing.</p>

<p>The association's age matters too, and the statute explains why. Under section 720.307, owners other than the developer are entitled to elect a majority of the board three months after 90 percent of the parcels in all phases have been conveyed to them, with other triggers listed. Builders who buy lots to build and resell do not count as owners for that test. We found no source that tells us whether the Preserve has reached that point, so ask.</p>

<p>Then there is the condition of the neighborhood itself. At the district's June 11, 2024 meeting, a speaker said "the city has not accepted the roads and improvements yet." The minutes record a punch list, mostly signage, striping and speed limit signs, that was being worked. At the March 27, 2026 meeting, the minutes record a report that "Lennar is still completing the punch list they have" in the Preserve Phase B and that Lennar had retained a contractor for punch list items. A speaker at that meeting said "Lennar flags" can stay up because builders "have rights in their agreements and declarations as far as sales ability." Those are dated statements about particular items, and they may well be resolved by the time you read this. They are the reason to ask a short list of questions: which sections have had their roads accepted by the city, which punch list items remain open, and whether any open item sits next to the lot you want.</p>

<p>On taxes, the mechanics are the county's and the state's, and they are straightforward. The Volusia County Property Appraiser says an owner must own the home and make it a permanent residence before January 1 to qualify for homestead that year, and that applications are due by March 1. Someone who moves in after January 1 is encouraged to pre-file for the following year. Once homestead is in place, the Florida Department of Revenue says the annual rise in assessed value cannot exceed the lower of three percent or the change in the consumer price index, which makes the cap 2.7 percent for 2026. For the filing itself, see <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption</a>.</p>

<p>Flood and insurance questions belong to the address, not the subdivision. The FEMA Flood Map Service Center lets you search by address, and see also <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/daytona-beach-flood-zones-how-to-check-any-address">Daytona Beach Flood Zones</a>. Run the address before your inspection period ends so the result can still shape your offer. For the wider community, see <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/lpga-international-in-daytona-beach-a-buyer-s-guide">LPGA International in Daytona Beach</a>.</p>

<p>The bottom line is that the city's February 2025 update says the Preserve was approved in 2019 and was about 85 percent built out. The Preserve association and the Indigo district apply, and the district's assessment appears on your annual property tax bill. A link to the LPGA International master association rests on one speaker's statement in the district minutes and is unconfirmed, so ask for the recorded document. Before you offer on one of the <a href="http://www.adamscameron.com/s/fl/daytona-beach-city/lennar-at-preserve-at-lpga-subdivision">homes for sale in the Preserve at LPGA</a>, collect the Preserve's declaration, the Development Code, the current budget, an estoppel certificate if it is a resale, and the district's assessment for that exact lot. If a fenced yard, a pool or a screen enclosure is what you are buying the house for, confirm it is allowed on that lot first.</p>

<p>Before you make an offer, answer these questions first:</p>

<ul>
<li>Which assessment area is the lot in, and what is its annual district assessment?</li>
<li>Has the Preserve reached the point where owners other than the developer elect a majority of the board?</li>
<li>Which sections have had their roads accepted by the city, and which punch list items remain open?</li>
<li>Does the fence, pool or screen enclosure you want fit the Development Code and the Preserve's declaration for that lot?</li>
</ul>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Is the Preserve at LPGA part of LPGA International?</strong></summary>
<p>Yes. The Preserve's own association website says it is located within the master planned community of LPGA International in Daytona Beach. It has its own homeowners association, separate from the International Residential Owners Association, which that site calls the master association. A speaker at a March 2026 district meeting said a recorded supplemental document commits the Preserve to the master association's covenants. Ask for that document along with the Preserve's own declaration.</p>
</details>

<details>
<summary><strong>What does the Indigo district's budget say about landscaping and lakes in the Preserve?</strong></summary>
<p>The Indigo district's fiscal year 2025 budget package has a section for the Preserve at LPGA that says the district will contract to maintain the Phase A and Phase B areas within the Preserve, with lines for landscape, lake, fountain and irrigation work. The district's own site says its assessments appear as a non-ad valorem assessment on the property tax bill. Ask for the Preserve association's budget and the district's current budget.</p>
</details>

<details>
<summary><strong>Will I get a monthly dues figure from this guide?</strong></summary>
<p>No. The builder's community pages redirected to its general Florida page, and the third-party listing sites we saw disagree with one another. A number we cannot trace to the association's own documents would only mislead you. The association's website says its 2026 budget is available under its Resources tab or by written request to the management company. For a resale, the estoppel certificate form asks about transfer fees, open violations, board approval of a transfer, any right of first refusal and other associations.</p>
</details>

<details>
<summary><strong>Can I put up a fence or add a pool in the Preserve?</strong></summary>
<p>Only with approval, and only within narrow limits. The IROA Development Code says only aluminum picket-style fencing will be considered and bans chain link, vinyl and wood. Fences in side and rear yards are limited to what each neighborhood's documents specify. Above-ground pools are not permitted. In-ground pools and any screen enclosure need written approval. Because some items point to neighborhood documents, read the Preserve's declaration for your exact lot before you plan on either one.</p>
</details>

<details>
<summary><strong>How long does an estoppel certificate take, and how long is it good for?</strong></summary>
<p>Section 720.30851 of the Florida Statutes gives the association 10 business days after a written or electronic request from the owner, the owner's designee, or a mortgagee. It is effective for 30 days if hand delivered or emailed and 35 days if mailed. If the association is late, it cannot charge a fee for the certificate. The form asks about transfer fees, open violations, board approval of a transfer, any right of first refusal and every other association the parcel belongs to.</p>
</details>

<details>
<summary><strong>What does the community development district disclosure cover on a resale?</strong></summary>
<p>The district warning that section 190.048 describes is required in contracts for the initial sale of a lot or residential unit. The statute's text is written for initial sales. The district's website says current assessment levels are in its current budget, and the assessment shows on the annual property tax bill. Ask the district manager which assessment area your lot is in and what its annual assessment is, then confirm it against the last tax bill.</p>
</details>

<details>
<summary><strong>How do I qualify for homestead if I buy in the Preserve?</strong></summary>
<p>The Volusia County Property Appraiser says you must own the home and make it your permanent residence before January 1 of the year you apply, and the application is due by March 1. If you move in after January 1, the county encourages you to pre-file for the next year. After you qualify, the Florida Department of Revenue says the yearly increase in assessed value is capped at the lower of three percent or the change in the consumer price index. That cap is 2.7 percent for 2026.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:03:05 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/the-preserve-at-lpga-in-daytona-beach-a-buyer-s-guide]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Grand Haven in Palm Coast: A Buyer's Guide to the CDD, the Master Association and the Rules]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/grand-haven-in-palm-coast-a-buyer-s-guide-to-the-cdd-the-master-association-and-the-rules]]>
        </link>
        <description>
            <![CDATA[<p>Grand Haven is a gated community of 1,901 residential units in 25 villages in Palm Coast, Flagler County, Florida. Two bodies run it, the Community Development District and the Grand Haven Master Association, and each has its own assessment. If you are looking at <a href="http://www.adamscameron.com/s/fl/palm-coast-city/grand-haven-subdivision">Grand Haven</a>, this guide lays out who does what, what the District's adopted budget shows, which rules apply to a home and lot, and which documents the statutes put in a buyer's hands.</p>

<p>This guide is built from the community's own sites, the District's adopted budget, the Florida statutes, the Florida Department of Revenue tax roll, FEMA and Flagler Schools. Where we could not read a source in full, the text says so. We did not fetch the Master CC&R text itself, so the covenant points below rely on the Master Association's own frequently asked questions.</p>

<h2>Who runs Grand Haven, and what each one controls</h2>

<p>The residents' information site describes Grand Haven as a gated community of over 1,400 acres, with 1,901 residential units in 25 villages. Its About page says the 1,901 are single unit homes, townhouses and condos, located between St. Augustine and Daytona Beach. The District's own site says the District encompasses approximately 997.82 acres of land located entirely within Flagler County. The two figures come from different sources.</p>

<p>The residents' site explains the split in one line. The Community Development District governs all common areas and the amenities. The Grand Haven Master Association governs homes and yards. The golf club is a third item. The information site describes it as a Jack Nicklaus Signature Design 18 hole course located within Grand Haven, privately owned and not part of the Grand Haven CDD, the Master Association or the amenities. Membership is separate, in several categories including social, and it is open to residents and non-residents. The About page says golf club membership must be purchased separately and is not part of the CDD-provided amenities.</p>

<p>Take the District first. The Grand Haven Community Development District is an independent local unit of special-purpose government created under Chapter 190 of the Florida Statutes. It was established by Flagler County Ordinance 97-03, effective March 3, 1997. It has a five-member Board of Supervisors. Since the general-election phase, supervisors are elected by qualified electors, meaning registered voters who live in the District, for four-year staggered terms. The District says land or home ownership is not a requirement to run. The next general election is in November 2026 for seats 1, 3 and 5.</p>

<p>The District holds public meetings in person at the Grand Haven Village Center, Grand Haven Room, 2001 Waterside Parkway, Palm Coast. Recorded meetings are on the District's YouTube channel. When the District's home page was fetched, it listed the next meeting for October 29, 2026 at 9:00 AM at the Creekside Amenity Center, 2 N. Village Parkway, Palm Coast, and then December 3, 2026.</p>

<p>The District's own frequently asked questions say its responsibilities in a community may include storm water management, potable and irrigation water supply, sewer and wastewater management, and street lights. The same page says a District complements homeowners associations, and that the associations have other responsibilities such as operating amenities and ensuring that deed restrictions and other quality standards are enforced. The Master Association's frequently asked questions say the streets in Grand Haven are the property of the Community Development District.</p>

<p>The Master Association's frequently asked questions say every fee simple property owner in Grand Haven is a member and is required to pay assessments. Its principal mission is to enforce the deed restrictions (CC&Rs). It includes a Fine Committee and an Architectural Design Committee. The residents' information site's governance page says the board has five members elected by property owners for two-year terms, and that the two standing committees are the Modification Architectural Design Committee and the Fine Committee. The same page names the management company is Southern States Management Group, 386-446-6333.</p>

<p>The Association's home page lists its Annual Members' Meeting and election for January 7, 2027 at 5:00 pm in the Village Center Grand Haven Room. The page's text prints the year of the annual meeting with a typo, and the attached notice file is named for 01.07.2027, so confirm the date with the Association. The Association's mission statement includes perpetuating the intended landscaping design, including the selection of the Live Oak as the primary street canopy tree.</p>

<p>Private Lawn Maintenance is an Association service in some villages. The Association's page lists the villages as Crossings, Heritage Oaks, Lakeside, Linkside, Linkside East, Linkside West, Pine Harbor, Reserve, Riverwalk and Village Oaks. It also describes a damage-claim protocol that requires a report to the management company with photos and written approval before any reimbursement. The villages on that list are the ones the page names.</p>

<p>The amenities at the Village Center and Creekside include seven Har-Tru clay tennis courts with lights, four pickleball courts with lights, two fitness centers, two pools with spas, two basketball courts, two bocce courts and three croquet courts. The amenity site's own pickleball count differs on two pages, four and two. This guide uses the resident site's four, so confirm the number. The Waterside Cafe at the Village Center and the Tiki Hut at Creekside are managed by Vesta Property Services under a contract with the District.</p>

<p>Reservations are required for lap swim at the Village Center pool, tennis, pickleball, bocce and Creekside croquet. Other amenities are open without reservations. The reservation office number is 386-447-0192. The residents' site also describes miles of walking and biking trails through preserve and natural areas, and along the Esplanade coquina trail that borders more than a mile of the Intracoastal Waterway.</p>

<p>There are five entry gates. The Main Gate is staffed by a guard 24/7. Kiosks, which replace callboxes, are at The Crossings, Wild Oaks, North Gate and South Gate. Visitors use e-passes sent from the Gatehouse Resident Web Portal. At the North and South gates, guards do not process visitors, so a visitor with no e-pass must first go to the Main Gate. Each address gets one portal username and password from the CDD office.</p>

<h2>What Grand Haven costs: the District, the Association and the tax bill</h2>

<p>The District's fiscal year runs October 1 to September 30. The current-year assessment schedules are in the Adopted Budget in the Documents section of its site. For fiscal year 2027, which runs October 1, 2026 to September 30, 2027, the adopted budget sets the operations and maintenance assessment for a single lot or occupied condo at two thousand six hundred eighty-two dollars and twelve cents, up ninety-seven dollars and twelve cents from two thousand five hundred eighty-five dollars. The capital reserve fund assessment is five hundred sixty-seven dollars and eighty-four cents, unchanged. The total is three thousand two hundred forty-nine dollars and ninety-six cents per year. The year before it was three thousand one hundred fifty-two dollars and eighty-four cents. The increase is ninety-seven dollars and twelve cents, or eight dollars and nine cents a month.</p>

<p>The budget gives per-unit totals by type. La Vista condos are three thousand four hundred twenty-seven dollars and twenty-seven cents, which includes a small separate La Vista landscape restoration assessment of one hundred seventy-seven dollars. Double lots are six thousand four hundred ninety-nine dollars and ninety-two cents, which is two units' worth at a 2.0 factor. An unfinished condominium parcel has its own total in the same table. The budget assesses 1,868 units in total, made up of 1,837 single lot and occupied condos, 24 La Vista condos, 5 double lots, 1 unfinished condo parcel and 1 Escalante parcel. That count differs from the 1,901 figure because the budget counts assessed units by type.</p>

<p>The District's frequently asked questions say property owners in the District pay a non-ad valorem assessment that appears on their annual property tax bill from the county tax collector. It may consist of two parts. The first is an annual assessment for operations and maintenance, which can fluctuate up and down from year to year based on the budget. The second is an annual capital assessment to repay bonds, which is generally fixed for the term of the bonds. The District says public hearings are held on its assessments, and that its budget is audited annually. The FY 2027 budget we read contains no debt service lines.</p>

<p>The net operations and maintenance budget for fiscal year 2027 is four million eight hundred seventeen thousand two hundred fifty-two dollars, up 3.76 percent from four million six hundred forty-two thousand eight hundred ten dollars in fiscal year 2026. The budget grosses up that net amount for county collection costs and an early payment discount, so the net figure becomes a gross operations budget of five million one hundred twenty-four thousand seven hundred thirty-six dollars. The Capital Reserve Fund net levy is one million nineteen thousand eight hundred sixty-seven dollars, unchanged from fiscal year 2026. The capital improvement plan lists total capital projects of eight hundred fifty-eight thousand four hundred three dollars for fiscal year 2027, and a reserve study line of two thousand dollars is budgeted.</p>

<p>The budget lines show what the District pays for. They include a landscape maintenance contract with VerdeGo, amenity management, gate access control staffing, street lights billed by FPL, a waterway and pond maintenance contract with SOLitude Lake Management, stormwater repairs and maintenance, planned stormwater maintenance, and a capital reserve fund. The budget text says the District pays for staffing of guards at certain gates within the community, and for card readers, gate arms, control boards and keypads. It also says the District purchases clickers for residents to buy.</p>

<p>In the 2025 Flagler County tax roll data from the Florida Department of Revenue, the line 02 GRAND HAVEN CDD appears in tax areas 067 and 068 at 0.0000 mills. That line does not mean the charge is a millage rate. The charge arrives as the separate non-ad valorem assessment described above. The finalized Palm Coast millage and county tax lines are in the tax-bill guide we have already published. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-property-tax-bill-line-by-line">related guide</a>.</p>

<p>The Master Association's frequently asked questions say every fee simple property owner in Grand Haven is a member of the Association and is required to pay assessments. The 2026 annual Association assessment is one hundred seventy-five dollars per year, due January 1 and delinquent after January 15. The same page says fines can be as much as one hundred dollars per day up to a cumulative total of one thousand dollars. It says owners may appeal to the Fine Committee, and that the prevailing party in legal action is entitled to legal fees.</p>

<p>The Save Our Homes figures come from the Florida statutes and the Department of Revenue's Save Our Homes guide. The Save Our Homes cap for 2026 is 2.7 percent. Assessed value resets to just value on January 1 after a change of ownership. The exemption application is due March 1. See also: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">related guide</a>.</p>

<h2>The rules that apply to a home and lot</h2>

<p>The Association's frequently asked questions say approval from its Architectural Design Committee is required any time there is a change to the exterior of a home or lot. The examples given are color, landscape, driveway, fences and generators. Tree removal needs the same approval. Submissions received by the Wednesday before the meeting by 4:00 p.m. go on the next agenda, with a written decision within a week.</p>

<p>The Association's frequently asked questions cite the ADC Standards, page 7, Section D-2. Construction and commercial landscape work by contractors is allowed from 7:00 am to 6:00 pm only. No such work is allowed on Sunday or federal holidays.</p>

<p>On parking, the Association's frequently asked questions say the CC&Rs prohibit parking on unimproved lots and regular street parking by a resident. Commercial vehicles with advertising may not be parked in public view overnight or on a regular basis. Dogs must be leashed. Owners may appeal fines to the Fine Committee, and the fine schedule is described in the cost section above.</p>

<p>On real estate signs, the Association's frequently asked questions say some villages may place the approved Grand Haven Available sign. All other villages must adhere to their CC&R obligations.</p>

<p>On leasing, the Association's home page lists a Leased Property Information Form among its Quick Documents. That is all we found. We did not find any rental rule in the documents available to us.</p>

<p>The Association's frequently asked questions say owners get the CC&Rs in their closing package from the seller or sales agent. A copy can also be requested from the management company, Southern States Management Group. The Governing Documents on the Association's site are the Articles, Master CC&Rs, By-Laws, Village CC&Rs and Board Resolutions. Read the recorded documents themselves, which we did not fetch in full.</p>

<p>The Association also posts a Severe Weather Event and Hurricane Protocol for Residents as a PDF. The FEMA Flood Map Service Center at msc.fema.gov is the official map lookup by address. For related reading, see also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-flood-zones-what-to-check-before-an-offer">our Palm Coast guide</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">our Florida insurance guide</a>. For condominiums, see also: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-condo-milestone-inspections-and-sirs-guide">related guide</a>.</p>

<h2>What the statutes put in a buyer's hands</h2>

<p>Section 720.401(1) of the Florida Statutes covers the homeowners' association disclosure summary. A prospective parcel owner must be presented the summary before executing the contract. It tells the buyer they will be obligated to be an association member, that restrictive covenants are recorded, that assessments and special assessments may change, and that a failure to pay could result in a lien. If it is not provided before signing, the contract is voidable by the buyer by written notice within three days after receiving the summary or before closing, whichever is first, and the waiver has no effect.</p>

<p>Section 720.30851(1) of the Florida Statutes covers the estoppel certificate. Within 10 business days after a written or electronic request, the association shall issue it. It must list the regular assessment, the paid-through date, the next installment and itemized amounts owed. It must also state whether a capital contribution or transfer fee is due, any open rule violation, whether board approval of a transfer is required, any right of first refusal, and the other associations of which the parcel is a member.</p>

<p>Section 190.048 of the Florida Statutes covers a notice in contracts. Each contract for the initial sale of a parcel or residential unit within a district must carry a boldface notice that the District may impose and levy taxes or assessments, or both, and that these are in addition to county and other local governmental taxes and assessments. The statute's trigger is the initial sale.</p>

<p>For schools, check the Flagler Schools locator for the assigned school. For trash, the City of Palm Coast contracts with FCC Environmental for garbage, recycling, yard waste and bulk trash. The pickup day is found by address search on the city's site.</p>

<p>This guide is the picture as of late October 2026.</p>

<h2>Bottom line</h2>

<p>Grand Haven has two bodies. The Community Development District governs all common areas and the amenities, and the Grand Haven Master Association governs homes and yards. The golf club is privately owned and separate from both. For the year that began October 1, 2026, the District's adopted budget sets a total of three thousand two hundred forty-nine dollars and ninety-six cents for a single lot or occupied condo, and the Association's 2026 assessment is one hundred seventy-five dollars. The District's charge arrives as a separate non-ad valorem assessment. See also <a href="http://www.adamscameron.com/s/fl/palm-coast-city/grand-haven-subdivision">Grand Haven</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/is-palm-coast-a-good-place-to-live-an-honest-look-for-buyers">our Palm Coast living guide</a>.</p>

<p>That covers the main points. The questions below are the ones this guide answers.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>What does the Grand Haven CDD charge, and where does it appear?</strong></summary>
<p>For the year that began October 1, 2026, the District's adopted budget sets the operations and maintenance assessment at two thousand six hundred eighty-two dollars and twelve cents and the capital reserve fund assessment at five hundred sixty-seven dollars and eighty-four cents for a single lot or occupied condo. The total is three thousand two hundred forty-nine dollars and ninety-six cents per year. The District says the assessment appears on the annual property tax bill from the county tax collector. The budget also gives totals for other types, including La Vista condos, double lots and an unfinished condominium parcel.</p>
</details>

<details>
<summary><strong>Is the CDD the same thing as the homeowners association in Grand Haven?</strong></summary>
<p>No. Two bodies run the community. The Community Development District is an independent local unit of special-purpose government created under Chapter 190 of the Florida Statutes, and it governs all common areas and the amenities. The Grand Haven Master Association governs homes and yards. Its principal mission is to enforce the deed restrictions (CC&Rs).</p>
</details>

<details>
<summary><strong>Is golf club membership included with a Grand Haven home?</strong></summary>
<p>The residents' information site says the golf club is privately owned and not part of the Grand Haven CDD, the Master Association or the amenities. Membership is separate, in several categories including social, and it is open to residents and non-residents. The About page says golf club membership must be purchased separately and is not part of the CDD-provided amenities.</p>
</details>

<details>
<summary><strong>Do I need approval to change my house or cut down a tree?</strong></summary>
<p>Yes. The Master Association's frequently asked questions say Architectural Design Committee approval is required any time there is a change to the exterior of a home or lot, such as color, landscape, driveway, fences and generators. Tree removal needs the same approval. Submissions received by the Wednesday before the meeting by 4:00 p.m. go on the next agenda, with a written decision within a week. Contractor work is allowed from 7:00 am to 6:00 pm only, and not on Sunday or federal holidays. The Association's fines can be as much as one hundred dollars a day, up to a cumulative one thousand dollars.</p>
</details>

<details>
<summary><strong>What do Grand Haven documents and statutes give a buyer?</strong></summary>
<p>Section 720.401 requires that a prospective parcel owner be presented the HOA disclosure summary before executing the contract. If it was not provided before signing, the statute lets the buyer cancel by written notice within three days after receiving the summary, or before closing, whichever comes first. Under section 720.30851, the association shall issue an estoppel certificate within 10 business days after a written or electronic request. The Association also says owners get the CC&Rs in their closing package.</p>
</details>

<details>
<summary><strong>Does the CDD charge show up as a millage rate on my tax bill?</strong></summary>
<p>Not as a millage rate. In the 2025 Flagler County tax roll data, the line 02 GRAND HAVEN CDD appears in tax areas 067 and 068 at 0.0000 mills. The District's charge is a separate non-ad valorem assessment that appears on the annual property tax bill from the county tax collector.</p>
</details>

<details>
<summary><strong>Can a visitor just drive in through any gate?</strong></summary>
<p>At the North and South gates, a guest without a pass has to go to the Main Gate first. Grand Haven has five entry gates. The Main Gate is staffed by a guard 24/7. Kiosks are at The Crossings, Wild Oaks, North Gate and South Gate, and visitors use e-passes sent from the Gatehouse Resident Web Portal. Guards do not process visitors at the North and South gates. Each address gets one portal username and password from the CDD office.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:02:49 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/grand-haven-in-palm-coast-a-buyer-s-guide-to-the-cdd-the-master-association-and-the-rules]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Breakaway Trails in Ormond Beach: A Buyer's Guide]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/breakaway-trails-in-ormond-beach-a-buyer-s-guide]]>
        </link>
        <description>
            <![CDATA[<p>Breakaway Trails is a private, gated community inside the city of Ormond Beach, and a directory describes one homeowners association for the community. The disclosure summary that Florida law requires states that recorded restrictive covenants govern use and occupancy. The association's own website says the entrances sit off State Road 40, just west of I-95, with a second gate on Tymber Creek. This is a guide to the association's documents and rules, not a listings page. Related page: <a href="http://www.adamscameron.com/s/fl/ormond-beach-city/breakaway-trails-subdivision">Breakaway Trails</a>. The guide covers what the association says about itself, what Florida law lets it do, and the paperwork the city and county describe.</p>

<p>Every fact about the community comes from the association's website or from a directory that names its data sources. Every rule cited comes from the 2026 Florida Statutes, a Florida Department of Revenue PDF, FEMA, city and county pages, or the association's own site, read on 2026-10-28. The city land development code was not accessible, so none is cited. Where a number could not be confirmed, we left it out and say so.</p>

<h2>What Breakaway Trails is, and who runs it</h2>

<p>Start with the plain description. The association's website calls Breakaway Trails a private gated community located in the City of Ormond Beach, within Volusia County. Its mailing address is 16 Breakaway Trail, Ormond Beach, Florida 32174. The website says the entrances to the neighborhood are off a scenic stretch of State Road 40, just west of I-95, and that the second gate is on Tymber Creek.</p>

<p>The website is run through Leland Management. The page lists a community association manager and a 386 phone number, and it says the support office is typically open Monday through Friday from 9 am to 5 pm, excluding holidays. It also describes what a manager does. The manager gives administrative support to the board, keeps records, handles communications, enforces the rules as dictated by the governing documents and promulgated by the board, and oversees vendors.</p>

<p>Visitors can access limited information, such as public documents and the management company's contact information. Owners log in to a private side. The menu includes Home, Resources, Documents, FAQs, Contact Us and an Estoppel Request item.</p>

<p>One note about old links. An older web address for the association now shows a Site Shutdown notice, and the notice says a shutdown can be due to a change in management company. The current site is the one named above, run through Leland Management.</p>

<p>Now the size and the amenities. A Florida HOA directory describes a guard-gated community of about 976 single-family homes. It says one HOA funds the amenities and the 24-hour gate, with no CDD. It lists a clubhouse, a pool, a fitness center, tennis, pickleball and basketball courts, a park and playground, a dog park, a barbecue pavilion and walking trails. It draws its data from Sunbiz, where the association's document number is N14531 and its status is active, and from listing sites. The directory also says it is not affiliated with the HOA and that its information may not be current, and it lists the year established as not listed.</p>

<p>We have not stated a lot count from county records, a plat date or a year built, because we did not confirm Breakaway Trails against the county's parcel records. We have also left out the builder names, home sizes, prices, association dues, and whether the clubhouse or pool is open to anyone other than owners, because none of those were stated in a source we could read. Neither the association's site nor the directory states a fee.</p>

<p>The directory also points to the public record. It says the declaration and its amendments are public records in Volusia County's official records, that board rules are usually not recorded, and that the exact legal name can be checked on Sunbiz.</p>

<h2>What the association can and cannot do to you and your house</h2>

<p>The Florida Statutes include Chapter 720, which covers homeowners associations. This guide cites five sections of it, 720.401, 720.30851, 720.3085, 720.305 and 720.3035, plus section 720.303 on official records. Section 720.401 does not apply to associations regulated under chapters 718, 719, 721 or 723.</p>

<p>The first is the disclosure summary. Under section 720.401, a prospective buyer must be presented a disclosure summary before executing the contract for sale. The form states that the buyer will be obligated to be a member of a homeowners association, that recorded restrictive covenants govern the use and occupancy of properties in the community, and that the buyer will be obligated to pay assessments and any special assessments. It also states that failure to pay could result in a lien on the property, and that there may be an obligation to pay rent or land use fees for recreational facilities. The buyer may void the contract by written notice within three days after receiving the summary or before closing, whichever occurs first. The law says any purported waiver has no effect, and the right ends at closing.</p>

<p>The second is the estoppel certificate. Under section 720.30851, within 10 business days after a written or electronic request from a parcel owner or the owner's designee, or from a mortgagee or the mortgagee's designee, the association shall issue the certificate. The law requires each association to designate on its website a person or entity with a street or email address for these requests, and Breakaway Trails has an Estoppel Request item in its menu. The certificate can be delivered by hand, by regular mail or by email. It states the regular periodic assessment and what it is paid through, the next installment due date, and an itemized list of amounts owed. It says whether a capital contribution, resale, transfer or other fee is due, and whether there is any open violation noticed in the official records. It says whether board approval is required for a transfer, whether there is a right of first refusal, and which other associations the parcel is a member of. It also lists contact information for the insurance the association maintains.</p>

<p>The certificate is effective for 30 days if it is hand delivered or sent electronically, and 35 days if it is sent by regular mail. An association waives the right to collect money owed above the amounts in the certificate from a person who relies on it in good faith. If the certificate is not delivered within 10 business days, no fee may be charged. The statute allows a reasonable fee not exceeding two hundred fifty dollars if there are no delinquent amounts, an extra hundred dollars if the certificate is expedited within three business days, and an additional fee not exceeding one hundred fifty dollars if amounts are delinquent.</p>

<p>Under section 720.3085, a parcel owner is liable for all assessments that come due while an owner. The owner is also jointly and severally liable with the previous parcel owner for all unpaid assessments that came due up to the time of transfer of title, without prejudice to the right to recover from the previous owner. When the governing documents authorize it, the association has a lien on each parcel. A claim of lien secures unpaid assessments plus interest, late charges, and reasonable costs and attorney fees. The association may foreclose a lien.</p>

<p>The third piece is fines. Under section 720.305, an association may levy reasonable fines. Unless the governing documents provide otherwise, a fine may not exceed one hundred dollars per violation. A fine may be levied per day of a continuing violation, with a single notice and opportunity for hearing, not exceeding one thousand dollars in the aggregate unless the documents provide otherwise. A fine under one thousand dollars may not become a lien against a parcel. A fine or suspension requires at least 14 days' written notice of the right to a hearing. The hearing is held within 90 days after the notice, before a committee of at least three members appointed by the board who are not officers, directors or employees, or their close relatives. If the committee does not approve a proposed fine or suspension by majority vote, it may not be imposed. A suspension of common-area use may not block vehicular and pedestrian access to the parcel, including the right to park.</p>

<p>The fourth is architectural review. Section 720.3035 says the authority exists only to the extent that it is specifically stated or reasonably inferred in the declaration or in published guidelines authorized by it. The association must apply its standards reasonably and equitably to all owners. It may not regulate the interior of a structure that is not visible from the street frontage, an adjacent parcel or a common area. It may not require approval of an A/C system that is not visible and is substantially similar to an approved one. It may not require a government building permit as a prerequisite for its review. A denial of a request must be in writing and must state with specificity the rule or covenant relied on, and the specific part of the improvement that does not conform.</p>

<p>Hurricane protection has its own rule in section 720.3035(6), which applies to all homeowners associations regardless of when they were created. Every board or architectural committee must adopt hurricane protection specifications, and the specifications must comply with the building code. The board may not deny an application for installation, enhancement or replacement of hurricane protection that conforms to its own specifications. The statute defines hurricane protection to include roof systems meeting ASCE 7-22, permanent fixed storm shutters, roll-down track shutters, impact-resistant windows and doors, polycarbonate panels, reinforced garage doors, exterior fixed generators and fuel storage tanks. The board may not deny an application that conforms to them.</p>

<p>Official records are covered by section 720.303. They must be kept at least 7 years and made available to a parcel owner for inspection or copying within 10 business days after the board receives a written request. Under section 720.303 these records are for parcel owners.</p>

<h2>The paperwork, taxes and storm costs the city and county describe</h2>

<p>The Volusia County Property Appraiser describes the homestead exemption. The rules are these. You must have legal or beneficial title recorded in the Official Records of Volusia County and reside on the property as of January 1, and you must be a permanent Florida resident. The filing deadline is March 1. The regular filing period runs from January 2 to March 1, and pre-filing runs from March 2 to December 31. Failure to file by March 1 waives the exemption for that year. The exemption does not transfer to a new home, and ownership changes require reapplying. See also the <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County homestead exemption</a> guide.</p>

<p>The county also explains how the bill is built. Just or market value, capped by Save Our Homes, gives the assessed value. The assessed value minus exemptions gives the taxable value. The taxable value times the millage rate divided by 1,000 gives the taxes. The county notes that an August Notice of Proposed Property Taxes, known as TRIM, is sent. The Save Our Homes cap says the annual increase in assessment may not exceed the lower of three percent or the change in the Consumer Price Index, and the Florida Department of Revenue chart shows 2.7 percent for 2026, revised in January 2026. The county says the status of a property on January 1 is the criteria for establishing value for the entire year. See also the <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/ormond-beach-property-tax-bill-line-by-line">Ormond Beach property tax bill</a> guide.</p>

<p>Next, building permits. The City of Ormond Beach says a building permit is required for all projects to construct, enlarge, alter, repair, move, demolish or change the occupancy of a structure, and for installing, altering, repairing, removing or replacing electrical, gas, mechanical or plumbing systems. The exceptions are carpeting, wood flooring, tile, cabinet replacement and residential painting. Applications go through the Tyler EnerGov Civic Access portal and include all contractors with their license numbers. The owner-builder exemption requires the owner to appear in person at the Building Department (Room 104) and sign a notarized affidavit, and the home must be for the owner's use and not for rent, lease or sale within one year of completion.</p>

<p>The city also posts a notice about fraudulent emails that seek payment for permits. It says invoices come only through the Tyler system and that staff never ask for a wire transfer. Questions go to 386-610-0540.</p>

<p>Flood and wind come next. The city's floodplain page says flooding is the most frequent and costly natural hazard in the Volusia County area, according to the 2015 Volusia County Multi-Jurisdictional Local Mitigation Strategy. It says FEMA is updating flood risk data in Volusia County under Risk MAP and that no changes are proposed within the limits of the City of Ormond Beach. It also says most standard homeowners policies do not cover flooding from rising water, that most flood insurance policies have a 30-day waiting period, and that some flood policies are transferable.</p>

<p>To find a property's flood zone, localized drainage issues or historical flooding, the city says to contact its Planning Department or use the city's Forerunner page. The FEMA Map Service Center has an Address Search that allows you to search by specific address or location and find the effective Flood Insurance Rate Map. The city adds that an Elevation Certificate may be on file at the local government office. See also the <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/ormond-beach-flood-zones-and-insurance-guide">Ormond Beach flood zones and insurance</a> guide. We have not stated a flood zone for Breakaway Trails, because we did not verify one.</p>

<p>The same floodplain page has a rule for substantial improvement. Repairs or improvements equal to or greater than 50 percent of market value must meet the current Florida Building Code and the floodplain ordinance. The city also asks residents to keep natural areas undisturbed, because wetlands and open space store storm water, and not to dump in storm drains. See also the <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida home insurance for buyers</a> guide.</p>

<p>The city's hurricane page says residents near rivers, beachside or in mobile homes may be asked to evacuate. It says to check your kit and not to duct tape your windows, and it says shutters, window film or boarding are effective.</p>

<p>See also the <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">closing costs in Volusia County</a> guide. The statute caps the estoppel fee as described above.</p>

<p>The bottom line is this. Breakaway Trails is a private gated community in Ormond Beach, and the association's website is run through Leland Management. A third-party directory describes one homeowners association, which we did not confirm. The association's own site gives limited public documents and an estoppel request item. Florida law gives a buyer a disclosure summary. It also requires the association to issue an estoppel certificate within 10 business days after a request from the parcel owner, the owner's designee, or a mortgagee, and it sets fine limits with a hearing and a written denial that cites the rule. The amenities and fees in the directory do not appear on the association's website. See also our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/living-in-ormond-beach-neighborhoods-costs-and-what-to-know">living in Ormond Beach</a>, and <a href="http://www.adamscameron.com/s/fl/ormond-beach-city/breakaway-trails-subdivision">Breakaway Trails</a>.</p>

<p>These questions cover the basics of the documents and rules described above.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Is Breakaway Trails inside the city of Ormond Beach?</strong></summary>
<p>Yes. The association's own website describes it as a private gated community located in the City of Ormond Beach, within Volusia County, with entrances off State Road 40 just west of I-95 and a second gate on Tymber Creek. We did not confirm it against Volusia County parcel records.</p>
</details>

<details>
<summary><strong>Who manages the association and how do I get its documents?</strong></summary>
<p>The association's website is run through Leland Management, which lists a community association manager and a phone number. Visitors can access limited information such as public documents and management company contact info, and owners log in to a private side. The menu has a Documents item. Official records must be made available to a parcel owner within 10 business days after the board receives a written request. Under section 720.303 these records are for parcel owners.</p>
</details>

<details>
<summary><strong>What is an estoppel certificate and how long does it take?</strong></summary>
<p>It is the association's certificate stating the assessment, amounts owed, whether a transfer or resale fee is due, any open violation and whether board approval is required for a transfer. Under section 720.30851 of the Florida Statutes, the association shall issue it within 10 business days after a written or electronic request from a parcel owner, the owner's designee, a mortgagee or the mortgagee's designee. It is effective for 30 days if delivered by hand or electronically and 35 days if mailed. Breakaway Trails has an Estoppel Request item on its website.</p>
</details>

<details>
<summary><strong>Do I owe the seller's unpaid association dues?</strong></summary>
<p>Under section 720.3085, a parcel owner is jointly and severally liable with the previous parcel owner for all unpaid assessments that came due up to the time of transfer of title, without prejudice to the right to recover from the previous owner. An association may also hold a lien when its governing documents authorize one.</p>
</details>

<details>
<summary><strong>Can the association fine me or turn down my window or roof project?</strong></summary>
<p>It can fine you, within limits, and it can review exterior changes, within limits. A fine may not exceed one hundred dollars per violation unless the governing documents provide otherwise, and a fine requires at least 14 days' written notice of the right to a hearing before a committee of at least three members appointed by the board who are not officers, directors or employees. For exterior projects, the association's authority exists only to the extent stated or reasonably inferred in its declaration or published guidelines, and a denial must be in writing and state the rule or covenant relied on. The board may not deny an application for hurricane protection that conforms to its own specifications.</p>
</details>

<details>
<summary><strong>How many homes are in Breakaway Trails, and are there extra district fees?</strong></summary>
<p>A Florida HOA directory describes about 976 single-family homes and says there is no CDD. The directory says it is not affiliated with the HOA and that its information may not be current, and these figures were not confirmed against county parcel records.</p>
</details>

<details>
<summary><strong>How do I check the flood zone for a Breakaway Trails address?</strong></summary>
<p>The FEMA Map Service Center has an Address Search that allows you to search by specific address or location and find the effective Flood Insurance Rate Map. The city says to contact its Planning Department or use its Forerunner page for a property's flood zone, localized drainage issues or historical flooding. The city also says most standard homeowners policies do not cover flooding from rising water and most flood insurance policies have a 30-day waiting period.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:02:33 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/breakaway-trails-in-ormond-beach-a-buyer-s-guide]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Lincoln Oaks in DeLand: A Buyer's Guide to the Rules]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/lincoln-oaks-in-deland-a-buyer-s-guide-to-the-rules]]>
        </link>
        <description>
            <![CDATA[<p>Lincoln Oaks in DeLand is a planned development adopted by the City of DeLand in 2019, with up to 182 single-family lots on one parcel and up to 84 on another. The approval sets the rules for the site, and the agreement states what is allowed and required.</p>

<p>If you are searching <a href="http://www.adamscameron.com/s/fl/deland-city/lincoln-oaks-subdivision">Lincoln Oaks homes for sale</a> on your phone, listing photos show the house. They do not show the lot width, the parking rule, the buffer next to the neighboring streets or the association behind it all. This guide covers those items using the city's approval, Florida statutes and official county and FEMA sources, with local press used only for the location. It does not state prices, HOA dollar amounts or amenity lists, because no official source for those figures was found.</p>

<h2>What the city approved for Lincoln Oaks</h2>

<p>The official name is the Lincoln Oaks Planned Development. The City of DeLand adopted it as Ordinance 2019-23 in Case Z-18-109. The City Commission heard the request on August 19, 2019, and the Planning Board held its hearing on January 16, 2019. The applicant was Volusia Oaks, LLC, the contract purchaser at the time, and the application was filed on November 19, 2018. The land is 78.987 acres, more or less, made up of contiguous parcels.</p>

<p>The ordinance rezoned the parcel from R-3 in Volusia County and from the city's R-3 and M districts to PD. It also amended the city's official zoning map to show the parcel as Lincoln Oaks PD. The rezoning to PD sets the plan for this site. The plan is the Development Plan Map prepared by Mitch Collins, PE, Inc., dated August 1, 2019, which is Exhibit B, together with the agreement itself.</p>

<p>Where the agreement is silent, the C-1 zoning provisions apply to Parcel 2 and the R-1 provisions apply to Parcel 3.</p>

<p>The location, according to a Beacon news report from June 19, 2019, is the north side of West Plymouth Avenue, east of North Orange Avenue. The same report says the project is in part within the city's medical-services overlay district. The news report gave lot counts that differ from the agreement, so this guide uses the agreement's numbers only.</p>

<p>The agreement describes the concept as a mixed-use development with medical and related ancillary uses and single-family residential uses near the hospital. Its stated intent is "a compact, pedestrian friendly neighborhood with diverse housing options adjacent to the existing hospital and related medical uses." It refers to the City's Community Health Designation Overlay. It also says the plan "transitions to the existing, rural neighborhoods adjacent to the property to the north and east."</p>

<p>The agreement splits the site into three parcels, numbered 1, 2 and 3.</p>

<p>Parcel 1 is a single-family area of up to 182 single-family lots, with a minimum lot width of 38 feet. Parcel 3 is a second single-family area of up to 84 single-family lots, with a minimum lot width of 50 feet. The words "up to" mark a maximum. Parcel 2 is set aside for medical and related support uses. The listed uses include hospitals, clinics, offices, labs and care facilities.</p>

<p>The agreement states what is allowed and required. It dates from 2019. The agreement says a preliminary and final plat is required under Article 13 of the DeLand Land Development Regulations (Ordinance 2013-11) before construction, and that includes clearing and landfill. No more than ten model homes, plus their infrastructure, may be built before the final plat is approved and recorded. A Final Site Plan under Article 12 is required where site plan review applies.</p>

<p>The agreement also says the applicant must keep unified ownership until the Final Plat is recorded. Tracts may be sold for re-subdivision. The phases are generally Parcels 1, 2 and 3, with timing based on market demand, and the neighborhood mitigation is part of the initial phase.</p>

<p>Amendments are covered too. Minor modifications are made by City staff, and they may not add a use, raise density or intensity, or change the mitigation terms. Major amendments are handled like a rezoning.</p>

<p>The agreement has a reverter clause. The City Commission may rezone any portion that has not secured a final development order within 5 years of the effective date, which is the date the ordinance is recorded, unless the Commission extends the period for good cause. The recording date was not confirmed for this guide.</p>

<h2>The lot and house rules written into the agreement</h2>

<p>This is the part that sets the lot and house standards. The numbers below come straight from the agreement's development standards.</p>

<p>On Parcel 1, the minimum lot area is 4,180 square feet and the minimum width is 38 feet. The front setback is 20 feet, or 25 feet to the garage face. The rear setback is 15 feet. The side setback is 5 feet, or 15 feet on a side corner. The maximum lot coverage is 75 percent, the maximum height is 35 feet, and the minimum driveway width is 18 feet.</p>

<p>On Parcel 3, the minimum lot area is 6,000 square feet and the minimum width is 50 feet. The minimum width is 60 feet where a lot is adjacent to an external landscape buffer 30 feet wide or less. Lots on the northern boundary of Parcel 3 have a minimum width of 60 feet and are limited to 4 lots. The front setback is 20 feet, or 25 feet to the garage face. The rear setback is 15 feet (20 feet on lots along the northern boundary). The side setback is 5 feet, or 15 feet on a side corner. The maximum lot coverage is 60 percent, the maximum height is 35 feet, and the minimum driveway width is 18 feet.</p>

<p>Minimum lot sizes differ by parcel: 4,180 square feet on Parcel 1 and 6,000 square feet on Parcel 3. Maximum lot coverage also differs, at 75 percent on Parcel 1 and 60 percent on Parcel 3. This guide does not list what counts toward lot coverage.</p>

<p>The agreement also sets a minimum floor area. It is 1,400 square feet on Parcel 1 and 1,600 square feet on Parcel 3. Both figures include the garage area. This guide does not verify any home's floor area.</p>

<p>Parcel 2 has its own standards. The minimum lot area is 10,000 square feet and the minimum width is 100 feet. The front setback is 30 feet, the rear is 15 feet and the side is 15 feet. Maximum building coverage is 35 percent and maximum height is 45 feet.</p>

<p>The permitted uses on the single-family parcels are detached single-family dwellings (not mobile homes), mini and neighborhood parks, accessory dwelling units, community gardens, private parks, and home occupations under section 33-27.01 of the city's regulations. The agreement lists accessory dwelling units as a permitted use. Ask the city whether a given lot can take one.</p>

<p>All single-family dwellings must have garages sized for two full-size vehicles. The garage rule applies to every home. The parking terms in the agreement go further.</p>

<p>The project's covenants must require owners to keep parking in the garage for the number of vehicles it was designed for, at least two full vehicles on Parcel 1. Sidewalks must stay unobstructed by parked vehicles. Visitor parking, on-street or street-adjacent, is set at 0.25 spaces per unit for lots under 50 feet wide. On-street parking tracts outside the public right-of-way are owned and maintained by the HOA or POA. The HOA is to prohibit on-street parking in the public right-of-way in its covenants "to the extent it is legally able to do so." No on-street parking is allowed along the new access road to Westoak Drive.</p>

<p>The architecture rules limit identical front designs. Identical front architecture is allowed only where 3 full lots separate identical houses on the same side of the street. At least 1 full lot must separate identical houses across the street. The agreement says designs include fiber-cement lap or board and batten siding, contrasting window trim, shutters or other accents, and natural or cultured stone accents.</p>

<h2>Neighbors, roads, trees and water around Lincoln Oaks</h2>

<p>Part of the agreement is about the existing neighborhoods to the north and east. It names the neighbors on Westoak Drive and Washington Oaks Drive in its neighborhood mitigation terms.</p>

<p>Buffers and tree protection areas next to the neighborhoods to the north and east are to be kept in natural condition. The agreement requires a minimum average buffer width of 75 feet and a minimum actual width of 72 feet along the northern boundary of Parcel 3. No trails or walkways may be built within 50 feet of the common boundary. No more than 4 lots, each with a 60 foot minimum width, may be placed along that boundary. When Parcel 3 is developed, the agreement calls for a vinyl fence of at least 6 feet along the rear lot lines on the eastern and northern boundary of Parcel 3.</p>

<p>Roads are a second theme. The developer is to seek abandonment of North Adelle Avenue. Either way, the developer is to build a new road connection between Orange Avenue and the Westoak Drive neighborhood. The road is built before the closure. The new road gets live oak street trees at 35 feet on center. A double swing electric gate with a keypad is placed at the end of the public right-of-way where Westoak Drive begins, and the Westoak Drive residents maintain it. Mailboxes are placed near the gate, and an underground electric extension goes to the Westoak transformer.</p>

<p>For access to the main community, the agreement shows two Parcel 1 connections to Orange Avenue, and one of them is aligned with Peachwood Drive. Orange Avenue is a Volusia County facility. Parcel 2 has full access on Orange Avenue. The primary access to Parcels 2 and 3 is along Plymouth Avenue. Transit access is to be coordinated with Votran. Sidewalks follow the City LDRs. Street lights are paid for and maintained by the HOA or POA or by a street lighting district.</p>

<p>Trees are a third theme. The tree protection areas shown in Exhibit B must satisfy preserving at least 15 percent of the total area within the Tree Protection Areas. Those areas are located outside individual lots and are under HOA or POA control and maintenance. Mulched pathways may be permitted.</p>

<p>Recreation and open space for Parcels 1 and 3 are shown on the Development Plan Map. At final plat the developer "may choose" additional amenities. The list in the agreement includes gardens, playgrounds, walkways, fountains, benches, pavilions, gazebos, pools and clubhouses, and courts may be permitted. The agreement does not promise any specific amenity.</p>

<p>Water is the fourth theme. Stormwater follows the city's LDRs. A joint-use stormwater pond in partnership with Volusia County is proposed, subject to review by Volusia County, the City and other agencies. Reclaimed water is to be provided in coordination with the City.</p>

<p>This guide does not state a flood zone for any lot. The FEMA Flood Map Service Center is the official address search for flood hazard information. Search each address on the FEMA Flood Map Service Center. Related guide: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida Home Insurance for Buyers</a>.</p>

<h2>What to verify before you make an offer</h2>

<p>The sections above describe what the city allowed in 2019. The items below describe the association, the Florida statutes and the county records.</p>

<p>First, the association. The agreement says a homeowners or property owners association will be established to manage common elements and enforce private covenants. A separate association may be created for Parcel 2. The charter, bylaws and covenants are furnished to the City and recorded in Volusia County Official Records. The City enforces only the Development Agreement and its LDRs, "not the private agreements." So covenant rules are enforced by the association, not by the city. Ask for the recorded covenants and bylaws.</p>

<p>Second, the disclosure. Section 720.401 of the Florida Statutes says a prospective parcel owner must be presented a disclosure summary before executing the contract. The summary must say that membership is mandatory and that covenants have been or will be recorded. It must say that assessments, including special assessments, are owed, and that failure to pay could result in a lien. It must also say that the developer may have the right to amend covenants without owner approval, and that the documents are public record.</p>

<p>If the summary is not provided before signing, the contract is voidable by written notice within 3 days after receipt or before closing, whichever is first. The right cannot be waived and ends at closing. The disclosure is supplied by the developer, or by the owner if the seller is not the developer.</p>

<p>Third, the estoppel certificate. Section 720.30851 says the association must issue it within 10 business days of a written or electronic request from the owner, the owner's designee, the mortgagee or its designee. It must be delivered by hand, mail or email. The form asks about assessments owed, transfer or capital contribution fees, open violations, whether board approval is required for a transfer, any right of first refusal, other associations and insurance contacts.</p>

<p>The certificate is effective for 30 days when delivered by hand or electronically, or 35 days by regular mail. The association waives amounts above the certificate for a person who relies on it in good faith. A fee may not be charged if the certificate is late.</p>

<p>Fourth, the tax bill. The Volusia County Property Appraiser says the owner must own and occupy the home as a permanent residence before January 1, and that the homestead application is due no later than March 1 of the year the exemption is to begin. Section 193.155 of the Florida Statutes says that after a change of ownership the property is assessed at just value as of January 1 of the year following the change. After that, the annual change is limited to the lower of 3 percent or the change in the consumer price index. Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-property-taxes-explained-for-buyers">Volusia County Property Taxes</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County Homestead Exemption</a>.</p>

<p>Fifth, new construction. Related guide: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-new-construction-in-volusia-county-builder-contracts-inspections-and-costs">Buying New Construction in Volusia County</a>.</p>

<p>Sixth, schools and the wider area. Check the Volusia County Schools locator for the assigned schools at the exact lot. Related guide: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deland-fl-neighborhoods-costs-and-what-to-know">Living in DeLand</a>.</p>

<p>This guide leaves out several items because no official source for them was found. They are HOA dues, the amenities that actually exist, the plat book and page, the current number of homes built, the rental share, sale prices, the flood zone for the parcel, school assignments and millage.</p>

<p>The agreement requires a plat before construction. Ask whether a recorded plat exists and what it shows. Check the recorded plat for the lot you want.</p>

<p>The bottom line is simple. Lincoln Oaks is a planned development with written rules about lot size, setbacks, garages, parking, siding and buffers, and those rules are in the agreement attached to Ordinance 2019-23. The agreement states what is allowed and required. The plat and the recorded covenants and association documents are the next records to check. If you are weighing <a href="http://www.adamscameron.com/s/fl/deland-city/lincoln-oaks-subdivision">homes for sale in Lincoln Oaks</a>, those documents are the next place to look.</p>

<p>The answers below stick to what the city's agreement, Florida law and official county and FEMA sources say.</p>

<h2>Frequently Asked Questions</h2>

<details>
  <summary><strong>Is Lincoln Oaks inside the city of DeLand?</strong></summary>
  <p>Yes. The City of DeLand adopted the Lincoln Oaks Planned Development as Ordinance 2019-23 and amended its official zoning map to show the parcel as Lincoln Oaks PD. Where the agreement is silent, the C-1 zoning provisions apply to Parcel 2 and the R-1 provisions apply to Parcel 3. Confirm the parcel address with the City of DeLand or the county.</p>
</details>

<details>
  <summary><strong>How many homes can Lincoln Oaks have?</strong></summary>
  <p>The agreement allows up to 182 single-family lots on Parcel 1 and up to 84 on Parcel 3, which adds up to a ceiling of 266 residential lots. Parcel 2 is for medical and related support uses. These are maximums from the 2019 approval. The agreement requires a plat before construction, so ask whether a recorded plat exists and what it shows.</p>
</details>

<details>
  <summary><strong>How big are the lots and how close can houses sit?</strong></summary>
  <p>On Parcel 1 the minimum lot area is 4,180 square feet and the minimum width is 38 feet, with a 5-foot side setback and a 15-foot rear setback. On Parcel 3 the minimum lot area is 6,000 square feet and the minimum width is 50 feet, with a 5-foot side setback and a 15-foot rear setback (20 feet on lots along the northern boundary). Lot coverage is capped at 75 percent on Parcel 1 and 60 percent on Parcel 3. Check the recorded plat for the lot you want.</p>
</details>

<details>
  <summary><strong>Do I have to join the homeowners association?</strong></summary>
  <p>The agreement says a homeowners or property owners association will be established to manage common elements and enforce private covenants. Under section 720.401, a prospective parcel owner must be presented a disclosure summary before executing the contract, and it says that membership is mandatory and that assessments are owed. Failure to pay could result in a lien. Ask for the recorded covenants and bylaws.</p>
</details>

<details>
  <summary><strong>What is an estoppel certificate and when do I get one?</strong></summary>
  <p>The form asks about assessments owed, transfer or capital contribution fees, open violations, whether board approval is required for a transfer and any right of first refusal. Under section 720.30851, the association must issue it within 10 business days of a written or electronic request from the owner, the owner's designee or a mortgagee. It is effective for 30 days when delivered by hand or electronically, or 35 days by regular mail.</p>
</details>

<details>
  <summary><strong>Can I add an accessory dwelling or run a business from a Lincoln Oaks home?</strong></summary>
  <p>The agreement lists accessory dwelling units and home occupations as permitted uses on the single-family parcels. Home occupations are covered by section 33-27.01 of the city's regulations. The agreement does not say whether a given lot can take an accessory dwelling unit. Ask the city.</p>
</details>

<details>
  <summary><strong>How do I check flood risk for a Lincoln Oaks address?</strong></summary>
  <p>The FEMA Flood Map Service Center is the official address search for flood hazard information. This guide does not state a flood zone for any lot. It says stormwater follows the city's regulations and that a joint-use stormwater pond with Volusia County is proposed. Search each address on the FEMA Flood Map Service Center.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 28 Oct 2026 14:02:07 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/28/lincoln-oaks-in-deland-a-buyer-s-guide-to-the-rules]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Moving to Edgewater, FL: Utilities, Trash and Permits]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-edgewater-fl-utilities-trash-and-permits]]>
        </link>
        <description>
            <![CDATA[<p>In Edgewater, one monthly statement from City Hall covers your water, sewer, stormwater, garbage and recycling, and the city's own sample sheet for October 2026 puts the base charges on a standard residential meter at one hundred four dollars and sixty-two cents before you use a single gallon. That is the first number to know. The second is who to call, because every one of those services runs through the same office at 104 North Riverside Drive. If you are still choosing a house, start with the current <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">Edgewater homes for sale</a> and keep this page for the week your contract goes firm.</p>

<p>What follows is the local part of moving, the part a national checklist cannot give you. It covers how the city account is opened and what it costs to keep it in good standing, which day the trucks come and what they will refuse, which projects need a permit before you touch them, and what the state expects of you in the first thirty days. Every figure comes from the City of Edgewater's published pages and forms or from state sources, read on October 21, 2026. Where two city documents disagree, this guide says so and tells you to ask. Related guide: <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-edgewater-fl-neighborhoods-costs-and-what-to-know">living in Edgewater</a>.</p>

<h2>One statement, one account, and a few dates that matter</h2>

<p>The city calls it a utility statement, and it warns that people confuse it with a water bill. It is all-inclusive. Water, sewer, stormwater, garbage, recycling and, where you have it, reclaimed irrigation water arrive together. The city points out that in other communities many of these services are billed separately through the annual tax assessment, so a bill that looks high next to a neighbor town's water bill is not an apples-to-apples comparison. Customer Service answers at 386-424-2400, extension 4000, Monday through Friday from 8 a.m. to 4:30 p.m. There is also an automated payment line at 386-427-3279 that runs around the clock, and an after-hours emergency number at 386-424-2490.</p>

<h3>Opening the account</h3>

<p>An owner brings a copy of the signed settlement statement, the warranty deed, or any document filed with the clerk of courts that shows the property changed hands, plus a driver's license. You can fax the copies to 386-424-2409 or bring them to City Hall. A tenant brings the signed lease and a driver's license. One odd requirement is worth knowing in advance. The city asks that the garbage cart be on the outside of the house so staff can verify the address, so check that the cart is there before you go in.</p>

<p>The up-front money is where the city's own documents stop agreeing, so ask before you show up. One FAQ answer describes a deposit of two hundred dollars plus a thirty-five dollar service charge, and says two hundred thirty-five dollars is the most you would pay, less if your utility credit is good. A separate deposits FAQ lists one hundred dollars for water and one hundred dollars for sewer on a three-quarter inch meter, either of which can be waived with a good credit rating. The billing terms mention a base service charge of thirty-five dollars for account transfers. Those three descriptions do not line up exactly. The tenant FAQ adds that the full amount must be in hand at sign-up or the water stays off, so tenants in particular should confirm the figure first.</p>

<p>The deposit is not gone for good. The billing terms say the city applies it to your final bill when you end service and refunds the difference, though no refund check goes out for less than ten dollars. They also say you are responsible for every charge on the account until you notify Customer Service in writing, so do not assume the old owner's account closes itself the day you close.</p>

<h3>What the monthly statement is made of</h3>

<p>The fiscal year 2026 average-bill sheet shows the pieces for a three-quarter inch residential meter inside city limits, with rates reflecting the October 1, 2026 increase. The base charges that arrive every month regardless of use are stormwater, refuse, recycling, a water base, a sewer base, and a utility tax equal to ten percent of the water charge. They total one hundred four dollars and sixty-two cents. Add reclaimed irrigation service and the base rises by ten dollars and forty-three cents.</p>

<p>Then comes usage. Water is tiered and the tiers climb. The first 3,000 gallons are billed at the lowest rate, the next 2,000 at a higher one, the band from 5,001 to 10,000 at a higher one still, and anything above 10,000 at the top rate. Sewer is a single flat rate per thousand gallons with no tiers. The sheet works three examples. A month with 1,000 gallons used totals one hundred twenty dollars and forty-one cents. At 3,000 gallons the total is one hundred fifty-one dollars and ninety-nine cents. At 6,000 gallons it is two hundred nineteen dollars and fifty-nine cents. Reclaimed water carries a base charge only, with no usage rate. The sheet states plainly that actual bills depend on location and what services you use, so treat the examples as a shape, not a quote.</p>

<h3>Paying on time, and what happens if you do not</h3>

<p>Payment is due within 20 days of the statement date, and the due date moves to the next business day when it lands on a weekend or a holiday. A five percent late fee applies after the due date. The account becomes delinquent 21 days after the statement date and can be disconnected, and a thirty-five dollar fee is added if the balance is still open at 30 days. The city also says that not receiving a bill does not stop a disconnection, so a missing statement is a reason to call, not a reason to wait. Reconnecting after 4:30 p.m., on a weekend or on a holiday carries a one hundred dollar charge.</p>

<p>The simplest defense is the automatic bank draft. The city offers it at no cost. The form needs a voided check, the draft happens on the due date, and you keep receiving a bill that shows the amount and date. The one trap is that you must keep paying by hand until your statement actually carries the "BANK DRAFT" message. Payments received before 2 p.m. are credited that day, and the blue drive-up dropbox sits in the north parking lot at City Hall. Two warnings from the city are worth repeating. It will never call you asking for payment information, and DOXO, a third-party payment site that shows up in search results, is not associated with the city.</p>

<h3>The meter, the leak credit and the lawn</h3>

<p>Know where your responsibility starts. The city owns the water meter, the backflow prevention assembly and the pipes connecting them to the system. You own everything from the outside of the backflow assembly into the house, and repairs there are yours. If a bill spikes, the city grants a water credit when the high-consumption bill is at least twice your average, one credit per twelve-month period. Customers on Edgewater sewer can also get a sewer credit back down toward their average. Filling a pool is treated differently. It does not qualify for the water credit, though you can request a sewer credit in writing and include the date of the fill. For a main break, call 386-424-2400 during business hours or 386-424-2490 after them.</p>

<p>Watering rules are posted on the city's watering page, and this is a spot to verify rather than trust. The schedule on the page lets odd-numbered addresses water Wednesday and Saturday and even-numbered addresses Thursday and Sunday, never between 10 a.m. and 4 p.m., but the dates printed above it run from March 9, 2025 to November 9, 2025. That is last year's posting. A schedule labeled for 2025 may not be the one in force this season, so ask Public Works at extension 4007 for the schedule that applies to you now. Reclaimed customers are asked to water only when the yard needs it.</p>

<h2>Trash, recycling and yard waste, day by day</h2>

<p>Edgewater's refuse service is bundled into the statement and it covers a lot. Per the city's refuse FAQ, you get garbage collection twice a week, recycling once a week, bagged or canned yard waste once a week on Wednesday, furniture once a week on Wednesday, and curbside pickup of loose or bundled yard waste, household appliances and four tires per household. Garbage days are either Monday and Thursday or Tuesday and Friday, depending on your location, and the city's collection map settles which. Recycling comes on one of your two garbage days. If your address is new to you, call Public Works at 386-424-2400, extension 4007, between 7 a.m. and 3:30 p.m. and ask for your days by address, because that is faster than reading a map.</p>

<h3>The cart and the set-out rules</h3>

<p>The city supplies each residence one garbage cart in 35, 65 or 95 gallons. The cart carries a serial number assigned to the address, and the city is explicit that it stays with the house. Do not write on it, and do not take it with you when you leave. You can exchange it once in any 24-month period at no charge. An extra cart is a one-time charge of thirty-five dollars plus five dollars a month on the statement. If the house you buy has no cart, Environmental Services will deliver one. If it is damaged, the city repairs or replaces it unless the damage was intentional.</p>

<p>Containers must be at the curb by 7:00 a.m. on collection day. You may put them out the evening before, and they must be gone from the street by 11:00 p.m. that day. Place everything beside the street without blocking the mailbox, the driveway or the swale in front of your home. Excess garbage can go in bags or in a 20-gallon can that has handles. One more rule that sounds trivial and is not: do not leave items for sale near the street, because refuse crews pick them up.</p>

<h3>What the trucks will not take</h3>

<p>Household hazardous waste does not go curbside. That means solvents, paint, auto fluids, household and pool chemicals and anything combustible. Empty containers can go in the garbage, and paint cans must be empty and completely dried out first. Volusia County holds household chemical collection days, or you can drive items to the county landfill at 1990 Tomoka Farms Road in Daytona Beach, 386-947-2952. Needles belong in a sharps container, and the crews cannot take anything in red or yellow bio-hazard bags.</p>

<p>If you hire a tree service, make sure disposal is written into the price. The city's FAQ says contractors are responsible for hauling away what they generate, and that the city will bill you for disposal if they leave it.</p>

<h3>Recycling and yard waste have their own habits</h3>

<p>The city contracts recycling to Southard Enterprises, reachable at 386-426-8858. Put recyclables in the bin loose, not bagged. Rinse every container, because food contaminates the load. Flatten all cardboard and leave it in or under the bin. Junk mail and mixed paper go inside a paper bag, while newspaper may go in loose. Caps can stay on bottles, and plastics numbered 1 through 7 are on the accepted list. Each household may have two bins, and extra material can sit in a grocery bag on top.</p>

<p>Yard waste has the most rules. Bagged or contained yard waste is collected every Wednesday except during holiday weeks. Loose piles smaller than four feet on each side go on a continual route, and the city's page admits that can take several weeks at peak season, while the refuse FAQ describes about twice a month. Read that as a range and plan on the longer end in peak season. A pile bigger than four by four by four feet carries an additional charge. Never use the recycling cart for yard waste, because it will not be collected. Appliances and furniture are also skipped in holiday weeks, and the observed holidays are New Year's Day, Martin Luther King Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.</p>

<h2>Permits and rules to check before you change anything</h2>

<p>Edgewater enforces the 8th Edition (2023) Florida Building Code and the 2020 National Electric Code. Its Building Division names pools, screen enclosures, doors and windows, fences, storage sheds, re-roofs and water hook-ups among the work that needs a permit. Applications of every type can be emailed to the Building Division with plans signed and sealed digitally. Once you have a permit number you can log in at any hour to pay fees, schedule, reschedule or cancel inspections and read results, or call 386-427-3279 and choose option 2. A live person answers Monday through Friday, 8:00 a.m. to 4:30 p.m., excluding legal holidays.</p>

<p>Every permit form carries the same warning about contracts of five thousand dollars or more. A certified copy of the recorded Notice of Commencement has to be submitted, and the fence and tree forms spell out the risk in capital letters: failing to record one may result in paying twice for improvements to your property. The notice must be recorded and posted at the job site before the first inspection. If a lender is financing the work, the form says to consult the lender or an attorney before recording.</p>

<h3>A worked example: the fence you want in week two</h3>

<p>Say you close on a Friday and want a privacy fence by the end of the month. The fence permit comes with an affidavit, and its numbers are specific. Between the front property line and the front of the house, a residential or riverfront lot not subject to site plan review is limited to four feet, and the fence there must be non-opaque. Everywhere else on a residential lot the limit is six feet, side corner yards included. A six-foot fence on a side corner lot must sit ten feet back from the property line. Corner lots also have to respect the site triangle under City Ordinance 21-38.02(d). The good side faces out. Raising ground with fill or a berm just to get a taller barrier is prohibited. And the application needs a survey showing exactly where the fence will go.</p>

<p>The affidavit also puts the burden on you. It is the applicant's responsibility to confirm the fence does not conflict with any easement, restriction or right of way, whether recorded, private or verbal. Private restrictions include an association's rules, so if the neighborhood has one, read its documents too.</p>

<h3>Pools, roofs, sheds and trees</h3>

<p>A pool permit asks whether the pool is above ground or in-ground, whether any part of the barrier is a wall of the house with doors or windows in it, and then wants a survey with setbacks, a pool plan, TDH calculations and the name of the electrical subcontractor. A re-roof permit asks for the number of roofing squares, the product approval numbers and the underlayment. Owners may pull a re-roof permit themselves, but the owner affidavit says the owner must supervise on site and that a home sold or leased within one year of completion is presumed to have been built for sale, which defeats the exemption.</p>

<p>A storage shed or other accessory building needs an established house on the lot first. The accessory structure affidavit says such buildings may not be rented or used as a dwelling, may not sit in a front yard, a public right of way or a public easement, and must meet the setback and coverage limits in the city's code. That is a land-use rule about the structure, and it is the reason to ask before you order a shed online.</p>

<p>The city also regulates trees. Its Land Development Code requires a tree removal permit for any tree six inches or larger in diameter, measured four and a half feet up the trunk, anywhere inside city limits, with replacement when too few trees remain on the lot. Single-family and duplex lots must keep one tree per 1,500 square feet. Specimen trees of 36 inches or more, except Laurel Oak, are treated as historic and come out only with City Council approval. Check before the tree company arrives.</p>

<h3>Small jobs, garage sales and who enforces what</h3>

<p>There is a limited exemption for small work. The city's permit exemption form covers work valued at under seventy-five hundred dollars on a single-family residence, but it excludes electrical, mechanical, plumbing, gas and structural work, and the project cannot be split into phases to get under the line. You submit the request, and the city emails confirmation that the work is exempt. That email is not an inspection. Keep the confirmation with your closing papers.</p>

<p>Garage sales are allowed only on residentially zoned property, four a year, each up to three consecutive days. You may post one sign of no more than four square feet at the sale and up to two off-site with the property owner's permission, and signs in the right of way are treated as abandoned. The permit is free on the city's website, and the City Hall cashier charges five dollars. Code Enforcement handles property maintenance, zoning, signs, vehicles, noise and building activity at 386-424-2400, extension 2210, and the city says Florida law generally prohibits anonymous complaints. A violation notice carries a deadline, and contacting the city does not extend it.</p>

<p>Finally, ground work near water has its own rule. The city's floodplain pages say any development in a floodplain, including fill, new construction and remodeling, needs a permit. If you plan a major renovation of your own, read the <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/edgewater-canal-and-river-lots-permits-utilities-flood">Edgewater canal and river lots guide</a> before you sign a contractor.</p>

<h2>The first month, in the order it tends to matter</h2>

<h3>Week one: the account and the paperwork</h3>

<p>Open the utility account as soon as the deed is recorded, and ask in the same call for your garbage and recycling days, a recycling bin if the house has none, and the draft form. Put the dates in your calendar. The statement date plus 20 days is the due date, and plus 21 days is delinquent. The billing terms say all service changes must be made in writing, so follow any phone call with the paperwork, by fax or in person.</p>

<h3>The state's two clocks</h3>

<p>If you are moving to Florida from another state, two clocks start. The Florida Department of Highway Safety and Motor Vehicles says a new resident must get a Florida driver license within 30 days of establishing residency, and must have insurance from a Florida-licensed agent in order to title and register vehicles within 10 days. The same page says you may be considered a resident when you start work, enroll a child in public school, register to vote, file for homestead exemption or live in the state more than six consecutive months. Several ordinary first-month steps, including a homestead filing, are on that list. Driver license applications are made in person. For a car with no lien you bring proof of identity, proof of Florida insurance, the original out-of-state title and a completed title application with a vehicle identification number inspection done by law enforcement, a licensed Florida dealer or a tax collector employee.</p>

<h3>Homestead, flood coverage and the small local items</h3>

<p>Homestead has a hard date. State law says the owner who holds legal title on January 1 must apply with the county property appraiser on or before March 1, and missing it waives the exemption for that year with narrow exceptions. A fall closing therefore has a first filing window from January 1 through March 1 of the next year. Related guides: the <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia homestead exemption guide</a> and the <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-property-taxes-explained-for-buyers">Volusia property tax guide</a>.</p>

<p>Flood insurance deserves a call in the first week, not the first storm. The city says most standard homeowner's policies do not cover flood, that it is required by law for a property in a special flood hazard area with a federally backed mortgage, and that policies typically take 30 days to go into effect. It also reports that policyholders outside the high-risk areas filed more than 40 percent of National Flood Insurance Program claims from 2014 to 2018. You can look up your property's zone on the city map, with FEMA's map service center or through the Building Department. Related guides: the <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida home insurance guide</a> and the <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">closing costs guide</a>.</p>

<p>The remaining items are short. Street light outages go to FPL at 1-800-468-8243. Mosquito control is run by Volusia County at 386-424-2920. The library is at 103 West Indian River Boulevard. Whistle Stop Park is open from 7 a.m. to 10 p.m., Rotary Park has the designated dog park, and dogs must be leashed in the parks along Riverside Drive. The boat ramp is at Kennedy Park, 103 North Riverside Drive. For assigned schools, use the Volusia County Schools locator with your address. Register to vote through the Volusia County Supervisor of Elections in DeLand at 386-736-5930.</p>

<p><strong>Bottom line.</strong> Moving to Edgewater is one account, one set of dates and a short list of things to ask before you act. Open the utility account with your closing documents, confirm the deposit amount out loud because the city's pages disagree, and consider the bank draft, which withdraws on the due date. Keep paying by hand until your statement shows the BANK DRAFT message. Look up your garbage days by address, put yard waste in bags or a spare can, and check the permit list before you order a fence, a shed or a tree service. Then keep the state's 10-day and 30-day clocks and the March 1 homestead deadline in your calendar. If you are ready to look at houses, begin with <a href="http://www.adamscameron.com/edgewater-florida-real-estate-and-homes.html">homes for sale in Edgewater</a> and bring this checklist to the closing table.</p>

<p>That is the checklist. Here are the questions that tend to come up in the first weeks, answered from the same city and state pages.</p>

<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Do I need separate accounts for water, sewer and trash in Edgewater?</strong></summary>
<p>No. The city sends one monthly utility statement that covers water, sewer, stormwater, garbage and recycling, plus reclaimed irrigation water if the property has it. Utility Customer Service at City Hall, 104 North Riverside Drive, sets up owner and tenant accounts and answers at 386-424-2400, extension 4000. Owners bring the signed settlement statement or deed and a driver's license. The city also asks that the garbage cart be outside the house so staff can verify the address.</p>
</details>
<details>
<summary><strong>How much is the utility deposit when I buy a house in Edgewater?</strong></summary>
<p>The city's pages give different answers. One FAQ describes a deposit of two hundred dollars plus a thirty-five dollar service charge, with two hundred thirty-five dollars as the most you would pay. Another lists one hundred dollars each for water and sewer on a three-quarter inch meter, which can be waived with good utility credit. The billing terms mention a thirty-five dollar charge for transfers. Call Customer Service at extension 4000 for the exact amount before you go, because tenants must pay the full amount at sign-up.</p>
</details>
<details>
<summary><strong>What day is garbage and recycling pickup in Edgewater?</strong></summary>
<p>Garbage is picked up twice a week, either Monday and Thursday or Tuesday and Friday, depending on where the home is. Recycling is collected once a week on one of those two days. Bagged or contained yard waste and furniture go out on Wednesdays, except in holiday weeks. Containers must be at the curb by 7:00 a.m. and removed by 11:00 p.m. on collection day. Public Works can confirm your days by address at 386-424-2400, extension 4007, Monday through Friday from 7 a.m. to 3:30 p.m.</p>
</details>
<details>
<summary><strong>Does Edgewater take yard waste and old furniture at the curb?</strong></summary>
<p>Yes, with rules. Bagged or contained yard waste is collected every Wednesday except in holiday weeks, and furniture, mattresses and appliances can go to the curb as well, though they are skipped in holiday weeks. Loose yard debris is collected on a continual route and can take several weeks, and piles over four by four by four feet carry an additional charge. Do not put yard waste in the recycling cart. Tires are limited to four per household per year, and tree service waste is the contractor's job to haul.</p>
</details>
<details>
<summary><strong>Do I need a permit for a fence, a shed or a new roof in Edgewater?</strong></summary>
<p>Yes. The city's Building Division lists fences, storage sheds, re-roofs, pools, screen enclosures, and doors and windows among the work it permits. Applications can be emailed to the division. A fence is limited to four feet and must be non-opaque between the front property line and the front of the house, and six feet elsewhere on a residential lot, with a survey required. Small work valued under seventy-five hundred dollars may qualify for an exemption, but never electrical, plumbing, gas, mechanical or structural work.</p>
</details>
<details>
<summary><strong>What are the first deadlines after moving to Edgewater from another state?</strong></summary>
<p>Florida requires a driver license within 30 days of establishing residency. It also requires Florida insurance from a licensed agent so you can title and register your vehicles within 10 days. Homestead exemption has its own date. If you hold title on January 1, you apply to the county property appraiser on or before March 1, and missing it waives the exemption for that year with narrow exceptions. Filing for homestead is also one of the things the state lists as establishing residency.</p>
</details>
<details>
<summary><strong>Is the Edgewater watering schedule posted on the city website current?</strong></summary>
<p>The posted schedule is dated March 9, 2025 to November 9, 2025, so it is a prior-year posting. It says odd-numbered addresses water Wednesday and Saturday, even-numbered addresses Thursday and Sunday, and nobody waters between 10 a.m. and 4 p.m. Daylight saving time ends in early November, so confirm the current schedule with Public Works at 386-424-2400, extension 4007, or at PublicWorks@CityofEdgewater.org. Reclaimed water customers are asked to water only when the yard needs it.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:59:07 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-edgewater-fl-utilities-trash-and-permits]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Moving to DeLand: Utilities, Trash, Permits, Month 1]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-deland-utilities-trash-permits-month-1]]>
        </link>
        <description>
            <![CDATA[<p>Move into a DeLand house inside the city limits and one office, City Hall's Utility Billing, starts your water, sewer, stormwater and garbage service. It wants three things from you: a completed application, a government photo ID and proof that you own the place. The city says online and email paperwork can take one to two business days to process, so this is the first errand on the list. If you are still choosing between <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand homes for sale</a>, keep this page for the week after the offer is accepted, when the calendar starts to matter.</p>

<p>This guide is the order of operations for arriving. Related guides: <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-taxes-utilities-and-the-city-vs-county-line">DeLand taxes, utilities and the city versus county line</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-deland-fl-neighborhoods-costs-and-what-to-know">living in DeLand</a>. It covers what you do, who you call and which deadline arrives first. Every rule below was read on the City of DeLand, Volusia County, state agency or Florida Statutes pages on October 21, 2026, and where a page was silent or two pages disagreed, this guide says so.</p>

<h2>Open the city account before closing day</h2>

<p>The city runs its own utility billing, so inside the city limits there is no private water company to shop. The Finance Department's Utility Billing team describes its job as monthly billing and collection of water, sewer, stormwater and garbage collection services. That list matters, because it tells you what the one monthly statement will contain. Electricity, natural gas and internet are not on it. The city pages we read do not say who supplies those, so ask the seller and your closing agent for the current providers at the address and call them yourself.</p>

<p>The city's page sets out the requirements to start service. You need a completed Request for Service application, which you can fill out online or bring in on paper. You need a valid government-issued photo ID, such as a driver license, state ID card or passport. And you need proof that you own or lease the property. For an owner who has just bought, the city lists a signed ALTA settlement statement and a notarized, signed deed. For a renter, it asks for a signed lease with both the owner's and the tenant's signatures visible. If a property manager signed the lease, the city wants a copy of the management agreement too, and a lease signed under a power of attorney needs that paperwork attached.</p>

<p>You can send all of it four ways. You can upload it with the online application, email copies in a single message, bring the originals to DeLand City Hall at 120 South Florida Avenue, or mail legible copies. The city says documents sent online or by email may take one to two business days to process, and that anyone who needs service faster should contact customer service. Customer service is 386-626-7051.</p>

<p>One rule on that page deserves a slow read. The city says any prior debt and outstanding account balances must be paid in full before service can be connected. It will refuse service to an applicant where the current property owner has an outstanding balance at that address, and to an applicant where the service location has a lien on the property. The city's FAQ explains where liens come from. It states that unpaid balances billed to property owners constitute a lien against the property, citing Florida Statute 159.17, and that the city also files paper liens that accrue interest until paid. Ask your closing agent whether the title work checked the city utility account, and ask for the answer before the closing table, not after.</p>

<p>Deposits and fees are printed on the city's rate sheet, which the Utility Rates page still posts as the sheet effective October 1, 2025. Check that page for a newer one. On that sheet the deposit for water and sewer on a standard three-quarter-inch meter is two hundred fifty dollars. Water only is one hundred thirty and sewer only is one hundred eighty. The sheet also lists a billing fee of four dollars and ninety-nine cents per bill, a twenty-five dollar charge for an account set-up that needs a field verification, a ten dollar late payment fee and a fifty dollar delinquent fee. The city's FAQ separately says tenants must put a deposit on every new account and that deposits come back as a credit after three years of good standing. It does not say how that three-year rule applies to an owner, so ask when you call.</p>

<p>Now the part people skip. The FAQ page describes two different penalties for paying late. One entry says a ten dollar late fee is added if payment does not reach the office by 8 am the day after the due date on the bill, and that the city does not recognize the postmark as the payment date. Another entry says a fifty dollar delinquent charge is added if payment has not reached the office by 8 am six days after the due date, and that the account is then subject to immediate disconnection, with the disconnect date printed on the front of the bill. The two entries sit on the same page and they do not agree on every detail, which is a reason to take the shortest reading. Pay by the due date, and use the automatic bank payment form if you do not trust yourself to remember. The city also says that failing to receive a bill does not excuse the payment, so if the first statement has not arrived a month after the move, call 386-626-7051. The city also offers one payment extension per twelve months, giving two weeks past the due date.</p>

<p>Last, the city bill covers a house inside the city. A property outside the city limits belongs to unincorporated Volusia County, and the city's building page tells you to check with the Property Appraiser to find out which side of the line an address falls on. See also our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-taxes-utilities-and-the-city-vs-county-line">DeLand taxes, utilities and the city versus county line</a>. For this checklist, do that lookup before you call anyone, because every phone number below assumes the city.</p>

<h2>Trash, yard waste and watering: the weekly rules</h2>

<p>DeLand's solid waste, yard waste and recycling are collected by GFL Environmental, under the city's contract, and the charge rides on your city utility bill. On the rate sheet, residential curbside garbage pickup is eighteen dollars and eighty-five cents a month. You get one weekly pickup of each of three things. Garbage goes in one 96-gallon or 64-gallon cart. Recycling goes in one 64-gallon cart. Yard waste is limited to one cubic yard a week. The city says that anything outside the cart is subject to additional charges, and that one extra garbage cart can be bought through GFL for an extra fee. All materials must be out for collection by 6 am.</p>

<p>The city's page does not print your pickup day. It tells residents who do not know their schedule to use a lookup link, so ask the seller what day the cans go out and then check the lookup on the day you move in. GFL's numbers on the page are 386-222-0693 and 386-626-7195, the second one labeled as an additional phone. Crews work every holiday except Martin Luther King Jr. Day, Thanksgiving Day, Christmas Day and New Year's Day, and on those days the normal pickup happens the next business day.</p>

<p>Yard waste has the strictest rules, and they explain most of the complaints about a pile left behind. The city says yard waste must be tied in bundles or held in a private container. Each piece has a maximum of four feet long by six inches in diameter, the total pile may not exceed twenty-four inches across, and each container or bundle is capped at seventy-five pounds. The same page adds another instruction, that yard debris must be tied, bundled or contained in clear bags or bins of 32 gallons or less, and never in your garbage or recycling cart. Think of a freshly closed house with a back yard full of palm fronds and a fallen limb. The limb has to be cut to four-foot pieces and bundled, and the fronds have to go in a clear bag or a can under 32 gallons. Dragging it all to the curb in one heap is the way to have it all left behind.</p>

<p>Bulk collection is worth knowing in the first month, because a move leaves boxes and old furniture. Up to three cubic yards is picked up weekly on the same day as your solid waste. Appliances are a separate special collection. The city allows two pickups per year at no charge, and they must be scheduled through GFL. It also allows four tires a year at no charge. The page does not define what counts as bulk beyond the volume, so call GFL before you set out a sofa and a mattress and a broken dresser together.</p>

<p>Some things belong in neither cart. Volusia County's solid waste page says gasoline, paints, thinners, solvents and pool chemicals cannot go in the garbage because they are harmful to the environment. Residents can take them to the household hazardous waste facility at the West Volusia Transfer Station, 3151 East New York Avenue in DeLand, which also operates a paint exchange. Motor oil and lead acid batteries are banned from landfill disposal, and the county says any retailer that supplies batteries must accept your old one. The county adds that it offers hazardous waste collection events, usually in November and April. Call the West Volusia solid waste office at 386-943-7889 before a trip, because the page is not a schedule of hours. If the garage came with half-empty cans of paint or pool chemicals, set them aside for that trip.</p>

<h3>Watering rules and reclaimed water</h3>

<p>Lawn watering is governed by the city's schedule, and it changes with the clock. While Daylight Saving Time is in effect, residential irrigation at odd-numbered addresses, or addresses with no number, is allowed on Wednesday and Saturday. Even-numbered addresses water on Thursday and Sunday. Nobody may water between 10 am and 4 pm, no zone may receive more than three-quarters of an inch on a watering day, and no zone may run more than one hour. When Eastern Standard Time is in effect, the schedule narrows to Saturday for odd addresses and Sunday for even ones, with the same hours and limits. Check the irrigation controller on move-in day against that schedule, and check it again when the clocks change.</p>

<p>Some DeLand properties can use reclaimed water, which is highly treated and disinfected wastewater reused for irrigation. The city's FAQ says it is ideal for irrigation and not suitable for human or animal consumption. Reclaimed irrigation is not limited by day or time as a normal practice, but the Utilities Director can declare a shortage, and then the water is turned off for set periods. The FAQ also lists uses that are prohibited, including filling swimming pools, sharing a reclaimed connection between properties and washing cars, boats or driveways. Piping and sprinkler heads must be purple, and each potable connection needs a backflow device. Connecting to the system takes an application through Utility Billing and a one-time fee set by meter size. The city requires purple piping and sprinkler heads on reclaimed connections, so ask the seller whether the house is connected. If it is not, ask the city whether the street has a line before you plan around it.</p>

<h2>Permits, code rules and the paperwork that follows you to Florida</h2>

<p>Almost every new owner has a project list by week two. The city's Building Division handles permits for projects inside the city limits, and a project in unincorporated Volusia County goes to the county's Building Department. The city's permit types are broader than most people expect. Its accessory structure category covers fences, retaining walls, pools, screen enclosures, decks, gazebos, pergolas, sheds, detached garages, carports, patios and driveways. So the new fence you had in mind is a permit, and so is the patio. Replacing an air conditioning unit falls under mechanical permits. A service change or panel change, or a generator, is an electrical permit. Reroofing has its own permit type, and the city is blunt about it: the inspections for the underlayment, for re-nailing the sheathing when that is required, and the final are mandatory. A second pass is not allowed for anyone who misses these state-mandated inspections.</p>

<p>Every residential permit application carries a non-refundable application fee of one hundred dollars at submittal, and the city lets you check the status of an application on its Accela Citizen Portal. The city also notes that the Florida Building Code, 8th Edition (2023), applies to permits applied for on or after December 31, 2023. The city's own conclusion is simple. Work done without proper permits can complicate a sale and bring fines. Pull the permit history on anything you inherit before you add to it. See also our guide on <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida home insurance for buyers</a>.</p>

<p>Code Enforcement is the other side of the city. It enforces the City of DeLand Code of Ordinances on building maintenance, property maintenance, lot maintenance, business tax receipts and building permits. Since July 1, 2021, under Senate Bill 60, code officers cannot start an investigation from an anonymous complaint, so a person who reports a violation must give a name and address. Noise and overnight on-street parking are not Code Enforcement matters. The Police Department number is 386-626-7400. The practical lesson is that a yard, a fence or a shed is regulated even when nobody complains loudly, so learn the rules before the first neighbor conversation.</p>

<h3>The state paperwork, with its real deadlines</h3>

<p>Several clocks start the day you establish residence, and they belong to the state and the county, not the city. Florida's Department of Highway Safety and Motor Vehicles tells a new resident to get a Florida driver license within 30 days of establishing residency and to buy Florida insurance from a licensed Florida agent to title and register vehicles within 10 days. It also says driver license applications must be made in person. The Volusia County Tax Collector's site links to that page for new residents. If you already hold a Florida license, Florida Statute 322.19 has its own rule: when you change the legal residence or mailing address on a license, you must obtain a replacement within 30 calendar days. Vehicle registration needs the street address of your permanent Florida residence and proof of address, so ask the Tax Collector which proof of address it accepts and keep your closing paperwork handy.</p>

<p>Voter registration is a quicker task. Florida Statute 97.1031 says a voter who changes residence address must notify the supervisor of elections. For a move within Florida, the statute allows a phone or electronic notice with your date of birth plus the last four digits of your Social Security number or your Florida driver license or ID number. The Volusia County Supervisor of Elections is at 1588 North Woodland Boulevard in DeLand, and the number is 386-736-5930.</p>

<p>The deadline that costs real money if you miss it is the homestead filing. Under Florida Statute 196.031, the exemption belongs to a person who holds title on January 1 and makes the property a permanent residence in good faith. Under 196.011, the application is due to the county property appraiser on or before March 1, and missing it waives the exemption for that year, with narrow exceptions in the statute. Because the January 1 title date comes first, a buyer who closes in March has not yet qualified for that tax year, and a buyer who closes in November should file in the next window. See also our <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">guide to the Volusia County homestead exemption</a>. The appraiser's own homestead page would not load for us on October 21, so the dates here come from the statutes. Confirm the filing steps with the appraiser's office.</p>

<p>Two more items are about safety. Sign up for AlertVolusia, the county's emergency notification system, which sends voice calls, texts and emails for events such as hurricanes and evacuations. The sign-up page lists DeLand as one of the areas with its own notifications, and it says anyone in a city listed there should also sign up for the city's alerts, while countywide alerts reach anyone registered in any area. Then check the evacuation map. Volusia Emergency Management says to evacuate if you live in the hurricane evacuation zone, in a low-lying flood-prone area including homes along river basins, or in a mobile home, recreational vehicle or similar structure, and that failing to obey an evacuation order is a violation of Florida law. The county names three evacuation levels, A, BC and DE, and says mobile home and RV residents must leave for all of them. The city's FAQ includes a Fire Department smoke detector program, so test the alarms in a new house. The city's FAQ cites an analysis in which 85 percent of victims in homes where alarms were present but did not work had a dead or missing battery or power source.</p>

<p>If you have children, the district's Find My School tool takes a street address and zip code and returns the schools your student is zoned for. Use it on your actual address, since the page says an address that is not found should be checked on the interactive attendance boundary map. We do not rank schools. The tool is the district's own answer.</p>

<h3>A first-month checklist, in order</h3>

<ul>
<li><strong>Before closing:</strong> confirm the property is inside the city limits, send the Request for Service application with your ID, ask your closing agent about any lien or open balance on the city account, and line up electric, gas and internet providers with the seller's help.</li>
<li><strong>Closing day:</strong> keep the signed settlement statement and recorded deed, because the city, the state vehicle office and the appraiser all ask for proof of address or ownership.</li>
<li><strong>Week one:</strong> learn the pickup day, set the irrigation controller, empty the garage of anything hazardous, and sign up for AlertVolusia and the city alerts.</li>
<li><strong>Within 10 days:</strong> if you are new to Florida, buy Florida insurance and register your vehicles.</li>
<li><strong>Within 30 days:</strong> get a Florida driver license, or a replacement showing the new address, and update your voter registration.</li>
<li><strong>Before March 1:</strong> file the homestead application if you held title on the previous January 1.</li>
<li><strong>Before any project:</strong> check whether the fence, shed, patio or air conditioner replacement needs a city permit.</li>
</ul>

<h2>The bottom line</h2>

<p>Moving to DeLand is mostly a paperwork problem, and the paperwork has a clear order. Start the city account first, because the city will not connect service until prior debt and outstanding balances are paid in full. Learn the cart and yard waste rules before the first pickup, because those are the rules that leave a pile behind. Treat permits as the default for any exterior project, and put the state deadlines on a calendar. This guide does not tell you what DeLand costs, which neighborhood fits you or whether a given house is a good one. For that, start with our <a href="http://www.adamscameron.com/deland-florida-real-estate-and-homes.html">DeLand real estate</a> page, and see our <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/deland-taxes-utilities-and-the-city-vs-county-line">DeLand taxes and utilities guide</a>. If one thing from this page sticks, make it this one: ask the city about the account balance before you close.</p>

<p>That is the order of operations. The questions below are the ones a new owner has to settle before the moving truck leaves, with the answers pulled from the same city, county and state pages.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>How do I start water service when I buy a house in DeLand?</strong></summary>
<p>Send the City of DeLand's Utility Billing office a completed Request for Service application, a government photo ID and proof of ownership. For a recent purchase the city lists a signed ALTA settlement statement and a notarized, signed deed. You can upload online, email, bring originals to City Hall or mail copies. The city says online and email documents may take one to two business days to process, so send them before closing. The number is 386-626-7051.</p>
</details>
<details>
<summary><strong>Can a lien or old balance stop my utilities from turning on?</strong></summary>
<p>Yes. The city's page says prior debt and outstanding balances must be paid in full before service can be connected. It also refuses service where the current property owner has an outstanding balance at the address or where the location has a lien. The FAQ says unpaid balances billed to property owners constitute a lien. Ask your closing agent to confirm the city account was checked in the title work before you close.</p>
</details>
<details>
<summary><strong>Who picks up my trash in DeLand and what are the limits?</strong></summary>
<p>The city uses GFL Environmental for garbage, recycling and yard waste, once a week each, billed through the city utility bill. Garbage goes in one 96-gallon or 64-gallon cart and recycling in one 64-gallon cart. Yard waste is limited to one cubic yard, with pieces no longer than four feet and no wider than six inches, in bundles or containers up to seventy-five pounds. Everything must be out by 6 am. GFL's number is 386-222-0693.</p>
</details>
<details>
<summary><strong>Where do I take paint, pool chemicals and old batteries in DeLand?</strong></summary>
<p>Volusia County says gasoline, paints, thinners, solvents and pool chemicals cannot go in your garbage. Residents can use the household hazardous waste facility at the West Volusia Transfer Station, 3151 East New York Avenue in DeLand. Motor oil and lead acid batteries are banned from landfill disposal, and retailers that supply batteries must accept your old one. Call West Volusia solid waste at 386-943-7889 to confirm hours before you drive over.</p>
</details>
<details>
<summary><strong>Do I need a permit for a fence or shed in DeLand?</strong></summary>
<p>Inside the city limits, probably yes. The city's accessory building or structure permit category covers fences, retaining walls, pools, screen enclosures, decks, gazebos, pergolas, sheds, detached garages, carports, patios and driveways. A project in unincorporated Volusia County goes to the county's Building Department instead. Residential applications carry a non-refundable application fee of one hundred dollars. Call the city's Building Division with your address and the project before you buy materials.</p>
</details>
<details>
<summary><strong>How soon do I need a Florida driver license after moving to DeLand?</strong></summary>
<p>The state's new resident page says a new resident must obtain a valid Florida driver license within 30 days of establishing residency, and must apply in person. It also says to buy Florida insurance and then title and register vehicles within 10 days. If you already hold a Florida license and only changed your address, Florida Statute 322.19 requires a replacement within 30 calendar days. The Volusia County Tax Collector links to the state page.</p>
</details>
<details>
<summary><strong>What is the homestead deadline for a new DeLand owner?</strong></summary>
<p>Florida Statute 196.011 requires the application to reach the county property appraiser on or before March 1, and missing it waives the exemption for that year, with narrow exceptions. Under 196.031 the owner must hold title on January 1 and make the home a permanent residence in good faith. A buyer who closes after January 1 files for the following year. Confirm the filing steps with the appraiser's office.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:58:50 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-deland-utilities-trash-permits-month-1]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Moving to Port Orange: Utilities, Trash and Permits]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-port-orange-utilities-trash-and-permits]]>
        </link>
        <description>
            <![CDATA[<p>Water and sewer service in Port Orange starts at City Hall, and the city takes a new service account no more than one week before you need it. That one detail shapes the whole move. If you are still choosing a house, start with <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange homes for sale</a>, then come back here for the part no listing covers: who you call, what they ask to see, how trash day works and what the city expects before you touch the house.</p>

<p>This guide is the practical side of arriving. Related reading: our <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/port-orange-florida-a-buyer-s-guide-to-neighborhoods-and-costs">Port Orange buyer's guide</a> and our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-utilities-and-reclaimed-water-for-new-owners">Port Orange utilities and reclaimed water</a>. Everything below was read on October 21, 2026 from the City of Port Orange's own pages, the Volusia County offices or the Florida Statutes. Where two city pages disagree, this guide says so and tells you who to call. It gives no rates and no deposit amounts, because the city's pages either leave them undated or send you to a resolution.</p>

<h2>Opening your city accounts</h2>

<p>Port Orange runs its own utility billing. The city's Customer Service office at 1000 City Center Circle handles new accounts, and the number is 386-506-5720. Hours are Monday through Friday from 8 a.m. to 5 p.m., except Wednesday, when the office closes at 4 p.m. Plan a Wednesday visit accordingly.</p>

<p>The city's Starting Service page lists what an owner brings. You bring a completed service application, proof that you bought the home, which means the warranty deed or the closing disclosure, a photo ID, a deposit and a service charge. A renter brings the same application and ID, plus a lease signed by both the tenant and the home owner. The city's older utility checklist adds a detail that catches people. The lease has to be signed by the owner as registered on the Volusia County Property Appraiser's website. If a property management company signed it, the city wants a copy of the contract between the owner and the manager. Only one name appears on a bill, although a co-owner can be added when that person shows a photo ID.</p>

<p>Now the part where the city's own pages disagree. The Starting Service page carries a banner that an order placed after 3 p.m. is treated as next-business-day service and costs extra. An older Finance Department page says same-day service is available for orders placed before 1 p.m. and that orders are taken up to ten business days ahead. The one-week limit and the ten-day figure cannot both be right. The checklist, which the document itself dates to July 2021, says same-day service runs Monday through Friday from 8 a.m. to 3 p.m., with no holidays. So treat any single page as a starting point. Call 386-506-5720 a few days before closing, ask what the cutoff is today, and ask what the service charge is today. The 2021 checklist lists a forty-dollar charge under Resolution 17-21 and the same amount again for a request outside normal hours, but a figure that old should be confirmed rather than budgeted.</p>

<p>The deposit is where owners and renters part ways. The city bases it on the customer type, the number of meters and the meter size, and sets it by resolution. An owner who has paid on time for 36 months can ask to have the deposit applied toward future bills. An individual owner can share one deposit across the first three properties they own. Renters and business accounts cannot share. If you are moving from one Port Orange address to another, the city says a deposit can move with you when the new account is opened within seven days of closing the old one and the old balance is zero.</p>

<p>One more item deserves attention before you sign anything at the closing table. If a prior owner defaulted on more than two utility bills, the city may have placed a lien on the property. Every lien must be paid in full before water service can begin for a new owner. The city also notes that monthly availability charges keep running, so it recommends asking for an updated lien search before closing. The City Clerk's office handles the request at 386-506-5563. See also our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">closing costs in Volusia County</a>.</p>

<p>Stopping service at the old address follows its own rules. A termination request can be made no more than one week ahead. A selling owner shows a signed settlement statement, a recorded deed or a certificate of title, plus an ID and a forwarding address. If you share a deposit across several properties, it is not refunded when one account closes. And if you keep the old home as a rental, the city will not remove your name until the renter sets up service in theirs.</p>

<p>The city does not provide everything. Its list of independent providers names Florida Power & Light for electric at 386-252-1541, Teco Peoples Gas for natural gas at 877-832-6747, AT&T for telephone at 844-486-2513 and Spectrum for cable at 386-760-9950. Whether a given address has gas service at all is something the list does not say, so ask before you plan a gas range. After your first city bill arrives, sign up for AquaHawk, the city's online tool. It graphs your drinking, reclaimed and irrigation water use, flags a leak inside or outside the home, and sends an alert by phone, text or email when you cross a limit you set in gallons or estimated dollars.</p>

<h2>Trash, recycling and yard waste: how pickup works here</h2>

<p>Port Orange has an exclusive franchise agreement with Waste Pro of Florida for garbage, recycling, yard waste and bulk pickup. You do not choose a hauler. The schedule for your street is in the city's Solid Waste brochure, which lists collection days by neighborhood and by streets outside neighborhoods, and the city says you receive a schedule when you sign up for utility service. If the brochure and your calendar ever disagree, Waste Pro answers at 386-492-8855 and Public Works answers at 386-506-5575.</p>

<p>Garbage is collected twice a week. Put it out by 7 a.m. on collection day, and no earlier than 7 p.m. the evening before. The cart or can must be off the curb by 7 a.m. the next morning. Household garbage goes in watertight bags inside cans with handles, kept tightly covered. A can may not exceed 32 gallons or 50 pounds, and anything larger still has to stay under 50 pounds. The city also asks you to place carts three to five feet away from utility boxes, the mailbox, trees, gas and water meters, fire hydrants, cars and sprinkler heads, so nothing damageable sits next to the truck.</p>

<p>Hazardous waste is the category that surprises new owners clearing out a garage. Paint, batteries, medical sharps, medications, pressurized containers, garden and pest products and cooking oil are not accepted at the curb. The city points residents to the Tomoka Landfill and the West Volusia Transfer Station. Sheet glass, such as a shower door or a mirror, may go out with the garbage if you tape it with duct tape or similar tape first, so a break does not shatter into the crew.</p>

<p>Recycling is collected once a week, with a limit of three bins per household. The city's list has two bins. One holds aluminum and steel cans, plastic deli containers, prescription bottles and plastic containers marked 1 through 7. The other holds newspaper, junk mail, magazines, mixed office paper, cereal and snack boxes, and cardboard. Two rules trip people up. Glass is not accepted, and pizza boxes, Styrofoam and plastic bags of any kind are not accepted either. The city leaves a non-recyclable item in the bin to tell you it was refused. Cardboard must be broken down to no larger than five feet by five feet and should not be bundled or tied. Anything bigger goes out with the garbage. The city does not hand out garbage cans, but its 2021 checklist says recycling bins are available at 407 Virginia Avenue, and a broken bin is replaced by calling Customer Service. Leave the broken one outside.</p>

<p>Yard waste comes on Wednesday, citywide, once a week. Grass clippings, hedge trimmings, pine needles and leaves go in garden-size bags or in garbage cans. Branches are bundled at four feet or shorter, and the yard waste page caps a bundle at 50 pounds. The main Solid Waste page describes the same bundle as four feet long and no more than 18 inches across. The two limits are different measurements, so keep a bundle inside both. Larger piles of tree trimmings or palm fronds are collected by zone on a separate day, which you schedule by phone. Do not stack a pile under power lines or on top of utility boxes and sprinklers. The city states that damage to anything under power lines, utility boxes or sprinklers is the property owner's responsibility.</p>

<p>Bulk items follow a similar logic. A sofa or appliance may be set out on your garbage day. A large item or several items are collected on your Claw Zone day, and you call Waste Pro to be sure they are picked up. The city's FAQ also routes bulk requests through its Citizen Connect system. Debris from remodeling is the one rule worth reading twice. The city collects it only when the resident does the work. A licensed contractor, a carpet installer, a tree service or a landscaper must haul away their own debris at their own expense. The city's rule puts that cost on the contractor.</p>

<h2>Permits, pets and what the city expects before you change anything</h2>

<p>Before you plan a weekend project, learn which kind of house you bought. Port Orange runs permits through an online portal called SmartGov, where you apply, pay, check status and request inspections. The Building Division's phone is 386-506-5602. The city states that an application missing any document on the permit checklist is considered incomplete and will not be processed, so the checklist is the first thing to open, not the last.</p>

<p>A new state law changed the picture this summer. Under House Bill 803, effective July 1, 2026, a city must exempt the owner of a single-family home, and the owner's contractor, from a building permit for work valued at less than seven thousand five hundred dollars. That sounds broad, and the city's own guide lists what it does not cover. Electrical, plumbing, mechanical, gas and structural work still need permits no matter the price. So does any work on a property located partly or entirely in a special flood hazard area. The city lists exterior window and door replacement, re-roofing, screen enclosures, accessory structures and freestanding masonry walls as structural. It lists painting, flooring that does not involve a shower pan, cabinets without plumbing or electrical work, and drywall replacement as examples of non-structural work. The state statute, section 553.79, says the same thing in its own words and adds that a project may not be split into pieces to slip under the limit. To use the exemption you submit a written request with a copy of the contract or other proof of what the work is and what it costs. The statute also says the city owes no legal duty for work done under the exemption.</p>

<p>The exemption does not erase every approval. The city's guide says a fence still needs a zoning permit, and so does a small shed under 120 square feet. Roof work has its own FAQ. A repair limited to 100 square feet of shingles, with no replacement of sheathing or structural parts, does not need a permit. Replacing roof sheathing does. A roofing permit is required whenever you re-roof more than 30 square feet, up to 25 percent of the roof area. If your house is in a flood zone, the earlier exclusion applies, and the city says new construction, repairs, renovations and remodeling in Flood Zones A and AE have to follow floodplain rules and need a permit first. See also our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-flood-zones-and-flood-insurance-for-buyers">Port Orange flood zones and flood insurance</a>. The city adds that most flood insurance policies carry a 30-day waiting period, so ask about coverage early rather than the week a storm forms.</p>

<p>Other small permissions turn up in the first month. A yard sale requires a permit, the city caps the number at two sales per address per calendar year, and each sale is limited to three consecutive days or two consecutive weekends of two days each. A well for lawn sprinkling needs a permit from Volusia County Environmental Management, even to pump from a retention pond. Planting within 15 feet of the edge of a city street, adding a driveway, or building a masonry mailbox or planter structure in the right-of-way needs a city right-of-way approval. A mailbox post set carefully with hand tools does not.</p>

<p>Hiring is part of permitting. The city's unlicensed contractor page lists warning signs: a contractor who asks you to pull the permit yourself, wants a large down payment, asks for cash, wants a check made out to a person instead of a company, or cannot show proof of insurance. You can verify a license with the state at 850-487-1395.</p>

<p>Pets are the last piece of city paperwork. The Animal Tags page says tags and rabies vaccinations are required each year for every dog and cat in the city, and tags are sold at City Hall with proof of vaccination. The 2021 checklist says new residents have 60 days to register a pet without additional penalties. The two pages describe the same duty at different moments, so call 386-506-5720 and ask which date applies to you. The same page says up to four dogs, cats, rabbits, guinea pigs or ferrets are generally allowed per dwelling, and that leash and curbing rules apply citywide.</p>

<h2>A first-month checklist, in order</h2>

<p>The city handles the first half. The state and the county handle the second. Here is the sequence that follows the deadlines in the order they come due.</p>

<p>Before closing: ask your closing agent whether a lien search was ordered for the city's utility account. Call Customer Service on 386-506-5720 within the week before you move to confirm the cutoff time and service charge. If your old address is also in Port Orange, close that account no more than a week ahead.</p>

<p>Move-in week: confirm water is on, find your garbage and yard waste days in the Solid Waste brochure, and put the recycling rules where the family can see them. Sign up for the city's emergency alerts through the Alert Port Orange system and the city's text message page. After the first city bill, sign up for AquaHawk.</p>

<p>Within 30 days: the Florida Highway Safety and Motor Vehicles agency says a new Florida resident must obtain a Florida driver license within 30 days of establishing residency. It also says you need Florida insurance from a licensed agent to title and register a vehicle within 10 days of establishing residency. If you already hold a Florida license and only moved within the state, section 322.19 requires a replacement license that shows the new address within 30 calendar days. The Volusia Tax Collector handles driver license and tag appointments. Registration requires the street address of your permanent Florida residence plus proof of address and a REAL ID license, a valid U.S. passport, or a valid foreign passport with an unexpired I-94, per section 320.02. Check the current document list before the trip.</p>

<p>Also this month: update your voter registration. Section 97.1031 says a voter who moves must notify the supervisor of elections. For a move within Florida, the Volusia office at 1588 N Woodland Blvd in DeLand, 386-736-5930, accepts an update by phone or online with your date of birth and the last four digits of your Social Security number or your Florida license or ID number. Register your pets with the city. And ask your insurance agent about wind and flood coverage, well before hurricane season.</p>

<p>Before the next March 1: file for homestead. Section 196.031 ties the exemption to holding title on January 1 and making the home your permanent residence in good faith, and section 196.011 sets the application deadline at March 1, with a missed deadline waiving the exemption for that year. Because the title test is January 1, a fall closing means your first filing is the one due the following March 1. Related guides: the <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County homestead exemption</a> and the <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-property-tax-bill-line-by-line">Port Orange property tax bill</a> guide.</p>

<h2>The bottom line</h2>

<p>The move goes smoothly when you do the city's paperwork in the right order. Confirm the lien search before closing, open the utility account within the week before you move, learn your pickup days before the first Monday, and treat every project as a permit question until the city says otherwise. The new state exemption helps with small jobs on single-family homes outside flood zones, and it does not touch electrical, plumbing, structural work or anything in a flood hazard area. Where two city pages disagree, a phone call settles it. If you are weighing a house here and want help sorting what to ask, browse <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange real estate</a> and bring this list to the showing.</p>

<p>That covers the order of operations. These are the questions that come up once the boxes are in the house.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>When can I start city water and sewer service at my new Port Orange home?</strong></summary>
<p>The city's Starting Service page says it accepts new service accounts no more than one week in advance. Its banner also says an order placed after 3 p.m. is treated as next-business-day service and carries additional fees. An older Finance page gives a 1 p.m. same-day cutoff and a ten-business-day window, so the pages disagree. Call Customer Service at 386-506-5720 a few days before closing and ask for today's cutoff. Bring a warranty deed or closing disclosure, a photo ID, and be ready for a deposit and a service charge.</p>
</details>

<details>
<summary><strong>What do renters need to open a utility account in Port Orange?</strong></summary>
<p>A renter completes the service application, shows a photo ID and provides a lease signed by both the tenant and the home owner, per the city's Starting Service page. The city's utility checklist adds that the owner who signs must match the owner shown on the Volusia County Property Appraiser's website. If a property management company signed the lease, the city asks for a copy of the contract between the owner and the manager. A deposit and a service charge also apply, and the city says renters cannot share a deposit across properties.</p>
</details>

<details>
<summary><strong>Which days is trash picked up in Port Orange, and who collects it?</strong></summary>
<p>Waste Pro of Florida holds the city's exclusive franchise for garbage, recycling, yard waste and bulk pickup. Garbage is collected twice a week, recycling once a week, and yard waste on Wednesday citywide. Your exact garbage and recycling days depend on your street and are listed in the city's Solid Waste brochure. Carts go out by 7 a.m. on collection day and no earlier than 7 p.m. the evening before. Call Waste Pro at 386-492-8855 or Public Works at 386-506-5575 if the brochure and your calendar disagree.</p>
</details>

<details>
<summary><strong>Do I need a permit for small projects now that Florida has a new exemption?</strong></summary>
<p>Maybe not. A state law effective July 1, 2026 requires cities to exempt owners of single-family homes, and their contractors, from a building permit for work valued under seven thousand five hundred dollars. Electrical, plumbing, mechanical, gas and structural work are excluded, and so is any work on a property in a flood hazard area. Fences and sheds under 120 square feet still need a zoning permit, per the city. You must submit a written exemption request with your contract, so call the Building Division at 386-506-5602 first.</p>
</details>

<details>
<summary><strong>Does my roof repair need a permit in Port Orange?</strong></summary>
<p>The city's FAQ says a repair limited to 100 square feet of shingles, with no replacement of sheathing or structural parts, needs no permit. Replacing roof sheathing or repairing structural components does require one. A roofing permit is required any time you re-roof more than 30 square feet, up to 25 percent of the roof area. Inspections are requested on the city's SmartGov portal, where you can note a morning or afternoon preference, though the city does not promise a time. Confirm your scope with the Building Division before hiring anyone.</p>
</details>

<details>
<summary><strong>What do I have to do about my pets and my driver license after moving?</strong></summary>
<p>The city's Animal Tags page says tags and rabies vaccinations are required each year for every dog and cat, and the city's 2021 utility checklist gives new residents 60 days to register without penalty. Call 386-506-5720 to confirm which date applies. For your license, Florida's highway safety agency says a new resident needs a Florida driver license within 30 days of establishing residency. If you already have a Florida license, section 322.19 requires a replacement showing your new address within 30 calendar days.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:58:34 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-port-orange-utilities-trash-and-permits]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Moving to New Smyrna Beach: Utilities, Trash, Permits]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-new-smyrna-beach-utilities-trash-permits]]>
        </link>
        <description>
            <![CDATA[<p>Two different offices will set you up in New Smyrna Beach, and neither one is City Hall. New Smyrna Beach Utilities handles your electric, water and sewer. FCC Environmental Services hauls your trash. The utility asks for a photo ID plus proof that you own the house or rent it. If you are still looking at <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach homes for sale</a>, this guide shows what happens after the contract is signed, in the order you will need it.</p>

<p>It stays on the practical side of arriving. See our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-new-smyrna-beach-beachside-mainland-costs-and-what-to-know">living in New Smyrna Beach</a>. Here the questions are smaller and more immediate. Who do you call? What do they want to see? What does a late payment cost? Everything below comes from the utility's own website, the city's pages, Volusia County, or the Florida Statutes, and it was read on October 21, 2026. Where a page does not give a number or a date, this guide says so and leaves the figure out.</p>

<h2>Starting electric, water and sewer service</h2>

<p>New Smyrna Beach Utilities, usually shortened to NSBU, is a separate organization from the city government. Its office is at 200 Canal Street, its main number is 386-427-1361, and office hours are Monday through Friday from 8:00 a.m. to 5:00 p.m. There is no menu of competing electric or water companies to pick from for a house it serves. You apply to NSBU, and that is the whole decision.</p>

<p>The form you want is called the Contract for Service for an existing home or business. It is on the utility's "Applying for Service" page, and some of the forms there also have an online version. The form asks for a requested start date, and that line is the one to fill in with care. Put the day you take possession, not the day you signed the contract. The service options are listed as checkboxes: electric, water, sewer, reuse water if it is available at the address, an irrigation meter, and a streetlight. You tick what the house actually has. If you are not sure whether a house is on sewer or on a septic tank, ask the seller or your agent before you tick anything, because the form assumes you know.</p>

<p>The paperwork has a few requirements that catch people out. NSBU wants photocopies of a driver license or other official state identification. It also wants proof of ownership, a lease, or a notarized account representative affidavit, which is the form to use if someone is opening the account on your behalf. For a purchase, a copy of the signed closing documents is the natural proof of ownership. The form states an initial connect charge of thirty-five dollars, billed on your first statement, and it says a deposit may be required. It does not say how much, so the right move is to call and ask. The application also asks for a date of birth and a Social Security number for the applicant, which is a normal request for a utility account.</p>

<p>Timing matters more than most buyers expect. NSBU's service fee schedule says requests received by 2:00 p.m. on a weekday are completed that day, and requests received after 2:00 p.m. are completed no later than the next business day. Service requests are only performed during regular business hours. After-hours service exists for emergencies only, as NSBU decides them, and carries a fee of one hundred fifty dollars instead of thirty-five. So picture a closing on a Friday afternoon. Send the application during the week of closing and ask for a start date, so the request is in before 2:00 p.m. on a weekday.</p>

<p>One more option helps sellers and landlords more than owner-occupants. The form includes a statement that lets NSBU turn service on in the owner's name between tenants without a new application. If you are buying a house to rent out, that box saves a call every time a lease turns over.</p>

<h3>What the bill looks like and what a late payment costs</h3>

<p>NSBU reads meters across 82 zones, and bills are mailed within about three days. Payment is due on receipt. The bill becomes delinquent 21 days after the billing date. If NSBU has not received payment by 5:00 p.m. on or before the due date, it mails a courtesy notice and adds a late charge. On a past-due balance above twenty-five dollars, the charge is five dollars or one and a half percent of the balance, whichever is greater. The notice then allows nine days after the due date to pay in full or make arrangements, or the account becomes subject to disconnection.</p>

<p>The reconnection rules are worth reading before you ever need them. After a disconnection for non-payment, NSBU requires the full amount owed, a reconnection charge of fifty dollars during business hours or one hundred fifty dollars after hours, an updated deposit set at twice your average monthly bill, and updated lease documentation. That is a lot to assemble on a Friday night. The utility also offers up to three extensions a year, each giving a two-week grace period, but you have to ask for them, and the page says the request cannot be recorded until the day after the bill is due.</p>

<p>Ways to pay are plentiful. You can pay by phone or online at no charge at any hour, with a twelve-digit account number. There is a drive-through at the Canal Street office, open 8 a.m. to 5 p.m. Monday through Friday, and a night drop for checks and money orders. Automatic Utility Bill Pay takes the amount from your bank account on the due date, and NSBU notes it suits part-time residents. Budget billing averages your bills and settles up at the end of the calendar year, but the page limits it to year-round customers on automatic payment who have had service at that location for at least twelve months. One warning appears on the payments page in plain words. If you pay through a bank's bill-pay service, schedule the payment to arrive two to three business days before the due date and use the full zip code 32170-0100. NSBU also says it is not affiliated with a third-party payment site that sometimes shows up in search results. Mail goes to P.O. Box 100, New Smyrna Beach, FL 32170.</p>

<h3>The water, the yard and the closing paperwork</h3>

<p>New Smyrna Beach draws its drinking water from the Floridan Aquifer, and NSBU publishes a Water Quality Report you can read as a PDF. Its FAQ page also explains a switch in disinfection method from chloramines to free chlorine. The utility says the purpose is to prevent or eliminate discoloration caused by minerals, biofilm or nitrification, and it states that the water is safe to drink and use as normal. If you notice a change in taste or smell after you move in, that page is the first place to look.</p>

<p>Irrigation deserves its own paragraph, because it is where a new owner's bill can surprise them. NSBU explains that unless your neighborhood has reuse water, the water that runs your sprinklers is the same treated drinking water that comes out of the kitchen tap. To find out whether reclaimed water reaches an address, you call customer service at 386-427-1361. A house with an in-ground sprinkler system and no reuse connection waters its lawn with treated drinking water. That is not a reason to skip the house. It is a reason to ask the seller for a year of bills and to ask which meter the sprinklers run on, since the application lists an irrigation meter as a separate option.</p>

<p>Volusia County sets the watering days, and its rules apply to everyone in the county, including people inside city limits. The county page says watering is not allowed between 10 a.m. and 4 p.m. During Daylight Saving Time, odd-numbered addresses may irrigate on Wednesdays and Saturdays, and even-numbered addresses on Thursdays and Sundays, from 4 p.m. to 10 a.m. During Eastern Standard Time the schedule shrinks to one day, Saturday for odd addresses and Sunday for even ones. The county says Daylight Saving Time ends on the first Sunday in November, so the schedule changes soon after this guide was written. Each zone gets no more than one hour and three-quarters of an inch of water per irrigation day, and automatic systems must have a working rain sensor or soil-moisture sensor. New plants have their own allowance. The county lets you water them any time for 30 days, then every other day for another 30. Reclaimed water follows its provider's rules instead, so ask NSBU if the house is connected.</p>

<p>One line item is easy to forget. NSBU does not lien account balances and will not give out balance information, but its lien search covers unpaid water and sewer fees. The request form is on the same "Applying for Service" page. NSBU charges twenty dollars per request and answers in 48 to 72 business hours. The city adds a separate twenty-five dollar research fee on lien verifications, and you reach the city about that at 386-410-2657. It is useful to know the form exists, and to know that a clean answer covers water and sewer fees only.</p>

<p>Last in this section, NSBU's home page says its engineering contractor is in the design phase of a septic-to-sewer conversion for the Silver Sands area. If a house you like is on a septic system, ask the city whether that address falls inside a conversion project. The utility's page gives no schedule or cost, so there is nothing more to say here without guessing.</p>

<h2>Trash, yard waste, bulk pickup and recycling</h2>

<p>FCC Environmental Services collects household waste in New Smyrna Beach, and the city's Solid Waste Services page gives its number as 386-888-8299. The city publishes collection maps and links to an FCC lookup where you type an address and see your days. Use the lookup. The page does not list the weekdays in text, and a neighbor's guess about which day is "trash day" is the sort of advice that leaves a tote at the curb for a week.</p>

<p>Household waste goes in the tote, and the city asks you to place it within five feet of the curb. Keep hazardous materials out of it. If you are physically unable to wheel the tote to the curb, the city has a medical-need back-door form. Ask the city about it before closing if anyone in the household will need it.</p>

<p>Bulk waste rides on the second household pickup day, which the city says is a Thursday or Friday. The limit is four cubic yards. The list the city gives includes furniture, mattresses, televisions, dishwashers, stoves, washers, dryers and freezers. Refrigerators and air conditioners that contain Freon need a special pickup arranged with FCC, which is a real nuisance when the old unit is already on the curb. The sensible order is to call first and then drag it outside.</p>

<p>Yard waste is collected once a week, and the day appears on the same map. The city says it can go out in personal cans or bags, while household waste must use the tote. Branches must be under six inches in diameter and no longer than four feet, and the pile may not top four cubic yards. There is a rule here that matters if you hire help. Anything a contractor generates, including lawn services, tree trimmers and yard crews, must be removed by that contractor. The city's page says so directly. So when you collect quotes for a tree removal, ask who hauls the debris and put the answer in the contract. A job priced without hauling is a job that leaves a pile in your yard.</p>

<p>Construction debris is a separate matter. The city sends you to FCC or to the solid waste compliance officer at 386-424-2207 for a list of approved commercial roll-off vendors. Household hazardous waste goes to a household hazardous waste facility, not in the tote. The hotline is 386-947-2952.</p>

<p>Recycling works differently from what many movers expect. The city's page says residents may deposit glass, plastic, paper and cardboard at three drop-off sites. They are the 27th Avenue Beachfront Park at 3701 S. Atlantic Avenue, Public Works at 124 Industrial Park Avenue, and the Pedestrian Trailhead at 433 Sugar Mill Drive. The page does not describe curbside recycling. If you are moving from a place that had it, call Public Works at 386-424-2212 and ask what applies to your street before you assume either way. Then plan the errand. A trip to a drop-off site is one more chore, and it is better to learn that on a calm weekday than from a garage full of boxes.</p>

<h2>Permits and the projects people start in month one</h2>

<p>The first month is when many owners start a project. A new owner wants a fence, a bathroom redone, an air conditioner replaced, or a pool. The city's Home Owners pages cover permits, and the Building Department takes permit questions at 386-410-2850 or 386-410-2860.</p>

<p>The rule the city states is wide. Permits are required for new construction and for structural, plumbing, mechanical and electrical changes. A remodel needs a permit, with painting and papering the stated exceptions. When no building permit is needed but plumbing or mechanical work is going on, those trades get their own permits, and electrical work needs one as well. The city adds that these descriptions cover one- and two-family dwellings. A permit expires if work does not start within 180 days of issue, or if work stops for 180 days or more. You can ask in writing to extend it for another 180 days.</p>

<p>Whoever does the work is responsible for getting the permit. That sentence matters, because it works in both directions. A homeowner doing the job alone must pull the permit. A contractor doing it must also pull the permit, and your contract should say which of you will do it. The city's contractor checklist lists "who will get the permit?" among the questions to ask. It also recommends three written, detailed bids, a license check through the state's DBPR portal and the county's Connect Live system, and a phone call to 386-410-2800 to confirm the license is active. A good contract names the materials, lists allowances, spells out a payment schedule with no full payment up front, requires signed change orders, and lists the warranties and start and completion dates.</p>

<p>Here is a case to picture. You buy a 1970s house on the mainland and decide to gut the hall bathroom in your second month. That job touches the structure, the plumbing and the electrical. The permit application asks for the property address, owner information, the contractor's license number, the subdivision, lot and parcel numbers, and a description of the work. Structural permits normally need plans, while plumbing, mechanical and electrical ones usually do not. The city says you cannot buy a permit online without a contractor's license, though you can review permits, schedule inspections and pay fees online. Once the permit exists, the inspections happen only when you or your contractor schedule them, through the Citizen Self-Service portal or by emailing inspections@cityofnsb.com. The city says inspectors look at the permitted work and nothing else, with one exception for a profoundly unsafe condition such as an exposed live wire. Ask the contractor to schedule the inspection before the walls are closed, and keep a copy of every approval.</p>

<p>There is one permit rule that ties into insurance and flood maps, and buyers of older waterfront and island houses should read it twice. The city's substantial improvement packet says that when the cost of an improvement equals or exceeds 50 percent of the structure's market value before construction, the project is treated as a substantial improvement. Then floodplain requirements apply, including an elevation certificate for the lowest floor, and the building may have to be raised to or above the flood elevation if it sits below it. The packet is undated, so ask the Building Department what is current before you plan a big renovation. See our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-flood-zones-flood-insurance-guide">New Smyrna Beach flood zones and flood insurance</a>.</p>

<h2>The paperwork, the passes and the checklist for your first month</h2>

<p>Utilities and trash are the urgent items. The rest of the list is paperwork that Florida law attaches to a change of address, plus a couple of local perks that are easy to miss.</p>

<h3>Do these in order</h3>

<p>Before closing, send NSBU the Contract for Service with a start date that matches possession, and call FCC or use its lookup for your pickup days. Ask the seller to close their own accounts, because an account stays active in whoever's name it is under until someone changes it. Check the sprinkler system and find out whether it is on reuse water or the regular meter.</p>

<p>On move-in day, read the meter numbers and take a photo. Walk the yard with the watering schedule in mind, since your first week might fall under a different Daylight Saving schedule than your last week. Find the water shutoff.</p>

<p>Within 30 days, update your driver license. Section 322.19(2) of the Florida Statutes says that when you change your legal residence or mailing address, you must obtain a replacement license or identification card within 30 calendar days of the change. A violation is a nonmoving violation. The Volusia Tax Collector's site offers appointment scheduling for driver license and tag services, and an appointment is better than a morning in a waiting room. Vehicle registration uses the same address. Section 320.02 requires the registration application to include the street address of your permanent Florida residence, along with proof of address and a REAL ID license or a valid passport. Bring those documents together.</p>

<p>Update your voter registration at the same visit or the same week. Section 97.1031 says a voter who changes residence must notify the supervisor of elections. For a move inside Florida, you can do that by phone or electronically with your date of birth and the last four digits of your Social Security number, or your Florida driver license or ID number. The Volusia Supervisor of Elections is at 1588 N. Woodland Boulevard in DeLand, phone 386-736-5930, and the office's website has an "Update Voter Info" link.</p>

<p>Apply for the Beach Lot Annual Parking Pass. This one is specific to New Smyrna Beach and easy to forget. The city's pass covers beachfront lots at places such as North Beach Community Park, Esther Street, the Flagler Avenue Boardwalk, Marianne Clancy Park and 27th Avenue. Volusia County residents get the pass without charge when they can prove residency. The city lists a Volusia County tax bill, a lease of at least six months, or four consecutive utility bills as proof, and you need a pass for each vehicle, applied for separately. That is the connection to everything above. Your first four NSBU statements are the proof, so keep them. The application also asks for your license and registration. If you would rather go in person, the Police Department at 246 Industrial Park Avenue takes applications Monday through Friday from 8:30 a.m. to noon and from 1:00 to 4:00 p.m. A non-resident annual pass costs one hundred dollars, which is the number to remember if you own a second home here but live elsewhere. Daily parking runs through the PayByPhone app, which the city started using on August 3, 2026.</p>

<p>Look up your assigned schools in the Volusia County Schools "Find My School" tool. Type the street address and the school year. This guide does not rank or compare schools, and neither should the listing. The locator is the district's own answer and the only one that counts.</p>

<p>File for homestead if the house is your permanent residence. The deadline is not the day you close. Under section 196.031 you must hold title on January 1 and make the property your permanent residence in good faith, and under section 196.011 you file with the county property appraiser on or before March 1 of that year. Missing the date waives the exemption for the year. So if you close in the fall, you are eligible for the following January 1, and you file early in that year. See our guides to the <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County homestead exemption</a> and the <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-property-tax-bill-line-by-line-2026">New Smyrna Beach property tax bill</a>.</p>

<h3>Storms and the first season</h3>

<p>Hurricane season does not wait for you to unpack. Volusia County's evacuation page says local officials may order one of three levels, A, BC or DE, which correspond to the flooding likely in a hurricane. It states that storm surge can run from about seven feet above sea level in a Category 1 storm to as much as 28 feet in a Category 5. Anyone in a mobile home or recreational vehicle must evacuate for every level. The county also says that when an evacuation is ordered, the east-bound lanes of bridges close to traffic. West-bound lanes stay open until sustained winds pass 39 miles per hour, and then all lanes close. New Smyrna Beach is divided by the Intracoastal Waterway, so before you buy, think about which side of the water your route sits on, and decide early where you would go. See our guides to <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida home insurance for buyers</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">closing costs in Volusia County</a>.</p>

<h2>The bottom line</h2>

<p>Moving to New Smyrna Beach is easier if you treat it as three separate tasks with three separate offices. Send the application to NSBU a week before closing with ID and proof of ownership. Look up your trash days instead of guessing. Pull a permit for any job the city lists, and decide in writing who pulls it. Then work down the paperwork list in the order the law makes it urgent, with the driver license first. The trade-off is that nothing here happens automatically. Recycling means a trip to a drop-off site. If you are comparing <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach real estate</a> ask about the meter, the sprinkler system and the sewer connection while you are standing in the house, before you write an offer.</p>

<p>A few of the details here may change, such as fees, hours and schedules. Confirm anything that matters with the office that runs it, and get the answer in writing if money depends on it.</p>

<p>We covered a lot of ground up there. These are the questions that come up after you read a list like that and sit down to actually do it.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Who provides electric and water service in New Smyrna Beach?</strong></summary>
<p>New Smyrna Beach Utilities provides electric, water and sewer service within its territory, and it also offers reuse water where it is available. It is a separate organization from the city government. The office is at 200 Canal Street, the main number is 386-427-1361, and office hours are weekdays from 8:00 a.m. to 5:00 p.m. You apply by filling out the Contract for Service and sending identification and proof of ownership or a lease. Ask the seller or your agent what services the specific address uses before you tick the boxes on the form.</p>
</details>

<details>
<summary><strong>What do I need to open an account with New Smyrna Beach Utilities?</strong></summary>
<p>The Contract for Service asks for copies of a driver license or other official state identification, plus proof of ownership, a lease, or a notarized account representative affidavit. It lists an initial connect charge of thirty-five dollars on the first statement, and a deposit may be required. The form does not state the deposit amount, so call 386-427-1361 and ask. Requests received by 2:00 p.m. on a weekday are completed that day. Requests after 2:00 p.m. are completed no later than the next business day.</p>
</details>

<details>
<summary><strong>How late can I be on a New Smyrna Beach Utilities bill before service is cut off?</strong></summary>
<p>The bill is due on receipt and becomes delinquent 21 days after the billing date. If payment has not arrived by 5:00 p.m. on or before the due date, NSBU mails a courtesy notice and adds a late charge. That notice allows nine days after the due date to pay in full or make arrangements. After that, the account is subject to disconnection. You can request up to three two-week extensions per calendar year, but you have to call the day after the bill is due. Reconnection after disconnection requires the full balance and an updated deposit.</p>
</details>

<details>
<summary><strong>Who picks up trash in New Smyrna Beach, and how do I find my day?</strong></summary>
<p>FCC Environmental Services collects household waste, and its number is 386-888-8299. The city's Solid Waste Services page links to collection maps and an FCC lookup tool where you can enter your address. Household waste goes in the tote, placed within five feet of the curb. Yard waste is collected once a week, and bulk waste is collected on your second household day, which the city says is a Thursday or Friday. Refrigerators and air conditioners with Freon need a special pickup, so call FCC before you set one out.</p>
</details>

<details>
<summary><strong>Is there curbside recycling in New Smyrna Beach?</strong></summary>
<p>The city's solid waste page lists three drop-off sites where residents may bring glass, plastic, paper and cardboard. They are 27th Avenue Beachfront Park, Public Works on Industrial Park Avenue, and the Pedestrian Trailhead on Sugar Mill Drive. The page does not describe curbside recycling pickup. If you want to know what applies to your street, call Public Works at 386-424-2212 and ask. The answer can change what you expect your weekly routine to look like, so ask before you close and not after.</p>
</details>

<details>
<summary><strong>Do I need a permit to replace an air conditioner or remodel a bathroom?</strong></summary>
<p>The city says permits are required for new construction and for structural, plumbing, mechanical and electrical changes, and for remodeling other than painting and papering. When a building permit is not required, plumbing and mechanical work still gets separate permits, and electrical work needs one too. The person doing the work is responsible for the permit, so your contract with a contractor should say who pulls it. Call the Building Department at 386-410-2850 or 386-410-2860 if you are not sure. A permit expires if work does not begin within 180 days.</p>
</details>

<details>
<summary><strong>How fast do I have to update my driver license after moving to New Smyrna Beach?</strong></summary>
<p>Section 322.19(2) of the Florida Statutes says that if you change your legal residence or mailing address after getting a license or identification card, you must obtain a replacement within 30 calendar days of the change. A violation is a nonmoving violation. The Volusia Tax Collector's website offers appointment scheduling for driver license services. Also update your voter registration with the Volusia Supervisor of Elections at 386-736-5930. For an in-state move, that can be done by phone or electronically, using identifying information the office can verify.</p>
</details>

<details>
<summary><strong>How do I get a New Smyrna Beach beach parking pass?</strong></summary>
<p>You apply online or in person at the Police Department, 246 Industrial Park Avenue, Monday through Friday from 8:30 a.m. to noon and 1:00 to 4:00 p.m. You need a driver license, the vehicle registration, and proof of Volusia County residency or property ownership. The city accepts a Volusia County tax bill, a lease of at least six months, or four consecutive utility bills. Each vehicle needs its own application. The pass is free to Volusia County residents. An annual pass for non-residents is one hundred dollars.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:58:18 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-new-smyrna-beach-utilities-trash-permits]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Moving to Daytona Beach: Utilities, Trash and First Month]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-daytona-beach-utilities-trash-and-first-month]]>
        </link>
        <description>
            <![CDATA[<p>Garbage in Daytona Beach is collected twice a week, either Monday and Thursday or Tuesday and Friday, and yard trash leaves on Wednesday. Which pair you get depends on a city map, so look up the address before you settle on a move-in date. If you are still choosing a house, start with the current <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach homes for sale</a> and come back to this page once you have a contract.</p>

<p>This guide covers the local part of moving, the part no national checklist can cover. It walks through how the city utility account works, what the city says about trash, recycling and yard waste, the watering rules that apply to your lawn, when a project needs a permit, and what the state and county expect in your first month. Every fact below was read on the City of Daytona Beach, Volusia County and State of Florida websites on October 21, 2026. Electric, gas, internet and cable are not covered, because no official page for them was checked, so ask for those providers by street address. For the neighborhoods themselves, the <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/daytona-beach-neighborhoods-beachside-mainland-golf-and-55-communities">Daytona Beach neighborhoods guide</a> comes first.</p>

<p>One boundary note before the details. Daytona Beach Shores is its own city. Everything here is about addresses inside the City of Daytona Beach, so confirm with the billing office that the city serves the address you are buying.</p>

<h2>Opening the city utility account</h2>

<p>The City of Daytona Beach runs a Utilities Department and a separate Utility Billing office. The billing office is in City Hall at 301 S. Ridgewood Avenue, Room 176. It is open Monday through Friday from 8 a.m. to 4:30 p.m., and the phone number is 386-671-8100. That office is where you start service, stop it, transfer it, set up a payment plan or ask why a bill looks wrong. The city's own rate pages are posted there too, and two of them are labeled as effective October 1, 2026, one for water and sewer and one for solid waste. Those sheets are the ones to read for current rates. This page does not quote any rate, because the sheets are scanned images and the city's stormwater FAQ prints an amount from fiscal year 2015 to 2016.</p>

<h3>What to bring and when it counts</h3>

<p>A new residential account needs four things according to the city's FAQ: an advance security deposit, a nonrefundable administration fee, a deed or a lease, and photo identification. The deposit depends on the size of the meter. It is refundable when the account is closed, or after two consecutive years of good payment history. The practical detail is the noon rule. For same-day activation the deposit has to be in by 12:00 noon, Monday through Friday, excluding holidays. Ask the billing office in advance which day the account should start and have the deed or settlement paperwork ready to show.</p>

<p>The online route runs through the city's customer portal. The billing page says the portal handles starting, stopping and transferring service as well as payments. Renters follow the same path with a lease in place of a deed. The city also lists a paperless option. You sign up through the online payment system, by phone at the number above, or at City Hall, and from then on a monthly email carries a link to a secure page where the bill sits.</p>

<h3>Paying the bill, and the two cutoff times</h3>

<p>Water meters in Daytona Beach are read monthly on a cycle, and the bill follows the read. If the city cannot get a read, it estimates the bill and corrects it later once a read is available. You can pay by mail, in the night depository box on the east side of City Hall, online, by the automated phone line or in person at the Ridgewood Avenue address. If you mail a check, the city asks for the payment stub and your account number to be included, which keeps the payment from landing on the wrong account.</p>

<p>Here the city's own pages disagree with each other, and the disagreement matters. The Utility Billing page says online payments made after 4:30 p.m. are credited the next day. The city's FAQ says any transaction completed after 4:00 p.m. counts as the next day's business. The billing page adds that to have a payment credited the same day and avoid a late fee, it must be made during business hours. The same page is blunt that paying online will not stop a scheduled disconnection for non-payment, will not restore service that was already cut off, and will not erase late fees after the due date. If service has been disconnected, the fix is a phone call to 386-671-8100 during business hours, not a portal payment. The safe habit is to pay before 4 p.m. on a business day and not wait for the last half hour.</p>

<h3>Closing out, meters and help with a bill</h3>

<p>When you leave a property, a residential customer can call, come in or write to stop service. The number for turn-offs is 386-671-8103. Give the address and account number, as the city asks for those on every inquiry. If a pipe breaks, the city's 24-hour utilities line is 386-671-8815, and that is the same number the city gives for reporting dumping into its ditches.</p>

<p>The city has also been replacing residential water meters. Its notice, posted April 17, 2025, says crews would visit around 15,000 addresses and that not every visit means a new meter, since some are for inspection or troubleshooting. Residents are supposed to get at least 72 hours of notice, installers do not need to come inside, and the water goes off for roughly 30 minutes to an hour during a swap. The notice also carries a disclaimer worth reading before you judge your first bill: with the increased accuracy of the new meters, some customers may see higher monthly bills, especially if the old meter was under-reporting usage. If your first bill surprises you, ask the billing office whether the meter at that address was replaced.</p>

<p>For a bill you cannot pay on time, the city has a payment plan arrangement form under Utility Billing. Its financial assistance page points to United Way at 2-1-1 and to Volusia County Utility Assistance, which offers electric and water help to eligible low-income households with a past-due balance. The appointment line for the county program is 386-239-7757.</p>

<h3>The stormwater fee</h3>

<p>One charge on the monthly bill has nothing to do with how much water you use. The city's stormwater fee pays for building, maintaining and operating public stormwater treatment and flood prevention projects, drainage studies and water-quality monitoring. The city's FAQ says anyone who owns developed property inside the city limits pays it, state, county and school buildings and churches included, and the fee goes up each October 1 with the US utility consumer price index. That FAQ still prints a fiscal year 2015 to 2016 amount, so ignore it and check the current sheet. A buyer who finds the fee odd on a house far from any canal has the city's answer: there are no exemptions for distance from a drain.</p>

<h2>Trash, recycling, yard waste and what cannot go in a bin</h2>

<p>The City of Daytona Beach runs its own solid waste division out of 950 Bellevue Avenue, and the phone number is 386-671-8670. A contractor, Waste Pro USA, does the collecting, and the city's FAQ says calls forward to that company when the city's lines are busy. The point for a new owner is that you do not arrange a hauler. Service comes with the address.</p>

<h3>Garbage days and the rules at the curb</h3>

<p>Garbage is collected twice a week. The city says that is either Monday and Thursday or Tuesday and Friday, depending on where you live, and it publishes a map for the pick-up schedule on its Collection Days page. The city's garbage service takes furniture, appliances and bulky items as well as household trash, though bulky items are a phone call to 386-671-8670 first. The rolling cart the city calls a toter is built to hold no more than 80 pounds. Anything beyond that can go in cans, bags or boxes, and the city's FAQ allows up to two closed 30-gallon bags next to the toter on the morning of service.</p>

<p>The timing rules are specific, and the city cites its code for them. The toter should be at the curb by 7:00 a.m. on your service day. You may put it out the night before after 6:00 p.m. It sits next to the driveway, not more than 5 feet from the curb line, and has to come back in by 8:00 p.m. after service. Garbage, junk and yard trash should never block the sidewalk or sit on or near a storm drain. The city also warns that trash set out late, or on a day that is not your day, may trigger a special pick-up, with the extra collection cost added to the utility bill.</p>

<p>One rule is easy to miss on moving day. The toters and recycling bins are provided as a courtesy and are not owned by the resident, and the FAQ asks you not to move them from the assigned property. If you are the seller, leave them. If you are the buyer, check that they are there on the day you take possession, because replacements are ordered through the same number or through Waste Pro USA at 386-788-8890.</p>

<p>Back door collection exists as a service by application. The city's form asks for the resident's signature and a physician's certification, and it is mailed to the solid waste office. That is the rule as the city states it, and the form itself is on the city website.</p>

<h3>Recycling and yard waste each have their own day</h3>

<p>Recycling is picked up once a week, with the day depending on location and a separate map. The city describes it as single stream, so everything goes in one bin. It accepts paper of all kinds, including newspaper with the plastic sleeve removed, office paper, cardboard, phone books, junk mail, magazines and paper bags. It accepts aluminum and steel cans, glass bottles in clear, green and amber, and plastic bottles marked with recycling symbols 1 through 5. One bin comes with the address, and the city says an extra bin is by application at 386-671-8670.</p>

<p>Yard debris is collected on Wednesday for every residential property in the city. Grass, leaves and small trimmings go out in bags, boxes or reusable containers. Limbs and palm fronds can be stacked in neat piles, with limbs no longer than 5 feet or wider than 6 inches. The FAQ allows up to 15 bags and limits collection to 3 cubic yards. Yard trash goes to a Volusia County mulching facility, so it has to stay separate from junk, litter or garbage, and a mixed pile can draw extra charges. Yard waste does not go in the toter at all.</p>

<p>Holidays are simpler than most people expect. The city says there is no curbside pickup of garbage, yard trash or recycling on New Year's Day, Thanksgiving Day and Christmas Day, and that collection usually moves to the following day. Martin Luther King Day, Presidents' Day, Good Friday, Memorial Day, Independence Day, Labor Day, Columbus and Indigenous Peoples' Day and Veterans Day are normal collection days if the holiday falls on yours.</p>

<h3>Move-in debris, cleanouts and hazardous waste</h3>

<p>Boxes are the least of it. Who is doing the work decides what the city will pick up. For a small project you do yourself, the city's FAQ lets you put construction and demolition material in heavy bags or boxes that each weigh no more than 40 pounds and can be lifted by hand. If a paid contractor does the project, the contractor has to dispose of all the waste, and the city will not remove it without a fee. Concrete and heavy construction material cannot go in toters at all, and the city warns that removal of concrete may be charged.</p>

<p>Trees are a separate case. The collection contract does not cover land-clearing debris, which includes trees cut down or blown down on your property, though you can order a special collection for a charge. The city also does not offer move-out, clean-out or eviction waste removal as part of regular service. Such a job can be ordered for a fee, and if a pile is left in the public right of way, the contractor can remove it and the fee can be charged to a water utility account in the property owner's name. That last sentence is why a buyer should walk the curb and the side yard at the final walkthrough.</p>

<p>Some items need their own handling. Glass mirrors have to be wrapped in cardboard and taped, and carpet must be cut, rolled and taped in sections no larger than 4 by 8 feet and 40 pounds. Residents may dispose of up to eight car tires a year, while truck and tractor tires go to the Tomoka Landfill. Appliances that contain coolants, such as refrigerators, freezers and air conditioning units, have to be ordered separately and need their doors removed.</p>

<p>Household hazardous waste goes elsewhere. The city lists car batteries, automotive liquids, paint and paint thinner, pesticides and fertilizers, pool and spa chemicals, fluorescent and compact bulbs, mercury thermometers and needles among the items that cannot go in the garbage. The permanent drop-off is Volusia County's Tomoka Landfill, 1990 Tomoka Farms Road in Port Orange. Volusia County says there is a second site, the West Volusia Transfer Station in DeLand, and that it holds collection events usually in November and April. The city also hosts a household hazardous waste amnesty day each November. The county will pump leftover heating oil out of an old residential tank, and the city page gives the county solid waste number for that, 386-257-6021. A house old enough to have one is worth asking about.</p>

<h2>Water outside the house, and when a project needs a permit</h2>

<h3>The sprinkler rules apply inside the city too</h3>

<p>Volusia County's water conservation page says its watering restrictions apply to all county residents, including those who live in cities. No one waters between 10 a.m. and 4 p.m. The days depend on the clock. During Eastern Standard Time, a residential address with an odd number may irrigate on Saturday and an even-numbered address on Sunday, from 4 p.m. to 10 a.m. During Daylight Saving Time, odd-numbered addresses get Wednesday and Saturday and even-numbered addresses get Thursday and Sunday. Daylight Saving Time begins the second Sunday in March and ends the first Sunday in November, so the schedule changes on the first Sunday of November, close to the date of this article.</p>

<p>The county caps each zone at one hour and three-quarters of an inch of water per watering day, and says a typical yard has four zones. Automatic systems must have a working rain sensor or soil-moisture sensor, whatever year they were installed. New plantings can be watered at any time for 30 days and then every other day for another 30, and the county asks you to keep the store receipt as proof. Hand watering with a hose that has an automatic shutoff is allowed at any hour. The rules cover every source of water, including a private well, with one exception: reclaimed water, for which the county sends you to the reclaimed water provider. To report a violation in Daytona Beach, the county's line is 386-257-6000, extension 12769.</p>

<h3>Reclaimed water, where the city offers it</h3>

<p>Parts of the city can irrigate with reclaimed water, also called reuse water. The city describes it as non-potable water that has gone through a high level of treatment and is made available for irrigation. It runs through purple pipes to a purple meter, and standard in-ground irrigation systems can use it. The city's FAQ says reuse is generally available in developments west of Jimmy Ann Drive and north of International Speedway Boulevard. It is not a citywide service, and the Utility Department at 386-671-8800 can tell you whether a given address can connect.</p>

<p>The conditions are strict. Reuse water is not for drinking. It is not for filling swimming pools, hot tubs or wading pools. The city says above-ground hose spigots are not connected to reuse piping, and reuse piping is not allowed to enter a residence, because of the risk of accidental connections to drinking water lines. Before activation the city installs a meter on the reuse line and an approved backflow preventer on each water service line that serves a residence. Applications go to the Water Billing office in City Hall, and the property owner has to sign a hold harmless agreement and read the city's reuse policy manual first. A buyer who sees purple lids in the yard should ask which of those steps the previous owner completed.</p>

<h3>Check before you build, fence or screen anything</h3>

<p>The city's Permits and Licensing office handles building permits through an online system called iMS. Its counter hours are Monday through Friday from 8 a.m. to 4 p.m. The billing office in City Hall stays open until 4:30 p.m. The department's advice is plain: always check before building, and start with zoning to see whether what you want to do is allowed. It adds that a survey should show every existing structure and the FEMA flood zone the property is in.</p>

<p>For a new house or an addition, the city lists what a single-family application needs. That includes two signed and sealed surveys, a tree permit form with two site plans, a full set of plans with elevations, footing details, wall sections and roof truss engineering, energy calculations, window and door specifications, and a statement showing whether Volusia County impact fees have been paid. For smaller jobs the city posts submittal checklists, including one for a residential swimming pool and one for a screened room or pool enclosure. Its permits page also lists garage sale permits and a zoning verification letter, which a buyer can request to confirm what a property's zoning allows. The garage sale permit rules sit behind the city's online login, so they are not described here.</p>

<p>The reason to look before the first project is not abstract. A fence line, a shed, a pool cage or a roof is a decision you make with the seller's survey and the flood zone in your hand. See our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/daytona-beach-flood-zones-how-to-check-any-address">Daytona Beach flood zones</a>.</p>

<h2>Your first thirty days, in the order they tend to matter</h2>

<p>The order below follows the deadlines, because the state sets some of them in days and the county sets others in months.</p>

<h3>Before and on closing day</h3>

<p>Call Utility Billing with the address and ask what the deposit will be, which day the account should start, and what documents to bring. Look up the garbage and recycling day on the city maps. Confirm that the toters are at the property. Ask the city whether the meter at the address has been replaced, and take a photo of the meter and its reading on the day you take possession, so a later estimated bill has something to be compared with. Sign up for AlertVolusia, the county's emergency notification system, which sends hurricane, wildfire, evacuation and missing person alerts by text, voice or email. The county's sign-up page lists Daytona Beach as its own area, and it asks residents to register for the countywide alerts and for their city's alerts as well.</p>

<h3>Within ten days and thirty days</h3>

<p>The Florida Department of Highway Safety and Motor Vehicles says that a new resident needs a Florida driver license within 30 days of establishing residency. To title and register a vehicle, you need insurance from an agent licensed in Florida, and the department says that has to happen within 10 days of establishing residency. License applications are made in person at a local office. Titling an out-of-state vehicle takes the original title, proof of identity, proof of Florida insurance and a completed application, and the vehicle identification number has to be physically inspected on the state form. The state's own list of what counts as establishing residency includes starting work, registering to vote, filing for a homestead exemption and living in Florida for more than six consecutive months, so the clock can start earlier than the closing date.</p>

<p>Voter registration is a county matter. The Supervisor of Elections says you must be registered at least 29 days before an election to vote in it, and mailed applications must be postmarked by that date. The office is at 1588 N. Woodland Boulevard in DeLand, and the number is 386-736-5930. Applications are also available at post offices, libraries, driver license offices and city halls.</p>

<h3>Homestead, flood insurance and the tax bill</h3>

<p>Homestead has the one date that cannot be repaired afterward. State law says the owner who holds legal title on January 1 must file with the county property appraiser on or before March 1 of that year, and failing to apply by then waives the exemption for that year, with a short list of exceptions. A buyer who closes in the fall is therefore filing in the first two months of the next year. See our guide to the <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/volusia-county-homestead-exemption-how-to-file-and-what-it-saves-you">Volusia County homestead exemption</a> and the <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/daytona-beach-property-tax-bill-line-by-line-2026">Daytona Beach property tax bill</a>.</p>

<p>Insurance deserves a call before closing rather than after. See our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">Florida home insurance for buyers</a>. Ask for the property's flood zone during the contract period, because the city says its permit office will want that zone on the survey anyway.</p>

<h3>A short list for the first month</h3>

<p>Pay the first utility bill before 4 p.m. on a business day, or set up the paperless statement and keep the billing office number saved. Put the trash day on the calendar and check it again at Thanksgiving, Christmas and New Year's. Learn your odd or even watering day and the March and November clock changes. Keep the store receipt for any new sod or plants, since the county asks for it as proof. Ask the city before you start a fence, a pool or an enclosure. Keep the Wednesday yard pile separate from junk and garbage, because the city says a mixed pile can draw extra charges.</p>

<p><strong>Bottom line.</strong> Moving to Daytona Beach is a handful of phone numbers and dates. Open the utility account with the deposit in by noon, pay before 4 p.m., find your garbage pair and your Wednesday yard day, learn the odd or even sprinkler schedule, and ask Permits and Licensing before any project. Then the state wants a license within 30 days, the county wants you registered 29 days before an election, and homestead waits until January 1 through March 1. If you are ready to look at houses with all of that in mind, the current <a href="http://www.adamscameron.com/daytona-beach-florida-real-estate-and-homes.html">Daytona Beach real estate and homes</a> are listed.</p>

<p>That is the local checklist. A few direct answers follow for the questions a move in the next few weeks tends to raise.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>What do I need to open a water account in Daytona Beach?</strong></summary>
<p>The city's FAQ lists an advance security deposit, a nonrefundable administration fee, a deed or lease, and photo identification. The deposit depends on the meter size and is refundable when you close the account, or after two consecutive years of good payment history. For same-day activation the deposit has to be paid by 12:00 noon on a business day. Utility Billing is at 301 S. Ridgewood Avenue, Room 176, open weekdays from 8 a.m. to 4:30 p.m., and the number is 386-671-8100.</p>
</details>

<details>
<summary><strong>What days is garbage collected in Daytona Beach?</strong></summary>
<p>The city collects residential garbage twice a week, Monday and Thursday or Tuesday and Friday, depending on your address. Recycling is once a week on a day that also depends on location, and yard debris is collected on Wednesday for all residential properties in the city. The city posts a map for each schedule on its Collection Days page. Put the toter out by 7:00 a.m. on service day, or after 6:00 p.m. the night before, and bring it in by 8:00 p.m. after service. The solid waste number is 386-671-8670.</p>
</details>

<details>
<summary><strong>Does paying my utility bill online late in the day count that day?</strong></summary>
<p>Not always. The city's Utility Billing page says online payments made after 4:30 p.m. are credited the next day, while the city FAQ says transactions after 4:00 p.m. count as the next day's business. The two pages differ, so pay before 4 p.m. on a business day. The billing page also says an online payment does not stop a scheduled disconnection, restore service already cut off, or remove late fees after the due date. For a disconnection, call 386-671-8100 during business hours.</p>
</details>

<details>
<summary><strong>What are the sprinkler rules in Daytona Beach?</strong></summary>
<p>Volusia County's watering restrictions apply to residents of cities too. No watering between 10 a.m. and 4 p.m. During Daylight Saving Time, odd-numbered addresses water on Wednesday and Saturday and even-numbered addresses on Thursday and Sunday. During Eastern Standard Time, odd-numbered addresses water on Saturday and even-numbered on Sunday. Each zone is limited to one hour and three-quarters of an inch per watering day, and automatic systems need a rain or soil-moisture sensor. Reclaimed water follows its own provider's rules.</p>
</details>

<details>
<summary><strong>Can I use reclaimed water on my lawn in Daytona Beach?</strong></summary>
<p>Only where the city has reuse lines. The city says reclaimed water is generally available in developments west of Jimmy Ann Drive and north of International Speedway Boulevard, and the Utility Department at 386-671-8800 can confirm an address. It is for irrigation only, not for drinking or for filling pools or hot tubs. The city installs a meter and a backflow preventer before activation, and the owner signs a hold harmless agreement and reads the city's reuse policy manual.</p>
</details>

<details>
<summary><strong>How long do I have to get a Florida driver license and register my car?</strong></summary>
<p>The Florida Department of Highway Safety and Motor Vehicles says a new resident needs a Florida driver license within 30 days of establishing residency. Vehicles must be insured with an agent licensed in Florida and titled and registered within 10 days of establishing residency. License applications are made in person. The department lists starting work, registering to vote, filing for homestead and living in Florida more than six consecutive months among the things that can make you a resident.</p>
</details>

<details>
<summary><strong>When do I file for homestead after buying a house in Daytona Beach?</strong></summary>
<p>State law requires the owner who holds legal title on January 1 to file with the county property appraiser on or before March 1. Missing March 1 waives the exemption for that year, with limited exceptions in the statute. A buyer who closes this fall holds title on the next January 1 and files between January 1 and March 1 of the new year. Confirm the filing steps with the Volusia County Property Appraiser's office.</p>
</details>

<details>
<summary><strong>Does the city pick up debris from a renovation or a cleanout?</strong></summary>
<p>It depends on who does the work. For a small project you do yourself, construction debris can go in heavy bags or boxes of no more than 40 pounds each. If a paid contractor does the project, the contractor must dispose of the waste, and the city will not take it without a fee. Land-clearing debris, such as a fallen tree, and move-out cleanouts are not part of regular service and can be ordered for a charge. Call 386-671-8670 before you set anything out.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:58:01 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/moving-to-daytona-beach-utilities-trash-and-first-month]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Palm Coast Condo Milestone Inspections and SIRS Guide]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-condo-milestone-inspections-and-sirs-guide]]>
        </link>
        <description>
            <![CDATA[<p>A Palm Coast condo buyer should ask two questions before anything else. How many stories is the building, and has its association finished the state's structural inspection and reserve study? Florida law applies both only to condominium buildings of three habitable stories or more, and for an association that must finish its milestone inspection by the end of 2026, the reserve study cannot be completed after December 31, 2026. If you are comparing <a href="http://www.adamscameron.com/palm-coast-florida-real-estate-and-homes.html">Palm Coast homes for sale</a> that include condominiums, the answers decide whether you are buying into a building with its homework done or one with a bill still on the way.</p>

<p>This guide stays on the City of Palm Coast. For the statewide rules, see our <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-a-condo-in-florida-under-the-new-condo-laws-a-volusia-county-guide">guide to buying a condo in Florida under the new condo laws</a>, and we do not repeat all of them here. This page covers what the city itself publishes, which questions the state rules leave to the local building office, and what to put in front of the seller before you sign. For the town as a whole, start with our look at <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/is-palm-coast-a-good-place-to-live-an-honest-look-for-buyers">whether Palm Coast is a good place to live</a>.</p>

<h2>What the milestone inspection is, and what Palm Coast says about it</h2>

<p>The milestone inspection is a structural check of a condominium or cooperative building that stands three or more habitable stories tall. Florida Statute 553.899 sets the default schedule. The first inspection is due by December 31 of the year the building reaches 30 years old, counted from the date its certificate of occupancy was issued, and another is due every 10 years after that. A building that turned 30 before July 1, 2022 owed its first inspection before the end of 2024. A building that turns 30 on or after July 1, 2022 and before the end of 2024 owed it before the end of 2025. Everything younger follows the plain 30-year clock unless the local government shortens it.</p>

<p>Here is the part a Palm Coast buyer needs to read twice. The statute lets the local enforcement agency decide that local conditions, with proximity to salt water as the named example, call for the first inspection at 25 years instead of 30. The 2026 text says the agency "may determine" that. The City of Palm Coast Building page, under its heading for milestone inspections of condominiums three stories and higher, reads more firmly. It says a building within three miles of a coastline, as Florida Statute 376.031 defines that term, must have its inspection by December 31 of the year it reaches 25 years of age. It also says that if the certificate of occupancy was issued on or before July 1, 1992, the first inspection had to be done before December 31, 2024.</p>

<p>We did not find a Palm Coast ordinance behind that wording. We searched the city's Code of Ordinances and its Land Development Code on Municode on the day we wrote this, and a search for "milestone" returned nothing in either one. That proves little by itself, because a city can act by an ordinance that has not been codified yet, and the building page may simply restate what the city expects. But it means two public sources use different verbs, and neither tells you whether a particular building sits inside the three-mile line. The statute defines the coastline as the line of mean low water along the part of the coast in direct contact with the open sea, plus the seaward limit of inland waters. Do not guess which side of that line a building falls on. Ask the Building Division in writing, with the building's address, and keep the reply with your file.</p>

<p>The city's Building Services number is (386) 986-3780, and the page names Buildingdivision@palmcoastgov.com as the address where inspection reports are to be emailed, one report per building and each showing the specific address. That tells you something useful. The city has a place where reports are received, so a buyer can ask whether one has arrived. Three questions are enough. What is the certificate of occupancy date on file? Did the building receive a written notice that an inspection is due? Has a Phase 1 report been filed, and has a Phase 2 report followed?</p>

<p>The notice matters because the statute starts the clock with it. The local agency must send written notice by certified mail, return receipt requested, and the association then has 14 days to tell unit owners the notice arrived and the date by which the inspection must be done. Phase 1 must be completed within 180 days after the owner receives that notice. Phase 1 is a visual examination of the habitable and nonhabitable areas, including the major structural components, by a licensed engineer or architect. If the inspector sees no substantial structural deterioration, the process ends there.</p>

<p>If the inspector does see it, Phase 2 follows. It can involve destructive or nondestructive testing, and the inspector owes the local agency a progress report with a timeline within 180 days of the Phase 1 report. The statute narrows what counts. Cracks, sagging, misalignment, signs of leakage and peeling finishes do not qualify on their own unless the inspector decides they point to a deeper structural problem. So a Phase 1 report can list a dozen maintenance items and still pass.</p>

<p>The city publishes the forms its engineers fill out, which gives a buyer a map of what a report covers. The Phase 1 form is labeled Form EB18, 2024. It offers a set of outcomes to check, from "Passed Phase 1 Inspections" through "Maintenance Needed but does not raise to the level of Substantial Deterioration or Dangerous," up to a dangerous condition and an immediate dangerous condition that must be reported to the building and fire officials. Its sections run through the foundation, bearing walls, floor and roof systems, steel and concrete framing, windows and exterior doors, wood framing and the building facade. Near the end are a safe occupancy determination, a summary of findings and a review of existing documents and permit records. The Phase 2 form asks for the damage and its extent, the testing results, a graded urgency for each recommended repair, and a second safe occupancy determination. When you get a report, turn to those last sections first. They tell you whether anyone had to leave and how fast the engineer wanted each repair done.</p>

<p>After Phase 2, the state expects teeth. Florida Statute 553.899 tells every city and county to adopt an ordinance requiring owners to schedule or start repairs for substantial structural deterioration within a set time after the agency receives the Phase 2 report, and never later than 365 days. If the owner cannot show the agency that repairs are scheduled or begun, the agency must decide whether the building is unsafe for human occupancy. We could not locate Palm Coast's version of that ordinance in the codified text, so the practical question is about the building in front of you. Has it received a Phase 2 report, what is the repair schedule, and which permits have been pulled? The statute also requires each local agency to report to the state every December 31 how many buildings must be inspected, how many have finished Phase 1 and Phase 2, and which have been found unsafe. The Building Division can tell you what it has on file.</p>

<h2>The reserve study and the money behind it</h2>

<p>The milestone inspection looks at condition. The structural integrity reserve study, shortened to SIRS, looks at money. Florida Statute 718.112 requires a residential condominium association to have one completed at least every 10 years for each building that is three habitable stories or higher. It rests on a visual inspection and must be performed or verified by a licensed engineer, a licensed architect, or a reserve specialist certified by one of two named professional bodies. For each item it covers, it must state the remaining useful life, the replacement cost or deferred maintenance expense, and a funding schedule with a recommended annual amount.</p>

<p>The study must cover the roof, the structure, fireproofing and fire protection, plumbing, electrical systems, waterproofing and exterior painting, and windows and exterior doors. It adds a catch-all for any other item above a dollar threshold whose failure would hurt those seven. The Division of Florida Condominiums adjusts that threshold for inflation, so read the study itself to see what was added. Items with more than 25 years of remaining life may be left out of replacement reserves, although the study can still recommend a deferred maintenance amount. That is a legitimate choice in the law, and it is also a reason to read the line items and not just the total.</p>

<p>The calendar is tight this year. An association that existed before July 1, 2022 and is controlled by unit owners had to complete its first study by December 31, 2025. The statute lets an association that must finish a milestone inspection by the end of 2026 do the study at the same time, and then it adds a hard stop: in no event may the study be completed after December 31, 2026. As we write this, that is about ten weeks away. A Palm Coast association that still has no study is running out of room. If you are under contract on a unit there, treat the gap as the first open item in the file and ask for the engineer's signed proposal and the date the work will finish.</p>

<p>The funding rules changed as well. For budgets adopted on or after December 31, 2024, the members of an owner-controlled association that must have a study can no longer vote to provide no reserves or less reserves for those listed items. The association can fund them through regular assessments, special assessments, a line of credit or a loan, and a special assessment, line of credit or loan needs a majority of all the voting interests. If an association borrows or levies a special assessment, the statute says the details belong in the annual financial statement that goes to owners and to prospective purchasers. That is where you will find it.</p>

<p>Two pressure valves exist, and a careful buyer should know both. A board that finished a milestone inspection within the previous two calendar years may, with a majority of all voting interests, pause or reduce reserve contributions for up to two consecutive annual budgets so the money can go to repairs the inspection recommended. That option covers only budgets adopted on or before December 31, 2028, and an association that paused must get a new study before contributions resume. Separately, an association that completes a milestone inspection may put off its study for no more than the two consecutive budget years that follow. Both are lawful. Both also mean a thin reserve line might be a permitted pause and not neglect, so ask which one it is and when full funding resumes.</p>

<p>Low-rise buildings sit differently, and this is worth saying plainly because many condominiums are not tall. The study requirement does not apply to buildings of fewer than three stories. The milestone rule uses the same three-story line. A two-story condominium building in Palm Coast is not on the milestone schedule at all, and nothing we found says how many buildings in the city are three stories or more. For those low-rise buildings the general reserve rule still reads that members may vote by a majority of all voting interests to provide no reserves or less than the statute calls for. That is not a defect. It is a fact about the budget, and it makes the reserve line and the age of the roof the things to ask about.</p>

<h2>What to ask for, and how the contract protects you</h2>

<p>Start with the paperwork you are owed. Under Florida Statute 718.503, a buyer under contract for a resale unit is entitled, at the seller's expense, to a current copy of the declaration, the articles of incorporation, the bylaws and rules, the annual financial statement and budget, the inspector-prepared summary of the milestone inspection report if one applies, the association's most recent reserve study or a statement that it has not done one, and the state's "Frequently Asked Questions and Answers" document. If the building finished a turnover inspection on or after July 1, 2023, that report is on the list too.</p>

<p>The same section changes what a contract says. A contract for a residential unit signed after December 31, 2024 must state, in conspicuous type, whether the association is required to have a milestone inspection or a study and has not completed it, or that it is not required to have one. If the work is done, the contract carries two clauses. One has the buyer acknowledge receiving the summary and the study more than 7 days before signing. The other makes the agreement voidable by written notice within 7 days after signing and receipt of the documents. Both counts exclude Saturdays, Sundays and legal holidays. Read the clause in your own contract. It is not filler, and it tells you which situation you are in.</p>

<p>Larger associations make the search easier. An association with 25 or more units that is not a timeshare must post its inspection reports and its latest study on a website or a mobile app within 30 days after it receives or creates them, and it must keep the inspection reports for 15 years. If the building is smaller, ask for the same documents directly, in writing.</p>

<p>The estoppel certificate is the association's written statement of what you would owe on the unit. If the association fails to deliver it within 10 business days of a request from an owner or mortgagee, the statute bars it from charging a fee for the certificate. A certificate delivered by hand or email stays effective for 30 days, and 35 days if mailed. If you rely on it in good faith, the association gives up the right to collect more than it states. Read it for any special assessment already levied, any scheduled to come due, and any capital contribution or transfer fee. For the other items on the settlement statement, see our <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">closing costs guide</a>. Keep in mind that an association assessment arrives on its own schedule, which is separate from the taxing authorities on the county bill. For those lines, see our <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-property-tax-bill-line-by-line">Palm Coast property tax bill guide</a>.</p>

<p>A concrete example shows how the pieces fit together. Suppose a four-story building received its certificate of occupancy in 1998. On the state's 30-year default it turned 30 in 2028, so the first inspection would not be due until the end of that year. On the city page's 25-year wording, which applies within three miles of a coastline, it turned 25 in 2023, and the first inspection would already have been due. Same building, two answers, both found in public sources. The buyer who asks the Building Division in writing which clock applies, and gets a reply, is in a very different spot from the buyer who assumed. If the answer is the 25-year clock, the next questions are whether a report was filed and what it said.</p>

<p>Last, think about the building itself. Palm Coast's flood information tells owners that new buildings in special flood hazard areas must be built at least one foot above base flood elevation, that the city's current flood maps took effect June 6, 2018, and that a flood insurance policy has a 30-day waiting period before coverage starts. The local building code amendment defines a substantial improvement as repairs or additions over a 10-year period whose cumulative cost reaches 50 percent of the structure's market value before the work starts. The city handout says it will visit a property to review its flood problems if you ask. A large repair program after a Phase 2 report is the kind of project that makes those definitions matter, so ask which flood zone the building is in. See our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-flood-zones-what-to-check-before-an-offer">Palm Coast flood zones and what to check before an offer</a> and our <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">home insurance guide</a>.</p>

<h2>Bottom line</h2>

<p>Count the stories first. If the building is under three stories, the milestone and reserve-study rules do not apply, and your questions shift to the budget, the roof and the estoppel. If it is three stories or more, you want four documents in hand before you commit: the inspector-prepared summary, the reserve study, the current budget and the estoppel certificate. Ask the city's Building Division, in writing, which inspection clock applies to the building, because the state statute and the city's own page do not use the same words. Treat any missing study as urgent, since December 31, 2026 is the last day it can be completed. A building with its paperwork done and its repairs funded is easier to buy into than a pretty unit in a building with open questions. Those open questions are exactly what a careful review of any Palm Coast listing should settle, and our <a href="http://www.adamscameron.com/palm-coast-florida-real-estate-and-homes.html">Palm Coast real estate page</a> is the place to start looking.</p>

<p>That covers the rules. Here are the questions that tend to come up next, with short answers you can check against the sources above.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Does every Palm Coast condo need a milestone inspection?</strong></summary>
<p>No. Florida Statute 553.899 applies to condominium and cooperative buildings of three habitable stories or more. A building of one or two stories is outside the milestone schedule. The reserve study rule in Florida Statute 718.112 uses the same three-story line. Count the stories in the building you are considering, then ask the association or the city's Building Division in writing whether the building has been placed on an inspection schedule.</p>
</details>

<details>
<summary><strong>Is the Palm Coast milestone deadline 25 years or 30 years?</strong></summary>
<p>Two public sources give different answers. The 2026 statute sets 30 years and says the local agency may require 25 because of conditions such as proximity to salt water. The City of Palm Coast Building page says a building within three miles of a coastline, as Florida Statute 376.031 defines it, must be inspected in the year it reaches 25. We found no codified ordinance. Ask the Building Division in writing which applies to the address.</p>
</details>

<details>
<summary><strong>What is the difference between a milestone inspection and a reserve study?</strong></summary>
<p>A milestone inspection is a structural check by a licensed engineer or architect that reports the building's condition and any substantial structural deterioration. A structural integrity reserve study is a financial plan for the roof, structure, fire protection, plumbing, electrical systems, waterproofing and painting, and windows and doors. It states each item's remaining life, replacement cost and the yearly amount to save. One says what is wrong. The other says whether the owners are funding the fix.</p>
</details>

<details>
<summary><strong>What happens if a condo association has not finished its reserve study?</strong></summary>
<p>For an association that existed before July 1, 2022 and is controlled by unit owners, the first study was due by December 31, 2025. An association that must complete a milestone inspection by the end of 2026 may do both at once, but the study cannot be completed after December 31, 2026. Officers who willfully and knowingly fail to complete it breach their duty to owners. Your contract must also say, in conspicuous type, that the study is required and not complete.</p>
</details>

<details>
<summary><strong>Can I cancel a condo contract in Palm Coast after I read the inspection summary?</strong></summary>
<p>For a contract signed after December 31, 2024, if the association has completed the milestone inspection or study, the contract makes the agreement voidable by written notice within 7 days after signing and receipt of a current copy of the summary, excluding Saturdays, Sundays and legal holidays. If the work is not complete, the contract must say so in conspicuous type. The clause is in Florida Statute 718.503. Check the exact wording in your own contract with your agent or attorney.</p>
</details>

<details>
<summary><strong>Where do I find a Palm Coast building's inspection report?</strong></summary>
<p>Start with the association. An association with 25 or more units that is not a timeshare must post inspection reports and its latest study on a website or mobile app within 30 days of receiving them. Associations must also deliver the inspector's summary to each owner within 45 days. The city asks that reports be emailed to its Building Division, one per building, so you can also ask Building Services at (386) 986-3780 whether a report is on file.</p>
</details>

<details>
<summary><strong>What does a passing Phase 1 report look like?</strong></summary>
<p>On the city's Phase 1 form, the inspector checks one outcome. "Passed Phase 1 Inspections" and "Maintenance Needed but does not raise to the level of Substantial Deterioration or Dangerous" both end the process at Phase 1. The other outcomes, from substantial structural deterioration to an immediate dangerous condition, require Phase 2. Read the summary of findings and the safe occupancy determination near the end of the form, and look at the list of maintenance items even on a pass.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:57:45 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/palm-coast-condo-milestone-inspections-and-sirs-guide]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[New Smyrna Beach Condo Milestone Inspection and SIRS Guide]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-condo-milestone-inspection-and-sirs-guide]]>
        </link>
        <description>
            <![CDATA[<p>Before you fall for a New Smyrna Beach condo, ask for two documents: the milestone inspection summary and the structural integrity reserve study. Florida law says a building that must finish its milestone inspection by the end of 2026 cannot complete its reserve study after December 31, 2026. That date is close, and it shapes what you should ask this month. If you are weighing <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach homes for sale</a> that include condominiums, these two papers tell you more about the next ten years of ownership than the view does.</p>

<p>This guide stays on the City of New Smyrna Beach. The statewide rules are laid out in our <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/buying-a-condo-in-florida-under-the-new-condo-laws-a-volusia-county-guide">guide to buying a condo in Florida under the new condo laws</a>, so we will not repeat all of it. Our <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/living-in-new-smyrna-beach-beachside-mainland-costs-and-what-to-know">guide to living in New Smyrna Beach</a> covers the beachside and mainland sides of town. Here we cover what the city's own code and building office say, where the state leaves a local decision open, and what a buyer here should put in writing before signing a contract.</p>

<h2>What the milestone inspection is, and what New Smyrna Beach has put in writing</h2>

<p>A milestone inspection is a structural check of a condominium building that is three or more habitable stories tall. Florida Statute 553.899 sets the default schedule. The first inspection is due by December 31 of the year the building turns 30, counted from the date its certificate of occupancy was issued. Another follows every 10 years. If the certificate date cannot be found, the statute falls back to the date of occupancy shown in any record kept by the local building official.</p>

<p>The same statute lets the local enforcement agency pull that date forward to 25 years, and it names proximity to salt water as an example of a local circumstance that could justify doing so. New Smyrna Beach sits on a barrier island between the Atlantic and the Intracoastal Waterway, so the question is natural. The answer is not something the state makes for the city. Only the city can make it.</p>

<p>On the day we wrote this, we searched every section of the city's Code of Ordinances and Land Development Regulations on Municode, which was last updated in September 2026, for the word milestone. It does not appear. The code says nothing we could find about condominium inspections, a 25-year election, or a repair deadline. That does not prove the city has never acted, because an ordinance can be adopted before it is codified, and a notice can be sent to a single building without ever appearing in the code. It does mean that nothing public we could find says New Smyrna Beach moved the date to 25 years. Do not assume it did. Do not assume it did not. Ask.</p>

<p>The office to ask is Building and Inspections, at 386-410-2860. Give them the building's street address and put three questions to them. What certificate of occupancy date is on file? Has the building been sent a written notice that an inspection is due? Has a Phase 1 report been filed? The statute requires the local agency to send that notice by certified mail, and the association then has 14 days to pass the news to unit owners. If a building is overdue and the city has not written to it, you want to know that before the offer, not after closing.</p>

<p>A little arithmetic shows why the date on the document matters more than the age of the building. Take the state default and no local change. A building with a certificate issued in 1990 turned 30 in 2020, so its first inspection was due before the end of 2024. A building from 1996 turns 30 in 2026, and its first inspection is due by December 31 of this year. A building from 2004 does not reach 30 until 2034. One older building may already hold a finished report and a repair program under way. A newer one may have no report at all, and your contract is supposed to tell you so.</p>

<p>The inspection itself runs in two phases. Phase 1 is a visual examination of habitable and nonhabitable areas, including the major structural components, by a licensed architect or engineer, and it must be done within 180 days after the owner receives the city's notice. If the inspector finds no signs of substantial structural deterioration, the process stops there. If the inspector does find them, Phase 2 follows, and it can involve destructive or nondestructive testing at the inspector's direction. The Phase 2 inspector owes the local agency a progress report with a timeline within 180 days after the Phase 1 report goes in.</p>

<p>The statute defines substantial structural deterioration narrowly, and this is where buyers misread reports. Cracks, sagging, misalignment, signs of leakage and peeling finishes do not count by themselves. They count only if the inspector decides they point to something deeper. So a Phase 1 report with a long maintenance list can still be a pass, and a short report can hide a serious finding in a single paragraph. Read the sealed report for what the engineer actually checked. The law requires it to describe the manner and type of inspection, identify any substantial deterioration and the recommended repairs, say whether unsafe or dangerous conditions were observed, and list any items needing further inspection. Then read the separate summary the inspector must prepare, because that is the part the association must send to every owner within 45 days.</p>

<p>What happens after a Phase 2 report is the part with teeth. State law tells every city and county to adopt an ordinance requiring owners to schedule or start repairs for substantial structural deterioration within a set time after the local agency receives the Phase 2 report, and never later than 365 days. If the owner cannot show the agency that repairs are scheduled or begun, the agency must decide whether the building is unsafe for human occupancy. We could not locate New Smyrna Beach's version of that ordinance in the codified text. So the practical question for a building with an open Phase 2 is simple. What is the repair schedule, and which permits have been pulled?</p>

<p>The city does have standing rules that would apply to any repair project. Chapter 26 of the Code of Ordinances adopts the International Property Maintenance Code, the Florida Building Code and the National Electric Code by reference. The city's building page says it is enforcing the 2023 edition of the Florida Building Code for permit applications filed since January 1, 2024. When a decision of the chief building official or an inspector is appealed, the building trades examining board sits as the construction board of adjustments and appeals. None of that is a condo-specific program. It is the backdrop for the permits that a major repair will need, and it tells you who decides a dispute over them.</p>

<h2>The reserve study and the money behind it</h2>

<p>A milestone inspection looks at condition. The structural integrity reserve study, usually shortened to SIRS, looks at money. Florida Statute 718.112 requires a residential condominium association to complete one at least every 10 years for each building three habitable stories or taller. It is based on a visual inspection, and it must be performed or verified by a licensed engineer, a licensed architect, or a certified reserve specialist or professional reserve analyst. For each item it studies, the study states the remaining useful life, the estimated replacement cost or deferred maintenance expense, and a funding plan with a recommended annual amount.</p>

<p>The items the study must cover are the roof, the structure including load-bearing walls, fireproofing and fire protection systems, plumbing, electrical systems, waterproofing and exterior painting, and windows and exterior doors. The law adds a catch-all for any other item whose repair or replacement exceeds a dollar threshold and whose failure would hurt the first seven. The Division of Florida Condominiums adjusts that threshold for inflation each year and posts it on its website, so check the posted figure instead of trusting a number in an old listing.</p>

<p>The calendar is the urgent part. An association that existed on or before July 1, 2022, and is controlled by unit owners, had to complete its first study by December 31, 2025. The statute then lets an association that must complete a milestone inspection by the end of 2026 do the study at the same time, and it adds a hard stop. In no event may the study be completed after December 31, 2026. On the day we checked, that was about ten weeks away. A New Smyrna Beach association that still has no study is running out of room, and a buyer in contract on a unit there should treat that gap as the first open item in the file.</p>

<p>The money rules changed as well. For budgets adopted on or after December 31, 2024, the members of an owner-controlled association that must have a study can no longer vote to provide no reserves or lower reserves for the items on the list. The old habit of waiving reserves by majority vote is gone for those items. The association can fund them through regular assessments, special assessments, a line of credit or a loan, and a special assessment, line of credit or loan needs approval from a majority of all the voting interests.</p>

<p>Two pressure valves exist, and they change how a thin reserve line should be read. A board that finished a milestone inspection within the previous two calendar years may, with approval of a majority of all voting interests, pause or reduce reserve contributions for up to two consecutive annual budgets so the money goes to repairs the inspection recommended. That option applies only to budgets adopted on or before December 31, 2028, and an association that pauses must get a new study before contributions resume. Separately, an association that completes a milestone inspection may delay its study for no more than the two consecutive budget years that follow. Both rules are lawful. A low reserve contribution may be a permitted pause and not neglect, so ask which one it is and ask to see the vote.</p>

<p>Here is a scenario to make it concrete. Suppose you are under contract on a unit in a six-story building, and the seller hands you a milestone summary that lists no substantial structural deterioration and a reserve study dated three years ago. The study is on time, the inspection is done, and the budget funds the roof. That is a clean file. Now suppose the summary reports Phase 2 testing on the balcony slabs and the budget shows a paused reserve line. That is not a reason to walk away, because the pause may be exactly what the law allows. It is a reason to read the repair schedule, ask what the pause covers, and ask the board what the next assessment looks like before the estoppel certificate arrives. The two files lead to two very different conversations, and you can only have the second one if you have asked for the papers.</p>

<h2>The paperwork you are owed, and the coastal rules around the building</h2>

<p>Under Florida Statute 718.503, a buyer under contract for a resale unit is entitled, at the seller's expense, to a current copy of the declaration, the articles of incorporation, the bylaws and rules, the annual financial statement and budget, the inspector-prepared summary of the milestone inspection report if one applies, the association's most recent reserve study or a statement that none has been completed, and the state's Frequently Asked Questions and Answers document. Contracts for the sale of a residential unit signed after December 31, 2024, must carry conspicuous language about the milestone inspection and the study. If the building has not finished a required inspection or study, the contract must say that in conspicuous type. If it has finished them, the contract must carry a clause that gives the buyer 7 days, not counting Saturdays, Sundays and legal holidays, to cancel by written notice after signing and receiving current copies. The buyer may also extend the closing by up to 7 days of the same kind after receiving the documents, if the request is in writing. Read that clause. It is not boilerplate, and the statute says a waiver of these rights has no effect.</p>

<p>Associations with 25 or more units that are not timeshares must post their inspection reports and their latest study on a website or a mobile application within 30 days of receiving or creating them. They must keep inspection reports for 15 years and studies for at least 15 years after completion. If the building is smaller, ask the board for the same documents directly. The association must also report each completed study to the state within 45 days, and the state's reporting page says the database shows entries exactly as submitted. You can look a building up before you tour it. A missing listing is a question for the board, not proof of anything by itself.</p>

<p>The estoppel certificate is the last document that matters. It is the association's written statement of what you would owe on the unit, and under Florida Statute 718.116 the association has 10 business days to issue it after a written or electronic request from an owner, a mortgagee or their designee. The statute requires the association to name on its website who receives requests. Read the certificate for any special assessment already levied, any scheduled to come due, and any capital contribution or transfer fee. Our <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">closing costs guide</a> covers the other items on the settlement table.</p>

<p>A beachside condo carries the same state inspection law as one on the mainland. What changes is the ground it stands on. New Smyrna Beach's Land Development Regulations place a Coastal Construction Setback Line at the same location as the state's Coastal Construction Control Line. Seaward of that line, between the line and the Atlantic Ocean, the code prohibits any part of a principal building, including porches, balconies and roof overhangs, and it prohibits accessory structures such as pools, decks, patios and gazebos, unless an exemption applies or a variance is obtained. For a condo buyer the point is practical. A repair or a rebuild near the water is not only a structural question. It is also a permitting question, and the answer depends on where the building sits relative to that line. Ask the association whether the building is seaward of it, and ask Building and Inspections what review a major repair would need.</p>

<p>Flood is its own check. The city's Development Services FAQ lists zones A, AE and VE as the special flood hazard zones in the city, and it lists zones X, X(500) and X Shaded as outside them. The city's Land Development Regulations send floodprone development to a Flood Damage Prevention article by section number. We could not find that article under those numbers when we searched the code, so ask the city which flood rules govern a particular building. The Engineering Department at 386-410-2812 helps with maps and flood history. Our <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-flood-zones-flood-insurance-guide">New Smyrna Beach flood zone guide</a> shows how to check an address, and our <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">home insurance guide</a> explains how the pieces fit for an owner. One line from the county's flood page is worth repeating here. In a condominium, a master policy does not usually cover the inside of the unit or its contents. Ask the association what its master policy covers and ask your own agent what you would need to add.</p>

<p>One last local point. The city's building page notes that since July 1, 2022, Volusia County handles permitting, code enforcement and public hearings for properties in unincorporated Volusia County under an agreement with the city. A New Smyrna Beach mailing address does not always mean a city parcel. Check which government has jurisdiction over the building before you call anyone, and use the county's building office at 386-626-6591 if it is the county. The property tax side of that question is in our <a href="http://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-property-tax-bill-line-by-line-2026">New Smyrna Beach property tax bill guide</a>.</p>

<h2>Bottom line</h2>

<p>The state rules are the same everywhere. What is local is the paperwork on file for one building, and in New Smyrna Beach nothing in the codified code tells you whether the city shortened the schedule. So you ask, in writing, and you ask early. Request the milestone summary, the reserve study, the budget and the estoppel certificate. Ask Building and Inspections whether a notice has gone to the building and whether a Phase 2 report is open. Read the contract clause before you sign it. A building with finished reports and a funded plan gives you answers on paper. A building with gaps is not a reason to panic. It is a reason to get the missing answers before you commit. If you want to see what is on the market, start with the <a href="http://www.adamscameron.com/new-smyrna-beach-florida-real-estate-and-homes.html">New Smyrna Beach real estate</a> listings and bring this list to the first showing.</p>

<p>Questions come up on every one of these deals, so here are the ones buyers in this city should settle before they sign.</p>

<h2>Frequently Asked Questions</h2>

<details>
<summary><strong>Does New Smyrna Beach require a condo inspection at 25 years instead of 30?</strong></summary>
<p>State law lets the local enforcement agency choose 25 years for buildings affected by local conditions such as salt water, but the choice belongs to the city. We searched the city's Code of Ordinances and Land Development Regulations on Municode on October 21, 2026, and found no text on milestone inspections. An ordinance could exist that is not yet codified, so call Building and Inspections at 386-410-2860, give the building's address, and ask for the certificate of occupancy date and any notice sent to the building.</p>
</details>

<details>
<summary><strong>What is the deadline for a condo association's reserve study?</strong></summary>
<p>An association that existed on or before July 1, 2022, and is controlled by unit owners had to complete its first study by December 31, 2025. One that must finish a milestone inspection by December 31, 2026, may do both at the same time. Under Florida Statute 718.112, the study cannot be completed after December 31, 2026. If the building has no study, the contract must say so in conspicuous type, and you should ask the board for its timeline in writing.</p>
</details>

<details>
<summary><strong>Can I cancel a condo contract after reading the milestone summary and the reserve study?</strong></summary>
<p>For a resale where the association has completed the inspection or study, the contract entered after December 31, 2024, must carry a clause that makes it voidable by written notice within 7 days after signing and receiving current copies. Saturdays, Sundays and legal holidays do not count. You may also extend the closing by up to 7 days of the same kind after receiving the documents, if you ask in writing. The right ends at closing, and the statute says a waiver has no effect.</p>
</details>

<details>
<summary><strong>Does a low reserve balance mean the association is behind?</strong></summary>
<p>Not always. A board that finished a milestone inspection within the previous two calendar years may pause or reduce reserve contributions for up to two consecutive annual budgets, with approval of a majority of all voting interests, so the money goes to repairs the inspection recommended. That option applies to budgets adopted on or before December 31, 2028, and a new study is required before contributions resume. Ask whether a vote took place, what the repairs are, and what the next assessment looks like.</p>
</details>

<details>
<summary><strong>Where can I find an association's inspection report and reserve study?</strong></summary>
<p>An association that manages 25 or more units and is not a timeshare must post digital copies of its inspection reports and its most recent reserve study on a website or mobile app within 30 days of receiving or creating them. Smaller associations must still provide the documents to a buyer under contract. The state also keeps a public database of reported studies, and it shows entries exactly as submitted, so a missing entry is a question for the board and not proof of anything.</p>
</details>

<details>
<summary><strong>Does the condo master insurance policy cover the inside of my unit?</strong></summary>
<p>Usually not. Volusia County's flood page says a master policy does not usually cover the inside of the unit or its contents, and it tells condominium owners to ask about flood coverage in particular. Ask the association for a copy of its master policy and its list of covered items, then ask your own agent what a unit owner's policy would add. The city's special flood hazard zones are A, AE and VE.</p>
</details>

]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:57:28 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/new-smyrna-beach-condo-milestone-inspection-and-sirs-guide]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
        <item>
        <title>
            <![CDATA[Port Orange Short-Term Rental Rules for Buyers]]>
        </title>
        <link>
        <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/port-orange-short-term-rental-rules-for-buyers]]>
        </link>
        <description>
            <![CDATA[<p>Port Orange's land development code never uses the words "short-term rental" or "vacation rental." A search of the city's online code on October 21, 2026 returned no hits for either phrase. That does not clear a nightly-rental plan. It means the answer is spread across zoning use lists, a city business tax receipt, a state license, a county tax and your own association's documents. If you are looking at <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange homes for sale</a> with a rental calendar in mind, this guide shows where each piece lives and what to ask for in writing before you make an offer.</p>

<p>It sits beside our broader look at <a href="http://www.adamscameron.com/real-estate-info/2026/09/29/port-orange-florida-a-buyer-s-guide-to-neighborhoods-and-costs">Port Orange neighborhoods and costs</a>. This one is narrower. It covers renting a house, villa or condo to guests for short stays, and it stays with what the city, the state and the county have published.</p>

<h2>What the city code says, and what it leaves out</h2>

<p>Start with the silence, because it surprises people. A section written just for short-term rentals, with a definition, a permit and a list of districts, is what you might expect to find. Port Orange's Land Development Code does not have one that we could find. The words are not in the definitions chapter, and they are not in the use lists for the zoning districts.</p>

<p>What the code does define is the older vocabulary. A hotel is "a multi-story, transient lodging facility as defined in F.S." A motel is "a transient lodging facility as defined in F.S." A bed and breakfast inn is "a house or portion thereof where short-term lodging rooms are provided, and meals may be provided," and the code adds that the operator of the inn shall live on the premises or in adjacent premises. Those are the three lodging uses the city wrote down.</p>

<p>Now look at where they show up. Hotels and motels are listed among the permitted uses in the highway commercial district and the interchange commercial development district. They are also listed in the planned commercial development district. The Ridgewood development district lists hotels, and so does the planned community district for the Port Orange Riverwalk. The bed and breakfast inn appears in the use lists for the office and residential transition district and the mixed use center district.</p>

<p>The residential districts read differently. The R-20SF single-family district lists single-family detached dwellings. The two-family district lists two-family dwellings. The high density multifamily district lists assisted living facilities and multifamily dwellings, with a density cap of sixteen units per gross acre. None of those residential sections mentions hotels, motels, lodging or rental.</p>

<p>Be careful about what you conclude from that. We are not telling you a nightly rental is allowed in a single-family district, and we are not telling you it is banned. The code does not say either thing in so many words. How the city classifies a house rented by the night is a question for the city's planning and zoning staff, and an answer you get over the phone is worth very little at closing. Ask for it in an email, name the parcel, and keep the reply.</p>

<h2>Home-based business rules and the business tax receipt</h2>

<p>One section of the code gets quoted more than it deserves, so read it for what it says. The home-based business section allows a business to operate from a residential property in a residential zone if it meets the listed conditions and Florida Statutes section 559.955. The conditions are about the ordinary traffic of a home office. Employees who work at the dwelling must also live there, with room for up to two who do not. Parking for the business may not be greater in volume than you would expect at a similar home with no business.</p>

<p>Then comes the line that matters to a rental buyer. Subsection (10) says the section "does not supersede local laws, ordinances, or regulations related to transient public lodging establishments, as defined in Florida Statutes, that are not otherwise preempted under Florida Statutes." Subsection (11) adds that home-based businesses remain subject to all other applicable ordinances and regulations. Read together, the home-based business section does not hand a nightly renter a permission slip, and it does not take one away. It steps aside and points to the lodging rules.</p>

<p>The city also runs a business tax receipt program. The city's page says that to conduct business in Port Orange, all businesses must first obtain a local business tax receipt, and that this includes home-based businesses. The fee varies by business. Where a business needs a state license or permit, the city requires a copy of it before issuing the receipt. The page also asks an applicant whether the business is properly zoned, and it points to the city's interactive zoning map.</p>

<p>That sequence is the useful part. The city wants the zoning answer and the state license before it issues its own paper. So the order of operations for a rental plan is not "buy, then get the receipt." It is zoning first, state license second, city receipt third. Whether renting your own house to guests counts as a business for this purpose is another question to put in your written email to the city. We did not find a published answer.</p>

<h2>The state side: the license, the preemption and the transient label</h2>

<p>Florida law carries more weight here than anything the city wrote. The key sentence is in section 509.032 of the Florida Statutes. A local law, ordinance or regulation may not prohibit vacation rentals or regulate the duration or frequency of rental of vacation rentals. The same paragraph then limits itself: it does not apply to a local law, ordinance or regulation adopted on or before June 1, 2011.</p>

<p>Put plainly, a city that wrote its rental restrictions after that date generally cannot enforce a ban or a limit on how often or how long you rent. A city that wrote them earlier keeps them. We could not find a Port Orange rule on this subject at all, so we cannot tell you which side of the date it falls on. That is a fair question for the city's attorney, and it is a good reason not to rely on an online forum that tells you what "Florida allows."</p>

<p>The preemption has edges. The state also keeps the regulation of public lodging establishments for itself, covering sanitation and inspections. The same statute says local governments may still inspect public lodging for the Florida Building Code and the Florida Fire Prevention Code. So the city is not powerless over a rental. It is limited in what it can say about how long and how often.</p>

<p>Now the label. The statutes define a vacation rental as any unit or group of units in a condominium or cooperative, or any individually or collectively owned single-family, two-family, three-family or four-family house or dwelling unit, that is also a transient public lodging establishment and is not a timeshare. Transient occupancy means occupancy that is temporary. It includes a stay at a vacation rental unless the written rental or lease agreement expressly states that the unit is the guest's sole residence. The label comes from how the property is used, not from what the listing calls it.</p>

<p>The license follows the label. Each public lodging establishment must obtain a license from the state's Division of Hotels and Restaurants. The license may not be transferred from one place or individual to another. Operating without one is a second-degree misdemeanor. For a buyer, the non-transfer rule is the part to underline. A seller's license does not come with the house. If the listing says "licensed vacation rental," you will apply for your own, and you should confirm the seller's status first. The division keeps a searchable online database of licensed vacation rentals by address that refreshes daily. Look up the address before you tour, and look it up again before you close.</p>

<h2>Two taxes and the paperwork that comes with them</h2>

<p>Rental income brings two tax questions that have nothing to do with zoning. They matter because both can attach to the person who owns the property on the day a guest pays.</p>

<p>The first is the state's transient rentals tax. Chapter 212 treats renting living quarters in a hotel, apartment house, condominium and similar accommodations as a taxable privilege. It exempts the rental of facilities intended primarily as a principal or permanent place of residence, and it says a facility that primarily serves transient guests does not get that exemption. We are not quoting a rate, because the rate belongs to the Department of Revenue and changes with local add-ons. Ask your accountant, and ask for the registration steps in writing.</p>

<p>The second is Volusia County's Tourist and Convention Development Tax, a local option transient rental tax the county collects. The county's page says every person who rents, leases or lets any living quarters for a term of 6 months or less is exercising a taxable privilege. It lists a bed, room, apartment, house and condo among the examples. Whoever collects the rent is responsible for collecting and remitting the tax. You register through the county's treasury office, which lists an email address and the phone number 386-943-7085.</p>

<p>Read the county's own caution before you treat registration as a green light. The page states that registration and payment of taxes does not guarantee compliance with other state and local laws, and it tells the reader to contact the city and county zoning departments. A tax account proves you are paying tax. It does not prove the city agrees you may rent.</p>

<h2>Association rules often decide the question first</h2>

<p>Port Orange has homes inside homeowners associations and units inside condominiums. In both cases the governing documents may restrict renting even where the city says nothing. Read them before you spend time on anything else.</p>

<p>For homeowners associations, section 720.306 sets how rental restrictions can be added. A governing document or amendment enacted after July 1, 2021 that prohibits or regulates rental agreements applies only to a parcel owner who acquires title after it takes effect, or one who consents to it. There is a separate path that applies to everyone. An association may amend its documents to prohibit or regulate rental agreements for a term of less than 6 months, and to prohibit the rental of a parcel more than three times in a calendar year, and those amendments apply to all parcel owners. The practical meaning is this: even a community that allowed weekly rentals when the seller bought can change that, and you would be bound by it.</p>

<p>For condominiums, section 718.110 is narrower. An amendment that prohibits unit owners from renting, alters the rental term or limits the number of rentals applies only to unit owners who consent and to owners who acquire title after the amendment's effective date. If you are buying, an amendment that already exists binds you. You can read it before you sign, and you should.</p>

<p>See our guide to <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/hoas-and-cdds-in-new-port-orange-subdivisions">HOAs and CDDs in new Port Orange subdivisions</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/townhomes-and-villas-in-port-orange-who-owns-what">townhomes and villas in Port Orange</a>.</p>

<p>Then there is the paper that gives you a right. Where a homeowners association governs the parcel, Florida requires the seller to hand you a disclosure summary before you sign the contract. If it was not provided before you executed the contract, the contract is voidable by written notice within 3 days after you receive the summary, or before closing, whichever comes first. A purported waiver of that right has no effect, and the right ends at closing. This section does not cover associations regulated under the condominium, cooperative, timeshare or mobile home chapters, which have their own disclosure rules. Use the summary to find the rental language, then read the full declaration, because the summary is only a summary.</p>

<h2>What to ask for before you make an offer</h2>

<p>Rental rules in Port Orange do not live in one place, so a checklist works better than a verdict. Do these in order and keep every answer in writing.</p>

<p>First, get the parcel's zoning district from the city and ask in an email how the city classifies renting the property to guests for short stays. Mention the district by name. If the answer is "we have no short-term rental category," ask what the city would treat the use as, and ask whether the home-based business section or the business tax receipt applies to it. A reply that says only "call the state" is an answer too, but get it on paper.</p>

<p>Second, check the state database for the address and ask the seller whether a current state license exists. Remember it cannot transfer, so the point is to learn the property's history, not to inherit a document.</p>

<p>Third, ask for the association's declaration, rules and every recorded amendment about leasing, and read the rental language yourself. Look for minimum lease terms and a cap on how many times a year a parcel can be rented. Ask about pending proposals, because the HOA statute allows an association to adopt the less-than-6-months limit and the three-rentals limit for all owners.</p>

<p>Fourth, ask your accountant about the state transient rentals tax and the county tax before you count a dollar of rental income in your budget. Ask what an owner must register and when.</p>

<p>Fifth, price the house as if no rental income existed. If the numbers work as a plain home, the rental becomes a bonus. If the numbers only work with a full calendar, you are betting on four unconfirmed permissions. See our guides to <a href="http://www.adamscameron.com/real-estate-info/2026/10/06/port-orange-property-tax-bill-line-by-line">the Port Orange property tax bill</a>, <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/florida-home-insurance-for-buyers-4-point-wind-mitigation-and-citizens-explained">home insurance for buyers</a> and <a href="http://www.adamscameron.com/real-estate-info/2026/09/30/closing-costs-in-florida-what-buyers-and-sellers-pay-in-volusia-county">closing costs in Volusia County</a>.</p>

<p>One more warning about timing. Zoning and association answers take days, and your inspection window is short. Ask for them in the first week under contract, and write the rental contingency into your offer with your agent, so that the answers shape the deal and not the other way around.</p>

<h2>The bottom line</h2>

<p>Port Orange does not have a rental code you can read in ten minutes, and that is the point. The city's written code lists hotels, motels and bed and breakfast inns in specific districts, lists single-family and multifamily dwellings in the residential ones, and does not name short-term rental anywhere we could find. Florida law limits what a city can do about how long and how often you rent. The state licenses the operation, the county taxes it, and the association can often shut it down on its own. Buy for the home, confirm the rental in writing, and treat anything verbal as a rumor. When you are ready to see what is on the market, start with <a href="http://www.adamscameron.com/port-orange-florida-real-estate-and-homes.html">Port Orange real estate</a> and bring your questions to us.</p>

<p>You have the rules now. Here are the questions that come up next, answered the way the sources state them.</p>
<h2>Frequently Asked Questions</h2>
<details>
<summary><strong>Does Port Orange allow short-term rentals?</strong></summary>
<p>The city's Land Development Code does not use the words short-term rental or vacation rental, and we found no section that allows or bans nightly rentals by name. The code does list hotels, motels and bed and breakfast inns in specific districts. How the city classifies a house rented to guests is a question for its zoning staff. Email them the parcel and ask for the answer in writing. Florida law also limits what a city can say about how long and how often you rent, if the city rule was adopted after June 1, 2011.</p>
</details>
<details>
<summary><strong>Does a seller's vacation rental license transfer to me?</strong></summary>
<p>No. Florida's public lodging statute says the state license may not be transferred from one place or individual to another. A new owner applies for a license of their own. Operating a public lodging establishment without one is a second-degree misdemeanor. Use the state's searchable database of licensed vacation rentals by address to learn the property's history before you tour, and look again before closing. A past license tells you the seller's status. It does not tell you what the city or the association will allow you to do.</p>
</details>
<details>
<summary><strong>Does Port Orange require a business tax receipt for a rental?</strong></summary>
<p>The city says all businesses, including home-based ones, must first obtain a local business tax receipt, and the fee varies by business. The city's page also asks whether the business is properly zoned, and it requires a copy of any needed state license first. We did not find a published answer on whether renting your own house to guests counts. Put that question in your written email to the city, along with the parcel address, and keep the reply with your closing file.</p>
</details>
<details>
<summary><strong>What taxes apply when I rent a Port Orange house to guests?</strong></summary>
<p>Two taxes come up. Florida's chapter 212 treats renting living quarters in a hotel, apartment house, condominium and similar accommodations as a taxable privilege, with an exemption for places intended primarily as a permanent residence. Volusia County also collects a Tourist and Convention Development Tax on rentals of 6 months or less, and whoever collects the rent registers with the county's treasury office. We do not quote rates here. Ask your accountant, and remember that registering for a tax does not prove the city allows the rental.</p>
</details>
<details>
<summary><strong>Can my HOA ban short-term rentals after I buy?</strong></summary>
<p>Often, yes. Under section 720.306, a rental restriction enacted after July 1, 2021 applies only to owners who buy after it takes effect or who consent. A separate rule lets an association amend its documents to prohibit or regulate rentals under 6 months, and to prohibit renting a parcel more than three times in a calendar year, and those amendments apply to all owners. Ask for the declaration, the rules and every recorded amendment, and ask whether a change is being proposed.</p>
</details>
<details>
<summary><strong>What if I am buying a condo and want to rent it for short stays?</strong></summary>
<p>Read the declaration and every amendment before you sign. Under section 718.110, an amendment that prohibits renting, changes the rental term or limits how many times you may rent applies to owners who consent and to owners who buy after the amendment takes effect. That means an amendment already on record binds you as a new buyer. See our condo guides as well, but the rental language in the documents decides whether a rental plan can start at all.</p>
</details>
<details>
<summary><strong>When should I check rental rules during the buying process?</strong></summary>
<p>In the first week under contract, because the inspection window is short and the answers take days. Ask the city for the zoning district and its written position, check the state license database, request the association documents, and talk to your accountant about the two taxes. Then decide whether the house works without rental income. If you are buying from an owner in an HOA, the disclosure summary must reach you before you sign, or you can void the contract within 3 days of receiving it, or before closing, whichever is first.</p>
</details>
]]>
        </description>
        <pubDate>
            <![CDATA[Wed, 21 Oct 2026 22:57:12 EST]]>
        </pubDate>
        <guid>
            <![CDATA[https://www.adamscameron.com/real-estate-info/2026/10/21/port-orange-short-term-rental-rules-for-buyers]]>
        </guid>
                    <category>
                <![CDATA[Communities]]>
            </category>
                                    </item>
    </channel>
</rss>
